Vous êtes sur la page 1sur 7

Implementation Completion Result - Report

Tamil Nadu Agricultural University


Tamil Nadu Agricultural University (TNAU) is one of the implementing agencies of
Tamil Nadu Irrigated Agriculture Modernization and Water bodies Restoration Management
Project funded by World Bank in Tamil Nadu. The Director, Water Technology Centre, Tamil
Nadu Agricultural University is the Nodal Officer implemented the TNAU Components of

TN-

IAMWARM Project. The project activities were carried out in 9 sub-basins (Phase I), 16 subbasins (Phase II), 25 sub-basins (Phase III) and 5 sub-basins (Phase IV) (ANNEXURE I and
ANNEXURE II).
Objectives of TNAU

Working towards large scale adoption of specific technologies such as SRI and improved
production technologies in maize, oilseeds, pulses and cotton.

Large scale adoption of Precision farming in agriculture and horticulture crops

in the sub basin commands.

Popularization of crop diversification options in the crops like maize, pulses and
sunflower.

Promotion of Seed Village Concept (SVC) to produce and supply quality seeds and
seedlings for diversified agricultural practices.

Promotion of organic farming concept in sub-basin villages.


Based on the existing cropping system in each sub basin, activities were formulated in

DPR (Detailed Project Report) in convergence with line departments as project mode and
mission mode with the prime focus on water conservation. System of Rice Intensification (SRI)
and Precision Farming (PF) were the major components demonstrated in all the sub basins in the
context of water saving and increased land and water productivity. Introduction of pulses in
irrigated condition and rice fallow situation was also in demonstrated largely in the sub basin.
Improved Production Technologies (IPT) were also introduced in less water consuming crops
like maize, sunflower, cotton and groundnut. Innovative programmes like, Sustainable Sugarcane
Initiative (SSI) and E-Velanmai were also introduced on pilot basis. The details of overall
physical and financial achievement for the TNAU component (2007-2015) is furnished in
ANNEXURE-III.
1

ANNEXURE I
PHASE-I
6.
7.
8.
9.

1.
2.
3.
4.
5.

Varahanadhi
Upper Vellar
South Vellar
Pambar
Kottakaraiyar

1.
2.
3.
4.
5.
6.
7.
8.

Ponniyar
Agniyar
Ambuliyar
Nichabanadhi
Therkar
Swethanadhi
Upper Gundar
Poiney

Manimuthar
Arjunanadhi
Aliyar
Palar

PHASE-II
9.
10.
11.
12.
13.
14.
15.
16.

Upper Vaigai
Kalingalar
Koundinyanadhi
Anaivari Odai
Chinnar
Sinkottaiyar
Sindapalli Uppodai
Varattar Nagalar

PHASE-III
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

Araniyar
Kosasthalaiyar
Pambanar & Varattar
Kambainallur
Nallavur
Ongur
Thurinjalar
Gadilam
Pambar to Thirukovilur
Gomukhinadhi
Girdhamal
Theniyar
Kanal Odai

14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.

1.

PHASE-IV
Cooum

2.

Adayar

3.

Cheyyar & Killiyar

4.

Paraliaru
2

Uthirakosamangai
Palar
Lower Gundar
Deviyar
Nageriyar
Sevalaperiyar
Vaippar
Uppodai
Korampallam Aru
Karumeniyar
Hanumanadhi
Vembar

5.

Amaravathy

Sl.
No.

Name of the Component

Cumulative total
of
Phase I

ANNEXURE II (Area in Ha)


Cumulative project progress of all sub basins by TNAU (2007-15)
Cumulative total
Cumulative total
Cumulative total
Total (Phase I+Phase II+
of
of
of
Phase III+Phase IV, Addl.)
Phase II
Phase III
Phase IV

Demo

Demo

Demo

Demo

Demo

Tar

Ach

Tar

Ach

Tar

Ach

Tar

Ach

Tar

Ach

6112

6112

1985

1985

8097

8097

SRI

Green Manure + SRI + RF


Pulses

1465

1465

3230

3230

4695

4695

SRI + RF Pulses

5834

5834

330

330

6164

6164

Sub Total

6112

6112

1985

1985

7299

7299

3560

3560

18956

18956

Maize

964

964

360

360

300

300

1624

1624

Pulses

5124

5124

2033

2033

10164

10164

4545

4334

21866

21655

Semidry Rice

505

505

200

200

705

705

Semidry Rice + RF Pulses

80

80

80

80

Other field crops

2148

2148

1113

1113

2844

2799

692

554

6797

6614

Precision farming

2261

2286

531

512

720

716

1031

1018

4542

4865

10

Intercropping of cocoa in
coconut

400

400

350

350

750

750

11

Thornless Bamboo

40

40

50

50

90

90

17049

17074

6422

6403

21612

21563

10328

9966

55410

55007

Total

ANNEXURE III
Project Financial Allocations and Expenditure Details up to 31.03.2015 (MDPU Statement)
(Rupees in Lakhs)
Sl.
No.

Details

I Year
200708

II Year
200809

III
Year
200910

IV
Year
201011

947.26

1136.59

859.79

395.05

129.06

0.00

0.00

0.00

3467.75

V Year
2011-12

VI
Year
201213

VII
Year
201314

VIII
Year
201415

Total

Phase I

DPR Cost

Supplementary
DPR

0.00

0.00

0.00

325.38

0.00

0.00

0.00

0.00

325.38

Project DPR

0.00

0.00

0.00

0.00

253.21

111.73

0.00

0.00

364.94

DPR Total

947.26

1136.59

859.79

720.43

382.27

111.73

0.00

0.00

4158.07

Admn. Sanction

974.26

977.41

741.10

268.62

262.70

135.82

0.00

0.00

3359.91

Expenditure

974.26

977.41

741.10

268.62

262.70

135.82

0.00

0.00

3359.91

Balance (4-5)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

II

Phase II

DPR Cost

0.00

484.70

384.59

137.06

0.00

0.00

0.00

0.00

1006.35

Supplementary
DPR

0.00

0.00

0.00

131.68

0.00

0.000

0.000

0.00

131.68

Project DPR

0.00

0.00

0.00

0.00

94.62

30.86

0.00

0.00

125.48

DPR Total

0.00

484.70

384.59

268.74

94.62

30.86

0.00

0.00

1263.51

Admn. Sanction

0.00

483.34

398.95

113.19

52.96

11.47

0.00

0.00

1059.91

Expenditure

0.00

483.34

398.95

113.19

52.96

11.47

0.00

0.00

1059.91

Balance (4-5)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

III

Phase III

DPR Cost

0.00

0.00

858.94

795.43

0.00

446.42

0.00

0.00

2100.79

Admn. Sanction

0.00

0.00

711.16

587.92

0.00

326.01

0.00

0.00

1625.09

Expenditure

0.00

0.00

711.16

587.92

0.00

326.01

0.00

0.00

1625.09

Balance (2-3)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

IV

Phase IV

DPR Cost

0.00

0.00

0.00

0.00

365.69

353.00

262.54

0.00

981.23

Admn. Sanction

0.00

0.00

0.00

0.00

225.84

169.30

326.71

0.00

721.85

Expenditure

0.00

0.00

0.00

0.00

225.84

169.30

230.11

0.00

625.25

Balance (2-3)

0.00

0.00

0.00

0.00

0.00

0.00

96.60

0.00

96.60

IV

Phase IV - Additional

DPR Cost

0.00

0.00

0.00

0.00

0.00

72.88

78.58

0.00

151.46

Admn. Sanction

0.00

0.00

0.00

0.00

0.00

48.69

78.58

0.00

127.27

Expenditure

0.00

0.00

0.00

0.00

0.00

48.69

70.75

0.00

119.44

Sl.
No.
4

III
Year
200910

IV
Year
201011

VI
Year
201213

VII
Year
201314

VIII
Year
201415

Details

I Year
200708

II Year
200809

Balance (2-3)

0.00

0.00

0.00

0.00

0.00

0.00

7.83

0.00

7.83

V Year
2011-12

Total

IV

Additional
activities

DPR Cost

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Admn. Sanction

0.00

0.00

0.00

0.00

0.00

0.00

539.15

0.00

539.15

Expenditure

0.00

0.00

0.00

0.00

0.00

0.00

539.15

0.00

539.15

Balance (2-3)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

IV

Model village

DPR Cost

0.00

0.00

0.00

0.00

0.00

0.00

500.00

0.00

500.00

Admn. Sanction

0.00

0.00

0.00

0.00

0.00

0.00

500.00

0.00

500.00

Expenditure

0.00

0.00

0.00

0.00

0.00

0.00

377.93

0.00

377.93

Balance (2-3)

0.00

0.00

0.00

0.00

0.00

0.00

122.07

0.00

122.07

Reappropreation 2014-15

DPR Cost

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Admn. Sanction

0.00

0.00

0.00

0.00

0.00

0.00

0.00

871.50

871.50

Expenditure

0.00

0.00

0.00

0.00

0.00

0.00

0.00

603.39

603.39

Balance (2-3)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

268.11

268.11

Consolidated

DPR Cost
Supplementary
DPR
Project DPR

947.26

1621.29

2103.32

1327.54

494.75

872.30

841.12

0.00

8207.58

0.00

0.00

0.00

457.06

0.00

0.00

0.00

0.00

457.06

0.00

0.00

0.00

0.00

347.83

142.59

0.00

0.00

490.42

Total DPR

947.26

1621.29

2103.32

1784.60

842.58

1014.89

841.12

0.00

9155.06

Admn. Sanction

974.26

1460.75

1851.21

969.73

541.50

691.29

1444.44

871.50

8804.68

Expenditure

974.26

1460.75

1851.21

969.73

541.50

691.29

1217.94

603.39

8310.07

Balance (4-5)

0.00

0.00

0.00

0.00

0.00

0.00

226.50

268.11

494.61

2
3

ANNEXURE IV
Details on Capacity Building Programme and Trainings (2007-2015)
Phase I
Phase II
Phase III
Phase IV
Particulars
No.*
Benef**
No
Benef
No
Benef No Benef
SRI
79
4346
91
4734
128
6555
61
3090
Aerobic rice
8
959
0
0
0
0
0
0
Labours training
28
1310
35
1981
0
0
0
0
Maize
21
1270
17
870
1
50
8
406
Pulses
36
2015
21
1239
42
2125
4
251
caster
13
825
3
158
0
0
0
0
Groundnut
10
903
6
311
8
674
5
258
Cropping System
8
590
0
0
0
0
0
0
Precision Farming
49
2170
29
1379
43
2145
5
238
Organic farming
3
111
4
203
0
0
0
0
cotton
0
0
8
394
7
354
2
100
Sunflower
0
0
16
784
1
35
0
0
Cocoa intercropping
6
455
3
150
0
0
0
0
Green manure
0
0
1
50
0
0
0
0
Others
73
3269
167
8016
0
0
0
0
Grama sabha meeting
2
116
0
0
6
116
0
0
Silpaulin
42
1674
0
0
166
7591
0
0
SRI in direct wet seeded rice
0
0
68
1069
0
0
0
0
Labours training
3
78
0
0
18
1000
8
400
Chilli
0
0
0
0
9
414
8
400
FIRB
0
0
0
0
0
0
0
0
Casurina saucer planting
2
111
0
0
0
0
0
0
Field/IAMWAM day
279
10215
367 14086 282
9130
23
691
Exposer Visit
43
2141
64
3116
96
2645
7
327
Good Agricultur Practice
0
0
0
0
0
0
4
200
Quality Seed Production
2
100
5
284
2
116
51
1550
Informal Meeting
4158
69199
4499 69568 2701 50818 740 13817
Semi dry rice
0
0
0
0
9
438
8
400
SWIC meeting
0
0
0
0
1
25
0
0
INM
0
0
0
0
4
199
0
0
SSI
7
400
0
0
1
50
2
91
e-velanmai
82
2436
12
370
1
103
0
0
FIRB
1
50
0
0
0
0
0
0
IICPT training
0
0
0
0
0
0
50
2500
Millet training
0
0
0
0
0
0
50
1875
IPT Vegetable
0
0
0
0
0
0
3
144
Application Of ICT tool in agriculture
0
0
0
0
1
55
0
0
Pro tray sowing of vegetable seeds
0
0
0
0
1
55
0
0
Rural Artisan Training
0
0
0
0
0
0
10
169
Total

*Number of Trainings; ** Number of Beneficiaries

Total
No
Benef
359
18725
8
959
63
3291
47
2596
103
5630
16
983
29
2146
8
590
126
5932
7
314
17
848
17
819
9
605
1
50
240
11285
8
232
208
9265
68
1069
29
1478
17
814
0
0
2
111
951
34122
210
8229
4
200
60
2050
12098 203402
17
838
1
25
4
199
10
541
95
2909
1
50
50
2500
50
1875
3
144
1
55
1
55
10
169
14948 325105

Vous aimerez peut-être aussi