BACK TO BASICS
for
MANAGING ENGINEERING
BEST PRACTICES CONFERENCE - 2015
Presenter:
Glen Warren
Co-Chair - COAA AWP/WFP Committee
PWPs
Work
commences
CONSTRUCTION WORK
PACKAGE EXECUTED
(CWP)
IWP 1
IWP 2
PROCUREMENT
PACKAGE (PWP)
Purchase Order to Supplier
IWP 3
PROCUREMENT
PACKAGE (PWP)
Work
commences
CONSTRUCTION WORK
PACKAGE EXECUTED
(CWP)
Maturity Model
AWP Maturity
PROJECT PERFORMANCE
1. Process Adherence
2. Organizational Alignment
3. Contract Integration
Project
Performance
1.
2.
3.
4.
5.
6.
AWP
MATURITY
Productivity
Cost
Safety
Schedule
Quality
Predictability
Maturity Model
AWP Early
Stages
PROJECT PERFORMANCE
Performance
Breakout
Productivity
Quality
Cost
Predictability
Safety
Schedule
AWP
MATURITY
Maturity Model
AWP Early
Stages
AWP Effectiveness
AWP Effectiveness
PROJECT PERFORMANCE
Performance
Breakout
Productivity
Quality
Cost
Predictability
Safety
Schedule
AWP
MATURITY
Maturity Model
AWP Early
Stages
AWP Effectiveness
AWP Business
Transformation
PROJECT PERFORMANCE
3
2
Performance
Breakout
Productivity
Quality
Cost
Predictability
Safety
Schedule
AWP
MATURITY
12
Clarify Scope
Contractual Issues
Review Schedule
Each CWP supported by predecessor
EWP(s)
Dates for associated vendor data tied to
each EWP.
Adequate lag from scheduled EWP IFC
date and associated start of CWP.)
Q&A