Académique Documents
Professionnel Documents
Culture Documents
Action by
Annexure
SEF
Annexure-A
Engg-S/s
Annexure-I,II,III a
LD&C
Annexure-III b, V
Region/Site
Annexure-IV, VI
Annexure-A
Final Arrangement
1. Name of the Link
2. Voltage level
3. Type of Link
4. Reactive compensation to
be provided
7. Date of commissioning
Interim Arrangement
Annexure - I
8(a).Bay Allocated in the switchyard of Connectivity - Final Connection
Arrangement
S.
No.
a)
b)
c)
d)
Annexure - II
9(a).Equipment to be provided by applicant in the allocated bay meeting the
requirement of Central Electricity Authority (Technical Standards for
Connectivity to the Grid) Regulations, 2007 which shall be compatible with the
equipment installed at other end- Final Connection Arrangement
S.
Name of Equipments
Nos. Ratings
No.
1.
Circuit Breaker
2.
Isolators
3.
Earth Switches
4.
CT
5.
CVT
6.
Wave Trap
7.
Surge Arrestors
8.
Others
9.
9(b).Equipment to be provided by applicant in the allocated bay meeting the
requirement of Central Electricity Authority (Technical Standards for
Connectivity to the Grid) Regulations, 2007 which shall be compatible with the
equipment installed at other end- Interim Connection Arrangement
Details in above format, if applicable
10(a).Protection Equipment to be provided by applicant shall be meeting the
technical standards as per Central Electricity Authority (Technical Standards for
Connectivity to the Grid) Regulations, 2007 and shall be compatible & matching
with the equipment installed at other end-- Final Connection Arrangement
a.
b.
c.
d.
10(b).Protection Equipment to be provided by applicant shall be meeting the
technical standards as per Central Electricity Authority (Technical Standards for
Connectivity to the Grid) Regulations, 2007 and shall be compatible & matching
with the equipment installed at other end-- Interim Connection Arrangement
Details in above format, if applicable
Annexure-III(a)
11(a). System recording Equipments shall be meeting the technical standards as
per Central Electricity Authority (Technical Standards for Connectivity to the
Grid) Regulations, 2007 and shall be compatible to facilitate exchange of data
with the existing system installed in the ISTS network--Final Connection
Arrangement
S.
No.
1.
2.
3.
4.
5.
6.
Name of Equipments
Nos.
Ratings
Event Logger
Disturbance recorder
Fault locator
Any other equipment
Annexure-III(b)
11(a).SCADA Equipments shall be meeting the technical standards as per Central
Electricity Authority (Technical Standards for Connectivity to the Grid)
Regulations, 2007 and shall be compatible to facilitate exchange of data with the
existing system installed in the ISTS network-- Final Connection Arrangement
S.
No.
1.
2.
3.
4.
5.
Name of Equipments
Nos.
Ratings
Annexure-IV
12.Details of the modification/alteration to existing facilities
accommodating proposed connection and its estimated cost
i)
for
________________
3. Metering
________________
4. PLCC/Communication ________________
5. Others..
ii)
________________
Required
Not Required
1.
________________
2.
________________
3.
________________
4.
________________
Annexure-V
13&14(a).Name of communication Link for Data and Voice Communication
& Communication Equipment details up to POWERGRID Data
Collection Point- Final Connection Arrangement
Details are as under:
Annexure-VI
15. Site responsibility schedule
A. Principle & Procedure :
The responsibility of control, operation, maintenance & all matters
pertaining to safety of equipments and apparatus at the connection point
shall lie with the owner. For ease of day-to-day operation as a general
practice O&M is carried out by the owner of the substation in whose
premises the proposed bay is located for which a separate O&M contract
is entered into, based on mutually agreed terms and conditions.
B. List of equipment and their ownership at the connection point :
Sl.
No.
Name of Equipments
Ownership
1.
2.
3.
4.
For
Interim
Arrangement
1.
2.
3.
4.
Connection