OPERATIONAL PROCEDURE
Equipment Type
Equipment Code
SG1
Location
Operation Procedure:
MACHINING NC II
Grind Workpiece
(Complex)
Date Developed:
Document No.
Issued by:
Date Revised
Developed by:
Mark Cecil M. Tano
RITTC
Revision # 01
Page 1 of 18
Template #2
HOUSEKEEPING SCHEDULE
Qualification
MACHINING NC II
Area/Section
In-Charge
Marlito Patunob
ACTIVITIES
Responsible
Person
Lab.
Asst.
Lab. Asst
Station/Bldg
ME LAB
Every
other
Day
Weekly
Every
15th
Day
Trainees
Activity is
done after
using the
area
Lab. Asst
Activity is
done after
using the
area
Janitors
graffiti/dust/rust
cobwebs and
outdated/unnec
essary
objects/items
Remarks
Activity is
done
before and
after
using the
equipment
Trainees
Monthly
obstructions
any used
materials/scraps
(slugs, stubs)
spilled liquid
open cracks
(floor)
4. Clean and check
work shop
ventilation and
illumination by
dusting
lamps/bulbs,
replacing nonfunctional lamps
and keeping
exhaust clean
Lab. Asst
Activity is
done after
using the
area
Janitors
MACHINING NC II
Grind Workpiece
(Complex)
Date Developed:
Document No.
Issued by:
Date Revised
Developed by:
Mark Cecil M. Tano
RITTC
Revision # 01
Page 2 of 18
Lab. Asst
Activity is
done
before and
after
using the
equipment
Trainees
X
Lab. Asst
Activity is
done
before and
after
using the
equipment
Check selector
knobs if in
normal positions
and are
functional
Check if
drainage is OK
7. Clean, check and
maintain Tool Room
Lab. Asst
Activity is
done after
using the
area
With visible
labels/signage
Logbook and
forms are
complete, in
order and
updated
Lights,
ventilation OK
8. Clean and check
Rest Room
Urinals, bowls,
wash basins,
walls and
partitions are
free from stains,
dirt, oils, graffiti
and unnecessary
objects;
Lab. Asst
Activity is
done after
using the
area
Janitors
MACHINING NC II
Grind Workpiece
(Complex)
Date Developed:
Document No.
Issued by:
Date Revised
Developed by:
Mark Cecil M. Tano
RITTC
Revision # 01
Page 3 of 18
Ceilings free
from cobwebs
and dangling
items
Floor is kept dry;
no broken tiles
or protruding
objects
Equipped with
dipper and pails;
properly located
after use
Water systems is
functional: no
dripping/damage
d faucets or
pipes
Drainage system
is working, no
water-clogged
areas
No offensive odor
Lights
/Ventilation
OK
9. Clean and check
wash area:
Walls/Floors-
free from oils,
molds, broken
tiles, gums,
stains or graffiti
Lab. Asst
Activity is
done after
using the
area
Janitors
Drainage system
is functional
Water system
functional; no
dripping faucets
or leaking pipes
Free from
unnecessary
objects (mops,
rags)
10. Disposal of waste
materials
(Follow waste
segregation system)
Lab. Asst
Activity is
done after
using the
area
Trainees
Janitors
MACHINING NC II
Grind Workpiece
(Complex)
Date Developed:
Document No.
Issued by:
Date Revised
Developed by:
Mark Cecil M. Tano
RITTC
Revision # 01
Page 4 of 18
Template #3
YES
NO
YES
NO
YES
NO
MACHINING NC II
Grind Workpiece
(Complex)
Date Developed:
Document No.
Issued by:
Date Revised
Developed by:
Mark Cecil M. Tano
RITTC
Revision # 01
Page 5 of 18
Template #4
SURFACE GRINDING MACHINE MAINTENANCE SCHEDULE*
8 HOURS
MACHINING NC II
Grind Workpiece
(Complex)
50 Hours
100 HOURS
Check
coolant
system
Date Developed:
Document No.
Issued by:
Date Revised
Developed by:
Mark Cecil M. Tano
RITTC
Revision # 01
Page 6 of 18
Template #5
EQUIPMENT MAINTENANCE SCHEDULE
EQUIPMENT TYPE
EQUIPMENT CODE
SG1
LOCATION
ACTIVITIES
1. Check panel
board, and
circuit breakers
electrical
connections,
cables and
outlets
MANPOWER
Daily
Weekly
Every
15th
Day
Monthly
Lab. Asst.
Activity is
done
before and
after using
machine
Lab. Asst.
Activity is
done
before and
after using
machine
Adjust
position and
alignment if
necessary
Inspect part
condition,
replace parts
if necessary
3. Check grinding
wheel condition
Remarks
Clean and
kept dry
Parts are
wellsecured/atta
ched and
Properly
labeled
2. Check wheel
guards and
work rests
Every
Other
Day
Lab. Asst.
Visually
check for
cracks,
replace
wheels if
necessary
Check
wheel face
and
sharpness,
perform
wheel
Activity is
done
before and
after using
machine
X
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Date Revised
Developed by:
Mark Cecil M. Tano
Document No.
Issued by:
RITTC
Revision # 01
Page 7 of 18
dressing if
necessary
4. Oil the
worktable
slides, swivel
table, headstock
and tailstock
spindle, and
wheelhead
Lab. Asst.
Lab. Asst.
6. Check the
coolant system
and replace the
coolant when
necessary
Lab. Asst.
7. Run the
grinding
machine for 2
minutes and
observe for
unusual noise
or abnormal
operation; if
repair is
necessary, send
to technician.
Lab. Asst.
Activity is
done
before and
after using
machine
Activity is
done
before
using
machine
Activity is
done
before
using
machine
X
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Activity is
done
before and
after using
machine
Date Revised
Developed by:
Mark Cecil M. Tano
Document No.
Issued by:
RITTC
Revision # 01
Page 8 of 18
Template #6
NO
In-Charge
Lab. Assistant
INSPECTION ITEMS
Date:
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Date Revised
Developed by:
Mark Cecil M. Tano
Document No.
Issued by:
RITTC
Revision # 01
Page 9 of 18
Template #7
EQUIPMENT MAINTENANCE INSPECTION CHECKLIST
Equipment Type
:
Surface Grinding Machine
Property Code/Number :
SG1
Location
:
Machine Shop Area
YES NO
INSPECTION ITEMS
1. Are the panel board, and circuit breakers,
electrical connections, cables and outlets cleaned
and dry, properly labeled, attached and secured?
2.
Date:
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Date Revised
Developed by:
Mark Cecil M. Tano
Document No.
Issued by:
RITTC
Revision # 01
Page 10 of 18
Template #8
DATE
ISSUED
TYPE
(Danger/Caution)
DESCRIPTION
(System Components,
Test Reference, etc.)
DATE
COMPLETED
2016-003
March
2016
Danger/Worn
belt drive
Lathe Machine
March
2016
2016-004
April
2016
Caution/Cable
with cuts
Welding Machine
May 2016
2016-005
April
2016
Danger/wheel
needs balancing
Pedestal Grinding
Machine
April 2016
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Date Revised
Developed by:
Mark Cecil M. Tano
Document No.
Issued by:
RITTC
Revision # 01
Page 11 of 18
Template #9
WASTE SEGREGATION LIST
Qualification
Machining NC II
Area/Section
In-charge
Lab Assistant
GENERAL / ACCUMULATED
WASTES
WASTE SEGREGATION
METHOD
Recycle
Compose
4. Torn/damaged workshop
aprons
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Dispose
Date Revised
Developed by:
Mark Cecil M. Tano
Document No.
Issued by:
RITTC
Revision # 01
Page 12 of 18
Template #10
WORK REQUEST
Unit No.
SG2
Observation/s:
Date Reported:
Defective motor
Activity:
Date Completed:
Replacement of motor
March 5, 2016
Signature:
Marlito V. Patunob
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Date Revised
Developed by:
Mark Cecil M. Tano
Document No.
Issued by:
RITTC
Revision # 01
Page 13 of 18
Template #11
BREAKDOWN / REPAIR REPORT
Property ID Number
SG2
Property Name
Location
Workshop Area
Findings:
Recommendation:
Defective Motor
Replacement of motor
Inspected by:
Reported to:
Marlito V. Patunob
Date:
Date:
Recommendation:
Replacement of motor
By:
Reported to:
Technician
Marlito V. Patunob
Date:
Date:
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Date Revised
Developed by:
Mark Cecil M. Tano
Document No.
Issued by:
RITTC
Revision # 01
Page 14 of 18
Template #12
SALVAGE REPORT
AREA/SECTION
IN-CHARGE
FACILITY TYPE
Workshop Area
Norben Dela Cerna
PART ID
RECOMMENDATION
Hacksaw blade
Pedestal Grinding
Machine
Motor
Forward to electrical
engineering department as
instructional material
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Date Revised
Developed by:
Mark Cecil M. Tano
Document No.
Issued by:
RITTC
Revision # 01
Page 15 of 18
Template #13
Lathe
Area
L1001
Title
Description PO No.
Bench
Makino
Lathe
Machines
Machines Inc.
Drawing
Ref.
10200
GO
02
1020L
10200
GO
02
1020M
10200
02
1020G
Serial No.
A11556-001
A11556-002
A11556-003
A11556-004
A11556-005
2
Milling
Area
M1002 2
Vertical
Makino
Milling
Machines
Machines Inc.
Serial No.
B1150-001
B1150-002
Grinding
Area
G1003
Surface
Black and
Grinding Decker
Machines Serial No.
GO
M0100-1A
M0100-2A
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Date Revised
Developed by:
Mark Cecil M. Tano
Document No.
Issued by:
RITTC
Revision # 01
Page 16 of 18
Template #14
INSPECTION REPORT
Property ID Number
SG 1 to 3
Property Name
Location
WORKSHOP AREA
Recommendation:
Findings:
All equipment are functional
Inspected by:
Reported to:
Marlito V. Patunob
Date:
Date:
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Date Revised
Developed by:
Mark Cecil M. Tano
Document No.
Issued by:
RITTC
Revision # 01
Page 17 of 18
Template #15
INSPECTION REPORT
Area / Section
Workshop Area
In-charge
FACILITY
TYPE
INCIDENT
ACTION
TAKEN
Requested for
new blades
PROGRESS/
REMARKS
Broken
Hacksaw
blades
Pedestal
Grinder
Motor
Sent to
Overheating technician for
repair
Cannot be
repaired; replace
new motor
Lathe Machine
Torn belt
drive
Requested for
new belts
Replace belts
Vertical Milling
Machine
Table
mechanism
stuck
Requested for
technician
inspection
Date Developed:
MACHINING NC II
Grind Workpiece
(Complex)
Date Revised
Developed by:
Mark Cecil M. Tano
Replace blades
Document No.
Issued by:
RITTC
Revision # 01
Page 18 of 18