METHOD STATEMENT

ARABTEC-WCT JV

Document No: MS-0044


Revision No: 00
Date: 27/01/2008

PROPOSED DEVELOPMENT AND CONSTRUCTION OF THE NAD AL


SHEBA RACECOURSE ON PARCEL ID 600-6888, NAD AL SHEBA,
DUBAI, UNITED ARAB EMIRATES
METHOD STATEMENT NO.: MS-0044

REV: 0

ORIGINATOR: Norafizah Mohamad

DISCIPLINE: ARCHITECTURAL

Title:

SCREEDING WORK
REVIEWER / APPROVER
REV

DATE

STATUS

REVISION DETAILS

27/01/08

FA

First submission for approval

JV

*EXTERNAL

Status Code:
D : Draft

FI : For Information

FC : For Construction

P : Preliminary

FA : For Approval

* External Authorization (Client),


where required

Distribution:

Table of Contents
Page 1 of 6

METHOD STATEMENT

1.
2.
3.
4.
5.
6.

Introduction
Scope of work
Location
Reference used
Responsible person/Contact no.
Resources
6.1 Manpower
6.2 Plants & Equipments
6.3 Materials
6.4 PPE List
7. Description of works
8. QA/QC Aspects
9. Safety & Health Aspects
10.Attachment
11.Site Safety Engineers Approval

1.0

INTRODUCTION

Page 2 of 6

ARABTEC-WCT JV

Document No: MS-0044


Revision No: 00
Date: 27/01/2008

METHOD STATEMENT

ARABTEC-WCT JV

Document No: MS-0044


Revision No: 00
Date: 27/01/2008

This method statement will describe on how to construct the screeding work including
the description of works, materials and machinery and equipment.
2.0

SCOPE OF WORK
Screeds are guided with a straightedge to bring a concrete surface to a desired elevation
or with a template to produce a desired curved shape.

3.0

LOCATION
To be apply on top of slab.

4.0

REFERENCE USED
Project Specification: Architectural Specification, Section 03500 : Concrete Screeds.

5.0

RESPONSIBLE PERSON/ CONTACT NO.


Project Manager, Construction Manager and Site Engineer of ATC-WCT JV

6.0

RESOURCES
6.1

6.2

6.3

Manpower

Site Engineer

Skill worker

Plants and Equipments

Brush or roller

Hand float or skip float or power float

Materials

Concrete grade 25N

Bonding agent

Curing compound
Page 3 of 6

METHOD STATEMENT

6.4

ARABTEC-WCT JV

Document No: MS-0044


Revision No: 00
Date: 27/01/2008

PPE List
1.

Safety Helmets

2.

Safety Shoes

3.

Hand Gloves

4.

Goggles

5.

Masks

6.

Coverall

7.0

DESCRIPTION OF WORKS

7.1

Site preparation:

Bases are sufficiently flat so as to permit specified levels and flatness of finished
surfaces.

7.2

Bases are cleaned and free from plaster, dirt, dust and oil.

Set pegging to floor and wall.

Application:

Apply with a single coat of bonding agent by brush or roller, taking care to work
the mixed material with the substrate. Ensure a uniform coating is achieved and
make sure no ponding occurs when applied horizontally. When used as an antichloride barrier two coats will be required.

Pour the screeding concrete onto the floor according to the shop drawing.

Using guiding lathes/battens of predetermined thickness, apply the non-flowable


screed to the base and compact by stamping.

Apply one coat at 4.5 5.5 m 2 / litre by low pressure knapsack spray or brush or
woolen roller. Apply as soon as possible after free water evaporates from
horizontal surfaces or vertical forms are stripped.

Page 4 of 6

METHOD STATEMENT

ARABTEC-WCT JV

Document No: MS-0044


Revision No: 00
Date: 27/01/2008

Falls in wet areas like kitchen and toilet should be in the correct directions
towards floor traps or discharge pints.

8.0

Screed need to be even.

No mortar stains or paint drips.

Surfaces should not be unduly rough or patchy.

QA/QC ASPECTS
The purpose of the quality control is to provide a guideline for a proper operation
framework such that the following targets will be attained: 1. To achieve consistently high quality standards of workmanship in all aspects of the
work.
2. All quality matters shall follows as per ISO standard and Project Quality Plan to
ensure the quality in construction.

9.0

SAFETY & HEALTH ASPECTS


Refer to the Risk Assessment

10.0

ATTACHMENT

10.1

Inspection and Test Plan

10.2

Risk Assessment

Page 5 of 6

METHOD STATEMENT

11.0

ARABTEC-WCT JV

Document No: MS-0044


Revision No: 00
Date: 27/01/2008

SITE SAFETY ENGINEERS APPROVAL

Approved

Approved Subjected to compliance with the following notes/comment

Not Approved - Reasons

Signed: ____________________

Dated: ________________

Page 6 of 6