Vous êtes sur la page 1sur 2

WVA CONSULTING ENGINEERS

Site Inspection Report


The site inspection focuses on the quality and progress of the construction work.

Principal contractor details


Trading name

A & E PROJECTS

Legal name
Business address

35/2907 E-4, Veliyil Building, Thammanam, Ernakulum

Contact person

Roy Antony

Telephone

9446005281

Email

a.anderprojects@gmail.com

Site representative details


Name

Mr. Sreekumar

Position

Site Engineer

Level of involvement in the


project

In charge of the piling operations

Project details
Project name

SCJM Convent & Day Care Centre at Edapally

Scope of work

G + 3 Residential Building

Type of work

Civil

Project reference #

RB-2099

Residential

Commercial

Other
(specify)

Contract duration (in weeks)


Site address

SCJM Convent
Edapally
Cochin

Date of inspection

26/05/2016

Auditor Name

Romy Mohan, Nithin Wilson

Telephone

9745419909

Email

romymohan@gmail.com

Acknowledgement
Romy Mohan, Structural Engineer, acknowledges the cooperation and assistance provided by the staff and
employees of A & E Projects and thanks them for their contribution to this site inspection.

Confidentiality
Information obtained from A & E Projects to assist in the development of this site inspection report will remain
confidential and will only be used for purposes associated with the C Earth Architects and Planners .

Disclaimer and distribution


This report has been prepared by Romy Mohan for the sole purpose of assessing the standard of construction
practices of A & E Projects.
SITE INSPECTION REPORT

Page 1 of 2

WVA CONSULTING ENGINEERS

Summary
Introduction
SCJM Convent and day care centre is a G + 3 building occupying located near Edapally, Cochin. The area of
different floors is as follows:
Ground Floor- 946.83 sqm
Other Floors- 899.25 sqm
Terrace Floor- 138.14 sqm
Two bore holes were taken at the site during soil investigation and both presents nearly consistent N values.
The site is having Clayed Sand and Clayed Silt up to 13.5 metre. Thereafter fine silty sand with clay is present
up to 17 metre. After 17 metre very fine silty sand with N value greater than 50 is available. Based on the
available soil test report, bored cast in situ DMC piles resting in hard rock is recommended for the above
building.

Inspection procedure
This inspection was conducted in accordance with the standard procedures. The findings in the inspection are
summarized below:-

Findings
The key findings are summarised below: Out of total 75 piles, 22 were casted in the site at the time of inspection.
Depth of piles varies in the range of 17 metres to 21 metres at site.
All the piles are embedded into hard rock by minimum of 50cm
Grade of concrete used is of M35 and Reinforcing Steel is of Fe 500.
Clear cover of 75mm is provided all around for all piles.
Materials used for construction is of approved quality.
Rock samples are inspected and are found to be satisfactory.

Conclusion
From the information made available during the site inspection, the contractor has been found conform to the
required standards.

SITE INSPECTION REPORT

Page 2 of 2

Vous aimerez peut-être aussi