GREENFIELD DEVELOPMENT CORPORATION

TECHNICAL SERVICES DEPARTMENT

BID BREAKDOWN FORM

PROJECT : SUPPLY & INSTALLATION: PLUMBING/SANITARY WORKS FOR SOHO CENTRAL PHASE 1
LOCATION : Mayflower corner Shaw Blvd., Mandaluyong City
REF. CODE : CHARGE TO :
DATE :

Item Unit Cost Total Unit Total


Item Description Qty Unit
No. Material Labor Equipment Cost Cost

I Preliminaries & General Requirements ###

Bonds, Permit, Plans


1. Performance/Guarantee/DP Bond lot
2. Construction Permit lot
3. As-built Plans, Shop Drawings lot

Temporary Facilities
1. Power mos.
2. Water mos.
3. Telecommunications mos.

Mobilization / Demobilization lot ###

Site Management; PE mos.

II Plumbing/Sanitary Works

1. SEWER, WASTE and VENT LINES, using PVC Pipe MOLDEX-


SANIMOLD" brand or approved equal. Include all required
fittings, 10mm.Ø hanger rod at every 1.00M., supports and fixing
to.
50mm Ø lm
75mm.Ø lm
100mm Ø lm
150mm Ø lm
200mm Ø lm

2. VENT LINES, using PVC pipe Series 600 "NELTEX-


SANIGUARD" brand or approved equal. Include all required
fittings, 10mm.Ø hanger rod at every 1.00M., supports and fixing
to..

50mm Ø lm
75mm.Ø lm
100mm Ø lm

3. CONDENSATE WASTE DRAIN LINES, sing PVC Pipe


MOLDEX-SANIMOLD" brand or approved equal. Provide 12mm.
Thk. POLYOLEFIN Rubber Insulation 'XCELLON" brand of
approved equal. Include all required fittings, 10mm.Ø hanger rod
at every 1.00M., supports and fixing to.

50mm. Ø lm
75mm. Ø lm
100mm. Ø lm

4. BRASS FLOOR DRAINS, using Unilex brand


50mm. Ø Floor Drain (Model U-623) pc
75mm. Ø Floor Drain (Model U-623) pc

5.

50mm. Ø pc
75mm. Ø pc
100mm. Ø pc

6. PVC CEILING CLEANOUTS, using "NELTEX" brand or


approved equal.
100mm Ø pc
150mm Ø pc

1 of 4 GDC-PDG-TSD
GREENFIELD DEVELOPMENT CORPORATION
TECHNICAL SERVICES DEPARTMENT

BID BREAKDOWN FORM

PROJECT : SUPPLY & INSTALLATION: PLUMBING/SANITARY WORKS FOR SOHO CENTRAL PHASE 1
LOCATION : Mayflower corner Shaw Blvd., Mandaluyong City
REF. CODE : CHARGE TO :
DATE :

Item Unit Cost Total Unit Total


Item Description Qty Unit
No. Material Labor Equipment Cost Cost
7. COLD WATER LINES, using polypropylene pipe (PPR) PN20
"MOLDEX" brand or approved equal. Include all required fittings,
10mm.Ø hanger rod at every 1.20M., supports and fixing to.

15mm. Ø lm
20mm. Ø lm
25mm. Ø lm
32mm. Ø lm
40mm. Ø lm
50mm. Ø lm
65mm. Ø lm
75mm. Ø lm
100mm. Ø lm

8. GATE VALVE, using Kitz, Tozen brand


15mm. Ø pc
20mm. Ø pc
25mm. Ø pc
32mm. Ø pc
40mm. Ø pc
50mm. Ø pc
65mm. Ø pc
75mm. Ø pc
100mm. Ø pc

9. CHECK VALVE, for Booster Pump using Kitz, Tozen brand


32mm. Ø pc

10. NON-SLAM CHECK VALVE, for Transfer Pump using Bermad


brand
100mm. Ø pc

11. WATER METER, using ARAD brand


20mm. Ø pc
25mm. Ø pc
50mm. Ø pc

12. HOSE BIBB for AHU and Janitorial room


15mm. Ø pc

13.
STAINLESS STEEL GREASE TANK, supply and installation to
1.00 set
include all piping and accessories.(see attached specifications)

14. STAINLESS STEEL ELEVATED WATER TANK, supply and


installation to include piping and accessories. 5000 Gallons (see 1.00 set
attached specifications)

15.
PLUMBING EQUIPMENTS, supply and installation to include
controller, foundation, wirings (from pumps to controller and to
power source) and accessories (see attached specifications)

Transfer Pumps 85 GPM, 170 FT TDH set


Booster Pump 20 GPM 50 FT TDH set
Stainless Steel Pressure Tank set

16.
Metal works, brackets, sway braces, supports, ladder rungs, etc.
lot

17. MISCELLANEOUS MATERIALS necessary to complete the


lot
installation.
lot
18. TESTING & COMMISSIONING

2 of 4 GDC-PDG-TSD
GREENFIELD DEVELOPMENT CORPORATION
TECHNICAL SERVICES DEPARTMENT

BID BREAKDOWN FORM

PROJECT : SUPPLY & INSTALLATION: PLUMBING/SANITARY WORKS FOR SOHO CENTRAL PHASE 1
LOCATION : Mayflower corner Shaw Blvd., Mandaluyong City
REF. CODE : CHARGE TO :
DATE :

Item Unit Cost Total Unit Total


Item Description Qty Unit
No. Material Labor Equipment Cost Cost

VII Other Costs (if any, to be filled up by supplier)

1. -
2. -
3. -
4. -
5.
6.
7.
8.

TOTAL DIRECT COST

Note: 1. Scope of supply and installation shall include all necessary accessories to complete the installation of the Plumbing/Sanitary
System as per designed.
2. Verify all actual dimensions before fabrication.
3. Submit your pump brochures including pump performace curve, and controller specification with complete diagrams
2 days before the Bidding event.
4. All participating Bidders must use this Bid Breakdown Form. Your own Company proposals only serve
as attachments to this Bid Breakdown Form.
5. All E-Bids/Paper Bids must be VAT inclusive.

Project Duration (# of calendar days to complete the requirements) :


Proposed Date of Delivery :
Installation Duration (# of calendar days) :
Warranty :
Validity of Offer :

Submitted by :
Company Name :
Authorized Representative :
Signature :
Title / Position :
Date :

3 of 4 GDC-PDG-TSD
GREENFIELD DEVELOPMENT CORPORATION CONTRACTED
TECHNICAL SERVICES DEPARTMENT

COST ESTIMATE SUMMARY

PROJECT : PROPOSED GREENFIELD BOOTH


LOCATION : Paseo de Sta. Rosa, Greenfield City, Sta. Rosa, Laguna
REF. CODE : CHARGE TO:
DATE : June 23, 2008

ITEM TOTAL COST (PHP) TOTAL COST


SCOPE OF WORK
NO. MATERIAL LABOR EQUIPMENT PHP

A. DIRECT COST #VALUE! #VALUE! #VALUE! #REF!

I. PRELIMINARIES & GENERAL REQUIREMENTS #VALUE! #VALUE! #VALUE! -


II. SITE PREPARATION #REF! #REF! #REF! #REF!
III. MAIN PLATFORM - - - -
IV. FURNITURE #REF! #REF! #REF! #REF!
V. JOINERY - - - -

B. INDIRECT COST #VALUE! #VALUE! #VALUE! #VALUE!

I. CONTRACTOR'S PROFIT (10%) #VALUE! #VALUE! #VALUE! #VALUE!


II. CONTINGENCIES (5%) #VALUE! #VALUE! #VALUE! #VALUE!
III. ARCHITECTURAL AND ENGINEERING FEE (3.0%) #VALUE! #VALUE! #VALUE! #VALUE!
IV. CONSTRUCTION MANAGEMENT FEE #VALUE! #VALUE! #VALUE! #VALUE!
V. ADMINISTRATION COST #VALUE! #VALUE! #VALUE! #VALUE!
VI. LABOR CHARGES - - - -
VII. ECC PERMITS ACQUISITION - -
VIII. APPLICATION FOR POWER (Transformer Upgrading) - -
IX. V.A.T. (12%) credited #VALUE! #VALUE! #VALUE!

C. TOTAL PROJECT COST (A+B) #VALUE! #VALUE! #VALUE! #REF!


Rate/m2 (at 57.44 m2) #REF!
Note: 1. Construction of Main Platform with plywood backing; Homogenous Floor Tile Finish.
2. Fabrication of 8 - Graphic Displayers.
3. Fabrication of 1 - Accent Wall with LCD Monitor.
4. Fabrication of 2 - Accent Walls with Graphic Displayer.
5. Fabrication of 1 - Graphic Wall Displayer.
6. Fabrication of 1 - Site Model Stand with Clear Glass Cover.
7. Includes LCD Monitor.
8. Includes 4 Chairs, 2 Tables, and 1 Ottoman.
9. Provided with 5 - Floor Mounted Pop-Up convenience Double Receptacles and 6 - Vertical Mounted Double Receptacles.
10. Includes Perimeter Strip Lighting T5.

Prepared by: Noted by: Approved by:

Francis D. R. Valenzuela Renato E. Rafon Ronnie Juan A. Del Rosario


TSD - Engineering TSD - Manager PDG - AVP