Académique Documents
Professionnel Documents
Culture Documents
= 0,0157 e x (A + B - 8e + 1,5 e)
= 0,002 x (A + B - 8e + 2e)
Superficie
Kg
6.07
150
150
0.59
75
15
4.19
100
75
15
0.54
150
50
5.66
150
50
0.49
= 0,00785 e x (A + B - 4e + 0,75e)
50
50
2.24
Superficie
50
50
0.20
= 0,00785 e (D - e )
Peso
50.8
3.54
Superficie
= 0,001 D
50.8
0.16
= 0,00785 e (D + e )
Peso
114.3
6.02
17.86
Superficie
= 0,001 (D + 2e)
50.8
0.18
35
35
Kg
231.89
2.38
350
350
C
-
t
8
8
700
500
A
1000
1000
B
1000
1000
C
-
D
-
0.22
0.0019
Superficie
= 0,0002 x x D/2
AREA (M2)
Pgina 1
A
A
B
A
A
B
Kg
Kg
= 0,00785 x ((D x D) / 4) x
C
C
A
A
Kg
Peso
Kg
Peso
A
A
Kg
100
= 0,00785 e x (A + 2B - 8e + 1,5e)
C
100
B
100
Kg
5
5
39.25
2.02
Kg
B
H
e
t
Estructura Metalica
CUBICACION ESTRUCTURA
Via Wines
OBRA :
1 Tubular A
A
2 Costanera A
A
B
7 Viga
H
B
3 Canal A
A
C
C
8 Planchas A
A
4 Angulo A
A
6 Caera
5 Tubo
B
9 Barras
D
SUPERFICIE
N
Elem.
Tipo
A/H
mm
B mm
Tubular
100
100
Costanera
100
75
Canal
25
25
Angulo
50
50
Tubo
Caeria
Viga
Plancha
Barras Redondas
DESCRIPCIN
C mm
D/t
mm
e mm
L mt
Cant.
Kg / Ml
Kgs Total
M2
Desc.
Total
1.00
6.07
0.00
0.00
0.00
0.00
2.00
4.19
0.00
0.00
0.00
0.00
1.5
4.00
0.83
0.00
0.00
0.00
0.00
5.00
2.24
0.00
0.00
0.00
0.00
50.8
6.00
3.54
0.00
0.00
0.00
0.00
114.3
6.02
7.00
17.86
0.00
0.00
0.00
0.00
700
350
35
8.00
231.89
0.00
0.00
0.00
0.00
1000
1000
9.00
39.25
0.00
0.00
0.00
0.00
10.00
0.22
0.00
0.00
0.00
0.00
190
200
6.5
10
6.00
40.07
1,683.12
49.01
0.00
49.01
200
100
5.6
8.5
6.00
21.39
1,155.04
42.60
0.00
42.60
140
73
4.7
6.9
1.69
36
12.56
764.41
34.23
0.00
34.23
Canal 100x50x2
100
50
1.10
90
3.04
300.64
38.69
0.00
38.69
Angulo 50x50x2
50
50
0.57
135
1.52
116.84
15.19
0.00
15.19
100
100
6.00
14.41
778.12
20.67
0.00
20.67
114.3
6.02
6.00
17.86
750.25
16.67
0.00
16.67
160
82
7.4
6.00
15.23
274.07
11.48
0.00
11.48
48.3
3.68
4.25
4.72
180.44
6.69
0.00
6.69
Pletinas
15
1.50
264.94
397.41
6.89
0.00
6.89
Perneria
20.00
0.62
12.33
0.06
0.00
0.06
Viga 102
870
300
14
32
8.05
239.30
3,852.72
46.88
0.00
46.88
Viga 103
1110
350
16
35
10.00
322.95
6,458.98
71.76
0.00
71.76
Viga 104
810
300
14
32
5.00
232.71
2,327.05
27.92
0.00
27.92
Viga 105
530
260
12
30
7.60
166.73
2,534.36
31.56
0.00
31.56
200
50
22.20
6.83
303.37
26.03
0.00
26.03
30
30
0.67
42
1.30
72.99
6.54
0.00
6.54
30
30
0.46
40
1.30
47.72
4.27
0.00
4.27
Estructura Superior
de Cubierta
Costanera
150x50x15x3
150
50
5.41
18
6.13
596.89
51.28
0.00
51.28
50
50
64.96
2.25
877.65
113.36
0.00
113.36
50
50
6.60
2.25
89.17
11.52
0.00
11.52
Pletinas Rigidas
1500
1500
15
1.50
264.94
397.41
6.89
0.00
6.89
140
73
4.7
6.9
5.66
12.56
142.23
6.37
0.00
6.37
300
100
10
16
5.66
46.16
261.25
5.55
0.00
5.55
120
64
4.4
6.3
6.00
33
10.04
1,987.89
96.47
0.00
96.47
42.4
3.2
6.00
3.09
92.81
4.00
0.00
4.00
100
100
6.00
11.73
211.21
6.95
0.00
6.95
75
75
6.00
8.59
257.82
8.59
0.00
8.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15
Elementos Verticales
1500
1500
10
15
Perdida 5%
Kgs 26,924
Kgs 28,270
M2
M2
768
807
Nota 1: En las Cubicaciones de la Constructora, ellos duplican la cubicacion de Vigas Transversales IPE 200, en sector estructura Voladizo sobre el Lago, debido a que se mencionan en dos Planos
Nota 2: Aparecio un plano nuevo donde indican gran cantidad de Vigas IPE 120 en sector de terrazas, que las incorpore debidamente
Nota 3: La Constructora Definio un global para planchas metalicas de 3.448 kg, en planos no se define m2 de planchas.
Nota 4: Las Caerias ASTM en 4" segn cubicacion de Contratista define cuantia de 96,42 kg/ml, esto se debe revisar, ya que segn catalogo el valor es 16,07 kg/ml
En Definitiva a Criterio se podria redondear el Valor a los 30.000 Kg
Pgina 2 de 2