Vous êtes sur la page 1sur 4
a a \VDRS - VENDOR DOCUMENT REVIEW SHEET oseer nL ve DAN-F, Dao hewoon nae: sanuosva pueuwae 60.70. loocumenr rm. GUALITY ASSURANCE PLAN FOR LUGE ON. MOTOR {oon Document no: rursneos {enon Revision no rv VENDOR DOCUMENT REVIEW FEEDBACK. [Permission lo proceed does not eaneiae aocoptance or approval ofesign Dual Caleuatons, Anabsis, Tos! Methods or Iitcrils developed OR selected by SUPPLIER, and doos NOT relieve SUPPLIER from FULL complanes with Contractual gallons oe aoe CO 5 fetnmtronin i Review not required, Work ed. : pee ri Cla [ate snot ovis & Ress tage Crs CAN Cancelled / Not required. [Eo] 4. Revise & Resubmit work may proceed, ubjee o incorporation of changes. px BATU KuNTukelotevew, TACoasC (slylid [Disciptine: aarac fequipmont No. | PK -654 4_-[N[K)7[9\0| 0) -/0/2\0] -/mR)o| 7| -[ola.v10.]0 PONS Doctat Sogo Rew. No. SMALPRRE HEH EEPERES (ale [ol*L*l*] Ee Refer last page (4/4) for approval mail by TPIA semana sy Soa wopnd = Sawa. 8 a8 a aiy/zal JH 27 ] ] PP eerste nt | srothcreavtpsen] PE | seen [noc lar 2cnl som| vn) Siegen wsonoremsy souvenes | onion | “sont soo reuse] | maypanarenme| _ qucernoioe = = sor i S| [oe at sere lesnmron) nets | acne | rowel _W a msn aby steno byte tea apsonsin| evnaeer | Seemed“ eso) soups j T | ees) | Srmaaserans =|. secs | a | wsevows | swareson) vn | “emendre ns, "rsmanen + mee PE rms Pee cee rem | more [re | ee meee fl Tan SISTENT SR ng] SSD NS NOONE ate SL a ee & eo cn rowan] mavren meen] (| ON Foe Oe Ere OOROROH= BVO ear } "ea spearsua een: UI RTE SONVRINSSV ALITVAD vsti an ota eee souenssy en jo peat Ke pronto corms enn se — Le NL 79559 eH art are/s 3493 aes Shinde Dattatray T. (ACR - QA Projects) Ghude, Chandrakant [chandrakant ghude@Ir.org} Thursday, March 14, 2013 1:07 PM Dattatray Shinde; Israni, Kavita; Pune Abhilash. Nair@ri.com; Sunil. Thakur@ri.com; Jaiswar Ramesh V. (ACR Projects); ‘CHAVARE DHANANJAY MUKUND; Kale 8 M. (ACR Projects); Thakare Pravin W. (ACR - Project QA); Bamgude, Hema Subject: RE: QAP for approval given with comments. Attachments: 10021-DPVC-XE1-7400350-A09-0006 Rev00.pdt Dear All, ‘The altached QAP refers column ‘N’ for customer/customer appointed TP. There is no witnessed point mention against this column. Hence please read 'R’ as 'W' in column ‘N' for final inspection serial No, 1 & 2 ie. assembled motor and routine test ‘The altached QAP is approved with comment as above. This is for information and necessary action. Regards, Chandrakant Ghude LRA Mumbai From: Dattatray Shinde {mailto:shindedt@kndco.tn) ‘Sent: 02 March 2013 12:50 To: Istani, Kavita; Pune Cc: Abhilash,Nair@riLcor; SunilS.Thakur@ril.com; Jalswar Ramesh V. (ACR Projects); CHAVARE DHANANJAY MUKUND; Kale BM, (ACR Projects); Thakare Pravin W. (ACR - Project QA) ‘Subject: QAP for approval Dear sir/Madam, Ref: PVC Reliance With reference to the discussion to Reliance for QAP approval of bought out items, please find the QAP for Trolley ‘mounted oil charging trolley for approval. Regards, Shinde Dattatray . Manager ACR-REF QA Kirloskar Pneumatic co. Lid Hadapsar Pune Ph, No. 491-(0}20-26727282 ‘Mo- 09011088029

Vous aimerez peut-être aussi