Académique Documents
Professionnel Documents
Culture Documents
INDEX
S.No
DESCRIPTION
Sheet
Nos.
PROJECT HIGHLIGHTS
01-04
1.0
INTRODUCTION
05-08
2.0
09-16
2.1
09
2.2
10
2.3
13
3.0
PROJECT PROMOTERS
17-21
4.0
22-29
4.1
22
4.2
22
4.3
27
5.0
TECHNOLOGICAL DEVELOPMENTS
5.1
Supercritical Technology
30
5.2
33
5.3
Equipment Manufacturers
34
6.0.0
6.1.0
30-35
36-66
36
6.1.1
36
6.1.2
41
6.1.3
Technical Data
45
6.2.00
46
6.2.01
Power cycle
46
6.2.02
47
6.2.03
48
6.2.04
Turbine
48
6.2.05
Blades
49
6.2.06
Valves
50
6.2.07
50
6.2.08
Shaft Glands
51
6.2.09
51
6.2.10
52
6.2.11
Governing/Regulation Systems
52
6.2.12
53
6.2.13
53
6.2.14
Turning Gear
53
6.2.15
54
6.2.16
54
6.2.17
54
6.2.18
Condensing Plant
55
6.2.19
Design Features
55
6.2.20
Air Extraction
57
6.2.21
Condensate System
57
6.2.22
Condensate Pumps
58
6.2.23
58
6.2.24
Turbine Drains
59
6.2.25
59
6.2.26
HP & LP Heaters
59
6.2.27
Deaerator
60
6.2.28
60
6.2.29
61
6.2.30
62
6.2.31
62
6.2.32
63
6.2.33
Sampling system
64
6.3.00
64
6.3.01
66
7.0.00
7.1.00
67
7.1.01
67
7.1.02
68
7.1.03
70
7.1.04
71
7.1.05
71
7.1.06
72
7.2.00
74
7.3.00
74
7.4.00
76
7.4.01
Design Parameters
76
7.4.02
76
7.4.03
77
7.4.04
77
7.4.05
79
7.4.06
80
7.4.07
81
67-103
7.4.08
82
7.4.09
83
7.5.00
84
7.5.01
85
7.5.02
86
7.5.03
Pre-treatment System
86
7.5.04
88
7.5.05
88
7.5.06
Demineralization plant
89
7.5.07
90
7.5.08
91
7.5.09
92
7.5.10
Chemical Laboratory
93
7.6.00
93
7.7.00
94
7.7.01
94
7.7.02
Ventilation System
95
7.08.0
97
7.09.0
100
7.10.0
Elevators
102
7.11.0
102
7.12.0
Mechanical workshop
103
7.13.00
ELECTRICAL SYSTEM
103-125
7.13.01
103
7.13.02
104
7.13.03
Power Evacuation
105
7.13.04
400 KV Switchyard
105
7.13.05
106
7.13.06
107
7.13.07
Station Transformer
108
7.13.08
Unit Transformer
109
7.13.09
Start-up Power
109
7.13.10
109
7.13.11
109
7.13.12
Bus Ducts
110
7.13.13
110
7.13.14
111
7.13.15
415 V switchgear
111
7.13.16
111
7.13.17
Electric Drives
112
7.13.18
Metering
113
7.13.19
Protection
114
7.13.20
Control Rooms
116
7.13.21
Grounding
117
7.13.22
118
7.13.23
118
7.13.24
119
7.13.25
Plant DC System
120
7.13.26
123
7.13.27
Illumination System
123
7.13.28
Electrical Laboratory
125
7.14.00
7.14.01
125
7.14.02
Design Philosophy
Distributed Digital Control, Monitoring & Information
System(DDCMIS)
7.14.03
132
7.14.04
Control System
139
125-180
128
7.14.05
157
7.14.06
168
7.14.07
168
7.14.08
24 V DC Power Supply
169
7.14.09
170
7.14.10
171
7.14.11
172
7.14.12
Field Instrumentation
176
7.14.13
Control Valves
178
7.14.14
Instrumentation Cables
179
7.14.15
Erection Hardware
180
7.14.16
180
8.00.00
8.01.01
8.01.02
Wind speed
181
181
8.01.03
Temperature
181
8.01.04
Relative Humidity
181
8.01.05
Seismicity
181
8.01.06
Soil characteristics
182
8.01.07
182
8.02.00
182
8.03.00
183
8.04.00
186
8.05.00
186
8.06.00
186
8.07.00
Water system
187
8.08.00
187
8.09.00
188
181-192
8.10.00
188
8.11.00
189
8.12.00
Switchyard
189
8.13.00
Chimney
189
8.14.00
Railway Siding
190
8.15.00
Auxiliary Buildings
190
8.16.00
Colony
191
9.00.00
9.01.00
CEA Guidelines
193
9.02.00
Plot Plan
194
9.03.00
196
9.04.00
Switchyard
196
9.05.00
196
9.06.00
197
193-199
200-208
201
201
203
204
207
208
208
11.00.0
209-214
11.01.0
209
11.02.0
211
11.03.0
Quality Assurance
211
11.04.0
212
11.05.0
212
11.06.0
213
11.07.0
Training
213
11.08.0
Completion Schedule
214
12.00.0
12.01.0
215
12.02.0
Cost Estimates
216
12.03.0
218
12.04.0
218
12.05.0
Financing Structure
219
12.06.0
219
12.07.0
Working Capital
219
12.08.0
Cost of Generation
219
LIST OF ANNEXURES
215-219
LIST OF ANNEXURES
1.
2.
3.
4.
Railway Map
5.
6.
Coal Analysis.
7.
8.
Climatological data
9.
Drawings.
10.
a)
Plot Plan
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
Certificate of incorporation
b)
c)
d)
e)
f)
g)
h)
i)
j)
ANNEXURES
LIST OF ANNEXURES
ANN. NO
1.
2.
3.
4.
5.
6.
7.
8.
9.
A
B
C
D
E
F
G
H
I
J
K
L
10.
11.
12.
13.
A
B
DESCRIPTION
D
E
F
G
H
I
J