EQUIPMENT DATASHEET (EDS)

PROJECT :
SUBJECT :

PLTM CIBERANG 2 X 2.9 MW


TURBIN & GENERATOR

WBS : GENERAL

LOCATION :
BOGOR
REV :
B
PAGE :

2
Rev
No.

PURCHASER INFO

NO

1 GENERAL
2

The purpose of small hydropower plant with type horizontal francis, with use main expose penstock and branch
become 2 line to powerhouse

3 DESIGN PARAMETER :
4
Normal Water Level (MDDL)

610.00

msl

Flood Rate Level (FRL)

615.00

msl

Rated Discharge (Qr)

2.90

m3/s

Gravity (g)

9.77

m/s2

Water Density ( )

998.00

kg/m3

Power Plant Efficiency (estimated) ()

90.00

10

Turbin center level (TCL)

490.00

msl

11

Generation Voltage

6.60

KV

12

Rated Frequency

50.00

Hz

13

Power factor

0.80

lag

14

Losses

5 -6

15

ID Penstock Tunnel before MIV (L)

0.80

16

Type of turbine

Horizontal Francis

18

Unit No.

19

Estimate Rated power Output/perunit

2.9

MW

(vendor to confirm)

20

No. of poles Generator

12

unit

(vendor to confirm)

21

Syncronous Speed

500

rpm

(vendor to confirm)

22

Type of inlet valve

Butterfly

(vendor to confirm)

(vendor to confirm)

23

ENG. NAME

SIGNATURE

DATE

APPROVED BY :

SIGNATURE

DATE

REVIEWER

SIGNATURE

DATE

SBR

DOC. PAGE NO. :

EQUIPMENT DATASHEET (EDS)


PROJECT : PLTM CIBERANG 2 X 2.9 MW WBS : GENERAL
LOCATION :
BOGOR
SUBJECT :
TURBIN & GENERATOR
REV :
B
PAGE :
NO
SUPPLIER INFO (VENDOR TO CONFIRM)
1 GENERAL
2 Supplier
(vendor to confirm)
3 Manufacturer / Model No. / Designation
(vendor to confirm)
4
5 TURBINE SPESIFICATION
6 Dimension
(vendor to confirm)
7 Material each component
(vendor to confirm)
8 Surface protection
(vendor to confirm)
9 Engineering design data supporting
(vendor to confirm)
10
11 GENERATOR SPESIFICATION
12 Dimension
(vendor to confirm)
13 Material each component
(vendor to confirm)
14 Surface protection
(vendor to confirm)
15 Engineering design data supporting
(vendor to confirm)
16
17 AUTOMATION & INSTRUMENTATION FOR TURBINE & GENERATOR
18 Location of isolation points
(vendor to confirm)
19 Control Panel IP Rating
(vendor to confirm)
20 Controller IP Rating
(vendor to confirm)
21 Control Power
(vendor to confirm)
22 Load cell maximum weight
(vendor to confirm)
23 Load cell readout size and location
(vendor to confirm)
24
25 GOVERNOUR SET & SPESIFICATION
26 Dimension
(vendor to confirm)
27 Material each component
(vendor to confirm)
28 Surface protection
(vendor to confirm)
29 Engineering design data supporting
(vendor to confirm)
30
31 MIV SET & SPESIFICATION
32 Dimension
(vendor to confirm)
33 Material each component
(vendor to confirm)
34 Surface protection
(vendor to confirm)
35 Engineering design data supporting
(vendor to confirm)
36
37 EXCITATION SYSTEM & SPESIFICATION
38 Dimension
(vendor to confirm)
39 Material each component
(vendor to confirm)
40 Surface protection
(vendor to confirm)
41 Engineering design data supporting
(vendor to confirm)
42
43 Drawing General Assembly
(vendor to confirm)
44 Estimating weight for all main part
(vendor to confirm)
45
46
47
48
49
50
51
52
53
54
55

/ 2
Rev No.