R00

First issue

11.07

MIA

MIA

Rev.
Index

Modificacin
Modification

Fecha
Date

Dibuj
Prep. by

Revis
Checked

Revis
Checked

Aprob
Appr.

OWNER:
Referencia Cliente / Customer Reference

Este documento es propriedad de ANDRITZ HYDRO GmbH, Eibesbrunnergasse 20, 1120 Vienna, Austria.
Respectar la nota de proteccin ISO 16016

STAMP RESERVED SPACE

CONTRACT:

TURNKEY ENGINEERING , PROCUREMENT AND CONSTRUCTION


CONTRACT FOR THE CERRO DEL AGUILA HYDRO POWER PLAN
CONTRACTOR:

Lista de Piezas / Partslist


Dimensin / Dimension
Grupo / Group

WA N
Class N
Tipo / Type
Escala / Scale

Quality Assurance Plan - Excitation Cubicles


Peso / Weight (kg)
HIT
Dib/Drawn
Rev/Check
Rev/Check
Apr/Appr

Fech/Date
STA
MIA

Nom/Name
11.07.2014
04.08.2014

Cliente/Client
Cerro del guila S.A
Proyecto/Plant
Cerro del guila HPP
Pedido/Project N
H110.002217
Contrato/Contract N
File/Date
04.08.2014
Interno N / Internal N

Material

Similar/Similar
Remplaza/Replace

=
+

Dibujo N / Drawing N

Rev/Index

Hoja / Sht 1

PE-ADZ-7E05010104-PIT-712

R00

de / of

This document is property of VA TECH HYDRO GmbH


And may neither be copied nor distributed and user without our
written consent. Violations will be prosecuted by Law according to
DIN 34 Standard.

CONTENT

1.
2.

EQUIPMENT................................................................................................................................ 3
REFERENCE DOCUMENTS ........................................................................................................... 4

2.1
2.2

Manufacturing documents.......................................................................................................................................4
General documents ..................................................................................................................................................4

3.
4.
5.
6.
7.
8.

MANUFACTURER: ....................................................................................................................... 5
DESCRIPTION OF PROCESSES ..................................................................................................... 6
GENERAL CHECKS ..................................................................................................................... 7
ELECTRICAL TESTS .................................................................................................................... 7
CHECK OF WIRING ...................................................................................................................... 8
PACKING & SHIPMENT................................................................................................................ 8

Cliente / Client

Cerro del guila S.A

Dibujado / Drawn

STA

11.07.2014

Archivo / Filename

CdA_QAP-Excitation_Rev00.docx

Central / Plant

Cerro del guila HPP

Compr. / Check.

MIA

04.08.2014

Ind.

Fecha de Arch. / Filedate

Proy. / Proj. N

H110.002217

Aprobado / Appr.

01

=
Interno / Internal N

DOC N

PE-ADZ-7E05010104-PIT-712

Fecha / Date

04.08.2014

Hoja / Page 2

de / of

1. EQUIPMENT

This document is property of VA TECH HYDRO GmbH


And may neither be copied nor distributed and user without our
written consent. Violations will be prosecuted by Law according to
DIN 34 Standard.

This Quality Plan and the tests mentioned in this document are applicable to following
equipment:
Unit 1 Excitation Cubicles

=1MKC10DE010 +1MKC01
=1MKC10DE010 +1MKC02
=1MKC10DE010 +1MKC03
=1MKC10DE010 +1MKC04
=1MKC10DE010 +1MKC05
=1MKC10DE010 +1MKC06

Unit 2 Excitation Cubicles

=2MKC10DE010 +2MKC01
=2MKC10DE010 +2MKC02
=2MKC10DE010 +2MKC03
=2MKC10DE010 +2MKC04
=2MKC10DE010 +2MKC05
=2MKC10DE010 +2MKC06

Unit 3 Excitation Cubicles

=3MKC10DE010 +3MKC01
=3MKC10DE010 +3MKC02
=3MKC10DE010 +3MKC03
=3MKC10DE010 +3MKC04
=3MKC10DE010 +3MKC05
=3MKC10DE010 +3MKC06

Cliente / Client

Cerro del guila S.A

Dibujado / Drawn

STA

11.07.2014

Archivo / Filename

CdA_QAP-Excitation_Rev00.docx

Central / Plant

Cerro del guila HPP

Compr. / Check.

MIA

04.08.2014

Ind.

Fecha de Arch. / Filedate

Proy. / Proj. N

H110.002217

Aprobado / Appr.

01

=
Interno / Internal N

DOC N

PE-ADZ-7E05010104-PIT-712

Fecha / Date

04.08.2014

Hoja / Page 3

de / of

2. REFERENCE DOCUMENTS
2.1 Manufacturing documents

This document is property of VA TECH HYDRO GmbH


And may neither be copied nor distributed and user without our
written consent. Violations will be prosecuted by Law according to
DIN 34 Standard.

Unit # Excitation Cubicles


Assembly Drawing

PE-ADZ-7E05010104-LAY-117

Circuit Diagram

PE-ADZ-7E05010104-SLD-118

Terminal Diagram

PE-ADZ-7E05010104-SLD-119

Part List

PE-ADZ-7E05010104-OTR-120

2.2 General documents


General
Single Line Diagram

PE-ADZ-7E05010104-LAY-116

Dimension Drawing

PE-ADZ-7E05010104-LAY

Cliente / Client

Cerro del guila S.A

Dibujado / Drawn

STA

11.07.2014

Archivo / Filename

CdA_QAP-Excitation_Rev00.docx

Central / Plant

Cerro del guila HPP

Compr. / Check.

MIA

04.08.2014

Ind.

Fecha de Arch. / Filedate

Proy. / Proj. N

H110.002217

Aprobado / Appr.

01

=
Interno / Internal N

DOC N

PE-ADZ-7E05010104-PIT-712

Fecha / Date

04.08.2014

Hoja / Page 4

de / of

3. MANUFACTURER:

This document is property of VA TECH HYDRO GmbH


And may neither be copied nor distributed and user without our
written consent. Violations will be prosecuted by Law according to
DIN 34 Standard.

Fa. Andritz AG
Stattegger Strasse 18
A-8045 Graz
is a sub-supplier on behalf of Andritz Hydro GmbH

Cliente / Client

Cerro del guila S.A

Dibujado / Drawn

STA

11.07.2014

Archivo / Filename

CdA_QAP-Excitation_Rev00.docx

Central / Plant

Cerro del guila HPP

Compr. / Check.

MIA

04.08.2014

Ind.

Fecha de Arch. / Filedate

Proy. / Proj. N

H110.002217

Aprobado / Appr.

01

=
Interno / Internal N

DOC N

PE-ADZ-7E05010104-PIT-712

Fecha / Date

04.08.2014

Hoja / Page 5

de / of

This document is property of VA TECH HYDRO GmbH


And may neither be copied nor distributed and user without our
written consent. Violations will be prosecuted by Law according to
DIN 34 Standard.

4. DESCRIPTION OF PROCESSES
Process

Action by

According to

Design of documents & drawings

AH

Contractual & specified requirements

Order of cubicles

AH

Order of devices

AH, SUB

Panel's specification (2.1.),


Assembly drawings (2.1.)
Panel's specification (2.1.),
Parts lists (2.1.)
Assembly drawings (2.1.)
Circuit diagrams (2.1.)
see 5.
see 6.
Circuit diagrams (2.1.), see 7.
see 6, (page 7),
AH packing regulation & storage
instruction

Installation of devices in panels


Wiring of cubicles
General checks
Electrical tests
Check of wiring
Packing & Shipment

SUB
SUB
AH
AH
AH
SUB

Witnessed by/
inspections

Checked through/by
Contract review, documents review &
internal design review by AH;
Approval by ELC
Incoming check
(type, dimensions, thickness) by SUB
Internal documents review and
purchasing dep. by SUB and AH
visual check by SUB
Check of wiring (see below) by AH
Internal workshop testing by AH
Internal workshop testing by AH
Internal workshop testing by AH
logistic dep. by AH

Approval

AH

AH
REP during FAT
AH

AH Andritz Hydro GmbH


SUB .. Andritz Hydros Sub-supplier (manufacturer)
REP .. Representative: Contractor (Astaldi)

Cliente / Client

Cerro del guila S.A

Dibujado / Drawn

Archivo / Filename

CdA_QAP-Excitation_Rev00.docx

Central / Plant

Cerro del guila HPP

Compr. / Check.

Ind.

Fecha de Arch. / Filedate

Proy. / Proj. N

H110.002217

Aprobado / Appr.

01

=
Interno / Internal N

DOC N

PE-ADZ-

Fecha / Date

04.08.2014

Hoja / Page 6

de / of

Records

in FAT-report
in FAT-report
in FAT-report
Transport authorization

Este documento es propriedad de ANDRITZ HYDRO GmbH, Eibesbrunnergasse 20, 1120 Vienna, Austria.
Respectar la nota de proteccin ISO 16016

5. GENERAL CHECKS
Item

Test

5.1

Visual Inspection
Verification of cubicle design
Verification of colour of the painting
Check of cubicles dimensions
Check of compartment number
Check of separation between the compartments
Check the divison for transport
Doors open to the correct side
Check of lock (handle) type
Check conductivity and ratings of fuses and
MCBs
Check of cubicle identification
Check of arrangement of terminals
Check cleanliness of the cubicles
Check protection class in acc. To area of
installation
Check of completeness of cubicle
Cubicle equipment

5.2

Remarks

5.3

Check of wiring
Ducts
Colours
Labelling

5.4

Check of earthing connections


Main earthing conductor
Earthing connections of all metallic parts
(doors, frames etc.)
Ground connections of racks

acc. to Assembly drawing


Acc. To project specification
Dimension drawing / Assembly drawing
Dimension drawing / Assembly drawing
Dimension drawing / Assembly drawing
Dimension drawing / Assembly drawing
Dimension drawing / Assembly drawing
Acc. To project specification
Parts list
Acc. To project specification
Assembly drawing
Acc. To project specification
acc. to Parts Lists

6. ELECTRICAL TESTS
Electrical characteristics
Rated operational voltages: 220VDC, 48VDC, 24VDC, 230VAC 60Hz

Cliente / Client

Cerro del guila S.A

Dibujado / Drawn

Archivo / Filename

CdA_QAP-Excitation_Rev00.docx

Central / Plant

Cerro del guila HPP

Compr. / Check.

Ind.

Fecha de Arch. / Filedate

Proy. / Proj. N

H110.002217

Aprobado / Appr.

01

=
Interno / Internal N

DOC N

PE-ADZ-

Fecha / Date

04.08.2014

Hoja / Page 7

de / of

7. CHECK OF WIRING
Check of all wires according to circuit diagrams:
supply circuits, polarity, function of consumer devices
complete I/O-check of all signals from/to the excitation system:
- energizing of each digital input one by one
- simulation of all temperature sensor inputs Pt-100
- simulation of all analog inputs 4-20mA, check of range
- set each digital output one by one
- simulation of each analog output, check of range

Este documento es propriedad de ANDRITZ HYDRO GmbH, Eibesbrunnergasse 20, 1120 Vienna, Austria.
Respectar la nota de proteccin ISO 16016

8. FUNCTIONAL TESTS
Complete functional testing of all the components installed in the excitation cubicles. For details
please see PE-ADZ-7E05010104-PIT-178.

9. PACKING & SHIPMENT


One excitation system consists out of 6 cubicles, therefore a transport separation is foreseen, to
divide one system into 2 times 3 cubicles.
The panels will be equipped with protection pads for the edges and wrapped into a foil for the
transportation to the local logistic company. There all cubicles will be prepared for the shipment by
seaworthy packing.

Cliente / Client

Cerro del guila S.A

Dibujado / Drawn

Archivo / Filename

CdA_QAP-Excitation_Rev00.docx

Central / Plant

Cerro del guila HPP

Compr. / Check.

Ind.

Fecha de Arch. / Filedate

Proy. / Proj. N

H110.002217

Aprobado / Appr.

01

=
Interno / Internal N

DOC N

PE-ADZ-

Fecha / Date

04.08.2014

Hoja / Page 8

de / of

Vous aimerez peut-être aussi