Vous êtes sur la page 1sur 5

Model DBS-300 Standard Sieve Shaker

S.N.93.10

Model DBS-300
Standard Sieve Shaker
Operation Instruction

Wuxi Jianyi Instrument & Machinery Co., Ltd.


The Peoples Republic of China

1. Introduction
===================================================================================
24
Address: 8 Chunyang Rd (E), Fangqian, New Dist. Wuxi, P.R.China
Tel. +86-510-88275668 Fax. +86-510-88275118
E-mail: wxjianyi@public1.wx.js.cn Http://www.wxjy.com

Model DBS-300 Standard Sieve Shaker

The shaker is designed to allow alternative use with either 200 or300 sieves, as specified
for test applications in the laboratories of building material industry, geology, metallurgy,
chemical industry, coal industry and medicine department for particulate material sifting and
testing.

2. Technical Data
200 or300
2.1 sieve required:
8 ( 9 for 300 sieve including pan)
2.2 No. of sieves:
236/min
2.3 Times of sieves (ro-tapping):
162/min
2.4 Times of sieves (vertical-tapping):
12.5 mm
2.5 Radius of circular rotation of sieve:
0.046-2.5 mm
2.6 Particles:
10 mm
2.7 Fall distance:
AC240 V
2.8 Voltage:
0.55 kW
2.9 Motor power:
Weight:
approx.
120 kg
2.10
2.11 Overall dimensions (LxWxH):
586x370x952 mm

3. Structure and principle


The shaker is composed of the upper and lower casings, the swing mechanism, the verticaltap mechanism and the sieve-clamping unit.

3.1 Circular rotation mechanism


Circular rotation of the sieve stack is obtained in the design of the mechanism to force the
particles to roll in all direction with 12.5 mm rotation radius of eccentric shaft

3.2 Vertical-tap mechanism


Vertical-tap action that automatically reverses up and down taps of 162 times every
minute is achieved with the rotation of cam assembly mechanism.

3.3 Clamping unit


When the sieves are mounted on the shaker, screw the knob in clockwise direction to force
the tap nut to move upward, at the same time the studdles will be moved forcedly to brace the
guide rod and clamp the sieves cover. Screw the knob tightly with the attached rod if
necessary.

4. Mounting and operation


4.1 The foundation drawing is available for users reference when placing the concrete base.
The base height depends on the users need.
4.2 Unscrew the plug screw from the top of the upper casing, and then fill the spindle
lubricant into the casing to the central line of the mark.
4.3 Connect the power supply with the electrical engineering regulations and make sure that
===================================================================================
25
Address: 8 Chunyang Rd (E), Fangqian, New Dist. Wuxi, P.R.China
Tel. +86-510-88275668 Fax. +86-510-88275118
E-mail: wxjianyi@public1.wx.js.cn Http://www.wxjy.com

Model DBS-300 Standard Sieve Shaker

the shaker is grounded reliably.


4.4 Fill No. 30 lubricant oil into three oil cups.
4.5 Place the loaded sieve stack and the cover onto the shaker and screw the knob tightly
with the rod.
4.6 Time setting: place the toggle switch to timed position, then open the case of time
relay to set operation time (1-99 minutes). Start the shaker by press the power switch.
The shaker will stop automatically in set time. If it is necessary to stop the shaker during
operation, press the power switch again. If it is not necessary to set the shaking time,
place the toggle switch to untimed position. The operation will be controlled through
the touch of the power switch.

5. Maintenance
5.1 The spindle lubricant should be replaced when the shaker has been used for one month.
After that, replace the lubricant once every three months.
5.2 Fill the lube oil into three oil cups once every half of the working day.
5.3 While carry or operate the shaker, take care of the bracing rod and the guide rod in order
to prevent them from out of shape.

6. Accessories
6.1 anchor bolt 2 pcs
6.2 rod
1 pc

===================================================================================
26
Address: 8 Chunyang Rd (E), Fangqian, New Dist. Wuxi, P.R.China
Tel. +86-510-88275668 Fax. +86-510-88275118
E-mail: wxjianyi@public1.wx.js.cn Http://www.wxjy.com

Model DBS-300 Standard Sieve Shaker

The Basic Circuit Diagram

Schematic Drawing

Foundation Drawing

===================================================================================
27
Address: 8 Chunyang Rd (E), Fangqian, New Dist. Wuxi, P.R.China
Tel. +86-510-88275668 Fax. +86-510-88275118
E-mail: wxjianyi@public1.wx.js.cn Http://www.wxjy.com

Model DBS-300 Standard Sieve Shaker

Spare Parts List


No

Drawing

No.

1
2

Name

JY197-00-

Plug

53

screw

JY-197-00-

Lower

30

casing

Qty

No

Drawing

No.

17

JY-197-00-

Name

Qty

No

Drawing

No.

Name

Qty

Bumper

32

GB1153-89

Oil cup

JY-197-00-

Guide

33

JY-197-00-

Auxiliary

02

plate

13

eccentric

47
1

18

shaft
3

JY-197-00-

Gear

27

shaft

19

JY-197-01-

Taper

07

nut

34

JY-197-00-

Auxiliary

12

eccentric

shaft
sleeve
4

Time

20

relay
5

Socket

21

JY-197-01-

Junk

05

ring

JY-197-01-

Rod

35

JY-197-00-

Gear

22

31

JY-197-01-

Washer

Nut

JY-197-00-

Main

17

eccentric

15
1

36

F
6

JY-197-00JY-197-0001

Knob

37

09

shaft
7

JY-197-00-

Pinion

23

35

GB894-1-

Elastic

86

shield

38

JY-197-00-

Shaft

16

sleeve

JY-197-00-

Gear (I)

JY-197-00-

Upper

19

camshaft

JY-197-00-

Lower

22

camshaft

JY-197-00-

Anchor

52

bolt

JY-197-00-

Gear (II)

JY-197-00-

Uppercasi

37

ng

ring
8

550w 220V

Electric

24

motor
9

JY-197-00-

Pan

25

09
10

JY-197-00-

Spring

26

39
11
12
13

JY-197-00-

Guide

38

sleeve

JY-197-00-

Adjustabl

42

e nut

JY-197-00-

Bar

3
3
3

27
28

44
14
15
16

JY-197-00-

Rubber

05

blanket

JY-197-00-

Sieve

06

support

JY-197-00-

Short

46

shaft

29

JY-197-01-

Shield

08

ring

JY-197-00-

Bracing

49

rod

JY-197-01-

Short

04

studdle

JY-197-01-

Long

10

studdle

JY-197-00-

Guide

04

rod

JY-197-01-

Clampin

01

JY-197-01-

Sleeve

39

18
1
2
1
3

40
41
42
43

30

20
1
3

44
45

02
1

Power

switch
Sieves

46

Fuse

cut-

off
1

31

JY-197-00-

Guide

43

key

47

Toggle
switch

===================================================================================
28
Address: 8 Chunyang Rd (E), Fangqian, New Dist. Wuxi, P.R.China
Tel. +86-510-88275668 Fax. +86-510-88275118
E-mail: wxjianyi@public1.wx.js.cn Http://www.wxjy.com

Vous aimerez peut-être aussi