4) Lead Time :
Summation of production times along the assembly
line or Total time required to manufacture an item
or it is the time that elapses between when a
process starts and when it is completed.
5) Idle Time:
Idle time is the time specified as period when
system is not in use but is fully functional at
desired parameters.
6) Bottleneck:
Delay in transmission that slow down the
production rate. This can be overcome by
balancing the line.
7) Precedence:
The product cant be move to the next station if it
doesnt complete at the previous station. The
products flow from one station to the other station. In
assembly line the products have to obey this rule. It
can be represented by nodes or graph.
1) Smoothness Index :
This is the index to indicate the relative
smoothness of a given assembly line
http://www.ijettjournal.org
Page 154
Where,
STmax - maximum station time (in most
cases cycle time),
STi - station time of station i.
2.
ISSN: 2231-5381
http://www.ijettjournal.org
Page 155
ISSN: 2231-5381
http://www.ijettjournal.org
Page 156
ISSN: 2231-5381
http://www.ijettjournal.org
Page 157
ISSN: 2231-5381
http://www.ijettjournal.org
Page 158
ISSN: 2231-5381
http://www.ijettjournal.org
Page 159
CONCLUSION
4. SUMMARY
Reference No.
1
2
3
ISSN: 2231-5381
6
7
8
10
11
12
13
14
http://www.ijettjournal.org
Author names
A. Seleim And
H.
Elmaraghy(2014)
Mark Hillmann
Et. al. (2014)
Gonca Tuncel
And Dilek Aydin
()
Parames
Chutima And
Wanwisa
Naruemitwong
(2014)
Ana S. Simaria
And Pedro M.
Vilanho (2009)
Raghda B. Taha
Et.Al (2011)
D. Roy And D.
Khan (2010)
Manuel Chica
Et.Al (2010)
Jonathan
Oesterle And
Lionel Amodeo
(2014)
Yeo Keun Kim
et. al. (2009)
Markus
Propstera et. al.
(2015)
Wenqiang
Zhanga et. al.
(2013)
N.Papakostas et.
al. (2014)
A. Al-Zuheri, L.
Luong And K.
Xing (2012)
Algorithm used
Max-plus
algebra
Failure Process
Matrix
Teaching
Learning Based
Optimization
Algorithm
Pareto
biogeographybased
optimization
Ant colony
optimization
algorithm
Genetic
Algorithm
Genetic
Algorithm
Multiple Ant
Colony System
and MultiObjective
Random Search
Genetic
Algorithm
Strength Pareto
Evolutionary
Algorithm II
Genetic
algorithm
Simulation of
Workforce
Flexibility
Multi-criteria
assembly line
design
Multi-criteria
assembly line
Design
Mathematical
model using
Walking
Worker
Assembly
Page 160
15
16
17
18
19
20
21
Chutima and
Chimklai (2012)
Abdolreza
Roshani and
Davide Giglio
(2015)
D. Battini et. al.
(2015)
Mohand Lounes
Bentaha et. al.
(2014)
Alexandre
Dolgui et. al.
(2015)
W. Grzechca and
L. R. Foulds
(2015)
Olga Battaia et.
al. (2014)
22
Wenqiang Zhang
et. al. (2014)
23
Zupan H. and
Herakovic N.
(2015)
24
M. Duran
Toksar et. al.
(2007)
Cristobal
Miralles et. al.
(2007)
Jonathan
Oesterle and
Lionel Amodeo
(2014)
25
26
Particle swarm
optimization
Mixed-integer
mathematical
programming
model
Multi-objective
model
Integer
programming
and Monte
Carlo sampling
Various
Balancing by
Task Splitting
Lagrangian
relaxation and
Monte Carlo
sampling
technique
Hybrid
Multiobjective
Evolutionary
Algorithm
Discrete event
simulation
Discrete event
simulation
Branch and
Bound
approach
Strength Pareto
Evolutionary
Algorithm II
REFERENCES
1. A. Seleim And H. Elmaraghy, Parametric Analysis Of MixedModel Assembly Lines Using Max-Plus Algebra, CIRP
Journal Of Manufacturing Science And Technology (2014),
7, 305-314.
2. Mark Hillmann et. al. Improving Small-Quantity Assembly
Lines For Complex Industrial Products By Adapting The
Failure Process Matrix : A Case Study, Procedia CIRP
(2014), 17, 236-241.
3. Gonca Tuncel And Dilek Aydin, Two-Sided Assembly Line
Balancing Using TeachingLearning Based Optimization
ISSN: 2231-5381
http://www.ijettjournal.org
Page 161
ISSN: 2231-5381
http://www.ijettjournal.org
Page 162