Responsibilities
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
44. Assists the Const: Manager in the supervising and monitoring of work execution at site.
45. Responsible of Contractors supply material as per Construction documents.
46. Review/approve the project schedule and mobilization plan
47. Review Method Statements, rigging plan, facilitate TRAs,
48. Liaise with operations, safety, QA/QC for smooth functioning of SD jobs
49. Foresee constructability difficulties and prepare a solution.
50. Participate in daily review meeting and report progress/areas of concern.
51. Verifies the adequacy of equipment to perform work safely. Supervise and coordinate the activities of construction contractors.
52. Ensure that contractors comply with all aspects of the worksite HSE plan and policy; site regulations, permit to work and client
requirements.
53. Receiving the approved drawing for fabrication.
54. Preparing the fabrication schedule according to priority.
55. Preparing the spool pack for traceability.
56. Allocating the task according to the ability of foreman.
57. Preparing the material request according to the requirement of spool.
58. Inspect the pipes and piping materials as per specification.
59. Visual inspection and receiving the materials from store.
60. Guiding the sub ordinate and workers regarding proper use of tools and tackles.
61. Resolving field problems and liaison client under the supervision of Mechanical Engineer and process Departments.
62. Adherence to construction safety and special safety requirement for working at plant.
63. Allocation of jobs among various working groups.
64. During the fabrication activities visual inspection of pipes and all fittings, edge preparation, fit up of the pipe, welding quality of
the pipe and D.P.T.
65. Co-ordination with concerned person during fabrication & erection.
66. Planning & supervision of piping fabrication.
67. Checking the daily progress report.
68. Reporting the Senior Engineer and construction manager regarding whole day production monitoring the front
availability.