Académique Documents
Professionnel Documents
Culture Documents
Reviewed By
Approved By
Controlled Copy
Table of Contents
1.0
Background 3
2.0
3.0
Escalation Matrix
4.0
Project Communication
5.0
Change Request
6.0
7.0
8.0
Comments
9.0
Approvals/ Signoff 10
10.0
Change Log 11
10
Controlled Copy
Prepared By
Date Prepared
S.Krishnaswamy
December-2012
Priority
High
1.0 Background
.
CTS
Ensure robust project management, quick issue escalation and resolution as required
Participate in Executive Management discussions and ensure that the group is kept
informed about engagement progress and outstanding issues
Risk Management
Controlled Copy
CTS
CTS
Escalation Matrix
Sanmar
CTS
Level
Controlled Copy
To
Sanmar
Steering
Committee
Project Manager
Responsibility
Project Team
Controlled Copy
Roles
Responsibilities
8.0 Comments
Comments
Controlled Copy
Signature
Signature
Name
Name
Position
Position
Date
Date
Controlled Copy
10.0Change Log
Please note that this table needs to be maintained even if separate Change item status log
is maintained in the tool / document and the version history needs to be given here. But
reference can be given to details of the changes if it is not given here.
Version
Number
V1.0
V1.1
Changes Made
Initial baseline created on <DD Month YYYY> by <Name of Author>
<Please refer the configuration control tool / change item status form if the
details of changes are maintained separately if not the template given below
needs to be followed>
Page
Changed
Effective
Changes Effected
No.
By
Date