\VDRS - VENDOR DOCUMENT REVIEW SHEET
oseer nL ve DAN-F, Dao
hewoon nae: sanuosva pueuwae 60.70.
loocumenr rm. GUALITY ASSURANCE PLAN FOR LUGE ON. MOTOR
{oon Document no: rursneos
{enon Revision no rv
VENDOR DOCUMENT REVIEW FEEDBACK.
[Permission lo proceed does not eaneiae aocoptance or approval ofesign Dual Caleuatons, Anabsis, Tos! Methods or
Iitcrils developed OR selected by SUPPLIER, and doos NOT relieve SUPPLIER from FULL complanes with Contractual
gallons
oe aoe CO 5 fetnmtronin
i Review not required, Work ed. : pee
ri
Cla [ate snot
ovis & Ress tage
Crs CAN Cancelled / Not required.
[Eo] 4. Revise & Resubmit work may proceed,
ubjee o incorporation of changes.
px BATU KuNTukelotevew, TACoasC (slylid
[Disciptine: aarac
fequipmont No. | PK -654
4_-[N[K)7[9\0| 0) -/0/2\0] -/mR)o| 7| -[ola.v10.]0
PONS Doctat Sogo Rew. No.
SMALPRRE HEH EEPERES (ale [ol*L*l*] Ee
Refer last page (4/4) for approval mail by TPIAsemana sy Soa wopnd
=
Sawa. 8 a8 a
aiy/zal JH 27
] ] PP eerste
nt | srothcreavtpsen]
PE | seen [noc lar 2cnl som| vn) Siegen wsonoremsy
souvenes | onion | “sont soo reuse] | maypanarenme| _ qucernoioe
= = sor
i S| [oe
at sere lesnmron) nets | acne | rowel _W a msn
aby steno byte tea apsonsin| evnaeer | Seemed“ eso) soups
j T
| ees)
| Srmaaserans
=|. secs | a | wsevows | swareson) vn | “emendre ns, "rsmanen +
mee PE rms Pee cee rem | more [re | ee meee fl
Tan SISTENT SR ng] SSD NS NOONE
ate SL a ee &
eo cn rowan] mavren meen] (|
ON Foe Oe Ere OOROROH= BVO ear }
"ea spearsua een: UI RTE SONVRINSSV ALITVAD vstian ota eee
souenssy en jo peat Ke pronto
corms enn se —
Le NL 79559 eH art
are/s 3493 aesShinde Dattatray T. (ACR - QA Projects)
Ghude, Chandrakant [chandrakant ghude@Ir.org}
Thursday, March 14, 2013 1:07 PM
Dattatray Shinde; Israni, Kavita; Pune
Abhilash. Nair@ri.com; Sunil. Thakur@ri.com; Jaiswar Ramesh V. (ACR Projects);
‘CHAVARE DHANANJAY MUKUND; Kale 8 M. (ACR Projects); Thakare Pravin W. (ACR -
Project QA); Bamgude, Hema
Subject: RE: QAP for approval given with comments.
Attachments: 10021-DPVC-XE1-7400350-A09-0006 Rev00.pdt
Dear All,
‘The altached QAP refers column ‘N’ for customer/customer appointed TP.
There is no witnessed point mention against this column. Hence please read 'R’ as 'W' in column ‘N' for final inspection
serial No, 1 & 2 ie. assembled motor and routine test
‘The altached QAP is approved with comment as above.
This is for information and necessary action.
Regards,
Chandrakant Ghude
LRA Mumbai
From: Dattatray Shinde {mailto:shindedt@kndco.tn)
‘Sent: 02 March 2013 12:50
To: Istani, Kavita; Pune
Cc: Abhilash,Nair@riLcor; SunilS.Thakur@ril.com; Jalswar Ramesh V. (ACR Projects); CHAVARE DHANANJAY MUKUND;
Kale BM, (ACR Projects); Thakare Pravin W. (ACR - Project QA)
‘Subject: QAP for approval
Dear sir/Madam,
Ref: PVC Reliance
With reference to the discussion to Reliance for QAP approval of bought out items, please find the QAP for Trolley
‘mounted oil charging trolley for approval.
Regards,
Shinde Dattatray .
Manager ACR-REF QA
Kirloskar Pneumatic co. Lid Hadapsar Pune
Ph, No. 491-(0}20-26727282
‘Mo- 09011088029