HDM-4 Applications
Project Appraisal
Project Formulation
Project Appraisal
Concerned with the economic justification of a project
defined by other means.
Project types
Reconstruction, resealing
Economic indicators
Roughness Progression
Gravel Road with 300 AADT
20.0
18.0
Roughness (IRI)
16.0
14.0
12.0
10.0
8.0
6.0
4.0
2.0
0.0
2005
2010
2015
2020
Year
Without Project
With Project
2025
Comparison of Alternatives
Evaluation Period = 20 years
Discount rate = 12.00 %
---- Present Values ---------------Internal
Construction & Road
Net
Rate of
Length
Maintenance User
Total Present Return
(km) Alt.
Costs
Costs Costs Value
(%)
10.0
Without
With
0.18
1.75
5.10
3.10
5.28
4.85
0.43
15.5
Net
Present
Value
at 12%
Internal
Rate of
Return
Project Formulation
Concerned with the economic comparison of project
alternatives to better define the project.
Types
Surface Thicknesses
Geometric standards
Timing of intervention
- Upgrade in 2007
- Upgrade in 2008
- Upgrade in 2009
Upgrade in 2007
0.45
0.40
Upgrade in 2009
Upgrade in 2008
0.35
Upgrade in 2006
0.30
0.25
0.20
0.15
0.10
0.05
0.00
0.00
0.50
1.00
1.50
Present Value of Agency Costs at 12%
2.00
A Paved Road
in Fair Condition
Roughness Progression
Paved Road 1500 AADT/3.0 IRI
9.0
8.0
Roughness (IRI)
7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0
2005
2010
2015
Year
13
2020
2025
0.60
0.50
25mm at 10%
25mm at 20%
0.40
25mm at 30%
0.30
0.20
80mm at 3.0 IRI
0.10
Reconstruction at 8.0 IRI
0.00
0.00
0.20
0.40
0.60
0.80
1.00
1.20
Present Value of Agency Costs at 12%
1.40
1.60
Procedure
17
18
19
Road
Section
N1-2
N4-7
N2-5
R312-1
R458-3
:
N4-16
R13-23
N521-5
:
N1-6
N7-9
F2140-8
:
20
Scheduled
Year
2000
2003
2000
2003
2000
2003
2000
2003
2000
2003
:
:
2001
2004
2001
2004
2001
2004
:
:
2002
2005
2002
2005
2002
2005
:
:
Cost Cumulative
$m
S$m
5.4
5.4
10.9
16.3
8.6
24.9
31.4
56.3
16.3
72.6
:
22.8
22.8
9.7
32.5
41.3
73.8
:
8.2
8.2
9.2
17.4
34.9
52.3
:
Objectives:
Determine
Strategic Planning
22
L
M
H
Road Network
Resource
Constraints
Optimization
Module
23
Program
without
Budgetary
Constraints
24
20.0
15.0
10.0
5.0
0.0
2
5
6
7
8
Roughness (IRI)
25
10
11
Reconstruction
25 cm Overlay
20 cm Overlay
Structural
Overlays
15 cm Overlay
13 cm Overlay
7.5 cm Overlay
Functional
Overlays
5 cm Overlay
30 mm TST
Functional
Reseals
25 mm DST
0.00
5.00
10.00
15.00
20.00
25.00
Surface
Asphalt
Concrete
Traffic (ADT)
< 1000
1000 - 3000
3000 - 5000
5000 - 7000
> 7000
Total
%
Good
Fair
Poor
Very Poor
< 3.5 IRI
3.5 < IRI < 5.0
5.0 < IRI < 7.0
> 7.0 IRI
< 2500 BI
2500 < BI < 3500 3500 < BI < 5000
> 5000 BI
<5% 5-25% >25% <5% 5-25% >25% <5% 5-25% >25% <5% 5-25% >25%
368
438
22
98
90
214
105
21
10
36
86
179 315
15
20
63
87
126
38
117 156
61
64
15
46
1286 463 256
0
138 276
0
97
213
15
0
46
46% 17% 9%
0%
5% 10% 0%
3%
8%
1%
0%
2%
72%
15%
11%
2%
%
13%
23%
17%
21%
25%
Total
1553
1346
474
429
773
4575
%
34%
29%
10%
9%
17%
Secondary Network
Surface
Surface
Treatment
Good
Fair
Poor
Very Poor
< 3.5 IRI
3.5 < IRI < 5.0
5.0 < IRI < 7.0
> 7.0 IRI
< 2500 BI
2500 < BI < 3500 3500 < BI < 5000
> 5000 BI
Traffic (ADT) <5% 5-25% >25% <5% 5-25% >25% <5% 5-25% >25% <5% 5-25% >25%
< 1000
132
66
476
125 754
1000 - 3000
22
71
47 1206
3000 - 5000
13
211
18
232
5000 - 7000
15
46
37
331
> 7000
49
25
69
14
616
Total
0
0
49
132
15
25
0
216 758
0
241 3139
%
0%
0%
1%
3%
0%
1%
0%
5% 17% 0%
5% 69%
1%
4%
21%
74%
Total
368
648
472
592
710
2790
27
Surface
Asphalt
Concrete
Secondary Network
Surface
Surface
Treatment
Good
< 3.5 IRI
< 2500 BI
5-25%
>25%
01 - 3
02 - 5
02 - 1
04 - 5
04 - 5
04 - 3
04 - 3
<5%
-
Good
< 3.5 IRI
< 2500 BI
5-25%
>25%
04 - 1
Fair
3.5 < IRI < 5.0
2500 < BI < 3500
<5%
5-25%
>25%
01 - 7
04 - 3
05 - 1
Fair
3.5 < IRI < 5.0
2500 < BI < 3500
5-25%
>25%
04 - 5
03 - 3
05 - 3
04 - 3
04 - 1
05 - 3
Year 5
6
28
Year 6
6
<5%
-
Poor
5.0 < IRI < 7.0
3500 < BI < 5000
5-25%
>25%
05 - 3
05 - 1
05 - 3
12 - 3
12 - 3
<5%
-
Poor
5.0 < IRI < 7.0
3500 < BI < 5000
5-25%
>25%
04 - 5
04 - 7
04 - 3
04 - 3
04 - 3
04 - 3
04 - 1
06 - 1
-
Consequences to Society
Society Net Benefits Present Value (Billion Rs)
300
250
200
150
100
50
0
0
80%
7.5
70%
6.5
60%
50%
5.5
40%
4.5
30%
20%
3.5
10%
Year
30
2004
2003
2002
2001
2000
2.5
1999
0%
90%
1998
100%
Poor
Fair
Good
Avg. IRI
Period: Years
7 to 20
3.0
Period: Years
1 to 6
4.5
6.0
0.0
20.0
40.0
60.0
80.0
100.0
Periodic Expenditures per Period (Billion Rs.)
31
200
150
100
50
0
1999
Without
Project
Case
Savings:
152 Billion Rs
2000
2001
2002
Year
32
2003
2004
1.0
2.0
6
3.0
4.5
6.0
3
2
1998
1999
2000
2001
Year
2002
33
2003
2004
Primary Roads
Flexible
Secondary Roads
Gravel
Flexible
Gravel
North
45.9
18.7
34.5
21.8
East
34.6
13.5
24.9
11.8
South
52.1
21.0
45.0
21.8
West
27.2
20.4
19.5
12.3
34
US $ m/year .
200
Development
Improvement
Periodic
Routine
150
100
50
0
2003
2004
2005
35
2006
Link
52
58
32
25
3
5
12
15
16
6
11
13
From
To
Length Width
City
City
Type (km)
(m)
Peshawar Jamrud
AC
19
7.3
AC
86
7.3
Chichawat Sahiwal
Shahdara Muridke
AC
15
7.3
Khanewal Mian Channu AC
46
7.3
Hala
Sakrand
ST
41
7.3
ST
56
7.3
Qazi AhmeMoro
Panu Aqil Ghotki
ST
28
7.3
Daherki Ubaro
ST
14
7.3
Ubaro
Sadiq Abad
ST
41
7.3
25
7.3
Moro
Nowshero Fer ST
Rohri
Panu Aqil
ST
32
7.3
25
7.3
Ghotki
Mir Pur Mathe ST
Rough
All
Rut
Total
ness Cracks Depth Traffic Road
Cost
(IRI)
(%) (mm) (ADT) Class Solution B Rs
3.3
27.5
14
3657 P3AZ 02 - 1
0.01
1.5
26.7
6
4628 P3AZ 02 - 1
0.07
9.9
0.0
0 13994 P5DX 06 - 1
0.15
9.3
76.6
0
9754 P5DZ 12 - 1
0.50
7.3
30.3
4
7040 S5DZ 12 - 1
0.43
7.7
47.9
4
8000 S5DZ 12 - 1
0.59
7.8
32.1
3
8736 S5DZ 12 - 1
0.30
10.7
26.2
10
8832 S5DZ 12 - 1
0.15
8.3
41.8
8
8880 S5DZ 12 - 1
0.43
8.6
32.6
7
7013 S5DZ 12 - 1
0.26
7.4
41.9
13 11101 S5DZ 12 - 1
0.34
8.5
36.1
5
8074 S5DZ 12 - 1
0.26
36
NPV
B Rs
0.46
2.06
2.72
7.29
5.37
7.34
3.67
1.84
5.37
3.28
4.19
3.28
NPV/
Cost
31.46
31.46
18.14
14.59
12.40
12.40
12.40
12.40
12.40
12.40
12.40
12.40
Road pricing
road use costs (to define fuel levies)
congestion charges
weight-distance charges
Vehicle regulations
axle load limits
energy consumption, vehicle emissions & noise
Engineering Standards
sustainable road network size
pavement design and maintenance standards
37
Technical Standards
12
10
8
6
4
2
0
-2
-4
-6
100
200
300
400
Traffic (ADT)
Vehicle Policies
9000
8000
7000
6000
5000
4000
3000
2000
1000
Non-vehicle-related
Vehicle-related
10000
6000
3000
1000
300
Loading-related