C.B.
SYSTEM
500KV
VOLTAGE
MANUFACTURER
LOCATION
DATE
"equipment manufacturer"
S/N
SERIAL
TYPE
SERIAL
TEST SUMMERY
1/Visual Inspection 2/CB contact resistance test 3/ CB Timing test
TEST REFERENCES
1/C.B instillation drawing. 2/Factory test report.
VISUAL INSPECTION / MANUAL MECHANICAL INSPECTION
TEST DESCRIPTION
RESULT
Check circuit breaker installation, overall control (circuit wiring, rating plates and
placement).
Check that the earthling wires, risers from the earthling net, are connected
Check the tightness of the bolted connections for both the breaker itself and for the
supporting structure to the right torque
Check SF6 gas filling. If the breaker is not filled with gas, refer to the installation
manual for the detailed instructions.
Make sure that there isnt blocking for the close or trip circuits of the circuit breaker
Check Anti-pumping, the anti-pumping feature prevents the breaker to close and
10 open in continuos action in case where both close and open commands are active all
the time.
PARITES
ELSEWEDY ELECTRIC
NAME
SIGNATURE
DATE
OWNER
CONSULTANT