Académique Documents
Professionnel Documents
Culture Documents
Table of Contents
Table of Contents______________________________________________________________ 2
1
Introduction ______________________________________________________________ 3
1.1
Log in ___________________________________________ 4
2.1.1
Transactions ______________________________________________________________ 6
3.1
Reports ____________________________________________________________________ 9
4.1
Hard Ceiling______________________________________________________________ 10
5.1
Transaction ______________________________________ 10
Page 2 of 11
Introduction
1.1
Through OSBP, the details in the forms mentioned and on the other forms required to
be submitted to DBM are now encoded online.
Page 3 of 11
Getting Started
2.1
Log in
2.1.1
1.
2.
3.
To log in:
Use any type of browser and type this URL : osbp1.dbm.gov.ph
The Online Submission of Budget Proposal login page (Figure 1) is displayed.
In the login page, enter a valid User ID and Password.
Note:
Click
button or hit Enter key to confirm login. On successful login, the
Online Submission of Budget Proposal home page will be displayed.
Page 4 of 11
Note : On the initial login, the user is required to change the default password.
The default password is the same as the username. The Change Password
Page is shown below :
In case of login failure, contact the DBM Budget Specialist and verify if
the user account is correctly enrolled to OSBP.
Page 5 of 11
Transactions
3.1
Actual Obligation
To access this module, go to Actual Obligation link under BP Form
201. The Search page on top of the transaction will be displayed as
shown below :
To change the coverage, select the desired values from the dropdown listbox of each
field on the Search page , then click the Search button.
Page 6 of 11
Actual Obligation data will be loaded as shown below. This page displays the ff.
components :
Program/Project/Activity (P/P/A)
UACS Code of the specific Program/Project/Activity
Personnel Service (PS)
Maintenance and Other Operating Expenses (MOOE)
Capital Outlays(CO)
Financial Expenses (FinEx)
To edit PS component, click the underlined amount under PS column of the particular
P/P/A
To edit MOOE component, click the underlined amount under MOOE column of the
particular P/P/A
To edit CO component, click the underlined amount under CO column of the particular
P/P/A
To edit FinEx component, click the underlined amount under FinEx column of the
particular P/P/A
To view the current changes made, click
OSBP Users Manual ver. 2015-1
February 16, 2015
button
Page 7 of 11
When editing whether PS, MOOE, CO or FinEx, after clicking the underlined amount, the
page will be redirected to the SubObject page. This page contains all the existing
subobjects of the selected allotment class in the GAA of a particular budget year as its
default.
the desired subobject is not existing on the current page displayed, select the
button
button
button
Page 8 of 11
Reports
4.1
Page 9 of 11
Hard Ceilimg
5.1
Transaction
This module is the data-entry facility provided for DBM Specialists
to encode the hard ceiling of each allotment class
(PS/MOOE/CO/FinEx) for a particular Program/Project/Activity
(P/P/A).
Note : Agency users has View-Only access to this module
To access this module, click the Other Forms menu. Under this is the Hard Budget
Ceiling as shown above.
To change the coverage, select the desired values from the dropdown listbox of each
field on the Search page , then click the Search button.
The list of Programs/Projects/Activities will be displayed as shown below.
Page 10 of 11
To edit PS component, click the displayed amount under PS column of the particular
P/P/A
To edit MOOE component, click the displayed amount under MOOE column of the
particular P/P/A
To edit CO component, click the displayed amount under CO column of the particular
P/P/A
To edit FinEx component, click the displayed amount under FinEx column of the
particular P/P/A
button
button
button
Page 11 of 11