Id
EDT
Nombre de tarea
Duracin
1.1
1.1.1
2.1
2.1.1
30 das
211,864.41
2.1.2
60 das
11,825,908.20
2.1.3
30 das
75,425.00
Costo
90 das
35,450.00
03 ene '16
J
35,450.00
90 das
35,450.00
35,450.00
90 das
35,450.00
SUFICIENTE EQUIPAMIENTO PARA EL SERVICIO DE RECOLECCIN, TRANSPORTE, ALMACENAMIENTO, BARRIDO, REAPROVECHAMIENTO Y DISPOSICIN FINAL
70DE
das
LOS RESIDUOS
12,182,647.81
SLIDOS
ADQUISICIN DE EQUIPOS PARA LA RECOLECCIN, TRANSPORTE, ALMACENAMIENTO, BARRIDO, REAPROVECHAMIENTO Y DISPOSICIN FINAL DE LOS RESIDUOS
70 das
SLIDOS
12,182,647.81
2.1.4
10
11
3.1
12
3.1.1
13
3.1.1.1
14
3.1.1.1.1
15
3.1.1.1.2
16
3.1.1.2
17
3.1.1.2.1
18
3.1.1.2.2
19
3.1.1.2.3
20
3.1.1.3
21
3.1.1.3.1
22
3.1.1.3.2
23
3.1.1.3.3
24
3.1.1.3.4
25
3.1.1.4
3,414,954.95
3,414,954.95
105 das?
2,071,166.85
2,071,166.85
15 das
37,125.00
37,125.00
DESCAPOTE Y LIMPIEZA
5 das
23,400.00
5 das
13,725.00
21 das?
92,133.00
10 das
13,629.00
5 das
34,200.00
1 da?
44,304.00
26 das
74,385.50
10 das
63,898.60
5 das
6,787.62
5 das
3,308.18
6 das
391.10
14 das?
9,788.40
26
3.1.1.4.1
27
3.1.1.4.2
3 das
1,163.40
3 das
1,492.80
28
3.1.1.4.3
3 das?
2,702.40
29
3.1.1.4.4
3 das
3,860.40
30
3.1.1.4.5
2 das?
569.40
31
3.1.1.5
14 das
25,889.83
32
3.1.1.5.1
33
3.1.1.5.2
4 das
10,593.22
5 das
7,288.14
34
3.1.1.5.3
5 das
8,008.47
35
3.1.1.6
27 das
319,913.24
36
3.1.1.6.1
10 das
74,151.00
37
3.1.1.6.2
5 das
245,762.24
38
3.1.1.7
15 das
210,450.00
39
3.1.1.7.1
15 das
210,450.00
40
3.1.1.8
45 das
1,050,016.80
41
3.1.1.8.1
ESTRUCTURA DE PERFILES LAMINADOS DE ACERO CON MONTENES, INC TIRANTES CON PERFIL REDONDO, CANALONES
25 das
915,264.00
42
3.1.1.8.2
30 das
111,024.00
43
3.1.1.8.3
10 das
23,728.80
44
3.1.1.9
10 das
68,850.00
45
3.1.1.9.1
46
3.1.1.10
47
3.1.1.10.1
48
3.1.1.10.2
49
DRENAJE
INSTALACION HIDROSANITARIAS
MUROS Y TABIQUES
LOSA DE PISO
CONCRETO FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON e=0.10 m
TECHUMBRE
ALBAILERIA
MUROS DE DRYWALL
69,450.20
23,400.00
13,629.00
63,898.60
1,163.40
10,593.22
319,913.24
74,151.00
245,762.24
210,450.00
210,450.00
CEMENTO PORTLAND TIPO I (42.5 kg)[3,750 bol],GASOLINA [300 gal],OPERARIO[198%],OFICIAL[99%],PEON[694%],MEZCLADORA DE CONCRETO 11 P3 (23 HP)[99%],HORMIGON [847.5 m3],AGUA PUESTA EN OBRA[127.5 m3],REGLA DE MADERA PINO 2" X 6" X 10'[7%]
1,050,016.80
915,264.00
52
3.1.1.11
2 das
21,694.40
21,694.40
53
3.1.1.11.1
54
3.1.1.12
55
3.1.1.12.1
56
3.1.1.13
57
3.1.1.13.1
58
3.1.1.14
59
3.1.1.14.1
60
3.1.1.14.2
61
3.1.2
62
3.1.2.1
63
3.1.2.1.1
DESCAPOTE Y LIMPIEZA
64
3.1.2.1.2
65
3.1.2.2
66
3.1.2.2.1
67
3.1.2.2.2
68
3.1.2.2.3
69
3.1.2.3
70
3.1.2.3.1
71
3.1.2.3.2
72
3.1.2.3.3
73
3.1.2.3.4
74
3.1.2.4
75
3.1.2.4.1
76
3.1.2.4.2
77
3.1.2.4.3
78
3.1.2.4.4
79
3.1.2.4.5
80
3.1.2.5
81
3.1.2.5.1
82
3.1.2.5.2
83
3.1.2.5.3
84
3.1.2.6
85
3.1.2.6.1
10 das
46,609.20
86
3.1.2.6.2
5 das
194,914.88
87
3.1.2.7
15 das
134,688.00
88
3.1.2.7.1
89
3.1.2.8
90
3.1.2.8.1
91
3.1.2.8.2
92
3.1.2.8.3
93
3.1.2.9
94
3.1.2.9.1
95
3.1.2.10
96
3.1.2.10.1
97
3.1.2.10.2
98
68,850.00
13,000.00
38,406.78
29,830.51
135 das?
1,343,788.10
10 das
23,760.00
5 das
14,976.00
5 das
8,784.00
8,784.00
16 das?
79,188.00
79,188.00
10 das
11,328.00
5 das
29,640.00
1 da?
38,220.00
26 das
58,587.12
10 das
50,678.20
5 das
4,627.92
5 das
2,737.80
6 das
543.20
14 das?
6,996.75
3 das
469.35
3 das
746.40
3 das?
1,351.20
3 das
3,860.40
2 das?
569.40
14 das
25,889.83
4 das
10,593.22
5 das
7,288.14
5 das
8,008.47
15 das
241,524.08
610,176.00
30 das
74,016.00
10 das
17,796.60
10 das
12,117.60
ALBAILERIA
MUROS DE DRYWALL
10 das
12,117.60
64 das
15,659.32
PUERTA METALICA DE 4.00x3.50 m.DOS HOJAS PIVOTANTE CON TUBO DE 2" Y MALLA ROMBO 2"x2"
2 das
13,000.00
2 das
745.76
3.1.2.10.3
2 das
813.56
CARPINTERIA METALICA
99
3.1.2.10.4
PUERTA VIDRIO PV - 01
2 das
720.00
100
3.1.2.10.5
4 das
380.00
101
3.1.2.11
5 das
43,388.80
102
3.1.2.11.1
5 das
43,388.80
103
3.2
104
3.2.1
105
3.2.1.1
106
3.2.1.1.1
107
3.2.1.1.1.1
108
3.2.1.1.1.2
109
3.2.1.1.2
110
3.2.1.1.2.1
111
3.2.1.1.2.2
112
113
114
3.2.1.1.3
115
3.2.1.1.3.1
116
3.2.1.1.4
117
3.2.1.1.4.1
60 das
696,836.16
118
3.2.1.1.4.2
20 das
1,444,206.24
119
3.2.1.1.4.3
GEOMEMBRANA T=2.00 mm
25 das
1,359,096.48
120
3.2.1.1.4.4
20 das
1,770,460.32
121
3.2.1.1.4.5
20 das
2,055,932.64
122
3.2.1.1.5
79 das?
346,498.90
123
3.2.1.1.5.1
12 das?
17,553.60
124
3.2.1.1.5.2
16 das?
59,347.73
125
3.2.1.1.5.3
GEOMEMBRANA T=2.00 mm
16 das?
55,850.26
126
3.2.1.1.5.4
16 das?
72,754.70
127
3.2.1.1.5.5
19 das?
84,485.81
128
3.2.1.1.5.6
5 das?
36,348.52
129
3.2.1.1.5.7
130
3.2.1.2
131
3.2.1.2.1
132
3.2.1.2.2
133
3.2.1.2.3
134
3.2.1.2.4
135
CONSTRUCCIN DE LA INFRAESTRUCTURA DEL SISTEMA DE DISPOSICIN FINAL DE LOS RESIDUOS SLIDOS (RELLENO SANITARIO Y TRATAMIENTO DE
869LIXIVIADOS)
das?
21,186.44
38,406.78
23,760.00
14,976.00
469.35
1,351.20
COMPACTADORA DE PLANCHA[2%],OFICIAL[60%],PEON[600%]
3,860.40
LUBRICANTE PARA PVC[6 gal],OPERARIO[48%],PEON[48%],TUBERIA PVC-SAP C-10 S/P DE 6" X 5 m[126 und]
569.40
25,889.83
10,593.22
7,288.14
8,008.47
241,524.08
46,609.20
194,914.88
134,688.00
134,688.00
CEMENTO PORTLAND TIPO I (42.5 kg)[2,400 bol],GASOLINA [192 gal],OPERARIO[200%],OFICIAL,PEON[700%],MEZCLADORA DE CONCRETO 11 P3 (23 HP),HORMIGON [542.4 m3],AGUA PUESTA EN OBRA[81.6 m3],REGLA DE MADERA PINO 2" X 6" X 10'[8%]
701,988.60
610,176.00
12,117.60
12,117.60
15,659.32
13,000.00
SC PUERTA METALICA 4.00x3.50 m. DOS HOJAS C/TUBO DE 2" Y MALLA GALV. 2"x 2" N10[200%]
745.76
813.56
380.00
43,388.80
43,388.80
851,057.86
DESCAPOTE Y LIMPIEZA
30 das
488,530.72
105 das
5,459,280.62
50 das
1,395,838.18
40 das
515,715.20
3.2.1.1.2.3
80 das
472,151.52
3.2.1.1.2.4
70 das
3,075,575.72
150 das
761,369.84
150 das
761,369.84
65 das
7,326,531.84
20,158.28
PEON[471%]
746.40
362,527.14
52,693.10
MOTOBOMBA 3" (7 HP)[5%],OFICIAL[5%],PEON[29%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[15%],MOTONIVELADORA 130 - 135 HP[15%],CAMION CISTERNA (3 500 GLNS.)[5%]
6,996.75
20 das
5 das
CEMENTO PORTLAND TIPO I (42.5 kg)[48 bol],PETROLEO D-2[2.74 gal],OPERARIO[60%],OFICIAL[90%],PEON[570%],OPERADOR DE EQUIPO LIVIANO[60%],MEZCLADORA DE CONCRETO 11 P3 (23 HP)[60%],PIEDRA MEDIANA[4.8 m3],HORMIGON [10.2 m3],AGUA PUESTA EN OBRA[2.16 m3]
543.20
42 das?
CEMENTO PORTLAND TIPO I (42.5 kg)[69.6 bol],CAPATAZ[10%],OPERARIO[192%],OFICIAL[96%],PEON[768%],OPERADOR DE EQUIPO LIVIANO[96%],MEZCLADORA DE CONCRETO 11 P3 (23 HP)[96%],PIEDRA GRANDE DE 8"[12 m3],HORMIGON [20.88 m3],AGUA[4.32 und]
2,737.80
14,744,739.06
4,627.92
851,057.86
50,678.20
50 das
DRENAJE
MOTOBOMBA 3" (7 HP)[10%],OFICIAL[10%],PEON[361%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[90%],MOTONIVELADORA 130 - 135 HP[90%],CAMION CISTERNA (3 500 GLNS.)[10%]
58,587.12
15,348,913.89
INSTALACION DE IMPERMEABILIZANTE
38,220.00
14,744,739.06
CEMENTO PORTLAND TIPO I (42.5 kg)[86.4 bol],NIVEL TOPOGRAFICO[11%],ESTACION TOTAL[11%],PINTURA ESMALTE[24 gal],PEON[183%],OPERARIO TOPOGRAFO[92%],HORMIGON [29.76 m3],AGUA PUESTA EN OBRA[2.88 m3],CORDEL[13%],TIZA BOLSA DE 40 kg[96 und]
29,640.00
15,348,913.89
MOTOBOMBA 3" (7 HP)[17%],OFICIAL[17%],PEON[401%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton,MOTONIVELADORA 130 - 135 HP,CAMION CISTERNA (3 500 GLNS.)[17%]
11,328.00
279 das?
MOVIMIENTO DE TIERRAS
1,343,788.10
348 das?
OBRAS PRELIMINARES
29,830.51
51,725,879.15
68,237.29
51,725,879.15
PRIMERA ETAPA
21,186.44
15 das
25 das
55,084.75
15 das
21,694.40
ESTRUCTURA DE PERFILES LAMINADOS DE ACERO CON MONTENES, INC TIRANTES CON PERFIL REDONDO, CANALONES
55,084.75
134,688.00
720.00
21,186.44
701,988.60
813.56
68,237.29
15 das
SC PUERTA METALICA 4.00x3.50 m. DOS HOJAS C/TUBO DE 2" Y MALLA GALV. 2"x 2" N10[200%]
1,118.64
10 das
65 das
16,412.20
30 das
68,850.00
760.00
TECHUMBRE
760.00
LOSA DE PISO
111,024.00
2 das
MUROS Y TABIQUES
362,527.14
CEMENTO PORTLAND TIPO I (42.5 kg)[3,565.84 bol],NIVEL TOPOGRAFICO[12%],ESTACION TOTAL[12%],PINTURA ESMALTE[990.51 gal],PEON[199%],OPERARIO TOPOGRAFO,HORMIGON [1,228.23 m3],AGUA PUESTA EN OBRA[118.86 m3],CORDEL[14%],TIZA BOLSA DE 40 kg[3,962.05 und]
488,530.72
MOTOBOMBA 3" (7 HP)[17%],OFICIAL[17%],PEON[399%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton,MOTONIVELADORA 130 - 135 HP,CAMION CISTERNA (3 500 GLNS.)[17%]
5,459,280.62
1,395,838.18
515,715.20
OPERARIO[13,637%],OFICIAL[27,229%],PEON[46,135%],TRACK DRILL NEUMATICO 660-690 PCM[6,818%],MARTILLO NEUMATICO DE 29 kg[27,229%],COMPRESORA NEUMATICA 700 - 800PCM 240 HP[6,818%],TRACTOR DE ORUGAS DE 300-330 HP[4,737%],DINAMITA AL 65%[4,427.5 kg],DETON...
472,151.52
3,075,575.72
MOTOBOMBA 3" (7 HP)[63%],OFICIAL[64%],PEON[399%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton,MOTONIVELADORA 130 - 135 HP,CAMION CISTERNA (3 500 GLNS.)[64%]
SC ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETES[19,715,229%]
761,369.84
761,369.84
PEON[200%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton,MOTONIVELADORA 130 - 135 HP,CAMION CISTERNA (3 500 GLNS.),MATERIAL GRANULAR[23,050.56 m3]
1,444,206.24
1,359,096.48
1,770,460.32
2,055,932.64
OPERARIO[44,328%],PEON[44,328%],CONTROLADOR OFICIAL[44,328%],CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3[44,328%],GRAVA 1/2" A 3/4"[31,029.6 m3]
346,498.90
17,553.60
59,347.73
55,850.26
72,754.70
84,485.81
36,348.52
OPERARIO[96%],PEON[96%],CONTROLADOR OFICIAL[96%],CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3[96%],GRAVA 1/2" A 3/4"[1,275.12 m3]
20,158.28
52,693.10
2 das
219.60
10 das
1,233.05
10 das?
13,036.80
5 das
6,155.20
3.2.1.2.5
5 das
7,048.45
136
3.2.1.2.6
10 das
25,000.00
137
3.2.1.3
43 das
150,847.47
150,847.47
138
3.2.1.3.1
43 das
150,847.47
150,847.47
139
3.2.1.3.1.1
MEDIDOR DE CAUDAL
3 das
2,966.10
140
3.2.1.3.1.2
DECANTADOR
5 das
12,288.14
141
3.2.1.3.1.3
PLANTA DE ALMACENAMIENTO
10 das
29,661.02
142
3.2.1.3.1.4
5 das
55,084.75
143
3.2.1.3.1.5
FILTRO PERCOLADOR
10 das
21,186.44
144
3.2.1.3.1.6
10 das
29,661.02
145
3.2.1.4
51 das?
400,634.26
400,634.26
146
3.2.1.4.1
51 das?
400,634.26
400,634.26
147
3.2.1.4.1.1
15 das
18,078.73
18,078.73
148
3.2.1.4.1.1.1
5 das
17,521.20
149
3.2.1.4.1.1.2
10 das
557.53
150
3.2.1.4.1.2
36 das?
248,216.20
151
3.2.1.4.1.2.1
16 das?
44,073.00
152
3.2.1.4.1.2.2
12 das
50,483.20
153
3.2.1.4.1.2.3
20 das
153,660.00
154
3.2.1.4.1.3
20 das?
126,039.60
155
3.2.1.4.1.3.1
10 das?
35,268.48
156
3.2.1.4.1.3.2
10 das?
90,771.12
Proyecto: PROGRAMACION
Fecha: dom 19/06/16
CONSTRUCCIONES COMPLEMENTARIAS
GESTION DE LIXIVIADOS
MOVIMIENTO DE TIERRAS
PERFILADO Y NIVELACIONES
Tarea
Divisin
Progreso
Hito
09 sep '18
M
8,008.47
INSTALACION HIDROSANITARIAS
7,288.14
3.1.1.10.5
DRENAJE
51
25,889.83
720.00
MOVIMIENTO DE TIERRAS
01 jul '18
D
LUBRICANTE PARA PVC[6 gal],OPERARIO[48%],PEON[48%],TUBERIA PVC-SAP C-10 S/P DE 6" X 5 m[126 und]
569.40
2 das
OBRAS PRELIMINARES
COMPACTADORA DE PLANCHA[3%],OFICIAL[80%],PEON[800%]
3,860.40
PUERTA VIDRIO PV - 01
22 abr '18
S
2,702.40
3.1.1.10.4
11 feb '18
M
PEON[583%]
1,492.80
50
MOTOBOMBA 3" (7 HP)[4%],OFICIAL[4%],PEON[21%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[10%],MOTONIVELADORA 130 - 135 HP[10%],CAMION CISTERNA (3 500 GLNS.)[4%]
813.56
55,084.75
03 dic '17
L
9,788.40
2 das
21,186.44
CEMENTO PORTLAND TIPO I (42.5 kg)[58 bol],PETROLEO D-2[3.31 gal],OPERARIO[73%],OFICIAL[109%],PEON[689%],OPERADOR DE EQUIPO LIVIANO[73%],MEZCLADORA DE CONCRETO 11 P3 (23 HP)[73%],PIEDRA MEDIANA[5.8 m3],HORMIGON [12.33 m3],AGUA PUESTA EN OBRA[2.61 m3]
391.10
20 das
24 sep '17
D
CEMENTO PORTLAND TIPO I (42.5 kg)[102.08 bol],CAPATAZ[7%],OPERARIO[141%],OFICIAL[70%],PEON[563%],OPERADOR DE EQUIPO LIVIANO[70%],MEZCLADORA DE CONCRETO 11 P3 (23 HP)[70%],PIEDRA GRANDE DE 8"[17.6 m3],HORMIGON [30.62 m3],AGUA[6.34 und]
3,308.18
3.1.1.10.3
10 das
6,787.62
1,118.64
13,000.00
74,385.50
2 das
21,694.40
16 jul '17
V
MOTOBOMBA 3" (7 HP)[11%],OFICIAL[11%],PEON[375%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[94%],MOTONIVELADORA 130 - 135 HP[94%],CAMION CISTERNA (3 500 GLNS.)[11%]
44,304.00
2 das
55,084.75
34,200.00
2 das
07 may '17
J
CEMENTO PORTLAND TIPO I (42.5 kg)[135 bol],NIVEL TOPOGRAFICO[12%],ESTACION TOTAL[12%],PINTURA ESMALTE[37.5 gal],PEON[200%],OPERARIO TOPOGRAFO,HORMIGON [46.5 m3],AGUA PUESTA EN OBRA[4.5 m3],CORDEL[14%],TIZA BOLSA DE 40 kg[150 und]
PUERTA METALICA DE 4.00x3.50 m.DOS HOJAS PIVOTANTE CON TUBO DE 2" Y MALLA ROMBO 2"x2"
20 das
26 feb '17
D
92,133.00
68,850.00
MOTOBOMBA 3" (7 HP)[15%],OFICIAL[15%],PEON[358%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[90%],MOTONIVELADORA 130 - 135 HP[90%],CAMION CISTERNA (3 500 GLNS.)[15%]
13,725.00
16,412.20
INSTALACIONES ELECTRICAS
18 dic '16
S
10 das
09 oct '16
V
10 das
CARPINTERIA METALICA
31 jul '16
J
75,425.00
135 das?
11,825,908.20
55,140,834.10
MOVIMIENTO DE TIERRAS
211,864.41
69,450.20
OBRAS PRELIMINARES
12,182,647.81
55,140,834.10
22 may '16
35,450.00
30 das
12,182,647.81
869 das?
13 mar '16
219.60
CEMENTO PORTLAND TIPO I (42.5 kg)[2.16 bol],NIVEL TOPOGRAFICO[2%],ESTACION TOTAL[2%],PINTURA ESMALTE[0.6 gal],PEON[32%],OPERARIO TOPOGRAFO[16%],HORMIGON [0.74 m3],AGUA PUESTA EN OBRA[0.07 m3],CORDEL[2%],TIZA BOLSA DE 40 kg[2.4 und]
1,233.05
CAPATAZ[10%],PEON[98%]
13,036.80
6,155.20
7,048.45
OPERARIO[73%],PEON[73%],CONTROLADOR OFICIAL[73%],CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3[73%],GRAVA 1/2" A 3/4"[159.5 m3]
25,000.00
2,966.10
12,288.14
29,661.02
55,084.75
21,186.44
29,661.02
17,521.20
557.53
248,216.20
44,073.00
50,483.20
153,660.00
OPERARIO[1,450%],OFICIAL[2,900%],PEON[5,994%],TRACK DRILL NEUMATICO 660-690 PCM[725%],MARTILLO NEUMATICO DE 29 kg[2,900%],COMPRESORA NEUMATICA 700 - 800PCM 240 HP[725%],TRACTOR DE ORUGAS DE 300-330 HP[386%],DINAMITA AL 65%[348 kg],DETONANTES PARA PER...
SC ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETES[985,000%]
126,039.60
35,268.48
90,771.12
Resumen
Tareas externas
Hito externo
MOTOBOMBA 3" (7 HP)[16%],OFICIAL[16%],PEON[377%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[95%],MOTONIVELADORA 130 - 135 HP[95%],CAMION CISTERNA (3 500 GLNS.)[16%]
PEON[188%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[95%],MOTONIVELADORA 130 - 135 HP[95%],CAMION CISTERNA (3 500 GLNS.)[95%],MATERIAL GRANULAR[2,939.04 m3]
Fecha lmite
Pgina 1
18 nov '18
X
27 ene '19
J
07 abr '19
L
16 jun '19
M
2
X
"Mejoramiento y Ampliacin de la Gestin Integral de Residuos Slidos Municipales del Distrito de San Juan de Lurigancho, Provincia y Departamento de Lima"
Id
EDT
157
3.2.1.4.1.4
158
3.2.1.4.1.4.1
159
3.2.1.4.1.5
160
3.2.1.4.1.5.1
161
3.2.1.4.1.5.2
162
3.2.2
163
3.2.2.1
164
3.2.2.1.1
165
3.2.2.1.1.1
166
3.2.2.1.1.2
167
3.2.2.1.2
168
3.2.2.1.2.1
169
3.2.2.1.2.2
170
171
172
3.2.2.1.3
173
3.2.2.1.3.1
174
3.2.2.1.4
175
3.2.2.1.4.1
176
3.2.2.1.4.2
177
Nombre de tarea
Duracin
OBRAS DE CONCRETO ARMADO
5 das
Costo
5,508.47
03 ene '16
J
13 mar '16
L
22 may '16
M
31 jul '16
J
09 oct '16
V
18 dic '16
S
5,508.47
5 das
5,508.47
6 das
2,791.26
3 das
1,550.70
3 das
1,240.56
1,240.56
225 das?
11,736,149.72
11,736,149.72
225 das?
11,427,998.80
11,427,998.80
50 das
364,914.45
364,914.45
20 das
100,304.13
DESCAPOTE Y LIMPIEZA
30 das
264,610.32
95 das
3,558,732.61
50 das
930,558.81
40 das
515,715.20
3.2.2.1.2.3
80 das
472,151.52
3.2.2.1.2.4
20 das
1,640,307.08
150 das
2,628,271.80
150 das
2,628,271.80
85 das
4,529,581.04
60 das
430,814.46
20 das
892,871.19
3.2.2.1.4.3
GEOMEMBRANA T=2.00 mm
25 das
840,252.63
178
3.2.2.1.4.4
20 das
1,094,575.67
179
3.2.2.1.4.5
20 das
1,271,067.09
180
3.2.2.1.5
84 das?
346,498.90
181
3.2.2.1.5.1
12 das?
17,553.60
182
3.2.2.1.5.2
16 das?
59,347.73
183
3.2.2.1.5.3
GEOMEMBRANA T=2.00 mm
16 das?
55,850.26
184
3.2.2.1.5.4
16 das?
72,754.70
185
3.2.2.1.5.5
19 das?
84,485.81
186
3.2.2.1.5.6
5 das?
36,348.52
187
3.2.2.1.5.7
188
3.2.2.2
189
3.2.2.2.1
190
3.2.2.2.2
191
3.2.2.2.3
192
3.2.2.2.4
193
3.2.2.2.5
194
3.2.2.3
195
3.2.2.3.1
196
3.2.2.3.1.1
197
3.2.2.3.1.2
198
3.2.2.3.2
199
3.2.2.3.2.1
200
3.2.2.3.2.2
201
3.2.2.3.2.3
202
3.2.2.3.3
203
3.2.2.3.3.1
204
3.2.2.3.3.2
205
3.2.2.3.4
206
3.2.2.3.4.1
207
3.2.2.3.5
208
3.2.2.3.5.1
209
3.2.2.3.5.2
210
3.2.2.4
211
3.2.2.4.1
212
3.2.2.4.2
213
SEALIZACION
SEGUNDA ETAPA
CONSTRUCCION DE RELLENO SANITARIO
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
DRENAJE
5 das
20,158.28
27 das?
27,693.10
26 feb '17
D
5,508.47
07 may '17
J
1,550.70
100,304.13
930,558.81
472,151.52
2,628,271.80
430,814.46
27 ene '19
J
07 abr '19
L
16 jun '19
M
2
X
840,252.63
1,271,067.09
OPERARIO,PEON,CONTROLADOR OFICIAL,CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3,GRAVA 1/2" A 3/4"[19,183.85 m3]
346,498.90
17,553.60
59,347.73
55,850.26
72,754.70
84,485.81
36,348.52
OPERARIO[96%],PEON[96%],CONTROLADOR OFICIAL[96%],CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3[96%],GRAVA 1/2" A 3/4"[1,275.12 m3]
27,693.10
2 das
219.60
10 das
1,233.05
10 das?
13,036.80
13,036.80
5 das
6,155.20
6,155.20
219.60
CEMENTO PORTLAND TIPO I (42.5 kg)[2.16 bol],NIVEL TOPOGRAFICO[2%],ESTACION TOTAL[2%],PINTURA ESMALTE[0.6 gal],PEON[32%],OPERARIO TOPOGRAFO[16%],HORMIGON [0.74 m3],AGUA PUESTA EN OBRA[0.07 m3],CORDEL[2%],TIZA BOLSA DE 40 kg[2.4 und]
1,233.05
20 das?
23,307.36
16 das?
33,945.60
12 das
55,536.00
20 das?
43,485.00
10 das?
12,168.00
10 das?
31,317.00
5 das
5,508.47
7,048.45
6,045.00
CAPATAZ[10%],PEON[98%]
OPERARIO[96%],PEON[192%],CAJA DE CONCRETO PARA POZO D=1000 MM[96 und]
OPERARIO[73%],PEON[73%],TUBERIA PVC-SAP 8" CRIBADO PARA DRENAJE[168]
OPERARIO[73%],PEON[73%],CONTROLADOR OFICIAL[73%],CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3[73%],GRAVA 1/2" A 3/4"[159.5 m3]
289.91
112,788.96
23,307.36
33,945.60
OPERARIO[975%],OFICIAL[1,950%],PEON[4,031%],TRACK DRILL NEUMATICO 660-690 PCM[488%],MARTILLO NEUMATICO DE 29 kg[1,950%],COMPRESORA NEUMATICA 700 - 800PCM 240 HP[488%],TRACTOR DE ORUGAS DE 300-330 HP[259%],DINAMITA AL 65%[234 kg],DETONANTES PARA PERFO...
55,536.00
43,485.00
12,168.00
MOTOBOMBA 3" (7 HP)[14%],OFICIAL[14%],PEON[325%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[82%],MOTONIVELADORA 130 - 135 HP[82%],CAMION CISTERNA (3 500 GLNS.)[14%]
31,317.00
PEON[162%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[82%],MOTONIVELADORA 130 - 135 HP[82%],CAMION CISTERNA (3 500 GLNS.)[82%],MATERIAL GRANULAR[1,014 m3]
5,508.47
5 das
5,508.47
6 das
2,170.98
3 das
1,240.56
3 das
930.42
25 das
110,169.50
PLANTA DE ALMACENAMIENTO
5 das
29,661.02
5 das
29,661.02
3.2.2.4.3
FILTRO PERCOLADOR
5 das
21,186.44
214
3.2.2.4.4
10 das
29,661.02
215
3.2.3
374 das?
24,640,815.54
24,640,815.54
216
3.2.3.1
297 das?
24,317,050.14
24,317,050.14
217
3.2.3.1.1
20 das
251,229.72
251,229.72
218
3.2.3.1.1.1
20 das
251,229.72
219
3.2.3.1.2
110 das?
1,878,997.16
220
3.2.3.1.2.1
80 das?
443,986.80
221
3.2.3.1.2.2
50 das
181,359.36
222
3.2.3.1.2.3
40 das
232,599.80
223
3.2.3.1.2.4
80 das
1,021,051.20
224
3.2.3.1.3
150 das
792,792.00
225
3.2.3.1.3.1
226
3.2.3.1.4
227
3.2.3.1.4.1
228
3.2.3.1.4.2
229
5,508.47
2,170.98
1,240.56
OPERARIO[50%],OFICIAL,CONCRETO PREMEZCLADO[2 m3],PERNO HEXAGONAL ROSCA CORRIENTE G-2 6" X 1/2"[8 und],POSTES DE CONCRETO PARA SEALES [4 und],SEALES REGLAMENTARIAS 75 X 75 cm[4 und]
930.42
OPERARIO[38%],OFICIAL[75%],CONCRETO PREMEZCLADO[1.5 m3],PERNO HEXAGONAL ROSCA CORRIENTE G-2 6" X 1/2"[6 und],POSTES DE CONCRETO PARA SEALES [3 und],SEALES REGLAMENTARIAS 75 X 75 cm[3 und]
110,169.50
29,661.02
29,661.02
21,186.44
29,661.02
251,229.72
CEMENTO PORTLAND TIPO I (42.5 kg)[2,471.11 bol],NIVEL TOPOGRAFICO[12%],ESTACION TOTAL[12%],PINTURA ESMALTE[686.42 gal],PEON[199%],OPERARIO TOPOGRAFO,HORMIGON [851.16 m3],AGUA PUESTA EN OBRA[82.37 m3],CORDEL[14%],TIZA BOLSA DE 40 kg[2,745.68 und]
1,878,997.16
443,986.80
181,359.36
OPERARIO[4,796%],OFICIAL[9,576%],PEON[16,224%],TRACK DRILL NEUMATICO 660-690 PCM[2,398%],MARTILLO NEUMATICO DE 29 kg[9,576%],COMPRESORA NEUMATICA 700 - 800PCM 240 HP[2,398%],TRACTOR DE ORUGAS DE 300-330 HP[1,666%],DINAMITA AL 65%[1,557 kg],DETONANTES...
232,599.80
MOTOBOMBA 3" (7 HP)[62%],OFICIAL[63%],PEON[394%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[99%],MOTONIVELADORA 130 - 135 HP[99%],CAMION CISTERNA (3 500 GLNS.)[63%]
1,021,051.20
150 das
792,792.00
125 das
4,406,265.64
60 das
422,286.36
60 das
867,866.04
3.2.3.1.4.3
GEOMEMBRANA T=2.00 mm
20 das
816,721.08
230
3.2.3.1.4.4
25 das
1,063,921.72
231
3.2.3.1.4.5
20 das
1,235,470.44
232
3.2.3.1.5
55 das
16,641,266.72
233
3.2.3.1.5.1
15 das
3,183,615.96
234
3.2.3.1.5.2
10 das
2,236,356.36
235
3.2.3.1.5.3
15 das
3,583,112.40
3,583,112.40
MOTOBOMBA 3" (7 HP)[8,580%],PEON[137,284%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[68,642%],MOTONIVELADORA 130 - 135 HP[68,642%],CAMION CISTERNA (3 500 GLNS.)[68,642%],MATERIAL GRANULAR[35,693.84 m3]
236
3.2.3.1.5.4
GEOMEMBRANA T=2.00 mm
15 das
2,104,563.72
2,104,563.72
237
3.2.3.1.5.5
15 das
2,616,333.28
2,616,333.28
238
3.2.3.1.5.6
15 das
2,917,285.00
2,917,285.00
239
3.2.3.1.6
47 das?
346,498.90
240
3.2.3.1.6.1
241
3.2.3.1.6.2
242
3.2.3.1.6.3
GEOMEMBRANA T=2.00 mm
243
3.2.3.1.6.4
244
3.2.3.1.6.5
245
3.2.3.1.6.6
246
3.2.3.1.6.7
247
3.2.3.2
248
3.2.3.2.1
249
3.2.3.2.2
250
3.2.3.2.3
251
3.2.3.2.4
252
INSTALACION DE IMPERMEABILIZANTE
DRENAJE
5 das
17,553.60
10 das?
59,347.73
2 das
55,850.26
10 das
72,754.70
10 das?
84,485.81
5 das
36,348.52
5 das
20,158.28
33 das?
52,693.10
792,792.00
4,406,265.64
422,286.36
PEON[200%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton,MOTONIVELADORA 130 - 135 HP,CAMION CISTERNA (3 500 GLNS.),MATERIAL GRANULAR[13,968.76 m3]
867,866.04
1,063,921.72
1,235,470.44
OPERARIO,PEON,CONTROLADOR OFICIAL,CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3,GRAVA 1/2" A 3/4"[18,646.6 m3]
16,641,266.72
3,183,615.96
OPERARIO[68,642%],PEON[68,642%],CONTROLADOR OFICIAL[68,642%],CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3[68,642%],GRAVA 1/2" A 3/4"[48,049.4 m3]
2,236,356.36
346,498.90
17,553.60
59,347.73
55,850.26
72,754.70
84,485.81
OPERARIO[96%],PEON[96%],CONTROLADOR OFICIAL[96%],CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3[96%],GRAVA 1/2" A 3/4"[1,275.12 m3]
36,348.52
20,158.28
52,693.10
1 da?
219.60
219.60
10 das
1,233.05
1,233.05
10 das?
13,036.80
4 das
6,155.20
3.2.3.2.5
4 das
7,048.45
253
3.2.3.2.6
4 das
25,000.00
25,000.00
254
3.2.3.3
28 das?
168,996.02
168,996.02
255
3.2.3.3.1
7 das?
6,157.61
6,157.61
256
3.2.3.3.1.1
4 das?
5,890.00
257
3.2.3.3.1.2
3 das?
267.61
258
3.2.3.3.2
19 das?
112,788.96
259
3.2.3.3.2.1
9 das?
23,307.36
260
3.2.3.3.2.2
5 das
33,945.60
261
3.2.3.3.2.3
5 das
55,536.00
262
3.2.3.3.3
8 das?
42,370.00
263
3.2.3.3.3.1
4 das?
11,856.00
264
3.2.3.3.3.2
4 das?
30,514.00
30,514.00
265
3.2.3.3.4
3 das
5,508.47
5,508.47
266
3.2.3.3.4.1
267
3.2.3.3.5
268
3.2.3.3.5.1
269
3.2.3.3.5.2
270
3.2.3.4
271
3.2.3.4.1
272
3.2.3.4.2
273
MOVIMIENTO DE TIERRAS
PERFILADO Y NIVELACIONES
CEMENTO PORTLAND TIPO I (42.5 kg)[2.16 bol],NIVEL TOPOGRAFICO[2%],ESTACION TOTAL[2%],PINTURA ESMALTE[0.6 gal],PEON[32%],OPERARIO TOPOGRAFO[16%],HORMIGON [0.74 m3],AGUA PUESTA EN OBRA[0.07 m3],C
CAPATAZ[10%],PEON[98%]
13,036.80
6,155.20
7,048.45
OPERARIO[73%],PEON[73%],CONTROLADOR OFICIAL[73%],CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3[73%],GRAVA 1/2" A 3/4"[159.5 m3]
SISTEMA COLECTOR DE GAS[13%]
5,890.00
267.61
112,788.96
23,307.36
33,945.60
OPERARIO[975%],OFICIAL[1,950%],PEON[4,031%],TRACK DRILL NEUMATICO 660-690 PCM[488%],MARTILLO NEUMATICO DE 29 kg[1,950%],COMPRESORA NEUMATICA 700 - 800PCM 240 HP[488%],TRAC
55,536.00
42,370.00
11,856.00
MOTOBOMBA 3" (7 HP)[13%],OFICIAL[13%],PEON[317%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[80%],MOTONIVELADORA 130 - 135 HP[80%],CAMION CISTERNA (3 500 GLNS.)[13%]
PEON[158%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton[80%],MOTONIVELADORA 130 - 135 HP[80%],CAMION CISTERNA (3 500 GLNS.)[80%],MATERIAL GRANULAR[988 m3]
3 das
5,508.47
5,508.47
4 das
2,170.98
2,170.98
2 das
1,240.56
2 das
930.42
930.42
16 das
102,076.28
102,076.28
PLANTA DE ALMACENAMIENTO
3 das
29,661.02
4 das
21,567.80
3.2.3.4.3
FILTRO PERCOLADOR
4 das
21,186.44
274
3.2.3.4.4
5 das
29,661.02
275
150 das
85,822,898.09
85,822,898.09
276
4.1
150 das
85,822,898.09
85,822,898.09
277
4.1.1
20 das
1,275,927.65
278
4.1.1.1
20 das
1,275,927.65
279
4.1.2
150 das
84,406,784.00
280
4.1.2.1
150 das
84,406,784.00
281
4.1.3
60 das
140,186.44
282
4.1.3.1
283
284
5.1
285
5.1.1
286
5.1.2
287
288
6.1
289
6.1.1
290
291
7.1
292
7.1.1
ETAPA DE HABILITACION
293
7.1.2
294
7.1.3
295
7.2
296
7.2.1
297
7.3
298
7.3.1
299
7.3.2
300
7.3.3
301
7.4
302
7.4.1
303
7.4.2
304
7.4.3
CAMPAAS PUBLICITARIAS
305
7.5
306
7.5.1
307
7.6
308
7.6.1
309
7.7
310
7.7.1
311
7.7.2
SEALIZACION
1,275,927.65
1,275,927.65
84,406,784.00
114,360.00
114,360.00
43,100.00
90 das
71,260.00
300 das
46,966.10
46,966.10
300 das
46,966.10
46,966.10
300 das
46,966.10
46,966.10
385 das
324,079.88
324,079.88
95 das
15,677.96
15,677.96
5 das
10,169.49
ETAPA DE OPERACION
50 das
2,966.10
40 das
2,542.37
30 das
11,525.42
PLAN DE CONTINGENCIAS
PLAN DE CONTINGENCIAS
30 das
11,525.42
65 das
13,135.60
ETAPA DE HABILITACION
20 das
2,203.39
ETAPA DE OPERACION
20 das
7,288.14
25 das
3,644.07
195 das
13,559.33
MATERIAL EDUCATIVO
15 das
4,237.29
TALLERES
30 das
5,084.75
150 das
4,237.29
30 das
7,627.12
PLAN DE HIGIENIZACION
PLAN DE HIGIENIZACION
PLAN DE SEGURIDAD HIGIENE Y SALUD OCUPACIONAL
PLAN DE SEGURIDAD HIGIENE Y SALUD OCUPACIONAL
30 das
7,627.12
60 das
22,330.51
60 das
22,330.51
100 das
240,223.94
RELLENO SANITARIO
50 das
228,423.73
RELLENO DE SEGURIDAD
50 das
11,800.21
Tarea
Divisin
Progreso
Hito
90 das
PANTALLA DE TROMMEL[1 und],SEPARADOR MAGENTICO[1 und],PANTALLA VIBRADORA BALISTICO Y VIENTO[1 und],SEPARADOR POR RAYOS INFRAROJOS[1 und],MAQUINA EXTRUSORA RDF[1 und],FAJA TRANSPORTADORA 18"X 50' 150ton/h[1 und]
84,406,784.00
190 das
IMPACTO AMBIENTAL
Proyecto: PROGRAMACION
Fecha: dom 19/06/16
29,661.02
114,360.00
21,186.44
140,186.44
OPERARIO[38%],OFICIAL[75%],CONCRETO PREMEZCLADO[1.5 m3],PERNO HEXAGONAL ROSCA CORRIENTE G-2 6" X 1/2"[6 und],POSTES DE CONCRETO PARA SEALES [3 und],SEALES REGLAM
21,567.80
114,360.00
OPERARIO[50%],OFICIAL,CONCRETO PREMEZCLADO[2 m3],PERNO HEXAGONAL ROSCA CORRIENTE G-2 6" X 1/2"[8 und],POSTES DE CONCRETO PARA SEALES [4 und],SEALES REGLAMENTARIA
29,661.02
60 das
1,240.56
190 das
PEON[199%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton,MOTONIVELADORA 130 - 135 HP,CAMION CISTERNA (3 500 GLNS.),MATERIAL GRANULAR[14,250.86 m3]
892,871.19
18 nov '18
X
PEON[136,534%],CONTROLADOR OFICIAL[68,267%],CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3[68,267%],MOTONIVELADORA 130 - 135 HP[68,267%]
112,788.96
4,529,581.04
27 das?
MOVIMIENTO DE TIERRAS
09 sep '18
M
2,628,271.80
289.91
5 das
OBRAS PRELIMINARES
MOTOBOMBA 3" (7 HP)[63%],OFICIAL[64%],PEON[399%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton,MOTONIVELADORA 130 - 135 HP,CAMION CISTERNA (3 500 GLNS.)[64%]
1,640,307.08
6,334.91
OPERARIO[13,637%],OFICIAL[27,229%],PEON[46,135%],TRACK DRILL NEUMATICO 660-690 PCM[6,818%],MARTILLO NEUMATICO DE 29 kg[27,229%],COMPRESORA NEUMATICA 700 - 800PCM 240 HP[6,818%],TRACTOR DE ORUGAS DE 300-330 HP[4,737%],DINAMITA AL 65%[4,427.5 kg],DETON...
6,045.00
TERCERA ETAPA
515,715.20
6,334.91
01 jul '18
MOTOBOMBA 3" (7 HP)[17%],OFICIAL[17%],PEON[399%],RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton,MOTONIVELADORA 130 - 135 HP,CAMION CISTERNA (3 500 GLNS.)[17%]
10 das
22 abr '18
S
3,558,732.61
15 das
SEALIZACION
11 feb '18
M
CEMENTO PORTLAND TIPO I (42.5 kg)[986.6 bol],NIVEL TOPOGRAFICO[12%],ESTACION TOTAL[12%],PINTURA ESMALTE[274.06 gal],PEON[197%],OPERARIO TOPOGRAFO[99%],HORMIGON [339.83 m3],AGUA PUESTA EN OBRA[32.89 m3],CORDEL[14%],TIZA BOLSA DE 40 kg[1,096.22 und]
264,610.32
170,288.32
03 dic '17
L
OPERARIO[50%],OFICIAL,CONCRETO PREMEZCLADO[2 m3],PERNO HEXAGONAL ROSCA CORRIENTE G-2 6" X 1/2"[8 und],POSTES DE CONCRETO PARA SEALES [4 und],SEALES REGLAMENTARIAS 75 X 75 cm[4 und]
7,048.45
PERFILADO Y NIVELACIONES
24 sep '17
D
OPERARIO[63%],OFICIAL[125%],CONCRETO PREMEZCLADO[2.5 m3],PERNO HEXAGONAL ROSCA CORRIENTE G-2 6" X 1/2"[10 und],POSTES DE CONCRETO PARA SEALES [5 und],SEALES REGLAMENTARIAS 75 X 75 cm[5 und]
170,288.32
MOVIMIENTO DE TIERRAS
10 das
OBRAS PRELIMINARES
2,791.26
57 das?
16 jul '17
140,186.44
43,100.00
71,260.00
10,169.49
2,966.10
5,084.75
TALLERES[1 glb]
4,237.29
7,627.12
7,627.12
Resumen
Tareas externas
Hito externo
Fecha lmite
Pgina 2