Role: Piping Engineer/Supervisor

Responsibilities
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.

Prepare daily reports of work progress and man power utilization.


Co-ordinate with the sub contractors to achieve the targets and schedule set by the planning.
Issue the work permits ensuring HSE requirements.
Conduct safety walk through in the site in co-ordination with the safety department on weekly basis.
Supervision of all piping works and ensures safety and quality standards of the client.
Inspection and approval of all the QA/QC submittals of the subcontractor.
To study the isometric drawing received from the clients and to identify the pipe lines and carry out the inspection
work.
Check flow direction arrows on valves; verify that they are properly identified and valves are installed in accordance
with flow direction.
Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the
pipe support details.
Monitoring the QA/QC Documentation of the subcontractors and ensure that all the activities are incorporated to their system
on daily basis and can be traced according to our requirements.
Supervise and Inspection of cold and hot insulation, cladding on piping and equipments.
Line check to verify the use of correct material fittings, valves, and supports, prior to hydro test and prepare punch list for
incomplete works, check and closing after the work is done.
Carry out Project Engineering activities related to the project's multidisciplinary nature.
Supervision of workshop activities for pre-fabrication of associated piping work.
Experience in construction, installation, commissioning and start-up of process machinery.
Monitoring of Erection of Piping and related Structural work
Co-ordination with Materials Department for issue and delivery.
Checking for quality control.
Liaison work with sub contractors and supporting staff
Supervision of Piping Fabrication
Work Scheduling
Inspection of the work to adhere to strict Quality Maintenance.
Controlling & monitoring of resources, Manpower, Materials and Equipment etc.
Planning of Work and scheduling
Work permit management for safe working
Ensuring proper Safety systems at the work place
Records keeping & File work for administrative purpose
Monitoring of Erection of Piping and related Structural works.
Co-ordination with Materials Department for issue and delivery.
Checking for quality control.
Liaison work with sub contractors and supporting staff
Scheduling of work prioritizing in sequential order

33. Planning & Allocating of Manpower, Materials & Equipments


34. Planning of Work and scheduling
35. Liaison with Quality Control Personnel for inspection and ensuring error - free
36. Supervision of Piping Pre Fabrication, Erection, Hydro Testing & Commissioning
37. Supervision of Pipe Stringing, Welding, Lowering, Hot Tapping etc
38. Supervision of Boiler Structure and Piping Erection
39. Coordination of Tank construction works
40. Work Permit Management for Safe working
41. Inspection of the work to adhere to strict Quality Maintenance
42. Overseeing of Safety Management System at the work place
43. Handling of Complete Documentation work & Record Keeping

44. Assists the Const: Manager in the supervising and monitoring of work execution at site.
45. Responsible of Contractors supply material as per Construction documents.
46. Review/approve the project schedule and mobilization plan
47. Review Method Statements, rigging plan, facilitate TRAs,
48. Liaise with operations, safety, QA/QC for smooth functioning of SD jobs
49. Foresee constructability difficulties and prepare a solution.
50. Participate in daily review meeting and report progress/areas of concern.
51. Verifies the adequacy of equipment to perform work safely. Supervise and coordinate the activities of construction contractors.
52. Ensure that contractors comply with all aspects of the worksite HSE plan and policy; site regulations, permit to work and client
requirements.
53. Receiving the approved drawing for fabrication.
54. Preparing the fabrication schedule according to priority.
55. Preparing the spool pack for traceability.
56. Allocating the task according to the ability of foreman.
57. Preparing the material request according to the requirement of spool.
58. Inspect the pipes and piping materials as per specification.
59. Visual inspection and receiving the materials from store.
60. Guiding the sub ordinate and workers regarding proper use of tools and tackles.
61. Resolving field problems and liaison client under the supervision of Mechanical Engineer and process Departments.
62. Adherence to construction safety and special safety requirement for working at plant.
63. Allocation of jobs among various working groups.
64. During the fabrication activities visual inspection of pipes and all fittings, edge preparation, fit up of the pipe, welding quality of
the pipe and D.P.T.
65. Co-ordination with concerned person during fabrication & erection.
66. Planning & supervision of piping fabrication.
67. Checking the daily progress report.
68. Reporting the Senior Engineer and construction manager regarding whole day production monitoring the front
availability.