Académique Documents
Professionnel Documents
Culture Documents
3
4
Activity description
Completion %
100
20
Forecast
completion
date
30/06/2016
23/06/2016
Comments/area of
concern
20
27/06/2016
30/06/2016
-100
26/06/2016
23/06/2016
50
27/06/2016
27/06/2016
30/06/2016
27/06/2016
27/06/2016
27/06/2016
27/06/2016
With presence of
NPCC & ADMA.
Completion
%
Comments/area
of concern
100
Forecast
completion
date
23/06/2016
20
27/06/2016
100
23/06/2016
Seeking witness on
28/06/2016.
3
4
5
6
With presence of
Schneider
Vendor.
Dear All,
Please find below report as on 25/06/16.
No
Activity description
26/06/2016
The communication issue (loop-2) from Incomer2 to PMS to be sort out at WHT-2.
26/06/2016
27/06/2016
27/06/2016
27/06/2016
27/06/2016
Completion
%
100
Forecast
completion
date
23/06/2016
20
27/06/2016
100
23/06/2016
100
23/06/2016
4
5
6
With presence of
NPCC & ADMA.
With presence of
Schneider
Vendor.
Dear All,
Please find below report as of 23/06/16.
Sl.No
1
3
4
Activity description
415V HVAC MCC (415-SWGR-2009) exhaust fan
stand by feeder local mode issue was solved by
Dan way Vendor at WHT-2.
415V HVAC MCC (415-SWGR-2009) exhaust fan
(duty) and spare feeder LTMR to be replaced at
WHT-2.
415V HVAC MCC (415-SWGR-2009) VFD (A5.1)
Feeder setting was updated at WHT-2.
WHT-2 Instrument FTRs of Fire Damper and LCP
was witnessed and handed over to Mr.Patil,
NPCC.
Comments/area
of concern
3
4
5
6
26/06/2016
26/06/2016
The pending FTRs and punch points related WHT2 to be completed from NPCC and ADMA.
The arrangement of vendor mobilization for testing
of 415V MCC feeders will be carried out at WHT-5.
The FTRs of Electrical and Instrument System will
be started at WHT-5.
The filter cleaning of package units and CFU to be
carried out at WHT-3.
27/06/2016
27/06/2016
27/06/2016
25/06/2016
With presence of
Schneider
Vendor.
Dear All,
Please find below report as of 08/06/16.
No
1
2
3
4
Activity description
Completion %
40
Forecast
completion date
12/06/2016
100
08/06/2016
100
08/06/2016
90
29/05/2016
Comments/area
of concern
09/06/2016
12/06/2016
08/06/2016
Dear All,
Please find below report as of 07/06/16.
No
1
2
3
4
Activity description
Completion %
40
Forecast
completion date
09/06/2016
100
07/06/2016
100
07/06/2016
90
29/05/2016
07/06/2016
08/06/2016
08/06/2016
Comments/are
a of concern
Dear All,
Please find below report as of 06/06/16.
No
1
3
4
Activity description
415V HVAC MCC (415-SWGR-2009)
exhaust fan feeders local mode operation
is checking by Danway Vendor at WHT-2.
Attended the pending items in HVAC
control panel by vendor at WHT-2.
Completion
%
40
Forecast
completion date
09/06/2016
Comments/area of
concern
50
09/06/2016
90
07/06/2016
90
29/05/2016
07/06/2016
07/06/2016
Activity description
Completion
%
Forecast completion
date
40
09/06/2016
70
100
90
07/06/2016
90
29/05/2016
Plan on 06/06/2016.
1
2
3
06/06/2016
05/06/2016
06/06/2016
06/06/2016
05/06/2016
Comments
/area of
concern
2
3
Activity description
Completion
%
40
Forecast
completion date
09/06/2016
40
Comments/area
of concern
06/06/2016
29/05/2016
90
04/06/2016
05/06/2016
05/06/2016
3
4
Activity description
Completion %
40
Forecast
completion date
09/06/2016
100
02/06/2016
90
05/06/2016
29/05/2016
04/06/2016
05/06/2016
09/06/2016
Comments/area
of concern
4
5
Activity description
415V HVAC MCC (415-SWGR-2009)
exhaust fan feeders local mode
operation is checking by Danway Vendor
at WHT-2.
Primary injection (CT &VT testing) for
i/c-1 was completed in 415V HVAC MCC
Feeders (475-SWGR-2009) at WHT-2.
Continue HVAC Field Instruments
functional testing at WHT-2.
Completion
%
40
Forecast
completion date
02/06/2016
50
02/06/2016
100
31/05/2016
05/06/2016
29/05/2016
90
04/06/2016
04/06/2016
02/06/2016
02/06/2016
Comments/area of
concern
Witnessed by
Mr.Patil.All from
NPCC.All pressure
transmitters was
tested by pressure
calibrator device.
Remaining TT &
MT was testing by
mA calibrator.
No
1
2
3
Activity description
Operation of Duty and Stand by
Package
Units at WHT-2.
SKM vendor tested and started the
units at WHT-2
Continue HVAC Field Instruments
functional testing at WHT-2.
Completion
%
100
Forecast
completion date
30/05/2016
100
31/05/2016
100
31/05/2016
31/05/2016
90
Comments/area of concern
Issues was solved by SKM
Vendor
Witnessed by Mr.Patil.All
from NPCC.All pressure
transmitters was tested by
pressure calibrator device.
Remaining TT & MT was
testing by mA calibrator.
29/05/2016
02/06/2016
01/06/2016
Primary injection(CT &VT testing) for i/c1 & i/c-2 feeders of 415V HVAC MCC
Feeders (475-SWGR-2009) to be carried
out at WHT-2.
01/06/2016
Completion
%
100
Forecast
completion date
30/5/2016
Comments/area of
concern
Issues was solved by
SKM Vendor
85
31/5/2016
Subject to
NPCC/ADMA witness.
2
3
Activity description
Operation of Duty and Stand by
Package
Units at WHT-2.
Continue HVAC Field Instruments
functional testing at WHT-2.
Verification of room pressure reading
verification on the HVAC control panel
at WHT-3.
HVAC MCC Feeders FTRs submitted in
under signature
90
31/5/2016
29/5/2016
31/5/2016
31/5/2016
31/5/2016
Activity description
Operation of Duty and Stand by
Package
Units at WHT-2.
Continue HVAC Field Instruments loop
testing at WHT-2
Verification of room pressure reading
verification on the HVAC control panel
at
WHT-3.
HVAC MCC Feeders FTRs submitted in
under signature
Completion
%
25
Forecast
completion date
30/5/2016
85
30/5/2016
Comments/area of
concern
SKM Vendor will come
on 30/05/2016
afternoon.
Subject to
NPCC/ADMA
witness.
31/5/2016
90
29/5/2016
31/5/2016
31/5/2016
25
30/5/2016
2
3
Activity description
Completion %
Comments/area of
concern
25
Forecast
completion date
30/5/2016
85
30/5/2016
Subject to
NPCC/ADMA witness.
29/5/2016
29/5/2016
29/5/2016
Activity description
Operation of Duty and Stand by Package
Units at WHT-2.
Continue HVAC Field Instruments loop
testing at WHT-2
Lux level measurement at WHT-2.
Completion
%
25
Forecast completion
date
30/5/2016
85
28/5/2016
100
26/5/2016
Comments/area
of concern
28/5/2016
29/5/2016
2
3
4
Activity description
Operation of Duty and Stand by Package
Units at WHT-2.
Recording the temperature/vibration
readings of Exhaust Fans at WHT-2.
Continue HVAC Field Instruments loop
testing at WHT-2
Lux level measurement at WHT-2.
Completion %
25
Forecast
completion date
30/5/2016
100
25/5/2016
85
28/5/2016
20
26/5/2016
1
2
26/5/2016
26/5/2016
26/5/2016
Comments/area
of concern
2
3
4
Activity description
Continue Powering Up and Solo Run Test of
CFU at WHT-2
Loop checks between HVAC MCC and HVAC
Control at WHT-2
Continue HVAC Field Instruments loop
testing at WHT-2
Powering Up and checking of Exhaust Fans at
WHT-2
Completion
%
100
Forecast
completion date
24/5/2016
100
23/5/2016
85
25/5/2016
100
24/5/2016
3
4
25/5/2016
25/5/2016
25/5/2016
25/5/2016
comments/area
of concern