Académique Documents
Professionnel Documents
Culture Documents
E.
Foundation:
1. Soils information based on well log.
2. Foundation design is based on an assumed soil pressure = 1500 psf.
B.
C.
Plywood.
1. All plywood except where otherwise noted on drawings shall be
standard C-D exterior with exterior glue as graded by the American
Plywood Association and be in conformance with U.S. Product standard
PS 1-74. All plywood shall be made with exterior type glue.
D.
Concrete
A.
E.
F.
Date:
Checked:
2007
Date:
TBQ
Scale:
------
A4 Building Sections
S1 Foundation Plan
By:
Lumber.
1. All lumber shall be visually graded in accordance with current
W.W.P.A. grading rules. All dimensional lumber shown on plans shall
be S4S seasoned lumber of the following grades:
a. 2x lumber
Hem Fir #2
b. 4x and wider lumber
Hem Fir #1
c. posts and timbers
Hem Fir #1
2. All wood ledgers, plates, sills, and nailers in contact with
concrete or masonry shall be treated in accordance with American Wood
Preservers Bureau standard AWPB-FDN, and bear that quality mark.
of
4
D.
A.
QandA@alaska.com
Wood
Consulting Engineers
C.
III.
Sheet Index:
--------
Admixtures:
a. Air-entraining admixtures shall comply with ASTM C260. Air content
of concrete shall be between 5
% and 7 %.
b. Calcium chloride shall not be used in any concrete mixture.
A Beginner's Guide to
Structural Engineering
B.
3.
QAssociates
uimby &
II.
A.
COVER SHEET
General Notes:
Design criteria
COV
HOUSE
House
I.
Sheet No.:
Revisions:
0. _/_/_
Project No.:
A Beginner's Guide to
Structural Engineering
1
East Elevation
BGSE: House
12
BGSE: House
North Elevation
BGSE: House
8
12
12
8
By:
TBQ
2007
Date:
Checked:
Date:
Scale:
------
ARCHITECTURAL ELEVATIONS
QandA@alaska.com
6
12
SCALE: 1" = 10'-0"
South Elevation
--------
BGSE: House
2
8
Consulting Engineers
West Elevation
Revisions:
12
A Beginner's Guide to
Structural Engineering
8
12
0. _/_/_
A1
Sheet No.:
of
HOUSE
Project No.:
A4
QAssociates
uimby &
A4
3'-0"
3'-8"
6'-0"
6'-7"
1
6'-0"
BGSE: House
Laundry
By:
Living Room
Powder
Garage
Excercise Room
16'-0"
4'-3"
1'-1 3"
4
4'-3"
B
A
2007
Date:
Checked:
Date:
Scale:
------
QandA@alaska.com
Guest Room
A Beginner's Guide to
Structural Engineering
Consulting Engineers
Kitchen
9'-5"
6'-0"
Revisions:
0. _/_/_
2'-4"
--------
4'-0"
24'-0"
QAssociates
3'-2"
34'-0"
5'-10"
8'-0"
A2
of
HOUSE
Sheet No.:
Project No.:
uimby &
Dining
14'-0"
24'-0"
4'-0"
22'-0"
4'-0"
2'-6"
1"
4'-4 2
4'-0"
1'-8"
5'-0"
1"
1'-4 2
3'-0"
1
60'-0"
3'-0"
5'-0"
4'-3"
5'-0"
2nd Floor
Joists
5/8" GWB
------
Scale:
1st Floor
Joists
Roof/Floor Sections
BGSE: House
QandA@alaska.com
3'-5"
4'-2"
Date:
By:
12'-6"
4'-0"
TBQ
12"
Batt
Insulation
Den
of
4
Trusses
Consulting Engineers
Bath
A Beginner's Guide to
Structural Engineering
14'-8"
Storage
Checked:
Roof
Section
Roof Sheathing
--------
Unheated
Attic
QAssociates
4'-0"
Bedroom
2007
Date:
Asphalt Shingles
7'-11"
A3
HOUSE
Revisions:
8'-5"
uimby &
5'-0"
0. _/_/_
2'-0"
5'-7"
Sheet No.:
Project No.:
A4
of
4
SCALE: 1/8" = 1'-0"
Building Section
BGSE: House
------
Scale:
Date:
2007
QandA@alaska.com
Studs (See
Structural)
--------
Consulting Engineers
Wall Sheathing
1/2" GWB
5/8" GWB
o/ 6 mill Vapor
Barrier
QAssociates
Batt Insulation
A Beginner's Guide to
Structural Engineering
By:
BGSE: House
TBQ
Building Section
uimby &
Checked:
Batt Insul.
Date:
BUILDING SECTIONS
Revisions:
A3
0. _/_/_
Aluminum Siding
o/ Tyveck
o/ 1/2" Plywd
Sheet No.:
Project No.:
HOUSE
of
4
4
S1
HOUSE
Sheet No.:
Project No.:
24'-0"
Revisions:
14'-0"
22'-0"
0. _/_/_
60'-0"
------
34'-0"
24'-0"
11'-0"
Conc ftg
Conc. Ftg
Scale:
Date:
9'-0"
Checked:
Conc. Ftg
2007
Date:
9'-5"
6'-0"
3'-2"
6'-6"
18'-4 1"
4
FOUNDATION PLAN
QandA@alaska.com
BGSE: House
QAssociates
Foundation Plan
uimby &
Consulting Engineers
36'-0"
4'-3"
--------
8"
16'-0"
A Beginner's Guide to
Structural Engineering
1'-4"
9'-1 1"
4
4'-0"
2'-0"
1"
4'-4 2
3'-0"
17'-0"
By:
TBQ
51 "
4
B
A
By:
___ Post
TBQ
2007
Date:
Checked:
Date:
Scale:
6'-0"
------
24'-0"
___" O.C
__" O.C
Revisions:
0. _/_/_
QandA@alaska.com
BGSE: House
Consulting Engineers
1
J102 @
J101 @
B101
_______ Plywd (Typ)
____ Post below
S2
of
HOUSE
Sheet No.:
Project No.:
24'-0"
--------
__" O.C
___ Post
14'-0"
A Beginner's Guide to
Structural Engineering
B101
J101 @
22'-0"
QAssociates
___ Post
4'-0"
6'-0"
2'-0"
uimby &
2'-0"
10'-0"
1
11'-0"
BGSE: House
___ Post
H211
B
A
By:
___ Post
TBQ
2007
Date:
Checked:
Date:
Scale:
------
Revisions:
D
0. _/_/_
6'-0"
H201
A Beginner's Guide to
Structural Engineering
24'-0"
H207
__" O.C
S3
of
HOUSE
Sheet No.:
Project No.:
11'-0"
QandA@alaska.com
24'-0"
Consulting Engineers
H210
H203
3'-6"
J202 @
DBL Joist
14'-2"
H202
H206
14'-0"
--------
H209
__" O.C
B201
22'-0"
QAssociates
H208
J201 @
__" O.C
H204
uimby &
B201
J201 @
___ Post
4'-0"
B202
H205
Sheathing
B
A
2007
Date:
O.C.
TBQ
Tru
24"
By:
@
sses
QandA@alaska.com
BGSE: House
Checked:
Date:
Scale:
C
------
Revisions:
Consulting Engineers
H310
ROOF FRAMING
H302
0. _/_/_
S4
of
HOUSE
Sheet No.:
Project No.:
1'-0" (TYP)
--------
24'-0"
QAssociates
O.C
H304
A Beginner's Guide to
Structural Engineering
H301
uimby &
14'-0"
6'-0"
22'-0"
24'-0"
4'-0"
24"
H309
H303
H308
O.C
16"
H306
@
2x10
ses
Trus
H307