Vous êtes sur la page 1sur 2

NEW PORT PROJECT

Construction Development Co. LLC


Boom Construction Co. LLC (JV)
NPP/0047: Centralised Customs
Inspection Area

Material Approval
Submittal
(MAS Form)

Contract:
MAS Ref:

NPP/0047 Centralised Customs Inspection Area


NPP0047-CDC-ACM-PLB-MA-0000x_rev
Date on
ePM:
Manufacturer /
Yorkshire (Yorkshire Copper Tube & Pegler
Country of
Supplier name:
Yorkshire) / Arabian Specialized Material
material
Company W.L.L
origin:
Supplier Pre-Qualification
NPP0047-CDC-PQ-00333_1
Reference:
Description of
material:
Specification
details:

UK

Copper Pipes & Fittings

Project Specifications NPP0047-CDC-DD-SPC-PM-00001_00, Section 19, Part 2,


Clauses 2.4.1 to Clause 2.4.3; QCS 2010, Section 19, Part 2, Clauses 2.4.1 to
Clause 2.4.3.
Location of use on
NPP/0047 CCIA Project Aboveground Potable Water Supply Piping (within the
project:
buildings)
Technical details:
WRAS Approved Copper Tube conforming to BS EN 1057 Standard (Formerly BS
2871 Part 1:1971 Table X. Kitemark, KIWA, & and WRAS Approved copper fittings
conforms to BS EN 1254 Standard)
Attachments to support the materials submittal:
1
Compliance Statement with Specification
Remar Please refer to pages 01 08
and QCS 2010
ks:
2
Material Technical Data Sheet/Product
Remar Please refer to pages 13 24
Specifications
ks:
3
Material Safety Datasheet
Remar Please refer to pages 25 28
ks:
4
Material Test Certificate
Remar Please refer to pages 29 31
ks:
5
Previous approval of the proposed material Remar Please refer to pages 32 38
from another Projects
ks:
6
Catalogue
Remar Please refer to pages 39 63
ks:
7
Supplier Local Registration
Remar Please refer to pages 64 67
ks:
8
Country of Origin Certificate
Remar Please refer to pages 68 70
ks:
9
Warranties/Guarantees
Remar Please refer to pages 71 74
ks:
10 Storage, Transport & Handling
Remar Please refer to pages 75 76
Requirements
ks:
11 ISO Certificates
Remar Please refer to pages 77 81
ks:
12 Information to the withdrawn BS 864
Remar Please refer to pages 82 83
ks:
13 Approval Certificates
Remar Please refer to pages 84 97
ks:
14 Employer's Approval on the PreRemar Please refer to pages 98 100
Qualification
ks:

Disclaimer
We understand that approval of the material(s) submitted herein is only intended to determine general
conformance with the intent of the project contract documents. By submitting these materials for approval,
we confirm we have performed all necessary on-site dimensional and building utility requirement
coordination, and if approval is granted, will further coordinate the information contained within with all
other concerned contractors employed by the NPPSC.
NPP00100-ACM-PRO-1201-MAS
Revision 0 24 March 2014

Page 1 of 2

NEW PORT PROJECT


Construction Development Co. LLC
Boom Construction Co. LLC (JV)
NPP/0047: Centralised Customs
Inspection Area

Material Approval
Submittal
(MAS Form)

Action:

Prepare
d by /
Submitt
ed by:

Checke
d by:

Reviewe
d by:

Name:

Amjad
Rawashd
eh
MEP
Project
Manager

Muhame
dMustafa
Technical
Manager

Glisson
George
QA/QC
Manager

04-052016

04-052016

04-052016

Reviewe
d&
Approve
d by
Design
Consulta
nt:

Design
Consultant stamp

Approve
d by:

Company
stamp

Shadi
Khashab
Project
Director

Signat
ure:

Date:

PMC review comments


Review status:
Status A
(reviewed)

Status B

(reviewed as noted)

Status C

Status D

(revise and resubmit)

(cancelled)

(insert CSRC reference that refers to the details of the review outcome)

Reviewed by:

(insert full name)

Date returned
to Contractor:

NPP00100-ACM-PRO-1201-MAS
Revision 0 24 March 2014

Signat
ure:

Dat
e:

Copies
distributed to:

Page 2 of 2