farest planner
http://farestplanner.wordpress.com/current-construction-issue/
1/15
7/19/2014
2. Open the page you want it to be saved as a pdf and click on the Print Preview button, at the Toolbar.
3. It also available in any directory window you open even in the reports you will find a Print Setup
http://farestplanner.wordpress.com/current-construction-issue/
2/15
7/19/2014
5. Now go to the Print icon and type Printer name also as PrimoPDF. Click OK
6. This Dialog box will appear automatically. In the ellipsis icon, select a directory where you want to
save the file in., e.g. Desktop.
After you have done this, click CreatePDF.
Now look at your Desktop, the document is saved a s a PDF format.
http://farestplanner.wordpress.com/current-construction-issue/
3/15
7/19/2014
Exporting Projects
credit to : http://www.ims-web.com (http://www.ims-web.com)
Problem: The customer, vendor or contractor has an older version of Primavera or another project
management tool, and needs to view a schedule.
Solution: Export the project.
Open the desired project to be exported
Go to File>Export
Choose the format including desired program and version. For Primavera PM/MM and Primavera
Contractor, there are now several options for versions.
http://farestplanner.wordpress.com/current-construction-issue/
4/15
7/19/2014
Do not try to save the file to your C drive or any other local drive on your computer. Try saving to a
network drive (in this example, the file is saved to the M: drive)
Click Finish
http://farestplanner.wordpress.com/current-construction-issue/
5/15
7/19/2014
Function Keys
credit to : http://www.ims-web.com (http://www.ims-web.com)
In both the P5/P6 client and web applications, the following function keys work:
F1
Context-Sensitive Help
F2
Toggles between Edit and Browse modes when the focus is in Description Panes in
Details Tabs for Notebooks, Steps, WPs and Docs and the Notes to Resources pane on
the Feedback Detail Tab
F3
F5
F7
Spell check when in Edit mode on the above-mentioned Panes and Tabs and in a given
column currently in focus in tables
F9
Schedule
Shift+F9
F10
P6 Hierarchies
credit to : http://www.ims-web.com (http://www.ims-web.com)
When creating hierarchies in P6 (for example, WBS), as an alternative to using the mouse, Ctrl +
arrows will promote, demote and move elements up and down.
6/15
7/19/2014
For example: Your personal or project workspace dashboard has a link to the weather or a link to your
company website. If the page delays in loading or has difficulty and freezes, you will need to know this
tip.
If Primavera or other dashboards are working, then likely the external website is having difficulty
loading, not that Primavera is having trouble.
DO NOT exit the web browseryou will remain logged in to the Primavera tool and not be allowed to
log in for 30 minutes or until your admin changes your password.
Instead, type 1=TRUE at the end of your URL in the URL field of the site and hit return.
Example: http://servername:8080/myprimavera/login_cmt/1=true
(http://servername:8080/myprimavera/login_cmt/1=true)
This restarts the page in safe mode and ignores external websites temporarily. Next time you logon
and the external website is working, you should not experience the problem. Now you are logged on
without the use of that external site. You can do all other work in Primavera until the external site is
working again.
SHORTCUT
http://farestplanner.wordpress.com/current-construction-issue/
FILE MENU
SHORTCUT
7/15
7/19/2014
File Menu
Alt+F
New Project
Ctrl+N
Edit Menu
Alt+E
Open Project
Ctrl+O
View Menu
Alt+V
Ctrl+P
Tools Menu
Alt+T
Exit
Alt+F4
Help Menu
Alt+H
Commit
F10
Refresh
F5
EDIT MENU
SHORTCUT
INSERT MENU
SHORTCUT
Cut Activity
Ctrl+X
New Activity
Ins
Paste Activity
Ctrl+V
Delete Activity
Del
Find
Ctrl+F
HELP MENU
SHORTCUT
TOOLS MENU
SHORTCUT
F1
Schedule Now
F9
8/15
7/19/2014
Weight
10
15
20
10
30
10
40
10
50
15
65
25
90
10
100
Weight
10
15
20
25
30
55
60
15
75
20
95
http://farestplanner.wordpress.com/current-construction-issue/
9/15
7/19/2014
100
Your EPS and your OBS need to have a one-to-one relationship. If you give a user a Responsible
http://farestplanner.wordpress.com/current-construction-issue/
10/15
7/19/2014
Your EPS and your OBS need to have a one-to-one relationship. If you give a user a Responsible
Manager assignment (OBS) that is not tied to an EPS, Project or WBS level, they will not see any
projects when they log into the Primavera Client application or the Web Application.
11/15
7/19/2014
Open a project.
Click on the Activities button in the Directory bar.
Turn on the resource profile in the bottom layout.
In the resource list on the left side of the resource profile, choose the Directory Bar.
Click on the Select View and then choose Resource.
Click on the Group and Sort By.
Choose the Manager resource code as the first option to group by.
Click on OK.
In the resource list, you should now see your resources grouped by the Manager name.
10. Click on the Manager name in the list and you will see the rollup information displayed in the
Profile view on the right of the screen.
12/15
7/19/2014
When adding header and footer information to your custom printing layouts or notes fields, Primavera
adds a double-space when you hit Enter for another line by default. You can get a single space by
holding down the Right Shift key while hitting Enter to minimize the space you need and make the
reports look more professional.
13/15
7/19/2014
7 Responses
http://farestplanner.wordpress.com/current-construction-issue/
14/15
7/19/2014
Hi,
I like the level of detail in the article.
Regards
Ravi
Reply
Rob, on May 12, 2011 at 1:36 am said:
Im also needing help in Primavera and Planning activities. I would like to know how can I be an
effective planner and what are the day to day task for a planning engineer do I need to be expert in
Primavera?
What are the key things I need to know?
Pls Help
Reply
Moshood Agboke, on December 19, 2011 at 5:53 pm said:
You are awesome!
Reply
manoj, on April 7, 2012 at 3:32 am said:
HOW TO CREATE S CURVE IN EXCEL USING DATAS FROM P3
Reply