Vous êtes sur la page 1sur 2

DSR Report

SAMPLE INFORMATION
Sample Name:
Operator:
Project:
Notes:

PEN 60/70 SETIEMBRE


WHP

File Name:
Time and Date:

C:\ProgramData\TA Instruments\TRIOS\Data\PEN 6070 SETIEMBRE.tri


08/09/2015 03:29:39 p.m.

REFINERIA CONCHAN - PETROPERU


Lote Setiembre

DSR/TEST SPECIFICATIONS
Manufacturer:
Model:
Bearing Type:
Temperature Control:
Test:
Geometry Diameter:
Gap:

TA Instruments
DHR-2
Air
UHP
Original Binder
25.00 mm
1000 m

RESULTS
Angular Freq. Temp. Osc. Stress
rad/s
C
Pa
1
10.0
52.0
0.83

% Strain

Delta
degrees
12.1
78.9

G*
kPa
6.85

G*/sin(delta) Pass/Fail
kPa
6.98
Pass

10.0

58.0

0.35

12.0

81.5

2.95

2.98

Pass

10.0

64.0

0.16

12.0

83.8

1.32

1.33

Pass

10.0

70.0

0.08

12.0

85.5

0.632

0.634

Fail

Page | 1

DSR Report, con nued

FAIL GRAPH
Sample Name:
File Name:
Fail Temperature:

Page | 2

PEN 60/70 SETIEMBRE


C:\ProgramData\TA Instruments\TRIOS\Data\PEN 6070 SETIEMBRE.tri
66.4 C

Vous aimerez peut-être aussi