Contents of the course

1.0 Installation Preparation


2.0 Cabinet Installation
3.0 Equipment Assembly
4.0 Laying & Connecting External Cable

2007, ZTE Corporation. All rights reserved.

1. Installation Preparation
n

Confidential?

1.1 Tools & Instruments Preparation

Measuring Tape

Diagonal Pliers

Screwdrivers

Adjustable Wrench

Wire Stripper

2007, ZTE Corporation. All rights reserved.

Confidential?

1. Installation Preparation
n

1.1 Tools & Instruments Preparation

Knife
Pliers

Crimping Pliers

Sharp Nose Pliers

2007, ZTE Corporation. All rights reserved.

Installation Preparation
n

Confidential?

1.1 Tools & Instruments Preparation

Meter For
Environment
Monitoring

Digital Multimeter

Optical Power
Meter

2007, ZTE Corporation. All rights reserved.

Installation Preparation
n

Confidential?

1.2 Technical Document Preparation


> Please ensure to bring the below documents for guideline :
a. TSSR Report .
b. Installation Quality Guideline
c. Labeling Guideline For IP RAN
d. IP RAN Quality Checklist

1.3 Material Inspection


> Before installation, please ensure the receive material comply the below
requirement :
a. Correct Material Type & Quantity according to Delivery Note.
b. Material in good condition.

2007, ZTE Corporation. All rights reserved.

Confidential?

Installation Preparation
n

1.4 Building Environment Inspection


(Cleanness, Temperature, Humidity etc).

Inspection Criteria

No apparent water trace on the floor,


walls or ceiling of the equipment
room or on any indoor article.
The air conditioner shall working
normally.
Before installing the equipment, the
civil engineering and decoration of
the equipment room should be
completed.
In the equipment room or nearby,
there is a fire-fighting equipment
that located within its validity period.

Photo 1. Water trace

2007, ZTE Corporation. All rights reserved.

Confidential?

Installation Preparation
n

1.4 Building Environment Inspection


(Cleanness, Temperature, Humidity etc).

Inspection Criteria

The equipment room, including the


floor, should be cleaned, and no
evident dust can be felt by hand on
any device.
There are no sundries (installation
materials irrelevant to operation,
like cartons or remnant cables or
wastes left after construction.

Photo 2. Cable tie on the floor

2007, ZTE Corporation. All rights reserved.

Confidential?

Installation Preparation
n

1.4 Building Environment Inspection


(Cleanness, Temperature, Humidity etc).

Inspection Criteria

The door and windows of the


equipment room, as well as the
cable-through holes leading outside,
should be sealed properly.

The equipment room is not allowed


to store flammable, explosive,
corrosive, or heat producing object
(such as paint, gasoline, and
electric cooker).

Photo 3. Water leakage from


improper seal hole

2007, ZTE Corporation. All rights reserved.

Confidential?

Installation Preparation
n

1.4 Building Environment Inspection


(Cleanness, Temperature, Humidity etc).

Anticorrosive
treatment
should be
taken for
any
grounding
terminal
outdoor.

2007, ZTE Corporation. All rights reserved.

Installation Preparation
n

Confidential?

1.5 Equipment Power Supply Inspection

Please check the voltage is enough/correct before we connect the power


cable to the ZXCTN 6300.
The breaker at Rectifier (existing or new) shall be at minimum value of 16A.

2007, ZTE Corporation. All rights reserved.

Confidential?

Installation Preparation
n

1.6 Grounding Requirement


When the user equipment provide only one grounding busbar, the cable
connection as per below diagram.

2007, ZTE Corporation. All rights reserved.

Installation Preparation
n

Confidential?

1.6 Grounding Requirement


When the user equipment provide Working Ground Brass Bar & Protection
Ground Brass bar, the cable connection as per below diagram.

2007, ZTE Corporation. All rights reserved.

Confidential?

Installation Preparation
n

1.7 Unpacking Material


Unload the equipment carefully & do not expose the equipment to direct
sunshine or rain.
Check if the goods are complete & meet the order requirement accordingly to
the order/contract & delivery note.
Lay down the wooden case horizontally before opening.
Handle the equipment with care & make sure that the coating of the
equipment is not damaged.
Use a curved claw hammer to lift along the edge of upper cover board.
Handle the equipment with care & make sure that the coating of the
equipment is not damaged.
The wooden packing case of ZXCTN 6300 is shown in Figure 1.

2007, ZTE Corporation. All rights reserved.

Installation Preparation
n

Confidential?

1.7 Unpacking Material (Cabinet)

2007, ZTE Corporation. All rights reserved.

Installation Preparation
n

Confidential?

1.7 Unpacking Material (Sub rack)

2007, ZTE Corporation. All rights reserved.

Confidential?

2. Cabinet Installation
n

2.1 Installation Mode

Installation Mode

Direct Installation

- Install at concrete ground

Installation on Base

- Install on raised floor

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.1.1 Installation Overview

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.1.1 Preparing Installation Accessories

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.1.1 Preparing Installation Accessories

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.1.1 Preparing Installation Accessories

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.1.1 Preparing Installation Accessories

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.2 Installation Preparation.


The arrangement, installation position, direction of cabinet should meet the
requirement mentioned in the engineering design drawing.
In case of installation with no feet, below are the steps :
a. Unscrew the four feet from the bottom of the cabinet.
b. Place the marking template at the place where the cabinet to be installed.
c. Mark the positions of the mounting holes & ensure the holes size
are correct.

Remarks : The marking template is a template that shipped with ZXCTN


6300 equipment marking & it has the same size as equipment base.

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.2 Installation Preparation.

Figure 2. The Marking Template of Cabinet (unit :mm)

2007, ZTE Corporation. All rights reserved.

Confidential?

2. Cabinet Installation
n

2.3 Installation Requirement.


The cabinet should be installed upright and firm. The vertical/horizontal
deviation should not exceed 0.1% of cabinet height.
The vertical distance between top cabling through & cabinet top should not be
less than 200mm.
All fastening components should be completed & firmly assembled.
When the cabinet arranged side by side, the space/gap among the cabinet
should be even & not greater than 3mm.

Warning !

Drilling holes on the cabinet without permission is forbidden as it


will damage the cabling inside & cause short circuit in the circuit
board.

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.4 Dismounting Cabinet Front Door.


Open the front door to about 90 angle.
Remove the ground cable from the grounding terminal on the bottom of the front door.
Hold the front door, pull the upper & lower door pivots off the pivot sleeve on the cabinet.
Turn the door pivot until they are locked to the pivot baffle.
Hold the front door & slant it outward slowly.

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.4 Dismounting Cabinet Front Door.

2007, ZTE Corporation. All rights reserved.

Confidential?

2. Cabinet Installation
n

2.4 Dismounting Cabinet Back Door.


Use screwdriver to remove the fastening screw on the cabinet back door.
Hold the back door, and slant it outward slowly.
Hold it from both sides & lift it to separate the alignment hole at the bottom door from
the alignment pin.

2007, ZTE Corporation. All rights reserved.

Confidential?

2. Cabinet Installation
n

2.5 Installing Cabinet.

2.5.1 Installing Cabinet on Concrete Ground (without legs)

** Pre-requisites
Before placing the cabinet, please remove 4 legs located at the bottom cabinet.
Steps :
Mark the position of mounting holes using the marking template.
Remove the marking template & drill four 16mm with depth 75mm.
Clean the floor & place 2 horizontal insulating washer on front/back or left/right hole.
Make sure the hole of insulating washer align with the hole at concrete ground.
Insert 4 expansion bolts (M12*100) into the hole insulating washer.
Move the cabinet to the installation position, and align the mounting holes on the
cabinet with expansion bolts.
Place a flat washer, spring washer & nut on each expansion bolt.
Adjust the cabinet position, then fasten the nuts to fix the cabinet on the concrete
ground.
Figure XX shows illustrate the installation cabinet on the concrete ground without legs

2007, ZTE Corporation. All rights reserved.

Confidential?

2. Cabinet Installation
n

2.5.1 Installing Cabinet on Concrete Ground (without legs)

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.5.2 Installing Cabinet on Concrete Ground (with legs)

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.5.2 Installing Cabinet on Concrete Ground (with legs)

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.5.2 Installing Cabinet on Concrete Ground (with legs)

2007, ZTE Corporation. All rights reserved.

Confidential?

2. Cabinet Installation
n

2.5.3 Installing Cabinet on Raised Floor (with Fixed Base)

2007, ZTE Corporation. All rights reserved.

Confidential?

2. Cabinet Installation
n

2.5.3 Installing Cabinet on Raised Floor (with Fixed Base)

2007, ZTE Corporation. All rights reserved.

Confidential?

2. Cabinet Installation
n

2.5.3 Installing Cabinet on Raised Floor (with Fixed Base)

2007, ZTE Corporation. All rights reserved.

Confidential?

2. Cabinet Installation
n

2.5.3 Installing Cabinet on Raised Floor (with Fixed Base)

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.5.3 Installing Cabinet on Raised Floor (with Adjustable Base)

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.5.3 Installing Cabinet on Raised Floor (with Adjustable Base)

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.5.3 Installing Cabinet on Raised Floor (with Adjustable Base)

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.5.3 Installing Cabinet on Raised Floor (with Adjustable Base)

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.5.3 Installing Cabinet on Raised Floor (with Adjustable Base)

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.5.3 Installing Cabinet on Raised Floor (with Adjustable Base)

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

2.6 Mounting Cabinet Doors

2.6.1 Mounting Front Cabinet Doors

Confidential?

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.6.1 Mounting Front Cabinet Doors

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.6.2 Mounting Back Cabinet Doors

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.6.2 Mounting Back Cabinet Doors

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.7 Fixing Cabinet

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.7 Fixing Cabinet

2007, ZTE Corporation. All rights reserved.

2. Cabinet Installation
n

Confidential?

2.7 Fixing Cabinet

2007, ZTE Corporation. All rights reserved.

3. Equipment Assembly
n

Confidential?

3.1 Installation Connection

2007, ZTE Corporation. All rights reserved.

3. Equipment Assembly
n

Confidential?

3.2 Installation Power Distribution Unit

2007, ZTE Corporation. All rights reserved.

3. Equipment Assembly
n

Confidential?

3.3 Installation Of Sub rack

2007, ZTE Corporation. All rights reserved.

3. Equipment Assembly
n

Confidential?

3.4 Installation Of Sub rack

2007, ZTE Corporation. All rights reserved.

3. Equipment Assembly
n

Confidential?

3.5 Installation Of Fan Unit

2007, ZTE Corporation. All rights reserved.

3. Equipment Assembly
n

Confidential?

3.6 Installation Of Antistatic Wrist Strap

2007, ZTE Corporation. All rights reserved.

3. Equipment Assembly
n

Confidential?

3.7 Installation Of Power Card

2007, ZTE Corporation. All rights reserved.

3. Equipment Assembly
n

Confidential?

3.8 Slot Layout

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.1 Sub rack Protection Ground Cable

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.1 Sub rack Protection Ground Cable

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.2 Sub rack DC Power Cable

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.2 Sub rack DC Power Cable

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.3 Alarm Cable

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.4 Cable Labeling & Laying (Power Cable)

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.5 Cable Labeling & Laying (Cable at SLOT , SL)

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.6 Cable Labeling & Laying (Cable at Patch Panel)

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.7 Cable Labeling & Laying (10 GE Cable)

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

!!

Confidential?

4.8 Labeling Photo (RJ45 Cable)


(A) To use label with height 12mm

(A)

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.8 Labeling Photo (10 GE Cable)

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.8 Labeling Photo (10 GE Cable)

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.8 Labeling Photo (Power & Ground Cable)

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.9 Labeling Photo (Label Marking Sticker)

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.10 Cable Layout & Binding

2007, ZTE Corporation. All rights reserved.

4. Laying & Connecting External Cable


n

Confidential?

4.10 Cable Layout & Binding

2007, ZTE Corporation. All rights reserved.

Confidential?

4. Cable Layout & Labeling


4.11 Cable at Sub rack (RJ45)
The cable bundles at same direction should be bound together
smoothly without any crisscross.
The cables and jumpers should be arranged straightly, bundled tightly
in proper tightness.

Photo 12.

IP RAN INSTALLATION QUALITY GUIDELINE for


7
2007, ZTE Corporation. All rights reserved.
DiGi PROJECT
6

Confidential?

4. Cable Layout & Labeling


4.11 Cable at Sub rack (RJ45)
The label should follow DIGI standard guidelines.

Photo 13.

IP RAN INSTALLATION QUALITY GUIDELINE for


7
2007, ZTE Corporation. All rights reserved.
DiGi PROJECT
7

Confidential?

4. Cable Layout & Labeling


4.12 Cable at Patch Panel
The cable bundles at same direction should be bound together
smoothly without any crisscross.
The cables and jumpers should be arranged straightly, bundled tightly
in proper tightness.
No Cable Tray to
Support Lan cable
at Patch Panel

Photo 17.
IP RAN INSTALLATION QUALITY GUIDELINE for
7
2007, ZTE Corporation. All rights reserved.
DiGi PROJECT
8

Confidential?

4. Cable Layout & Labeling


4.12 Cable at Patch Panel
The label should follow DIGI standard guidelines.

Photo 18.

IP RAN INSTALLATION QUALITY GUIDELINE for


7
2007, ZTE Corporation. All rights reserved.
DiGi PROJECT
9

Confidential?

Finding From IP RAN Acceptance with Digi


Digi Proposal: To add cable Protection tray to support the
LAN cable.

Cable tray to
support LAN Cable
at Patch Panel

2007, ZTE Corporation. All rights reserved.

Confidential?

5. Cleanliness
5.1 Cleanness After Installation
There shall be no installation material/rubbish left inside the
cabinet rack or cabin after the installation done.
Bad Sample

Photo 20.

Good Sample

Photo 21.

IP RAN INSTALLATION QUALITY GUIDELINE for


8
2007, ZTE Corporation. All rights reserved.
DiGi PROJECT
1

Room cleanness

Confidential?

IP RAN INSTALLATION 8
QUALITY GUIDELINE for2
DiGi PROJECT

2007, ZTE Corporation. All rights reserved.

Confidential?

Safety Equipments

IP RAN INSTALLATION 8
QUALITY GUIDELINE for3
DiGi PROJECT

2007, ZTE Corporation. All rights reserved.

Confidential?

Thanks

IP RAN INSTALLATION 8
QUALITY GUIDELINE for4
DiGi PROJECT

2007, ZTE Corporation. All rights reserved.

Vous aimerez peut-être aussi