Académique Documents
Professionnel Documents
Culture Documents
7
Chapter 7
Worked
Examples
July 2002
Manual Contents
Chapter 1
Overview
Chapter 2
Site Assessment
Chapter 3
Hydrology and Design Criteria
Chapter 4
Design
Chapter 5
Erosion and Sediment Control
Chapter 6
Maintenance and Remediation
Chapter 7
Worked Examples
Chapter 8
References
July 2002
Table of Contents
Introduction
7-1
7.1
7-1
7.2
7-3
7.3
7-5
7.4
7-7
7.5
Aquaplaning
7-9
7.6
7-9
7.7
7-12
7.8
7-16
7.9
7-17
7.10
Floodway Calculations
7-19
July 2002
iii
iv
July 2002
Chapter 7
Worked Examples
Introduction
Worked examples of some of the more commonly
used design calculations are given in this chapter.
It has been considered more appropriate to give
other worked examples immediately following
the description of design principles in other
chapters. For example, substantial calculations are
shown in the Appendix to the Underground
Drainage Systems Chapter.
Worked examples in this Chapter are:
7.1
7.2
7.3
7.4
7.5
Aquaplaning
7.6
Worked Example
7.7
7.8
7.9
Figure 7.1
(a)
7-1
(b)
(c)
Step 1
Figure 7.2
20
15.8
= 1.27
R 0.667S0.5
n
= 1.24 m/s
(Mannings formula)
Left Overflow
(Section 4.3.6)
A = 6 x 0.5
= 3 m
Q = A.cos100.V
= 20 x 0.985 x l.24
Q = 24.4 m/s
Step 2
For the higher design discharge of 42.5 m/s,
water will overtop the banks. As the flood plains
will flow at a shallower depth, for the same grass
7-2
Step 3
n = 0.03
V =
Figure 7.3
Given:
Main Channel
A
= 27.5 m
= 1.69
= 0.03
= 0.001 m/m
A.cos100.V
= 40.63 m/s
Right Overflow
Q = 0.74 m/s as per left overflow
Total Discharge
Total Discharge = Qleft overflow + Qmain channel +
Qright overflow
= 0.74 + 40.63 + 0.74
= 42.11 m/s
Therefore, the design flood of 42.5 m/s is at
height 22.5 m, approx.
Figure 7.4
Step 1
Assume a flood level as approximating the
expected design flood level.
This initial level is usually either
July 2002
7-3
where
Tc = time of concentration (h)
ch = Chezys No. = R0.167 / n
R = adopted average hydraulic radius
= 0.75Rs where the fall of the stream from the
top of the catchment to the site is fairly
uniform
= 0.65 Rs where there are significant lengths
of contrasting steep and flat sections of the
stream slope
n = average coefficient of roughness of the
main channel and overflows over the whole
stream length. It may be the same or 0.005
to 0.01 higher than n at the site.
L, M and H are as defined in Given above.
1.340.167
0.06
ch = 17.49
ch =
Tc =
Tc =13.1 hours
Rs =
q1R1 + q 2 R 2 + q 3R 3
Q tot
Rs =
Rs = 1.78 m
Step 3
Calculate the time of concentration using the
Modified Friend Formula.
It should be noted that as the time of concentration
is for zero (start of rainfall) to maximum flow in a
creek, an adjustment to the hydraulic radius at the
site and possible adjustments to the roughness
coefficient are made.
Tc =
7-4
8.5x 26.2
17.49 x118.2 0.1 x 0.280.4
Step 4
Calculate the average rainfall intensity for the
time of concentration for the design storm.
i.e. for this example, the average rainfall intensity
for a storm of 13.1 hours duration and an ARI of
50 years is required.
The RAIN2 Program from the Hydraulics Section
of Main Roads and available in most Districts is
used. Other programs are available which also use
parameters from Australian Rainfall and Runoff
(IEAust, 1987).
The RAIN2 Program which is interactive requests
the following input data. The actual Map number
and value of parameter from ARR is also shown.
8.5L
chM 0.1H 0.4
July 2002
C=
C=0.50
Therefore
0 + 0 + 10 + 40
100
Step 5
Step 1
(b)
where
Q = discharge (m/s)
Va = 1.8 m/s
Q = 0.28 C.I.A
(c)
(d)
(e)
(ii)
(f)
(g)
7-5
(b)
H = 0.26 m
Therefore,
HW = 0.26 + 1.8 - 0.12 = 1.94 m
Step 2
Determine the first trial culvert size:
(a)
(b)
(c)
Step 4
Try a culvert of another type or shape, if a
comparison of alternative design costs is to be
made and determine size and headwater by the
above procedure.
Step 5
Compute the velocity through the 3/2400 x 1500
RCBC.
(a)
Step 3
Step 6
Make selection and record all relevant data on
Figure F7 or similar form.
HW/D = 0.91
HW= 0.91 x 1.5= 1.37 m
This headwater is satisfactory as it is less
than the allowable given in the design data,
item (f) of Step 1.
7-6
July 2002
Figure 7.5
(b)
(c)
(d)
(e)
(f)
Step 1
Determine the allowable spread. This is to be the
smaller of
Allowable width of spread of water on the road
= 4.9 m (from Figure F32A), or
Width arising from the allowable depth of
water at the kerb for pedestrian safety. It will be
found, by trial and error, from Figure F34, that
the allowable depth of water at the kerb = 138
mm, giving a spread width of 2960 mm as
illustrated in Figure 7.6.
Figure 7.6
Step 2
Calculate the flow corresponding to the maximum
spread.
Using Figure F34 and Note 4, the flow for a 1.8%
grade and a spread of 2.960 m will be found to be
0.35 m/s ( = 350 litres/sec).
July 2002
7-7
Step 3
= 0.35 - 0.168
= 0.182 m/s
Using Figure F31
For Q = 0.182m/s
and W = 11.1 (given)
L2 = 300 m
(c)
7-8
Figure 7.7
July 2002
7.5 Aquaplaning
D = 4.94 mm
Given
Crossfall = 0% to 3%
Step 1
D = 3.37 mm
Therefore,
0.103x 0.60.11 x1040.43 x 500.59
D=
0.6
1.870.42
July 2002
Step 4
Check other drainage paths.
1
3F
7-9
v
(gd )0.5
(b)
(c)
(d)
Preliminary
The performance of existing culverts in similar
natural surface conditions should first be assessed.
Normally this would be an assessment of scouring
caused by existing culverts in the immediate
locality of the new design and the design velocity
for those culverts.
If records of the original design velocity are not
found, assume that the existing culverts were
designed for 1.8 - 2.4 m/s flowing full, which used
to be the standard practice.
At all times the design velocity mentioned in this
example, is located at the outlet of the culvert.
Step 1
Adopt a design velocity for the new culvert.
In this example, afflux upstream is not a problem
and culverts are expensive so that fewer culverts
designed for a higher than average velocity need
to be considered.
Because of divergence of flow leaving a culvert
barrel, at the end of standard culvert protection,
the actual velocity will be about half the design
velocity for most existing culverts. The number of
cells in a culvert will give a variation to this
velocity.
Therefore, if a design velocity of 4.0 m/s is used
instead of say the 2.4 m/s for existing culverts
with satisfactory performance in similar natural
surface conditions at the outlet, the allowable
7-10
July 2002
Figure 7.8
July 2002
7-11
Therefore,
AC =
BC
0
tan 13.1
1 .4
0.233
AC = 6.0 m
Figure 7.9
Step 3
Find the width BE at the end of the protection
where the velocity will not cause erosion.
Assume that the depth (d) of the water remains
constant as it flows downstream from the culvert
barrel, increasing its width at a uniform rate.
Then, as
Discharge = area x velocity
= width x depth x velocity
and is constant, then
WidthBE x d x VBE = WidthAF x d x VAF
Therefore,
Width BE VAF
=
Width AF VBE
B.
C.
Substituting,
BE =
BE= 4m
As CD = 1.2 m, then BC = DE = 1.4 m
Step 4
Find the distance AC to which the outlet
protection has to be extended.
7-12
BC
AC
July 2002
A.
Figure 7.10
Figure 7.11
Step 3
Find the length of horizontal apron required to
induce the hydraulic jump.
In this example,
V1 = 9.15 m/s
D1 = 0.5 m
It is required to find L1.
Step 1
First, calculate the Froude No.,
Froude No.,
F=
V
(gD)
0.5
9.15
(9.8x 0.5)0.5
Therefore, F = 4.13
Figure 7.12
L1
= 5.76
D2
Step 2
Therefore, L1 = 15.44 m
Therefore,
D2 = 5.36 D1 = 5.36 x 0.5
D2 = 2.68 m
July 2002
7-13
B.
Step 1
Locate the basin where the flow downstream of
the basin is sub-critical or where a simple transition as in Example 7.6 will lead to non scouring
(usually sub-critical) flow. i.e. locate the basin at
or near the end of the 6% slope. (Sub-critical flow
occurs when the Froude No. is < 1).
Step 2
Assume an initial basin shape for testing. Assume
a length, L = 8.0 m (about half the length of the
horizontal basin required from example A.
Assume a drop of 1.5 m at the front of the basin
(equal to a drop of 3y0 to the floor of the basin).
S0 = 0.06
Therefore, Z1 = Z2 = 3.5 m
V0
( gd)
0.5
9.14
(9.8x 0.5)0.5
F0 = 4.13
Step 4
Calculate the maximum effective width, W1 in the
basin. This is due to the natural flaring of the
water as it leaves the upstream channel.
2 L T ST2 + 1
W1 = WB = W0 +
3F0
Acceptable Design:
The design will be acceptable when the water
surface level at the end of the basin (top of y2) is
below the tailwater level at this point. The
tailwater is required to be higher to induce the
hydraulic jump.
W1 = 1.5 +
2 x 3 0.52 + 1
3x 4.13
W1 = 2.04 m
July 2002
Figure 7.13
Step 5
Step 7
y2 =
C1y1 ( 1 + 8F12 1)
2
y2 =
y2 = 2.58 m
The water surface height at the end of the basin is,
therefore, 100 + Z2 + y2
Step 6
V1 =
1x 0.31( 1 + 8x 6.22 2 1)
2
0.5
= 106.08 m
This is above the tailwater, TW height of
105.32m. Therefore the design is unacceptable as
the hydraulic jump will not form.
10.85
(9.8x 0.31)0.5
F1 = 6.22
July 2002
7-15
Step 8
Repeat Steps 1 to 7 until an acceptable depth is
obtained at y2. It is obvious the floor of the basin
has to be lowered to achieve this.
Final trial giving acceptable results gave:
Step 9
4 .5 y 2
F10.76
4.5x 2.52
7.24 0.76
LB = 2.52 m
From geometry,
Z3 - Z2 = 104.52 - 102.75 m = 1.77m
Therefore, Ls = 1.77 x 2 = 3.52 m
Total length
= LT + LB + Ls
= 4.5 + 2.52 + 3.52
= 10. 54 m
July 2002
Q
Ye2.5
) ( t )
where
A
Ye = ( )1 / 2
2
(1)
(2)
Ye = 0.82
Q = AV = 1.5 x 0.9 x 5
Q = 6.75 m/s
Q
Ye2.5
Q
Ye2.5
6.75
0.82 2.5
= 11.09
Step 2
Calculate the dimensions and volume of the
scour hole.
Depth, hs = 0.95 (0.82)1.0 (11.09)0.375 (30)0.10
= 2.70 m
Adopt hs = 1.40 m (approx. 0.5 hs calculated
for sand)
Width, Ws = 0.67 (0.82)1.0(11.09)0.915(30)0.15
= 9.89m
Adopt Ws = 4.5 m (approx. 0.5 Ws calculated
for sand)
July 2002
Given:
Time
Job Site
9.00
2.052
9.09
10.00
2.522
11.00
2.482
12.00
1.422
MHWS = 5.28 m
13.00
0.432
MLWS = 0.72 m
14.00
-0.038
15.27
Step 1
Compare the tidal ranges at the site and at the
gauge.
Difference between high and low tide (tidal range)
at the job site on 2/11/98,
Tidal Range, TRsite = 2.522 - (-0.038) = 2.56 m
At Gauge, TRgauge = 5.54 - 0.40 = 5.14 m
TR site
2.56
=
= 0.50
Tide Ratio,
TR gauge 5.14
Step 2
Calculate the Highest Astronomical Tide
(HAT) height at the job site.
7-18
July 2002
July 2002
Figure 7.14
7-19
Therefore,
h=H
V2
0.682
= 0.300
2g
2 x 9 .8
h = 0.28 m
Step 4
Step 5
Check for culvert requirements when the flood
is at the point of overtopping the road (Case 2).
Preliminary considerations at the start of this
example discussed batter protection, the need to
build up the tailwater and a culvert velocity of
2.30 - 2.45 m/s from a head of 450 mm.
These considerations apply to this example and
the velocity is acceptable. The discharge of
70m/s required through the culverts corresponds
to a tailwater Ht 322.13 m (0.45 m below the
crown of the road).
Step 6
L = length of floodway = 94 m
D = 1.60 m.
H = 0.30 m
Therefore
QR = 1.674 x 94 x 0.31.5
QR = 25.9 m/s
Discharge through culverts,
QC = Qtot - QR = 130.4 - 25.9
QC = 104.5 m/s
Therefore, culverts are required to take a discharge of 104.5 m/s operating under a head of
0.30 m and outlet control for this design condition
(say Case 1).
7-20
Step 7
If required, calculate the afflux in larger floods
(e.g. 50 year ARI flood) with procedure shown in
Section 4.2.3.3 (B. At Peak of the Flood).
July 2002
7-21