Académique Documents
Professionnel Documents
Culture Documents
BHEL/TSX/JPL/BLR-CP/05
Stage II: (4X600 MW)
Plant Area: Boiler
Commissioning Procedure of Air Pre Heater
Page 2 of 15
Project
Procedure
Purpose of Document
For Execution/Information
Document No.
Rev No. 00
Prepared By
Reviewed By
Approved By
Name
Sign
Signatures
JPL
BHEL
Date
List of Contents
1.0
Plant Details
2.0
Objectives
3.0
Proposals
4.0
Services Required
5.0
Safety Precautions
6.0
Emergency Procedures
7.0
8.0
Method
9.0
Completion Criteria
10.0
Appendices
a) Log Sheets
Signatures
JPL
BHEL
Page 3 of 15
1.0
Page 4 of 15
PLANT DETAILS
Rotary Air Preheaters supplied are of Tri-Sector type .
1.2
Air Motor 1 No
1.3
1.4
1.5
1.6
1.7
Deluge system
1.8
1.9
1.10
1.11
2.0
OBJECTIVE
To commission the rotary air preheater and make it available
for commissioning and operation of the main plant.
Signatures
JPL
BHEL
3.0
Page 5 of 15
PROPOSAL:
Commissioning of the rotary air preheater is proposed in the
following steps.
3.1
3.2
3.3
3.4
3.5
3.6
4.0
SERVICES REQUIRED:
4.1
4.2
4.3
4.4
4.5
4.6
4.7
Signatures
JPL
BHEL
Page 6 of 15
5.0
SAFETY PRECAUTIONS:
5.1
5.2
5.3
5.4
5.5
6.0
EMERGENCY PROCEDUES:
6.1
6.2
7.0
7.1
7.2
7.3
7.4
7.5
7.6
Cooling water for support and guide bearing lub oil pumps is
available for operation. (Equipment Cooling water System)
7.7
Signatures
JPL
BHEL
7.8
Deluge and water wash lines are erected upto APH and
drainage facility is ensured.
7.9
Page 7 of 15
7.10
Soot blower and its connected piping are erected and kept
ready for operation. Ensure either steam or air (temporary
source) is made available for commissioning APH during APH
start up till main steam source is made available.
7.11
Oil in support and Guide bearings and fluid coupling are filled
up with recommended oil up to correct level. (Refer O & M
Manual).
7.12
7.13
7.14
7.15
7.16
7.17
7.18
Oil level in the main gear drive ensured up to its normal level.
Local instrumentation of the gear drive completed.
7.19
7.20
7.21
Aluminium finger tabs sets installed after seals are set to the
specification.
Signatures
JPL
BHEL
Page 8 of 15
7.22
Air Seal cover and water shield of support bearing and air seal
cover of guide bearing are erected as per drawing.
7.23
7.24
7.25
7.26
7.27
7.28
7.29
All man hole doors are closed except one or two as decided by
the test team leader.
Signatures
JPL
BHEL
8.0
METHOD:
8.1
Page 9 of 15
8.1.1
8.1.2
8.1.3
After completion of motor trial run, both pump and motor are
coupled.
8.1.4
8.1.5
8.1.6
8.1.7
After completing the oil flushing, the filters are cleaned again
and put back in to the system.
8.1.8
Relief valve in the pump (or mounted in the discharge line) are
set at 2.0 KSC above the normal operating pressure of the
lub-oil system.
8.1.9
Signatures
JPL
BHEL
8.2
Page 10 of 15
8.2.1
8.2.3
8.2.4
8.2.5
Start the main motor and stop it after about 10-20 secs to
observe for its normal running. Any abnormal sound noticed
to be brought to the notice of the team leader.
8.2.6
Start the main motor again and allow APH to continonsly run.
8.2.7
Observe of
a) Load current (To be logged)
b) Vibration of motor and gear unit (To be logged)
c) Rubbing of Seals / Aluminium finger taps.
(Rubbing of Seals do take place in cold condition and the
team leader to ensure that such rubbings are normal /
abnormal)
Signatures
JPL
BHEL
8.3
Page 11 of 15
8.3.1
a.
b.
c.
d.
8.3.2
Open the bypass valve manually and slowly operate air motor
vis--vis the APH
8.3.3
8.3.4
8.4
8.4.1
8.4.2
Ensure
a.
b.
c.
d.
e.
f.
g.
Signatures
JPL
BHEL
Page 12 of 15
8.4.3
8.4.4
8.4.5
Charge the air line slowly and blow the SB arm and nozzle
sufficiently.
8.4.6
8.5
8.5.1
8.5.2
8.5.3
8.5.4
8.5.5
Signatures
JPL
BHEL
8.6
8.6.1
Page 13 of 15
General
Other miscellaneous system
a) Rotor stoppage alarm
a) Oil carry over unit
b) Light assembly for observation port
c)
9.0
COMPLETION CRITERIA
Air Preheater commissioning completed by carrying all the
proposals given in section 3.0 (Section 3.1 to 3.6)
Signatures
JPL
BHEL
Page 14 of 15
10.0
Date :
LOG SHEET - I
PROJECT
UNIT NO.1
ACTIVITY
Sl.No
TIME
PUMP IN SERVICE
A
B
DISCHARGE
PRESSURE
REMARKS
Signatures
JPL
BHEL
Page 15 of 15
10.0
Date :
LOG SHEET - II
PROJECT
UNIT NO.
ACTIVITY
Sl.
NO
TIME
MAIN MOTOR IN
SERVICE
VIBRATION
MOTOR
APH GEAR
BOX
Signatures
JPL
BHEL
REMARKS