Académique Documents
Professionnel Documents
Culture Documents
TCM 60
TCM 60
w w w. m a t i s a . c h
TCM 60
Basic execution
TCM
Options
XX
XX
XX
XX
XX
XX
Gantry 1
TCM 60
Pad insertion
Working direction
Gantry
Rail positioning
TCM 60
Complete execution
WES
Sens de travail
Rail advancing (2 units)
Rail insertion
Fastening insertion
Gantry 2
1 2
3 4 5 6 6 5 4 3
2 1
Working direction
Worksite set-up
Working direction
supplementary wagon
XX Rollers to be placed every 10 meters along the platform
system
XX 2 pairs of driven rollers under the WES, to push the rails
To guide the rails and to avoid any damage to the platform, support
rollers are placed manually every 10 meters directly onto the
platform.
These rollers are picked up when the sleepers are laid.
Working direction
Working direction
Platform
roller
Rail guiding
head
Working direction
1
2
3
6
7
Working direction
TCM 60
20 mm
Laying group, with lateral displacement control
Technical specifications
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
MATISA S.A.S.
MATISA S.p.A.
Arc-en-Ciel 2
Case postale
CH-1023 Crissier 1
Tl.: +41-21-631 21 11
Fax: +41-21-631 21 68
E-mail: matisa@matisa.ch
9, rue de lIndustrie
Z. I. Les Sablons
FR-89100 Sens
Tl.: +33-386 95 83 35
Fax: +33-386 95 36 94
E-mail: matisa@matisa.fr
Via Ardeatina Km 21
IT-00040 Pomezia/
Santa Palomba (RM)
Tel.: +39-06-918 291
Fax: +39-06-919 84 574
E-mail: matisa@matisa.it
Sucursal Espaola
C/Francia 39
Poligono Industrial La Estacion
ES-28971 Grion (Madrid)
Tel.: +34-91-814 01 71
Fax: +34-91-814 11 94
E-mail: matisa@matisa.e.telefonica.net
Kronenstrasse 2
DE-78166 Donaueschingen
Tel.: +49-771 15 80 63
Fax: +49-771 15 80 64
E-mail: matisa@matisa.de
JR Hatchobori Bldg., 8F
3-25-10 Hatchobori, Chuo-ku
JP-Tokyo 104-0032
Tel.: +81-3-5540-8211
Fax: +81-3-5540-8220
E-mail: matisa@matisa.jp