PRIYADARSHINI INSTITUTE OF ENGINEERING & TECHNOLOGY NAGPUR-19

DEPARTMENT OF CHEMICAL ENGINEERING


SESSION 2016-17

Name of Laboratory : Heat Transfer


S.
N.

Name of Equipment

Working

Not Working

Last Date of
Maintenance

Remark

Repairable

19/5/15

Repairable

Not required till


date
Not required till
date
19/5/15

1.Thermocouple to be replaced.
2.Manometer to be replaced
1.Few temp indicator points not
seen

Repairable

Forced Convection
Appratus
Natural Convection
Appratus
Emissivity Measurement
Appratus
Heat Pipe

Unsteady state Appratus

working

Agitator Vessel

working

Shell & Tube Heat


Exchanger
Rising Film Evaporator

1
2
3

8
9
10

Heat Transfer through


Lagged pipe
Open Pan Evaporator

working
working
working

Repairable

Not
Repairable

19/5/15

16/5/15

Repairable
working

19/5/15
19/5/15

1.The rusting of the tank needs to


be removed & needs to be paint
coated along with primer
1.Lot of fluctuations seen in
reading
2.The rusting of the rod needs to
be removed & needs to be paint
coated
1.Two number of thermometer to
be installed
1.Pump is not working
2.One heater is to be replaced.
1.Backwashing to be done
2.Flowmeter is not working
properly

working

Repairable

19/5/15

1.Heater (1.5 kw) needs to be


installed

S.
N.

Name of Equipment

Working

Not Working
Repairable

11

Muffule furnace

12

Double pipe Heat


Exchanger
Two phase Heat Transfer
Appratus

13

14

Stefen Boltzman
Appratus

Repairable
working

Repairable

Repairable

15

Water Bath

Repairable

16

Heating Mantles

Repairable

Last Date of
Maintenance

Not
Repairable
Not Required till
date
Not Required till
date
19/5/15

19/5/15

Not Required till


date

Remark

1.IC(Relay) needs to be replaced


2.Caliberation needed.
1.Replace geyser & Knobs
1. Appratus is not working due to
non availability of chilant
gas.(Freon -11)
2.Plumbing for continuous water
supply
1.Soldering of sample copper
plate needed
2.Few temp indicators not
working.
Problem to be identified
Heating lining needs to be
changed

Name & sign of Lab Incharge

S.
N.

Name of Equipment

Working

Not Working

Last Date of
Maintenance

Remark

Repairable
1

Tray Dryer

Working

S.
N.

Name of Equipment

Working

Absorption column for


gas absorption
Crystallization unit

Not
Repairable

Not Working

7/12/15

Last Date of
Maintenance
4/12/15

Repairable

7/12/15

Working

Cooling Tower

Working

8/12/15

Gas Liquid Diffusion

Working

8/12/15

Dissolution Tank(Benzoic
Acid)

Liquid Liquid diffusion

3/12/15

Repairable
Not
Repairable

9/12/15

1.Connecting nuts & bolts to be


installed

Remark

2.Manometric fluid needs to be


filled in
Bottom system of the column has
been choked due to corrosion.
1.The draining system has been
broken needs maintenance
2.Pump in not working also needs
to be replaced
1.Control System & its flow
controller not working hence
needs maintenance
1.Vernier scale needs to be
replaced
1. Stainless steel dye making
plate with stud needs to be
fabricated or procured
1.Two number of porous pots
need to be procured

Name of Laboratory : Mass Transfer

Name & sign of Lab Incharge

Name of Laboratory: Fluid Mechanics

Repairable
1
2

Hydrodynamics of
packed bed
Reynolds Experiments

Not
Repairable
16/11/15

Repairable
Working

17/11/15

Working

16/11/15

Combined Flow
Measurement
Filter Press

5
6

Impact Jet Appraratus


Cyclone Seperator

Working

7
8

Flow through V notch


Bernaulli Experiment

Working
Working

18/11/15
19/11/15

9
10
11
12

SIGMA mixer
Ribbon mixer
Ball mill
Jaw Crusher

Working
Working
Working
Working

19/11/15
17/11/15
16/11/15
18/11/15

Not
Repairable

Repairable

18/11/15

17/11/15
16/11/15

1.Pump is not working;Tullu pump


needs to be installed.
1.Capillary fixing arrangement
needs to be done.
1.Reciprocating pump needs to be
replaced
2.Half inch Tap is required.
3Pressure gauge needs to be
procured
1.The whole ducting system
needs to be replaced
1.Needs minor Repairs in the
Flowmeter

Name & sign of Lab Incharge


PRIYADARSHINI INSTITUTE OF ENGINEERING & TECHNOLOGY NAGPUR-19
DEPARTMENT OF CHEMICAL ENGINEERING

Miscllaneous Maintenance Requirement

s.n

Location

Mass Transfer Lab

Maintenance requiring for


1.Wooden Partition has been damaged & needs to be repaired near
door entrance.
2.Sunmica of the woking table needs to be replaced.

Heat Transfer Lab

3.Doors of the main working tables need to be repaired.


1.Doors of the main working tables need to be repaired

Fluid Mechanics Lab

1 Door of platform needs to be replaced.

Mtech Lab

1.Sunmica of the woking table needs to be replaced.

Chemical Technology lab

Appratus is working but the accessories need to be maintained.