1310
No of Pages 12 Course Code : 13EM07
Roll’ No:
(To be filled in. hy the candidate),
PSG COLLEGE OF TECHNOLOGY, COIMBATORE - 641 004
SEMESTER EXAMINATIO!
MAY - 2014
ME(PT)-ELECTRICAL MACHINES — Semester: 2/PhD(PT)+EEE.
13EM07 POWER ELECTRONICS IN WIND AND SOLAR POWER CONVERSION
‘Time: 3 Hours Maximum Marks: 100
INSTRUCTIONS:
L. Answer ALL quesiions from PART - A and Answer any 4 questions from PART - B.
Question under PART — C is compulsory.
PART -A, Marks! 10x3=30
1. Deseribe the classification of solar cells based en materials and tech nologies used.
2, Define the terms
4) Tilt angle
il) Fil Factor
il), Solar Iradiance
3. What are the different types of generators used in wind turbine’?
4, Contras: Line commutated inverter and Forced commutaied inverter.
5. Specily the uility of the following insiriments
i) Pyranometer
il) Anemometer
ii Wind vane
6. What is the Best option in thé. selection of power generation system 16 be used in reméte
areas? Explain
7. List the procedures to select suitatsle sites for installing windmills.
8. Explainthe need for self excitation in induction generator of Wind energy power system,
9. Compare plant load factor of wind turbinas to a conventional power generation plant like
thermal, nuclear. Howcan it really contribute to a utility's supply?
10. Interpret the potential causes il |-V curve of solar. cell have Notches or Steps.
Page No: |1310
No of Pages 12 Course Code : 13EM07
PART-B Marks :4y 125 =50
11. What is the pringiple of solar photovoltaic power generation? What are the main
elements of a PY system? Explain with block diagram.
12, Explaih the principle of wind electric. system. State the’ basic Components’ and their
working in wind electric system, with block diagram.
13 What is power quality? Discuss in detail the’ Power Quality Issues in Grid Connecied
Wind Farms?
14, Define Tip speed ratio. Explain’ MPPT technique based on Tip ‘speed ratio and
advantages of MPPT techniqies for optimization of energy conversion
15, What is the (i) capital.cost (i) cost of électricity generation (ii) Payback period for 2MwW
of solar power plant and 2MW of Wind power plant. Justify your answer
PART-C Marks 21x 20=20
16, List_ the ‘sirategies to integrate distributed generation with common grid taking into
cénsideration Indian scenario of power System. Explain-with single line diagiam of power
system with) distributed generation incorporating smart grid concept. Explain
synchronizing requirements of Grid connected WEG and Solar.
JENDI
FDRL.
Page Nez?