Vous êtes sur la page 1sur 10

Actions related to each dept.

for completing Format-Con-5 for Signing of


Connection Agreement
Sno

Action by

Annexure

SEF

Annexure-A

Engg-S/s

Annexure-I,II,III a

LD&C

Annexure-III b, V

Region/Site

Annexure-IV, VI

Annexure-A
Final Arrangement
1. Name of the Link

2. Voltage level

3. Type of Link

4. Reactive compensation to
be provided

5. Maximum Import Capacity


through the Link

6. Maximum Export Capacity


through the Link

7. Date of commissioning

Interim Arrangement

Annexure - I
8(a).Bay Allocated in the switchyard of Connectivity - Final Connection
Arrangement
S.
No.
a)
b)
c)
d)

Bay Nos. at which connectivity is


to be established **

** Refer enclosed Single Line diagram


8(b).Bay Allocated in the switchyard of Connectivity-Interim Connection
Arrangement
Details in above format, if applicable

Annexure - II
9(a).Equipment to be provided by applicant in the allocated bay meeting the
requirement of Central Electricity Authority (Technical Standards for
Connectivity to the Grid) Regulations, 2007 which shall be compatible with the
equipment installed at other end- Final Connection Arrangement
S.
Name of Equipments
Nos. Ratings
No.
1.
Circuit Breaker
2.
Isolators
3.
Earth Switches
4.
CT
5.
CVT
6.
Wave Trap
7.
Surge Arrestors
8.
Others
9.
9(b).Equipment to be provided by applicant in the allocated bay meeting the
requirement of Central Electricity Authority (Technical Standards for
Connectivity to the Grid) Regulations, 2007 which shall be compatible with the
equipment installed at other end- Interim Connection Arrangement
Details in above format, if applicable
10(a).Protection Equipment to be provided by applicant shall be meeting the
technical standards as per Central Electricity Authority (Technical Standards for
Connectivity to the Grid) Regulations, 2007 and shall be compatible & matching
with the equipment installed at other end-- Final Connection Arrangement
a.
b.
c.
d.
10(b).Protection Equipment to be provided by applicant shall be meeting the
technical standards as per Central Electricity Authority (Technical Standards for
Connectivity to the Grid) Regulations, 2007 and shall be compatible & matching
with the equipment installed at other end-- Interim Connection Arrangement
Details in above format, if applicable

Annexure-III(a)
11(a). System recording Equipments shall be meeting the technical standards as
per Central Electricity Authority (Technical Standards for Connectivity to the
Grid) Regulations, 2007 and shall be compatible to facilitate exchange of data
with the existing system installed in the ISTS network--Final Connection
Arrangement
S.
No.
1.
2.
3.
4.
5.
6.

Name of Equipments

Nos.

Ratings

Event Logger
Disturbance recorder
Fault locator
Any other equipment

11(b).System recording Equipments shall be meeting the technical standards as


per Central Electricity Authority (Technical Standards for Connectivity to the
Grid) Regulations, 2007 and shall be compatible to facilitate exchange of data
with the existing system installed in the ISTS network--Interim Connection
Arrangement
Details in above format, if applicable

Annexure-III(b)
11(a).SCADA Equipments shall be meeting the technical standards as per Central
Electricity Authority (Technical Standards for Connectivity to the Grid)
Regulations, 2007 and shall be compatible to facilitate exchange of data with the
existing system installed in the ISTS network-- Final Connection Arrangement
S.
No.
1.
2.
3.
4.
5.

Name of Equipments

Nos.

Ratings

Data Acquisition System


Communication equipment
Any other equipment

11(b).SCADA Equipments shall be meeting the technical standards as per Central


Electricity Authority (Technical Standards for Connectivity to the Grid)
Regulations, 2007 and shall be compatible to facilitate exchange of data with the
existing system installed in the ISTS network-- Interim Connection Arrangement
Details in above format, if applicable

Annexure-IV
12.Details of the modification/alteration to existing facilities
accommodating proposed connection and its estimated cost
i)

for

For Final Connection Arrangement

A. Modification/alteration to existing facilities in terminal substation for


accommodating proposed connection :
a) Required
Not Required
b) If required, details of modification(s) /alteration(s) are as under :
1. Terminal Bay ________________
2. Protection

________________

3. Metering

________________

4. PLCC/Communication ________________
5. Others..
ii)

________________

For Interim Connection Arrangement


Details in above format, if applicable

B. Modification/alteration to existing transmission line for accommodating


proposed connection
i)

For Final Connection Arrangement a)

Required
Not Required

b) If required, details of modification(s) /alteration(s) are as under :

1.

________________

2.

________________

3.

________________

4.

________________

Total estimated Cost of above works (A+B) : Rs ____ Cr


ii)

For Interim Connection Arrangement

Details in above format, if applicable

Annexure-V
13&14(a).Name of communication Link for Data and Voice Communication
& Communication Equipment details up to POWERGRID Data
Collection Point- Final Connection Arrangement
Details are as under:

13&14(b).Name of communication Link for Data and Voice Communication


& Communication Equipment details up to POWERGRID Data
Collection Point- Interim Connection Arrangement
Details are as under:

Annexure-VI
15. Site responsibility schedule
A. Principle & Procedure :
The responsibility of control, operation, maintenance & all matters
pertaining to safety of equipments and apparatus at the connection point
shall lie with the owner. For ease of day-to-day operation as a general
practice O&M is carried out by the owner of the substation in whose
premises the proposed bay is located for which a separate O&M contract
is entered into, based on mutually agreed terms and conditions.
B. List of equipment and their ownership at the connection point :
Sl.
No.

Name of Equipments

Ownership

For Final Connection Arrangement

1.
2.
3.
4.
For
Interim
Arrangement

1.
2.
3.
4.

Connection