PROYECTO FINAL DISEO

DE VAS
ICYA 3307

Juan Camilo Pinzn


Camilo Andrs Ramrez
Daniela Rosales
Juan Fernando Toro
Mariana Valencia

201023209
201026103
200916420
201016138
200813605

NOVIEMBRE DE 2014

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Contenido
Listado de Tablas ....................................................................................................................................................3
Listado de Figuras ...................................................................................................................................................5

1.

Introduccin ................................................................................................................................7

2.

Descripcin de la zona del proyecto.........................................................................................7


2.1.
Ubicacin ....................................................................................................................................................7
2.2.
Composicin de los Suelos y Geologa .................................................................................................10
2.3.
Hidrologa ..................................................................................................................................................10
2.4.
Climatologa ..............................................................................................................................................12
2.4.1.
Clasificacin del Clima de Kppen ....................................................................................................12
2.4.2.
Clima en Caldas.................................................................................................................................12

3.

Estudio de Trnsito ..................................................................................................................14


3.1.
rea de Influencia.....................................................................................................................................14
3.2. TPDa Chinchin La Manuela .......................................................................................................................20
3.3.
Regresiones del TPDa..............................................................................................................................21
3.4.
Inters Compuesto ...................................................................................................................................26
3.5.
Redistribucin del trfico segn su ao. ...............................................................................................30
3.6.
Nivel de Servicio .......................................................................................................................................30

4.

Criterios del Diseo Geomtrico .............................................................................................37


4.1.
4.2.
4.3.
4.4.
4.5.
4.6.
4.7.
4.8.
4.9.

Velocidad...................................................................................................................................................37
Distancia de visibilidad y adelantamiento y parada ..............................................................................38
Radio mnimo ............................................................................................................................................40
Peralte mximo y peralte para las curvas con radio superior al mnimo ............................................41
Curvas verticales ......................................................................................................................................43
Ancho de carril y berma ...........................................................................................................................45
Inclinacin de taludes ..............................................................................................................................45
Ancho de cunetas.....................................................................................................................................46
Pendiente longitudinal mxima ...............................................................................................................46

5.

Resumen de Curvas Horizontales ...........................................................................................47

6.

Resumen de Peraltes ...............................................................................................................53


6.1.
6.2.

Curvas Circulares Simples ......................................................................................................................53


Curvas Espirales ......................................................................................................................................54

7.

Resumen de Curvas Verticales ...............................................................................................64

8.

Seccin transversal tpica utilizada ........................................................................................67

9.

Resumen de Volmenes de Movimiento de Tierras ..............................................................68

10.

Criterios y diseo de Sealizacin ......................................................................................72


1

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

10.1.
Aspectos Generales .............................................................................................................................72
10.1.1. Funcin ..............................................................................................................................................72
10.1.2. Visibilidad...........................................................................................................................................72
10.1.3. Uso ....................................................................................................................................................72
10.1.4. Conservacin .....................................................................................................................................73
10.2.
Sealizacin Vertical............................................................................................................................73
10.2.1. Generalidades ...................................................................................................................................73
10.2.2. Colocacin de las Seales.................................................................................................................73
10.2.3. Clasificacin.......................................................................................................................................74
10.3.
Sealizacin Horizontal .......................................................................................................................76
10.3.1. Generalidades ...................................................................................................................................76
10.3.2. Materiales y Colores ..........................................................................................................................76
10.3.3. Clasificacin.......................................................................................................................................76

11.

Resumen del Diseo de Sealizacin .................................................................................78

12.

Presupuesto ..........................................................................................................................85

13.

Cronograma de Ejecucin y Flujo de Caja .........................................................................90

13.1. Duracin de Actividades y Diagrama Temporal ........................................................................................90


13.2. Flujo de Caja y Porcentaje de Completacin .............................................................................................91

14.

Conclusiones, Recomendaciones y Sugerencias .............................................................96

Referencias .......................................................................................................................................97
Anexos...............................................................................................................................................98

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Listado de Tablas
Tabla 1.Precipitacin media mensual por estacin presente en la cuenca. (Lpez Ocampo, 2012) ...........................11
Tabla 2.Estaciones de influencia sobre el trazado. ......................................................................................................14
Tabla 3.Estaciones relevantes con TPDs y desviacin estndar (INVIAS 2002, 2005, 2006, 2007, 2011) .................15
Tabla 4.Resumen de parmetros.................................................................................................................................17
Tabla 5.TPDa estacin Manizales Chinchin............................................................................................................17
Tabla 6.TPDa estacin Chinchin Santa Rosa .........................................................................................................18
Tabla 7.Volumen de trnsito por vehculo Manizales Chinchin...............................................................................19
Tabla 8.Volumen de trnsito por vehculo Chinchin Santa Rosa. ...........................................................................20
Tabla 9.TPDa nico .....................................................................................................................................................21
Tabla 10.Valor de los factores R2 para autos, buses y camiones ...............................................................................24
Tabla 11.Valor de los factores R2 totales. ...................................................................................................................26
Tabla 12.Tasa Crecimiento PIB (DANE). .....................................................................................................................27
Tabla 13.TPDa ao de aforo, ao actual, ao base y ao de proyeccin Total...........................................................28
Tabla 14.TPDa ao de aforo, ao actual, ao base y ao de proyeccin Autos. ........................................................28
Tabla 15.TPDa ao de aforo, ao actual, ao base y ao de proyeccin Buses.........................................................29
Tabla 16.TPDa ao de aforo, ao actual, ao base y ao de proyeccin Camiones. .................................................29
Tabla 17.Redistribucin del trnsito. ............................................................................................................................30
Tabla 18.Valores de velocidad de los tramos homogneos en funcin de la categora de la carretera y el tipo de
terreno (INVIAS, 2008).................................................................................................................................................37
Tabla 19.Mnima distancia de visibilidad de adelantamiento para carreteras de dos carriles de dos sentidos (INVIAS,
2008) ............................................................................................................................................................................40
Tabla 20.Radio mnimo de curvatura para peralte mximo del 8% y friccin mxima. (INVIAS, 2008) .......................41
Tabla 21.Radio mnimo de curvatura para peralte mximo del 6% y friccin mxima (INVIAS, 2008) ........................41
Tabla 22.Valores de K y LCV mnimos para el control de la operacin. (INVIAS, 2008) .............................................44
Tabla 23.Taludes recomendados para cimentaciones superficiales ............................................................................45
Tabla 24.Valores geomtricos de la cuneta. ................................................................................................................46

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 25.Valor porcentual de la pendiente media mxima de acuerdo al valor de la velocidad de diseo del trazado
(INVIAS, 2008) .............................................................................................................................................................47
Tabla 26.Valor porcentual de la pendiente media mxima de acuerdo al valor de la velocidad de especfica de la
tangente vertical. (INVIAS, 2008).................................................................................................................................47
Tabla 27.Resumen curvas Horizontales 50km/h peralte 6% .......................................................................................47
Tabla 28.Resumen curvas Horizontales 40km/h peralte 8% .......................................................................................49
Tabla 29.Resumen curvas Horizontales 40km/h peralte 7% .......................................................................................51
Tabla 30.Resumen de los valores de peralte para curvas circulares ...........................................................................54
Tabla 31.Resumen velocidad 50km/h y peralte 6% .....................................................................................................55
Tabla 32.Resumen peralte 40km/h y peralte 8% .........................................................................................................57
Tabla 33.Resumen peralte 40km/h y 7% de peralte. ...................................................................................................61
Tabla 34.Resumen curvas verticales 50km/h y peralte................................................................................................64
Tabla 35. Resumen curvas verticales 40km/h y peralte 8% ........................................................................................65
Tabla 36.Resumen curvas verticales 40km/h y peralte 7% .........................................................................................66
Tabla 37.Ancho de calzada Manual de diseo ............................................................................................................67
Tabla 38.Anchos de Bermas Manual de diseo ..........................................................................................................68
Tabla 39.Inventario puentes 50 km/h peralte 6% .........................................................................................................69
Tabla 40.Inventario puentes 40 km/h peralte 8% .........................................................................................................69
Tabla 41.Inventario puentes 40 km/h peralte 7% .........................................................................................................69
Tabla 42.Inventario tneles 50 km/h peralte 6% ..........................................................................................................69
Tabla 43.Distancia Mnima para la colocacin de seales dobles (INVIAS, 2004). .....................................................74
Tabla 44.Distancias para la Ubicacin de seales Preventivas - Carretera. (INVIAS, 2004) ......................................75
Tabla 45.Distancias mnimas de visibilidad, para demarcacin de zonas de prohibido adelantamiento. (INVIAS,
2004) ............................................................................................................................................................................77
Tabla 46. Tipo de lnea ................................................................................................................................................78
Tabla 47. Sealizacin horizontal 40km/h peralte 8%. ................................................................................................79
Tabla 48.Sealizacin horizontal 40km/h peralte 7%. .................................................................................................81
Tabla 49.Demarcacin vertical carril izquierdo. ...........................................................................................................82
Tabla 50. Demarcacin vertical carril derecho. ............................................................................................................84

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 51.Presupuesto 50 km/h peralte 6%. .................................................................................................................85


Tabla 52.Presupuesto 40 km/h peralte 8%. .................................................................................................................86
Tabla 53.Presupuesto 40 km/h peralte 7%. .................................................................................................................88
Tabla 54.Presupuesto 40 km/h peralte 7%. .................................................................................................................90
Tabla 55. Duracin, tiempo de inicio y tiempo de fin de cada actividad .......................................................................90
Tabla 56. Flujo de caja velocidad 40km/h peralte 8%. .................................................................................................92
Tabla 57.Presupuesto 40 km/h peralte 7%. .................................................................................................................93

Listado de Figuras
Ilustracin 1.Mapa Geogrfico de la zona (Fuente: Google Earth) ................................................................................8
Ilustracin 2.Ubicacin de la zona en Colombia (Fuente: Google Maps).......................................................................9
Ilustracin 3.Ubicacin del proyecto dentro del tringulo del caf (Fuente: Google Maps) ...........................................9
Ilustracin 4.rea comprendida dentro de la Cuenca del ro Chinchin y sus estaciones de medicin (Fuente:
Universidad Nacional) ..................................................................................................................................................11
Ilustracin 5.Precipitacin media anual departamento de Caldas. Fuente: (Universidad de Manizales) .....................12
Ilustracin 6.Evapotranspiracin media anual departamento de Caldas. Fuente: (Universidad de Manizales) ...........13
Ilustracin 7.Temperatura media anual departamento de Caldas. (Fuente: Universidad de Manizales) .....................13
Ilustracin 8.Departamento de Caldas (INVIAS 2011) .................................................................................................16
Ilustracin 9.Departamento de Risaralda (INVIAS 2011) .............................................................................................16
Ilustracin 10.Regresin Lineal para autos, buses y camiones. ..................................................................................22
Ilustracin 11.Regresin logartmica para autos, buses y camiones. ..........................................................................22
Ilustracin 12.Regresin potencial para autos, buses y camiones.. ............................................................................23
Ilustracin 13.Regresin exponencial para autos, buses y camiones. .........................................................................23
Ilustracin 14.Regresin lineal total. ............................................................................................................................24
Ilustracin 15.Regresin logartmica total. ...................................................................................................................25
Ilustracin 16.Regresin potencial total. ......................................................................................................................25
Ilustracin 17.Regresin exponencial total ..................................................................................................................26
Ilustracin 18.Dimensiones y trayectoria de giro para un camin 3S2 (caso ms crtico) (INVIAS, 2008) ..................38
Ilustracin 19.Distancia de visibilidad de adelantamiento (INVIAS, 2008) ...................................................................39
5

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 20.Peraltes Vs. Radios con peralte mximo del 6% ...................................................................................42


Ilustracin 21.Peraltes Vs. Radios con peralte mximo del 7% ...................................................................................42
Ilustracin 22.Curvas verticales segn su tipo. (INVIAS, 2008) ...................................................................................44
Ilustracin 23.Geometra de la cuneta .........................................................................................................................46
Ilustracin 24.Grfica diagrama de masas velocidad 50 Km/h peralte6%. ..................................................................71
Ilustracin 25. Grfica diagrama de masas velocidad 40 Km/h peralte 8%. ................................................................71
Ilustracin 26. Grfica diagrama de masas velocidad 40 Km/h peralte 7%. ................................................................72
Ilustracin 27.Configuracin de Ubicacin Lateral - Carretera.....................................................................................74
Ilustracin 28. Esquema demarcacin de zonas de adelantamiento prohibido - Curvas Verticales (Planta) (INVIAS,
2004) ............................................................................................................................................................................77
Ilustracin 29. Esquema demarcacin de zonas de adelantamiento prohibido - Curvas Verticales (Alzado) ..............77
Ilustracin 30. Esquema de demarcacin de zonas de adelantamiento prohibido - Curva Horizontal.........................78
Ilustracin 31. Diagrama temporal del proyecto a partir de las actividades de grandes partidas de pago...................91
Ilustracin 32. Curva S velocidad 50 Km/h peralte 6%. ...............................................................................................94
Ilustracin 33.Curva S velocidad 40 Km/h peralte 8%. ................................................................................................94
Ilustracin 34.Curva S velocidad 40 Km/h peralte 7%. ................................................................................................95
Ilustracin 35: Resumen de Seales Preventivas ........................................................................................................98
Ilustracin 36: Resumen de Seales Reglamentarias .................................................................................................99
Ilustracin 37: Resumen de Seales Informativas ..................................................................................................... 100

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Introduccin

El presente informe tiene como objetivo presentar una evaluacin completa sobre las posibilidades de construir
tres alternativas de va en el departamento de Caldas. Cada una de estas alternativas contempla un diseo
diferente a partir del cual se define el radio de curvatura y la pendiente de la va. Se pretende que al final del
informe se muestre la viabilidad del proyecto desde una perspectiva econmica y tcnica.
Las vas propuestas tienen pendientes mximas de 6%, 7% y 8%. De acuerdo a esta informacin se definen
los radios de curvatura correspondientes. El diseo de geomtrico de las tres alternativas de va fueron hecho
a partir de las normas AASHTO. Sin embargo, a lo largo del proyecto se mencionaran algunas normativas
INVIAS, como por ejemplo la sealizacin.

1. Descripcin de la zona del proyecto


1.1.

Ubicacin

Para la realizacin del proyecto se ha pensado empezar con coordenada aproximada de inicio de 50109.01N
y 753511.86O. Este punto corresponde al sur-occidente del departamento de Caldas en un punto intermedio
entre Manizales y Chinchin. El recorrido es paralelo a la va actual entre La Manuela y Chinchin y al ro
Chinchin, es decir que su recorrido es de Norte a Sur. El rea es de terreno ondulado-montaoso en donde se
presentan variaciones importantes, lo cual es tpico de esta regin del pas. En la zona Este del rea del
proyecto se encuentran los picos ms altos de la Cordillera Central, incluyendo el Volcn Nevado del Ruiz,
mientras que al Oeste se encuentra el valle del ro Cauca. El proyecto est comprendido dentro de la micro
cuenca del ro Chinchin, ro que hace parte de la cuenca del ro Cauca.
El desnivel entre el punto de inicio del proyecto y el punto de llegada del mismo es de aproximadamente 100
metros. Es decir, inicia desde una altura de 1,258 metros sobre el nivel medio del mar hasta llegar a una altura
de 1,360 metros sobre el nivel medio del mar. Esta condicin permite reconocer que el terreno del proyecto
ser ondulado-montaoso dado que la longitud del mismo esta entre cinco y siete kilmetros de longitud,
segn sea el caso.
A continuacin se presenta una imagen en donde se muestra el rea dentro del departamento de Caldas en el
cual se desarrollar el proyecto.

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 1.Mapa Geogrfico de la zona (Fuente: Google Earth)

El proyecto se encuentra en una zona estratgica para el pas. El tringulo cafetero compuesto por los
departamentos de Caldas, Risaralda y Quindo han sido foco de desarrollo econmico e industrial durante ms
de 50 aos. Es por esta razn que es necesario contar con una infraestructura que promueva la competitividad
de la regin cafetera y que la conecte con reas importantes del pas, as como son los puertos martimos y
areos para la entrada y salida de suministros en el exterior. Al norte de dicho tringulo se encuentra el
departamento de Antioquia, regin estratgica por la alta actividad econmica y consumo. Al sur, el Valle del
Cauca, departamento que durante algunas dcadas se ha destacado por ser un foco industrial de diferentes
productos. Igualmente, existe la carretera que comunica con Buenaventura, el mayor puerto martimo del pas
sobre el Ocano Pacfico. Al oriente se encuentra la Cordillera Central y detrs de esta el valle del ro
Magdalena el cual ha sido muy importante en la historia de Colombia, puesto que ha sido la principal ruta de
entrada y salida de productos y bienes desde el centro del pas hacia la Costa Atlntica.

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 2.Ubicacin de la zona en Colombia (Fuente: Google Maps)

La nueva va pretende ser una alternativa a la va ya existente. Para la regin es necesario contar con vas
suficientes para que estas puedan mantener una capacidad ptima ante la gran cantidad de trfico como
consecuencia de la dinmica econmica.

Ilustracin 3.Ubicacin del proyecto dentro del tringulo del caf (Fuente: Google Maps)

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

1.2.

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Composicin de los Suelos y Geologa

A partir de informacin obtenida de un estudio de suelos por parte del Instituto Geogrfico Agustn Codazzi
(IGAC) se ha podido obtener informacin geolgica y de los diferentes suelos del departamento. Este revela
que la regin ha sido afectada por procesos importantes de tectonismo y volcanismo, gracias a los cuales se
presenta el relieve actual. Se recuerda que la regin se encuentra prcticamente encima de las fallas de la
Placa Sudamericana y del Caribe, razn por la cual es importante comprender los procesos tectnicos del
lugar ante la amenaza latente de movimientos telricos.
En las vertientes de las montaas existe gran cantidad de material metamrfico e gneo que han sido cubiertos
durante largos procesos por capas de cenizas volcnicas. En zonas cercanas a los ros y recursos hdricos
superficiales importantes, predominan los materiales sedimentarios que han sido arrastrados de las partes
altas de las cordilleras. En cuanto a los componentes geomorfolgicos, la zona presenta diferentes variaciones
en su relieve; pasando de vertientes de montaas, valles angostos, terrazas y colinas.
En cuanto al tipo de suelo se tiene informacin que en zonas de clima fro y medio, los suelos ms abundantes
son una mezcla de Dystrandepts, Troporthents, Dystropepts y Hapludolls. Tambin se tiene informacin de que
en las colinas, terrazas y valles los suelos evolucionan bajo condiciones de humedad limitada.
Los suelos de clima seco presentan condiciones favorables para las actividades agropecuarias; sin embargo,
existen limitaciones debido a las altas pendientes que se presentan y el terreno quebrado existente. Las
propiedades fsicas en estos climas muestran que hay un gran predominio de arena en suelos derivados de
materiales piroclsticos. En suelos derivados de rocas gneas y metamrficas existe una alta presencia de
arcillas y limos. Las estructuras de suelo que sobresalen en el terreno son bloques subangulares y los grnulos
que han tenido un desarrollo prolongado cuentan con una participacin importante de material orgnico junto
con algunos microorganismos. La densidad de los suelos est, en su mayora dentro de los lmites
establecidos para suelos minerales como estos. Las condiciones de drenaje natural que presentan los suelos
estn entre buenos y excesivamente buenos gracias a la condicin de alta pendiente.
De un estudio mineralgico de la fraccin de arena existente se encontr una abundante presencia de
feldespatos, anfboles, piroxenos y cuarzo. Por su parte, la fraccin de arcilla es rica en caolinita y
montomorillonita.
Por ltimo, es importante decir que la evolucin que han tenido los suelos en el departamento se debe al clima
variable que existe entre los diferentes pisos trmicos. Las temperaturas son determinantes para la
composicin del suelo, dado que estas crean condiciones especiales para la evolucin del suelo.

1.3.

Hidrologa

Como es bien sabido, Colombia es un pas que cuenta con abundantes recursos hdricos gracias a su
geografa, geologa y composicin del suelo, adems de su ubicacin en la zona media del Ecuador. Es por
este motivo que a lo largo del ao se presentan perodos de lluvia y perodos secos, los cuales caracterizan los
componentes hidrolgicos de cada regin del pas. La zona de evaluacin del proyecto se encuentra en la
parte baja del lado oriental de la cuenca media del ro Cauca, sin embargo se ubica en su totalidad dentro de la
cuenca del ro Chinchin. Esta cuenca se caracteriza en particular por tener un importante abastecimiento de
aguas venidas de los picos nevados de la cordillera central, adems de aguas que bajan de los pramos de
dicha cordillera.

10

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 4.rea comprendida dentro de la Cuenca del ro Chinchin y sus estaciones de medicin (Fuente: Universidad Nacional)

La cuenca del Ro Chinchin es una de las de mayor importancia en el Departamento de Caldas, por
pertenecer a una regin que se define como ecosistema estratgico productor de recursos naturales, como es
el Parque Nacional Natural de Los Nevados. Esta cuenta con un rea de 144,00 hectreas, es una zona
privilegiada en cuanto a recursos naturales de agua. Suelo y biodiversidad.
Su rio principal el cual es el Ro Chinchin cuenta con un caudal promedio de 49,874.43 L/s (Corporacin
Autnoma Regional de Caldas, 2013)
A continuacin se presenta una tabla con la precipitacin media mensual por estacin hidrolgica de la cuenca
del Ro Chinchin:
Tabla 1.Precipitacin media mensual por estacin presente en la cuenca. (Lpez Ocampo, 2012)

11

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

1.4.

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Climatologa

1.4.1.
Clasificacin del Clima de Kppen
Uno de los sistemas de clasificacin ms utilizados en el mundo es la clasificacin climtica de Kppen. Segn
esta clasificacin, la zona de Caldas, y en general, Colombia se encuentra en una zona de bosque tropical
hmedo con connotaciones regionales de clima de selva tropical lluviosa (Af) y clima monznico segn la
poca del ao (Am).
1.4.2.
Clima en Caldas
A partir de un estudio realizado por la Universidad de Manizales se ha hecho una discriminacin del clima que
se presenta en el departamento. Cabe anotar que las variaciones del clima se presentan en gran medida por
las diferencias de altura entre cada lugar lo cual permite que se tengan valores diferentes para la precipitacin
media anual, evapotranspiracin media anual y temperatura media anual, entre otras. A continuacin se
presenta la informacin obtenida por el estudio en donde la metodologa usada fue a partir de herramientas de
Sistemas de Informacin Geogrfica (SIG) usando rasters, principalmente.

Ilustracin 5.Precipitacin media anual departamento de Caldas. Fuente: (Universidad de Manizales)

12

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 6.Evapotranspiracin media anual departamento de Caldas. Fuente: (Universidad de Manizales)

Ilustracin 7.Temperatura media anual departamento de Caldas. (Fuente: Universidad de Manizales)

Los valores para el rea del municipio de Chinchin segn las ilustraciones anteriores son de 2200 a 2400
milmetros de precipitacin anual, 1200 a 1400 milmetros de evapotranspiracin anual y un promedio de 22
centgrados de temperatura media anual.

13

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

2. Estudio de Trnsito
3.1.

rea de Influencia.

A continuacin se presenta el resumen del estudio de trnsito realizado. Para esto fue necesario escoger una
zona de influencia, es decir se revisaron las estaciones ms cercanas que podan afectar al proyecto y a partir
de ello se delimit cules eran las estaciones que realmente se deban tener en cuenta para hacer el estudio.
Tabla 2.Estaciones de influencia sobre el trazado.

Cdigo Estacin
Sector
Territorial
338
Chinchin - Manizales
719
Chinchin - Palestina
Caldas No. 5
1130
Chinchin - La Manuela
702
Estacin Uribe - La Manuela
337
Santa Rosa - Chinchin
336
Cerritos - Cartago
Risaralda No. 21
926
Pereira - Dos Quebradas
1154
Dos Quebradas - Pereira (Viaducto)
Para la realizacin del estudio se sigui un procedimiento similar al que se hizo para el Proyecto de
Trnsito. Sin embargo, para este se tuvieron en cuenta las cartillas del INVIAS con las series histricas del
trnsito promedio diario semanal para los territorios de Caldas No. 5 y territorial de Risaralda No. 21. Se
obtuvieron dos registros: De 1992 a 1996 y de 1997 a 2011; sin embargo, se encontraron las cartillas de
registro para los aos 2005, 2006 y 2007 con desviaciones estndar reales para cada ao. Para los dems
aos la caracterstica de que presentan un valor de desviacin estndar igual para todos los aos, lo cual,
de alguna manera puede producir un sesgo durante el estudio.
Con esta informacin resumida, se decidi que seran dos las estaciones a tener en cuenta dado su
impacto directo que podran llegar a presentar una vez se haya culminado el proyecto. Adicionalmente,
estas dos estaciones miden el trfico de mayor volumen entre las ciudades de Manizales y Pereira,
pasando por Chinchin.
A continuacin se presenta una tabla con la informacin general de estos aos para estas estaciones.

14

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 3.Estaciones relevantes con TPDs y desviacin estndar (INVIAS 2002, 2005, 2006, 2007, 2011)

Estacin Manizales - Chinchin


Ao
TPDs

1992
3265
431
1993
3347
431
1994
3262
431
1995
3724
431
1996
4680
431
1997
4350
982
1998
5381
982
1999
4820
982
2000
4521
982
2001
6676
982
2002
6650
982
2003
6438
982
2004
6621
982
2005
5836
485
2006
7098
1044
2007
6130
604
2008
6175
982
2009
6945
982
2010
6508
982
2011
4259
982

Estacin Chinchin - Santa Rosa


Ao
TPDs

1992
5211
512
1993
4909
512
1994
5535
512
1995
5718
512
1996
5839
512
1997
5676
1279
1998
5247
1279
1999
5352
1279
2000
5478
1279
2001
5488
1279
2002
3988
1279
2003
5963
1279
2004
6314
1279
2005
6287
465
2006
3357
1117
2007
4018
471
2008
3053
1279
2009
4062
1279
2010
2698
1279
2011
0
0

Se observa que para el ao 2011 en la estacin de Chinchin Santa Rosa no hay datos. Ante esto se ha
decidido ignorar el valor de esta estacin para este ao y tomar nicamente el valor de la estacin de
Manizales Chinchin, esto dado que el proyecto comprende el tramo entre Chinchin Manizales con mayor
relevancia.
Se presentan las ilustraciones generadas en la cartilla del INIVAS presentando el rea de cada departamento y
su sistema de carreteras evaluado con el TPDs.

15

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 8.Departamento de Caldas (INVIAS 2011)

Ilustracin 9.Departamento de Risaralda (INVIAS 2011)

Con esta informacin, se debe hacer el clculo del TPDA. Para esto se debe pasar el TPDs a TPDA. Lo
primero que se debe hacer el conocer el coeficiente adoptado que delimita la confiabilidad. Dadas las
caractersticas de la informacin, se ha adoptado una confiabilidad del 90%.

16

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

De esta manera se puede encontrar el factor K. Para ello, es necesario saber el promedio de la desviacin
estndar para cada una de las estaciones, el nmero de das de medicin (7), el nmero de das de que
tiene un ao (365) y el parmetro B anteriormente encontrado.

De esta forma se encuentran el valor de K con el que es posible tomar un lmite superior de trnsito sobre
la va. En la siguiente tabla se presenta un resumen con los parmetros obtenidos.
Tabla 4.Resumen de parmetros.

Parmetros
Cc
90%
n
7
N
365
B
3,16
K
953
El clculo del TPDa para cada ao y para cada estacin es el siguiente. El TPDa superior corresponde al
TPDs+K y el TPDa inferior al TPDs-K
Tabla 5.TPDa estacin Manizales Chinchin

Ao
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011

Estacin Manizales - Chinchin


TPDs

K TPDs+K TPDs-K
3265
431
953 4218
2312
3347
431
953 4300
2394
3262
431
953 4215
2309
3724
431
953 4677
2771
4680
431
953 5633
3727
4350
982
953 5303
3397
5381
982
953 6334
4428
4820
982
953 5773
3867
4521
982
953 5474
3568
6676
982
953 7629
5723
6650
982
953 7603
5697
6438
982
953 7391
5485
6621
982
953 7574
5668
5836
485
953 6789
4883
7098
1044
953 8051
6145
6130
604
953 7083
5177
6175
982
953 7128
5222
6945
982
953 7898
5992
6508
982
953 7461
5555
4259
982
953 5212
3306

17

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 6.TPDa estacin Chinchin Santa Rosa

Ao
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011

Estacin Chinchin - Santa Rosa


TPDs

K
TPDs+K TPDs-K
5211
512
1108 6319
4103
4909
512
1108 6017
3801
5535
512
1108 6643
4427
5718
512
1108 6826
4610
5839
512
1108 6947
4731
5676
1279
1108 6784
4568
5247
1279
1108 6355
4139
5352
1279
1108 6460
4244
5478
1279
1108 6586
4370
5488
1279
1108 6596
4380
3988
1279
1108 5096
2880
5963
1279
1108 7071
4855
6314
1279
1108 7422
5206
6287
465
1108 7395
5179
3357
1117
1108 4465
2249
4018
471
1108 5126
2910
3053
1279
1108 4161
1945
4062
1279
1108 5170
2954
2698
1279
1108 3806
1590
0
0
1108 1108
-1108

El siguiente paso es estimar el nmero de autos, buses y camiones que transitan por este corredor. Para ello,
cada una de las estaciones proporciona informacin porcentual sobre el trnsito de cada uno de estos
vehculos. La obtencin del nmero de vehculos para cada uno se hace multiplicando el porcentaje
correspondiente por el nmero de TPDa, de acuerdo al ao. Esto queda claro con el contenido de las
siguientes tablas.

18

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
Tabla 7.Volumen de trnsito por vehculo Manizales Chinchin.

Ao TPDa (Superior)
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011

4218
4300
4215
4677
5633
5303
6334
5773
5474
7629
7603
7391
7574
6789
8051
7083
7128
7898
7461
5212

Distribucin %
A
B
C
69% 13% 18%
66% 12% 22%
70% 7% 23%
77% 6% 17%
69% 8% 23%
73% 9% 18%
72% 8% 20%
77% 9% 14%
74% 10% 16%
76% 10% 14%
73% 12% 15%
73% 5% 22%
75% 11% 14%
79% 10% 12%
70% 13% 16%
73% 13% 15%
72% 12% 16%
80% 9% 11%
75% 10% 15%
75% 10% 15%

19

Autos
2911
2838
2951
3602
3887
3872
4561
4446
4051
5799
5551
5396
5681
5364
5636
5171
5133
6319
5596
3909

TPDa
Buses Camiones
549
760
516
946
296
970
281
796
451
1296
478
955
507
1267
520
809
548
876
763
1069
913
1141
370
1627
834
1061
679
815
1047
1289
921
1063
856
1141
711
869
747
1120
522
782

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 8.Volumen de trnsito por vehculo Chinchin Santa Rosa.

Ao TPDa (Superior)
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011

6319
6017
6643
6826
6947
6784
6355
6460
6586
6596
5096
7071
7422
7395
4465
5126
4161
5170
3806
1108

Distribucin %
A
B
C
62% 10% 28%
64% 10% 26%
65% 7% 28%
73% 8% 19%
64% 8% 28%
67% 6% 27%
57% 7% 36%
58% 14% 28%
62% 9% 29%
60% 10% 30%
47% 14% 39%
50% 13% 37%
44% 15% 41%
54% 13% 33%
46% 18% 36%
43% 20% 37%
43% 16% 41%
78% 8% 14%
34% 12% 54%

Autos
3918
3851
4318
4983
4447
4546
3623
3747
4084
3958
2396
3536
3266
3994
2054
2205
1790
4033
1295
0

TPDa
Buses Camiones
632
1770
602
1565
466
1861
547
1297
556
1946
408
1832
445
2288
905
1809
593
1910
660
1979
714
1988
920
2617
1114
3044
962
2441
804
1608
1026
1897
666
1707
414
724
457
2056
0
0

3.2. TPDa Chinchin La Manuela


Si bien el proyecto est comprendido entre estas dos poblaciones, su efecto directo se da sobre la va que
comunica a Manizales con Pereira. Por este motivo, se tuvieron en cuenta las estaciones analizadas
anteriormente.
Con la informacin presentada anteriormente, se debe encontrar un valor para el TPDa entre la medicin
de las dos estaciones. Para esto, se utiliz un factor de atraccin de trnsito del 60%. Esto es un supuesto,
puesto que con la informacin que se tiene hasta este momento es muy difcil hacer un estimado real de lo
que pueda pasar. Esta es la ecuacin con la que se unifican los valores del TPDa teniendo en cuenta el
factor de atraccin supuesto.

De esta ecuacin se obtiene la siguiente tabla. Estos sern los datos con los que se trabajar de ahora en
adelante.
20

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
Tabla 9.TPDa nico

Ao TPDa (Superior)
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011

3.3.

3952
3869
4072
4314
4718
4533
4759
4588
4523
5335
4763
5424
5624
5319
4694
4579
4234
4901
4226
2370

Distribucin %
A
B
C
66% 12% 23%
65% 11% 24%
68% 7% 26%
75% 7% 18%
67% 8% 26%
70% 8% 23%
65% 8% 28%
68% 12% 21%
68% 10% 23%
68% 10% 22%
60% 13% 27%
62% 9% 30%
60% 13% 28%
67% 12% 23%
58% 16% 26%
58% 17% 26%
58% 14% 29%
79% 9% 13%
55% 11% 35%
75% 10% 15%

Autos
2589
2515
2749
3236
3138
3174
3070
3097
3076
3628
2858
3336
3347
3538
2723
2656
2435
3872
2304
1778

TPDa
Buses Camiones
455
909
426
929
286
1039
302
777
378
1204
340
1020
357
1333
528
964
430
1018
534
1174
620
1287
489
1601
732
1547
612
1197
728
1221
756
1191
593
1207
417
613
465
1458
237
356

Regresiones del TPDa

A continuacin se presentan las regresiones hechas para estimar las proyecciones que se deben realizar.
Para esto se hacen 4 regresiones: lineal, logartmica, potencial y exponencial. La presentacin de esta
informacin se hace para autos, buses y camiones para cada una de las regresiones. En el eje X, se toma
el primer ao de aforo como el ao 0 y el ltimo (2011) como el ao 19.

21

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Regresin Lineal A-B-C


4500
4000

Trnsito de vehculos

3500

y = 12,311x + 2915,5
R = 0,02834

3000

Autos

2500

Buses

2000

Camiones
Lineal (Autos)

1500

y = 7,4602x + 1041,7
R = 0,02816
y = 13,15x + 358,02
R = 0,306

1000
500

Lineal (Buses)
Lineal (Camiones)

0
0

9 10 11 12 13 14 15 16 17 18 19
Ao

Ilustracin 10.Regresin Lineal para autos, buses y camiones.

Regresin Logartmica A-B-C


4500
4000
Trnsito de vehculos

3500

y = 154,33ln(x) + 2718,1
R = 0,08404

3000

Autos

2500

Buses

2000

Camiones
Logartmica (Autos)

1500

y = 92,831ln(x) + 923,5
R = 0,08229
y = 91,362ln(x) + 302,71
R = 0,27873

1000
500
0

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Ao

Ilustracin 11.Regresin logartmica para autos, buses y camiones.

22

Logartmica (Buses)
Logartmica (Camiones)

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Regresin Potencial A-B-C


4500
4000

Trnsito de vehculos

3500
y = 2729,8x0,047
R = 0,07046

3000

Autos

2500

Buses

2000

Camiones
Potencia (Autos)

1500
1000

y = 940,13x0,0693
R = 0,05059

500

y = 319,37x0,19
R = 0,2934

Potencia (Buses)
Potencia (Camiones)

0
0

9 10 11 12 13 14 15 16 17 18 19
Ao

Ilustracin 12.Regresin potencial para autos, buses y camiones..

Regresin Exponencial A-B-C


4500
4000
Trnsito de vehculos

3500
y = 2918,1e0,0031x
R = 0,01645

3000

Autos

2500

Buses

2000

Camiones
Exponencial (Autos)

1500

y = 1043,5e0,004x
R = 0,00909
y = 356,21e0,0279x
R = 0,33538

1000
500
0

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Ao

Ilustracin 13.Regresin exponencial para autos, buses y camiones.

23

Exponencial (Buses)
Exponencial (Camiones)

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
Tabla 10.Valor de los factores R2 para autos, buses y camiones

Valores R2
Regresin
Lineal
Logartmica
Potencial
Exponencial

A
0,028
0,084
0,070
0,016

B
0,028
0,082
0,050
0,009

C
0,306
0,278
0,293
0,335

A partir de los resultados obtenidos se puede observar que comparativamente la informacin de las grficas
no arroja un comportamiento que permita definir cul es la mejor regresin para poder adoptarla.
Adicionalmente, los valores que se muestran en el factor R2 tampoco permiten una fcil definicin. Sin
embargo, se observa que generando un global de los R2 para autos, buses y camiones, la mejor regresin
es la logartmica, donde el aumento del trfico tiende a estabilizarse y a hacer constante; no obstante, la
regresin potencial presenta informacin importante y su comportamiento grfico as tambin lo demuestra.
Sin embargo con el propsito de tener un lineamiento ms evidente se hacen las mismas regresiones pero
para el total de vehculos.

Regresin Lineal Total


Trnsito de vehculos

6000
y = 32,772x + 4314,2
R = 0,15868

5000
4000
3000
2000
1000
0

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Ao

Ilustracin 14.Regresin lineal total.

24

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Regresin Logartmica Total


Trnsito de vehculos

6000
y = 337,38ln(x) + 3944,2
R = 0,31736

5000
4000
3000
2000
1000
0

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Ao

Ilustracin 15.Regresin logartmica total.

Regresin Potencial Total


Trnsito de vehculos

6000
y = 3953,4x0,0751
R = 0,34616

5000
4000
3000
2000
1000
0

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Ao

Ilustracin 16.Regresin potencial total.

25

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Regresin Exponencial Total


Trnsito de vehculos

6000
y = 4292,7e0,0073x
R = 0,17321

5000
4000
3000
2000
1000
0

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Ao

Ilustracin 17.Regresin exponencial total

Tabla 11.Valor de los factores R2 totales.

Valores R 2
Lineal
0,158
Logartmica
0,317
Potencial
0,346
Exponencial
0,173
Segn esta informacin, se puede observar un mejor comportamiento para las regresiones logartmica y
potencial como se mencion anteriormente. De acuerdo con los valores que Excel genera al generar la
lnea de tendencia para cada regresin, se puede conocer los valores de R2. Estos valores, como se
observa en la tabla de arriba, son bastante similares para las regresiones de las cuales se ha venido
hablando. Dada la confiabilidad que genera este factor, se ha decidido escoger la regresin potencial por
tener un valor ms cercano 1.
Con esto definido, el siguiente paso es generar las proyecciones del TPDa para cada uno de los cuatro
casos de anlisis (auto, bus, camin y total). Para hacer esto se hacen los dos mtodos de proyeccin:
regresin del TPDa hecha anteriormente e inters compuesto.

3.4.

Inters Compuesto

A diferencia de lo que sucede con las regresiones en donde se genera una estadstica a partir de
mediciones, el inters compuesto tiene en cuenta el factor econmico. Este factor contempla la relacin que
existe entre la tasa de motorizacin generando un crecimiento a partir del crecimiento econmico. De esta
manera, el inters compuesto muestra el crecimiento a partir de una tasa de crecimiento establecida. Esta
expresin se resume a continuacin:
26

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Donde n es el ao de proyeccin del TPDa e i es la tasa de crecimiento que se ha determinado para


realizar el clculo. La tasa i puede ser tomada como el crecimiento econmico medio de los aos
seleccionados o tambin puede ser tomada como el crecimiento del parque automotor. Para este estudio
se ha decidido utilizar el crecimiento de la tasa del PIB a precios corriente, puesto que esta incluye la
inflacin; y con informacin de departamentos cercanos como lo son Valle del Cauca y Antioquia y del
departamento de Caldas por ser el lugar geogrfico donde se realizar el proyecto. Se escogieron estos
dos departamentos dado que estos generan un impacto importante en el movimiento de carga y pasajeros
por sus actividades econmicas y altos niveles demogrficos respectivamente.
A continuacin se presenta la informacin encontrada en el DANE.
Tabla 12.Tasa Crecimiento PIB (DANE).

Tasa Crecimiento PIB DANE


AntioquiaC Antioquia K Caldas C
Caldas K
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012p

7,6
9,2
9,8
15,8
10,2
12,6
12,4
7,2
5,0
5,8
12,8
8,4
6,0

0,9
3,0
3,5
8,8
5,7
7,2
7,0
1,7
-0,6
3,3
8,2
4,3
4,7

11,0
12,2
11,7
8,0
12,1
13,4
10,8
7,8
1,8
5,2
5,6
4,1
7,7

6,1
5,6
4,3
0,5
5,0
7,9
5,8
1,7
-4,6
2,4
0,2
1,2
5,8

Promedio

9,4

4,4

8,6

3,2

Valle C
7,1
7,2
7,5
7,8
8,2
8,4
9,0
9,1
9,0
9,0
9,3
9,8
9,7
8,6

ValleK
1,2
3,0
3,4
4,8
2,1
8,9
8,2
2,2
0,7
1,6
4,5
4,1
4,4

3,8

Se encuentra que el promedio del promedio de la tasa de crecimiento del PIB para estos tres
departamentos es de 8.8%. Este ser el valor que ser tomado como tasa de crecimiento en la ecuacin
del inters compuesto. Con este dato se puede estimar las proyecciones de trnsito total del proyecto.

27

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 13.TPDa ao de aforo, ao actual, ao base y ao de proyeccin Total.

Item
Z = Ao de Aforo 2011 (19)
Y = Ao existente 2014 (22)
X = Duracin construccin (5 y 10 meses)
W = Ao Base 2019 (27)
V = Aos de Proyeccin (25)
U = Ao de Proyeccin 2044(52)
TE = Trnsito Existente
Tat = Trnsito atrado Tat=0.2*TE
TA = Trnsito Actual TA=TE+Tat
CNT = Crecimiento normal del Trnsito CNT=U-TE
TG = Trnsito Generado TG=0.2*TA
TD = Trnsito Desarrollado TD=0.05*TA
TF = Trnsito Futuro TF=TA+CNT+TG+TD
THD = Trnsito Horario de Diseo THD=0.2*TPDa

Regresin Potencial
Inters
TPDa
Compuesto TPDa
4740
4740
4987
6105
5064

9307

5320
4987
998
5985
333
1197
300
7815
1563

76654
6105
1221
7326
70549
1466
367
79708
15942

Tabla 14.TPDa ao de aforo, ao actual, ao base y ao de proyeccin Autos.

Item
Z = Ao de Aforo 2011 (19)
Y = Ao existente 2014 (22)
X = Duracin construccin (5 y 10 meses)
W = Ao Base 2019 (27)
V = Aos de Proyeccin (25)
U = Ao de Proyeccin 2044(52)
TE = Trnsito Existente
Tat = Trnsito atrado Tat=0.2*TE
TA = Trnsito Actual TA=TE+Tat
CNT = Crecimiento normal del Trnsito CNT=U-TE
TG = Trnsito Generado TG=0.2*TA
TD = Trnsito Desarrollado TD=0.05*TA
TF = Trnsito Futuro TF=TA+CNT+TG+TD
THD = Trnsito Horario de Diseo THD=0.2*TPDa

28

Regresin
Inters
Potencial TPDa Compuesto TPDa
3555
3555
3157
4579
3188

6981

3287
3157
632
3789
130
758
190
4867
974

57491
4579
916
5495
52912
1099
275
59781
11957

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 15.TPDa ao de aforo, ao actual, ao base y ao de proyeccin Buses.

Item
Z = Ao de Aforo 2011 (19)
Y = Ao existente 2014 (22)
X = Duracin construccin (5 y 10 meses)
W = Ao Base 2019 (27)
V = Aos de Proyeccin (25)
U = Ao de Proyeccin 2044(52)
TE = Trnsito Existente
Tat = Trnsito atrado Tat=0.2*TE
TA = Trnsito Actual TA=TE+Tat
CNT = Crecimiento normal del Trnsito CNT=U-TE
TG = Trnsito Generado TG=0.2*TA
TD = Trnsito Desarrollado TD=0.05*TA
TF = Trnsito Futuro TF=TA+CNT+TG+TD
THD = Trnsito Horario de Diseo THD=0.2*TPDa

Regresin
Inters
Potencial TPDa Compuesto TPDa
474
474
1164
611
1181

931

1247
1164
233
1397
83
280
70
1830
366

7666
611
123
734
7055
147
37
7973
1595

Tabla 16.TPDa ao de aforo, ao actual, ao base y ao de proyeccin Camiones.

Item
Z = Ao de Aforo 2011 (19)
Y = Ao existente 2014 (22)
X = Duracin construccin (5 y 10 meses)
W = Ao Base 2019 (27)
V = Aos de Proyeccin (25)
U = Ao de Proyeccin 2044(52)
TE = Trnsito Existente
Tat = Trnsito atrado Tat=0.2*TE
TA = Trnsito Actual TA=TE+Tat
CNT = Crecimiento normal del Trnsito CNT=U-TE
TG = Trnsito Generado TG=0.2*TA
TD = Trnsito Desarrollado TD=0.05*TA
TF = Trnsito Futuro TF=TA+CNT+TG+TD
THD = Trnsito Horario de Diseo THD=0.2*TPDa

Regresin
Inters
Potencial Compuesto
711
711
575
916
598

1397

677
575
115
690
102
138
35
965
193

11499
916
184
1100
10583
220
55
11958
2392

De acuerdo con los datos obtenidos, se observa que no existe una relacin entre el inters compuesto y la
regresin adoptada. Dada la mayor rigurosidad en los datos trabajados para la estimacin de las
regresiones se va a tomar estos datos; adems, porque parecen tener un comportamiento ms
29

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

condescendiente. La estimacin que se hizo con el inters compuesto parece generar una sobrestimacin.
Es posible que la tasa de crecimiento seleccionada no haya sido la ms adecuada. Una mejor opcin pudo
haber sido haber evaluado el crecimiento del PIB de las regiones y la tasa de motorizacin de las mismas y,
a partir de esta informacin, generar una regresin que generara una proyeccin sobre los datos de
crecimiento para cada ao; de esta manera encontrar un valor medio mejor ajustado a la informacin
econmica de la regin.

3.5.

Redistribucin del trfico segn su ao.

A continuacin se presenta la informacin de lo que se proyecta sea el comportamiento del trfico de


acuerdo a las estimaciones realizadas.
Tabla 17.Redistribucin del trnsito.

Autos
Ao Actual
Ao Base
Ao Proyeccin
Ao Proyeccin (TF)

3.6.

TPDa
3157
3188
3287
4867

Buses
%
63,3%
63,0%
61,8%
62,3%

TPDa
1164
1181
1247
1830

%
23,3%
23,3%
23,4%
23,4%

Camiones
TPDa
%
575
11,5%
598
11,8%
677
12,7%
965
12,3%

Nivel de Servicio

Para la determinacin del nivel de servicio fue necesario remitirse a la hoja de clculo que fue hecha por un
estudiante, Esta hoja contiene una interfaz en donde se introducen ciertos valores correspondientes a
propiedades geomtricas del trazado. En general estos datos son los siguientes para todos los trazados (la
nica variacin est en el peralte).
-

Tipo Terreno: ondulado


Clase de va: II
Ancho de Carril: 3.65m de acuerdo al decreto Ley 105 de 1993
Ancho de Berma: 1.8m de acuerdo al decreto Ley 105 de 1993
Longitud de Trazado: K4+980, K5+200, K5+350, aproximadamente
Divisin direccional de la carretera para cada sentido: 50%
Factor de hora pico 0.8

Para la correcta generacin de los datos, es necesario calcular el nivel de servicio para el ao base y el ao
de proyeccin de cada uno de los trazados y de acuerdo a su peralte.
A continuacin se presenta el cuadra donde se ingresan los datos entradas y luego el resumen y el nivel de
servicio que el programa le genera a la va segn las especificaciones dadas.
Trazado de 40km/h con 8% de Peralte
1. Ao Base

30

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

31

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

2. Ao de Proyeccin

32

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Trazado de 40km/h con 7% de Peralte


1. Ao Base

33

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

2. Ao de Proyeccin

34

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Trazado de 50km/h con Peralte de 6%.


1. Ao Base

35

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

2. Ao de Proyeccin

Con base en la informacin obtenida se encuentra que el diseo que ms se adapta a la condiciones de
trnsito de vehculos y su correspondiente diseo de va son los trazados 1 y 2, en cambio el 3 tanto en su
ao base como en su ao de proyeccin presenta un nivel de servicio un grado ms bajo que las otras dos.
Las vas 1 y 2 presentan nivel de servicio tipo A en su ao base y pasan a ser tipo B en su ao de
proyeccin; en cambio la va 3 tiene nivel de servicio tipo C en su ao base y D en su ao de proyeccin.

36

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

3. Criterios del Diseo Geomtrico


3.1.

Velocidad

La velocidad es el parmetro de diseo que define las caractersticas geomtricas de un trazado para que este
tenga la comodidad y seguridad necesarias para el usuario. La velocidad se define como la relacin entre el
espacio recorrido y el tiempo que se tarda en recorrerlo. Esta se satisface por medio de una funcin lineal de
los parmetros previamente mencionados.

De acuerdo con esta definicin, para cada una de las propuestas de diseo se defini una velocidad mxima
de diseo a la cual los vehculos pueden circular cmoda y con seguridad. Sin embargo, cabe aclarar que
habr tramos en donde la velocidad de diseo de flujo para ciertos instantes deber ser menor dadas las
condiciones geomtricas de la va.
Cada una de las alternativas contempla una propuesta geomtrica diferente segn el criterio de velocidad
definido. La alternativa 1 propone una velocidad de 30km/h, la 2 de 40km/h y la 3 de 50km/h. Adicionalmente,
se debe considerar las condiciones del terreno por donde se desea ejecutar el proyecto. De acuerdo con las
caractersticas encontradas, el terreno se define como escarpado puesto que existen inclinaciones de ms de
40 grados en algunos tramos. De acuerdo con el Manual de Diseo Geomtrico de Vas del INVIAS se puede
hacer esta discriminacin. Para esto es necesario remitirse a la siguiente Tabla.
Tabla 18.Valores de velocidad de los tramos homogneos en funcin de la categora de la carretera y el tipo de terreno (INVIAS, 2008)

El diseo de vas est condicionado por una serie de restricciones que son importantes tenerlas en cuenta a la
hora de la ejecucin de las alternativas. En primer lugar, la longitud mnima para una va que su velocidad este
entre 20 km/h y 50 km/h debe ser de tres kilmetros. En segundo, lugar las variaciones de velocidad entre
tramos adyacentes no puede ser mayor a veinte kilmetros por hora.
37

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

3.2.

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Distancia de visibilidad y adelantamiento y parada

La distancia de visibilidad es importante puesto que esta es la que permite que el conductor vea hacia delante
la va con seguridad y tranquilidad. Por su parte, la distancia de adelantamiento es importante definirla puesto
que esta es el espacio para que los vehculos que pueden ser manejadas a una mayor velocidad puedan
adelantar a vehculos ms lentos y que esto se logre con seguridad para estos, as como para los vehculos
que circulan en sentido contrario. En ltimo lugar, aparece la distancia de parada la cual se define como la
distancia necesaria para que el conductor pueda detener el vehculo ante la aparicin de un obstculo sobre la
va. Esta distancia se divide en dos: la distancia de percepcin y reaccin del conductor y la distancia de
frenado.
A continuacin se presentan algunas ilustraciones y tablas ceidas bajo el Manual de Diseo Geomtrico de
Vas del INVIAS, las cuales han sido definidas como estndares para ser tenidos en cuenta a la hora de
disear un trazado.
Esta primera ilustracin sugiere las dimensiones de un camin de tipo 3S2, el caso ms crtico de los vehculos
estndares en el pas. A partir de ste se define la trayectoria que podra tener para as establecer unas
distancias de visibilidad seguras del vehculo.

Ilustracin 18.Dimensiones y trayectoria de giro para un camin 3S2 (caso ms crtico) (INVIAS, 2008)

Para el diseo de la distancia de adelantamiento se debe tomar en cuenta cuatro distancias.

38

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 19.Distancia de visibilidad de adelantamiento (INVIAS, 2008)

Como se muestra en la ilustracin, las distancias a ser tenidas en cuenta son la D1, D2, D3 y D4. Cada una de
ellas est definida por diferentes factores puesto que cada una representa momentos diferentes dentro del
proceso de adelantamiento.
- En primer lugar la distancia D1 se define como la distancia de percepcin y reaccin, en metros.

- En segundo lugar la distancia D2 es la distancia recorrida por el vehculo desde el momento en que invade
el carril contrario hasta que regresa a su carril, en metros.

- En tercer lugar la distancia D3 es la distancia de seguridad, cuando la maniobra de adelantamiento a


terminado, entre el vehculo que adelanta y el vehculo que viene en direccin opuesta, en metros.

- En ltimo lugar la distancia D4 es la distancia recorrida por el vehculo que viene en sentido contrario,
estimada en 2/3 de D2, en metros.

En la tabla mostrada a continuacin se muestra los valores tpicos de distancia de adelantamiento propuestos
por el INVIAS.

39

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 19.Mnima distancia de visibilidad de adelantamiento para carreteras de dos carriles de dos sentidos (INVIAS, 2008)

Por su parte, la distancia de parada se determina a partir de la ecuacin presentada a continuacin. En ella se
hace la suma entre las dos distancias mencionadas anteriormente.

3.3.

Radio mnimo

El radio mnimo se define a partir de la velocidad de diseo para un trazado, el peralte mximo correspondiente
y el coeficiente de friccin transversal mxima. El radio mnimo usualmente no es el que se tiene en los
trazados, pero ser usado en situaciones crticas donde las condiciones lleven a que este sea utilizado. Es
importante aclarar que un valor inferior a este radio mnimo conlleva que el diseo del trazado no cumpla con la
seguridad y comodidad que debe garantizar segn la velocidad de diseo establecida.
A continuacin se presenta la ecuacin con la que se determina el valor del radio mnimo de las curvas. Cabe
aclarar que para hacer ms sencillo el clculo el valor obtenido es aproximado a su entero mayor ms prximo.

Ahora se presentan las tablas para los peraltes mximos. Las normas de diseo geomtrico de carreteras de
los Estados Unidos AASHTO establece como peralte mximo el 8%; en cambio, el INVIAS, regularmente, lo
hace con el 6%.

40

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 20.Radio mnimo de curvatura para peralte mximo del 8% y friccin mxima. (INVIAS, 2008)

Tabla 21.Radio mnimo de curvatura para peralte mximo del 6% y friccin mxima (INVIAS, 2008)

3.4.
Peralte mximo y peralte para las curvas con radio superior al
mnimo
El peralte surge como una respuesta para contrarrestar los efectos de la fuerza centrfuga que es generada
sobre los objetos cuando estos entran en un movimiento circular. Su dimensionamiento depender del radio de
la curva, de la velocidad de diseo del trazado y de la friccin mxima entre el objeto y el suelo. En
consecuencia, el peralte ser mximo cuando el radio de curvatura sea el mnimo siempre y cuando el tramo
que comprende la curva mantenga la velocidad de diseo mxima especificada y la friccin tambin sea
mxima. Cuando lo anterior no se cumpla, el peralte no ser el mximo y para ello se debe redisear el valor
del peralte, que en cualquier caso ser menor al mximo.
A continuacin se presenta la ecuacin con la que se define el peralte en una curva.

41

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Como se mencion en el numeral anterior, la definicin del peralte mximo se genera a partir del tipo de va
que se est diseando. Normalmente en Colombia se maneja como peralte mximo el 6%, sin embargo, cada
vez es ms usual que el peralte sea de 8% para vas que tienen mejores especificaciones tcnicas. Esto ha
empezado a ocurrir gracias a las mejoras en la infraestructura nacional. Con esto dicho, se puede hacer una
clasificacin del peralte mximo segn el tipo de va. Para vas primarias y secundarias el peralte mximo ser
del 8%; por su parte, la vas terciarias tendrn un peralte mximo del 6%.
La definicin del peralte para curvas que no presentan el radio mnimo de curvatura se logra mediante la
aplicacin de la siguiente ecuacin.

Igualmente, se tienen grficas que muestran la relacin que se tiene entre cada uno de los parmetros
explicados en la ecuacin anterior.

Ilustracin 20.Peraltes Vs. Radios con peralte mximo del 6%

Ilustracin 21.Peraltes Vs. Radios con peralte mximo del 7%

42

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

3.5.

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Curvas verticales

Las curvas verticales se pueden clasificar en curvas verticales cncavas y curvas verticales convexas de
acuerdo a su tipo y de acuerdo a sus ramas verificando que sean simtricas o no. Dentro de las curvas
verticales se encuentran diferentes componentes de los cuales se puede generar una categorizacin de la
curva segn su diseo. Para esto es necesario definir los parmetros que la componen. El parmetro que
determina el diseo de las curvas verticales ser la distancia de visibilidad de parada, pero para llegar a este
primero es necesario definir las partes de la curva.

La definicin de qu longitud de curva vertical tomar est sujeta a la siguiente condicin:


Si, DVP<LCV1 se toma LCV1. Pero si, DVP>LCV2 se toma LCV2.
A continuacin se presenta una figura en donde se muestran las posibilidades de curvas verticales clasificadas
segn su concavidad.

43

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 22.Curvas verticales segn su tipo. (INVIAS, 2008)

A la informacin anterior se le debe sumar los siguientes valores propuestos por el INVIAS.
Tabla 22.Valores de K y LCV mnimos para el control de la operacin. (INVIAS, 2008)

44

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

3.6.

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ancho de carril y berma

El ancho del carril y berma fueron establecidos de acuerdo al THD y el TPDA y un anlisis de capacidad y
servicio de la va. Estos valores se deben determinar de igual manera en funcin de las tablas de AASTHO y
del Manual de Diseo Geomtrico del INVIAS. (Tafur Snchez, 2011, p. 33) (INVIAS, 2008).
Segn lo anterior se obtuvo que:
Ancho de carril=3.65m
Ancho berma=1.80m

3.7.

Inclinacin de taludes

De acuerdo con el documento de Diseo de Cimentaciones Superficiales y Profundas para Carreteras, se debe
tomar a consideracin la calidad del suelo. Es decir, que un suelo con caractersticas favorables permitir una
cimentacin menos costosa y que facilite su realizacin. En cambio, un suelo con condiciones blandas y
arcilloso har que estas labores demanden un tecnicismo mayor aumentando los costos. Al mismo tiempo, es
importante conocer las caractersticas de los movimientos de tierras naturales que existan en el sector.
Fenmenos como el Creep son frecuentes en zonas montaosas a causa de un drenaje sub-superficial de las
aguas que caen, lo que puede provocar que el diseo y la estructuracin de las cimentaciones de contencin
deban ser a gran escala y de altos costos.
A continuacin se presenta en la tabla 23 (MINFOMENTO 2004) (WSDOT 2008) a modo de resumen que el
INVIAS por medio del Manual de Diseo de Cimentaciones Superficiales y Profundas para Carreteras define
como lineamientos a tener en cuenta a la hora de estructurar una va que demande la intervencin en los
taludes. Se especifican tres tipos de suelo a, b y c. El suelo tipo a incluye suelos cohesivo con resistencia a la
compresin inconfinada de 1.5 kg/cm2 o mayor, por ejemplo arcilla y limos plsticos. El suelo tipo b , en
general, son suelos cohesivos con resistencia a la compresin inconfinada mayor a 0.5 kg/cm 2 pero menor a
1.5 kg/cm2 y suelos granulares con un alto ngulo de friccin interno, como por ejemplo grava angular y arena.
Por ltimo, el suelo de tipo c es bsicamente el resto de suelos no incluidos en los suelos tipo a y b.
Tabla 23.Taludes recomendados para cimentaciones superficiales

45

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

3.8.

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ancho de cunetas

El uso de las cunetas es para fines de desage de aguas que puedan caer sobre la carretera. Su diseo tiene
componentes hidrulicos gracias a que su geometra es establecida a partir de la informacin hidrolgica que
tenga la zona. Para esto, previamente se estableci informacin climatolgica de la zona en donde se encontr
el promedio multianual de precipitacin en el departamento de Caldas y en la zona sur-occidental del mismo,
zona en la que se encuentra ubicado el proyecto.
El zanjamiento de las aguas y posterior desage est sujeto a las normas que el INVIAS ha sentenciado como
estndar. De acuerdo a esta informacin y a la convencin adoptada en la clase, la cuneta presenta la
siguiente composicin geomtrica:

Ilustracin 23.Geometra de la cuneta


Tabla 24.Valores geomtricos de la cuneta.

3.9.

Pendiente longitudinal mxima

La definicin de la pendiente longitudinal mxima est sujeta a la velocidad de diseo que se quiere trabajar a
lo largo del proyecto. sta pendiente corresponde a la pendiente media la cual tericamente no debe ser
excedida en ningn tramo. De igual manera, existe un segundo factor que debe ser tenido en cuenta a la hora
de definir la pendiente y es el factor econmico. Adicionalmente, debe existir un valor de pendiente media
mnima el cual existe debido a la necesidad de drenaje de las aguas que se puedan precipitar sobre el trazado.
Este valor no ser menor al 0.5% de acuerdo con informacin reglamentada por el (INVIAS, 2008).

46

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

En los casos que se ha trabajado, las velocidades de diseo son de 30km/h, 40km/h y 50 km/h. Con esta
informacin existen dos criterios para la definicin de las pendientes medias mximas los cuales han sido
establecidos por el INVIAS. El primero de ellos es definido por la siguiente tabla. En l se especifica el valor
porcentual de la pendiente media mxima de acuerdo a la velocidad de diseo.
Tabla 25.Valor porcentual de la pendiente media mxima de acuerdo al valor de la velocidad de diseo del trazado (INVIAS, 2008)

Tabla 26.Valor porcentual de la pendiente media mxima de acuerdo al valor de la velocidad de especfica de la tangente vertical. (INVIAS,
2008)

Con base en esto se definieron los valores porcentuales de la pendiente media mxima para cada uno de los
trazados. Para el trazado con velocidad de diseo de 50km/h el valor porcentual de la pendiente media mxima
es de 6%, para la de 40km/h es de 7% y para la de 30km/h es de 8%.

4. Resumen de Curvas Horizontales


A continuacin se presenta a modo de resumen cada una de las curvas horizontales de cada trazado.
Tabla 27.Resumen curvas Horizontales 50km/h peralte 6%

TIPO
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral

LONGITUD
30.582m
30.910m
81.308m
30.910m
25.151m
35.450m
28.071m
35.450m
483.561m
32.730m

RADIO
134.070m

121.000m

47

START STATION
0+000.00m
0+030.58m
0+061.49m
0+142.80m
0+173.71m
0+198.86m
0+234.31m
0+262.38m
0+297.83m
0+781.39m

END STATION
0+030.58m
0+061.49m
0+142.80m
0+173.71m
0+198.86m
0+234.31m
0+262.38m
0+297.83m
0+781.39m
0+814.12m

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas
TIPO
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
LONGITUD
44.650m
32.730m
284.096m
35.450m
29.007m
35.450m
278.186m
35.450m
20.741m
35.450m
436.749m
35.450m
59.933m
35.450m
49.433m
35.450m
55.567m
35.450m
68.606m
26.360m
63.574m
26.360m
115.623m
31.800m
26.414m
31.800m
127.991m
28.180m
74.706m
28.180m
141.164m
30.910m
17.264m
30.910m
20.275m
33.640m
27.063m
33.640m
133.735m
31.500m
25.460m
31.500m
149.435m
34.550m
44.361m
34.550m
27.511m
36.360m
31.400m
36.360m
34.391m

RADIO
120.480m

91.539m

91.618m

91.618m

97.690m

187.090m

168.738m

162.080m

136.050m

109.900m

164.862m

100.800m

87.000m

48

START STATION
0+814.12m
0+858.77m
0+891.50m
1+175.60m
1+211.05m
1+240.06m
1+275.51m
1+553.69m
1+589.14m
1+609.88m
1+645.33m
2+082.08m
2+117.53m
2+177.47m
2+212.92m
2+262.35m
2+297.80m
2+353.37m
2+388.82m
2+457.42m
2+483.78m
2+547.36m
2+573.72m
2+689.34m
2+721.14m
2+747.55m
2+779.35m
2+907.34m
2+935.52m
3+010.23m
3+038.41m
3+179.57m
3+210.48m
3+227.75m
3+258.66m
3+278.93m
3+312.57m
3+339.63m
3+373.27m
3+507.01m
3+538.51m
3+563.97m
3+595.47m
3+744.91m
3+779.46m
3+823.82m
3+858.37m
3+885.88m
3+922.24m
3+953.64m
3+990.00m

END STATION
0+858.77m
0+891.50m
1+175.60m
1+211.05m
1+240.06m
1+275.51m
1+553.69m
1+589.14m
1+609.88m
1+645.33m
2+082.08m
2+117.53m
2+177.47m
2+212.92m
2+262.35m
2+297.80m
2+353.37m
2+388.82m
2+457.42m
2+483.78m
2+547.36m
2+573.72m
2+689.34m
2+721.14m
2+747.55m
2+779.35m
2+907.34m
2+935.52m
3+010.23m
3+038.41m
3+179.57m
3+210.48m
3+227.75m
3+258.66m
3+278.93m
3+312.57m
3+339.63m
3+373.27m
3+507.01m
3+538.51m
3+563.97m
3+595.47m
3+744.91m
3+779.46m
3+823.82m
3+858.37m
3+885.88m
3+922.24m
3+953.64m
3+990.00m
4+024.39m

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas
TIPO
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
LONGITUD
34.900m
254.768m
34.900m
191.080m
16.360m
55.468m
16.360m
226.859m
36.360m
56.046m
36.360m
0.036m

RADIO
203.531m

402.000m

84.270m

START STATION
4+024.39m
4+059.29m
4+314.06m
4+348.96m
4+540.04m
4+556.40m
4+611.86m
4+628.22m
4+855.08m
4+891.44m
4+947.49m
4+983.85m

END STATION
4+059.29m
4+314.06m
4+348.96m
4+540.04m
4+556.40m
4+611.86m
4+628.22m
4+855.08m
4+891.44m
4+947.49m
4+983.85m
4+983.89m

Tabla 28.Resumen curvas Horizontales 40km/h peralte 8%

TIPO
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral

LONGITUD
355.298m
26.000m
30.049m
26.000m
92.707m
25.520m
25.594m
25.520m
165.106m
24.790m
56.886m
24.790m
225.654m
24.060m
27.541m
24.060m
136.558m
26.980m
25.924m
26.980m
89.500m
29.170m
84.132m
29.170m
44.646m
29.170m
62.161m
29.170m
529.016m
29.170m
26.797m
29.170m
63.909m
29.170m
27.546m

RADIO
75.000m

75.000m

80.000m

90.000m

63.000m

45.000m

50.000m

43.000m

43.000m

49

START STATION
0+000.00m
0+355.30m
0+381.30m
0+411.35m
0+437.35m
0+530.05m
0+555.57m
0+581.17m
0+606.69m
0+771.79m
0+796.58m
0+853.47m
0+878.26m
1+103.91m
1+127.97m
1+155.52m
1+179.58m
1+316.13m
1+343.11m
1+369.04m
1+396.02m
1+485.52m
1+514.69m
1+598.82m
1+627.99m
1+672.64m
1+701.81m
1+763.97m
1+793.14m
2+322.15m
2+351.32m
2+378.12m
2+407.29m
2+471.20m
2+500.37m

END STATION
0+355.30m
0+381.30m
0+411.35m
0+437.35m
0+530.05m
0+555.57m
0+581.17m
0+606.69m
0+771.79m
0+796.58m
0+853.47m
0+878.26m
1+103.91m
1+127.97m
1+155.52m
1+179.58m
1+316.13m
1+343.11m
1+369.04m
1+396.02m
1+485.52m
1+514.69m
1+598.82m
1+627.99m
1+672.64m
1+701.81m
1+763.97m
1+793.14m
2+322.15m
2+351.32m
2+378.12m
2+407.29m
2+471.20m
2+500.37m
2+527.91m

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas
TIPO
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
LONGITUD
29.170m
339.384m
29.170m
38.984m
29.170m
47.526m
29.170m
27.007m
29.170m
165.319m
29.710m
32.744m
29.710m
23.549m
29.170m
20.932m
29.170m
21.185m
29.170m
19.961m
29.170m
27.144m
29.170m
36.108m
29.170m
22.501m
29.000m
48.019m
29.000m
22.062m
29.170m
60.005m
29.170m
29.997m
29.170m
74.179m
29.170m
36.401m
29.170m
14.460m
29.170m
9.882m
29.170m
35.430m
29.170m
17.776m
29.170m
60.127m
29.170m
31.860m
29.170m

RADIO

43.000m

60.000m

50.000m

43.000m

43.000m

50.000m

50.000m

43.000m

50.000m

43.000m

43.000m

43.000m

50

START STATION
2+527.91m
2+557.08m
2+896.47m
2+925.64m
2+964.62m
2+993.79m
3+041.32m
3+070.49m
3+097.50m
3+126.67m
3+291.98m
3+321.69m
3+354.44m
3+384.15m
3+407.70m
3+436.87m
3+457.80m
3+486.97m
3+508.16m
3+537.33m
3+557.29m
3+586.46m
3+613.60m
3+642.77m
3+678.88m
3+708.05m
3+730.55m
3+759.55m
3+807.57m
3+836.57m
3+858.63m
3+887.80m
3+947.81m
3+976.98m
4+006.97m
4+036.14m
4+110.32m
4+139.49m
4+175.89m
4+205.06m
4+219.52m
4+248.69m
4+258.58m
4+287.75m
4+323.18m
4+352.35m
4+370.12m
4+399.29m
4+459.42m
4+488.59m
4+520.45m

END STATION
2+557.08m
2+896.47m
2+925.64m
2+964.62m
2+993.79m
3+041.32m
3+070.49m
3+097.50m
3+126.67m
3+291.98m
3+321.69m
3+354.44m
3+384.15m
3+407.70m
3+436.87m
3+457.80m
3+486.97m
3+508.16m
3+537.33m
3+557.29m
3+586.46m
3+613.60m
3+642.77m
3+678.88m
3+708.05m
3+730.55m
3+759.55m
3+807.57m
3+836.57m
3+858.63m
3+887.80m
3+947.81m
3+976.98m
4+006.97m
4+036.14m
4+110.32m
4+139.49m
4+175.89m
4+205.06m
4+219.52m
4+248.69m
4+258.58m
4+287.75m
4+323.18m
4+352.35m
4+370.12m
4+399.29m
4+459.42m
4+488.59m
4+520.45m
4+549.62m

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas
TIPO
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line
Spiral-curve-spiral
Spiral-curve-spiral
Spiral-curve-spiral
Line

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
LONGITUD
19.160m
29.170m
61.331m
28.440m
27.809m
28.440m
530.078m
28.440m
26.576m
28.440m
8.378m

RADIO
43.000m

55.500m

55.000m

START STATION
4+549.62m
4+568.78m
4+597.95m
4+659.28m
4+687.72m
4+715.53m
4+743.97m
5+274.05m
5+302.49m
5+329.06m
5+357.50m

END STATION
4+568.78m
4+597.95m
4+659.28m
4+687.72m
4+715.53m
4+743.97m
5+274.05m
5+302.49m
5+329.06m
5+357.50m
5+365.88m

Tabla 29.Resumen curvas Horizontales 40km/h peralte 7%

TIPO
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line

LONGITUD
167.241m
31.000m
27.654m
31.000m
234.919m
31.000m
22.842m
31.000m
120.579m
31.000m
18.680m
31.000m
221.047m
31.000m
23.026m
31.000m
332.772m
31.000m
62.986m
31.000m
136.303m
31.000m
30.042m
31.000m
455.084m
31.000m
35.650m
31.000m
96.418m

RADIO

90.000m

85.000m

68.000m

105.000m

64.000m

55.000m

55.000m

51

START STATION
0+000.00m
0+167.24m
0+198.24m
0+225.90m
0+256.90m
0+491.81m
0+522.81m
0+545.66m
0+576.66m
0+697.23m
0+728.23m
0+746.91m
0+777.91m
0+998.96m
1+029.96m
1+052.99m
1+083.99m
1+416.76m
1+447.76m
1+510.75m
1+541.75m
1+678.05m
1+709.05m
1+739.09m
1+770.09m
2+225.18m
2+256.18m
2+291.83m
2+322.83m

END STATION
0+167.24m
0+198.24m
0+225.90m
0+256.90m
0+491.81m
0+522.81m
0+545.66m
0+576.66m
0+697.23m
0+728.23m
0+746.91m
0+777.91m
0+998.96m
1+029.96m
1+052.99m
1+083.99m
1+416.76m
1+447.76m
1+510.75m
1+541.75m
1+678.05m
1+709.05m
1+739.09m
1+770.09m
2+225.18m
2+256.18m
2+291.83m
2+322.83m
2+419.24m

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
TIPO

31.000m
57.338m
31.000m
166.838m
31.000m
22.154m
31.000m
138.999m
31.000m
22.308m
31.000m
217.473m
31.000m
LONGITUD

Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Line
Spiral-Curve-Spiral
Spiral-Curve-Spiral
Spiral-Curve-Spiral

47.301m
31.000m
239.798m
217.585m
31.000m
30.120m
31.000m
51.073m
31.000m
52.380m
31.000m
188.103m
31.000m
26.631m
31.000m
128.224m
31.000m
27.599m
31.000m
57.668m
31.000m
22.881m
31.000m
481.870m
31.000m
35.787m
31.000m

Line

3.398m

55.000m

57.000m

65.000m

RADIO
55.000m

55.000m

55.000m

90.000m

55.000m

102.000m

55.000m

52

2+419.24m
2+450.24m
2+507.58m
2+538.58m
2+705.42m
2+736.42m
2+758.57m
2+789.57m
2+928.57m
2+959.57m
2+981.88m
3+012.88m
3+230.35m
START STATION

2+450.24m
2+507.58m
2+538.58m
2+705.42m
2+736.42m
2+758.57m
2+789.57m
2+928.57m
2+959.57m
2+981.88m
3+012.88m
3+230.35m
3+261.35m
END STATION

3+261.35m
3+308.65m
3+339.65m
3+579.45m
3+797.04m
3+828.04m
3+858.16m
3+889.16m
3+940.23m
3+971.23m
4+023.61m
4+054.61m
4+242.71m
4+273.71m
4+300.34m
4+331.34m
4+459.57m
4+490.57m
4+518.16m
4+549.16m
4+606.83m
4+637.83m
4+660.71m
4+691.71m
5+173.58m
5+204.58m
5+240.37m

3+308.65m
3+339.65m
3+579.45m
3+797.04m
3+828.04m
3+858.16m
3+889.16m
3+940.23m
3+971.23m
4+023.61m
4+054.61m
4+242.71m
4+273.71m
4+300.34m
4+331.34m
4+459.57m
4+490.57m
4+518.16m
4+549.16m
4+606.83m
4+637.83m
4+660.71m
4+691.71m
5+173.58m
5+204.58m
5+240.37m
5+271.37m

5+271.37m

5+274.77m

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

5. Resumen de Peraltes
En el presente numeral se hace un balance sobre el sistema de peraltes presente a lo largo de cada uno de los
tres trazados. Antes de presentar el resumen para cada uno, se hace un resumen sobre los clculos utilizados
para la definicin de estos.
En primer lugar, se presenta el peralte que se tuvo en cuenta a lo largo del proceso de curvas circulares. Luego
se expondrn los criterios y clculos utilizados a lo largo de la espiralizacin de las curvas mencionadas
previamente.

5.1. Curvas Circulares Simples


El peralte de cada curva est compuesto por varios segmentos. Estos son la longitud de transicin de peralte
(LTP), longitud de transicin de bombeo normal (LTPN) y longitud mnima con peralte mximo. Cada una de
estas ser presentado a continuacin mostrando su frmula matemtica y sus parmetros respectivos.
o Longitud de transicin (LTP)

Donde,
Ac: Ancho de carril
Sa: Sobreancho de carril
S: Pendiente de la rampa de peraltes. Se define segn la velocidad de diseo de trazado.
emax: Peralte mximo del trazado.
o Longitud de transicin de bombeo normal (LTPN)

Donde,
Ac: Ancho de carril
Sa: Sobreancho de carril
S: Pendiente de la rampa de peraltes. Se define segn la velocidad de diseo de trazado.
BN: Peralte de Bombeo normal igual al 2%.
o Longitud mnima de peralte mximo.

Donde,
tp: Tiempo de percepcin que se fija en 2.5 segundos.
v: Velocidad de diseo del trazado.
A continuacin se presenta un resumen con los resultados de longitud para cada uno de los trazados.

53

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
Tabla 30.Resumen de los valores de peralte para curvas circulares

Trazado (km/h)
30
40
50
Longitud de Transicin de Peralte
Ac (m)
3,5
3,5
3,5
Sa (m)
0
0
0
S (%)
1,28%
0,96%
0,77%
emax
6%
6%
6%
LTP (m)
16,41
21,88
27,27
Longitud de Transicin de Bombeo Normal
BN (%)
2%
2%
2%
LTBN
5,47
7,29
9,09
Longitud mnima con Peralte mximo
tp (s)
2,5
2,5
2,5
Lmin
20,83
27,78
34,72

5.2.Curvas Espirales
Al igual que para las curvas simples, las curvas espirales tienen una divisin de las longitudes y
parametrizacin similar. Sin embargo, la longitud de transicin de peralte (LTP) no ser conocida con el mismo
nombre; ahora ser longitud de espiral (Le). Esto gracias a que el proceso de espiralizacin se hace mediante
el arreglo de variables que han sido definidas mediante la aplicacin de series y otros factores. Con esto claro,
la divisin de longitudes del peralte est compuesto as: la longitud espiral (Le), longitud de transicin de
bombeo normal (LTPN) y longitud mnima con peralte mximo. Cada una de estas ser presentado a
continuacin mostrando su frmula matemtica y sus parmetros respectivos.
o Longitud de transicin (LTP)

Donde,
Ac: Ancho de carril
Sa: Sobreancho de carril
S: Pendiente de la rampa de peraltes. Se define segn la velocidad de diseo de trazado.
emax: Peralte mximo del trazado.
o Longitud de transicin de bombeo normal (LTPN)

Donde,
: Ancho de carril
: Sobreancho de carril
: Pendiente de la rampa de peraltes. Se define segn la velocidad de diseo de trazado.
BN: Peralte de Bombeo normal igual al 2%.
o Longitud mnima de peralte mximo.
54

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Donde,
tp: Tiempo de percepcin que se fija en 2.5 segundos.
v: Velocidad de diseo del trazado.
Tabla 31.Resumen velocidad 50km/h y peralte 6%
ID CURVA

Start Station
0+027.85m
0+036.94m
0+046.03m
0+061.49m
0+142.80m
0+158.26m
0+167.35m
0+176.44m
0+199.77m
0+208.86m
0+217.95m
0+234.31m
0+262.38m
0+278.74m
0+287.83m
0+296.92m
0+779.58m
0+788.67m
0+797.76m
0+814.12m
0+858.77m
0+875.13m
0+884.22m
0+893.31m
1+174.69m
1+183.78m
1+192.87m
1+211.05m
1+240.06m
1+258.24m
1+267.33m
1+276.42m
1+552.78m
1+561.87m
1+570.96m
1+589.14m
1+609.88m
1+628.06m
1+637.15m
1+646.24m
2+081.17m
2+090.26m
2+099.35m
2+117.53m
2+177.47m
2+195.65m

Superelevation Curve
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown

55

Left Outside Lane


-2,00%
0,00%
2,00%
5,40%
5,40%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-5,60%
-5,60%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-5,60%
-5,60%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
6,00%
6,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-6,00%
-6,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
6,00%
6,00%
2,00%

Right Outside Lane


-2,00%
-2,00%
-2,00%
-5,40%
-5,40%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
5,60%
5,60%
2,00%
0,00%
-2,00%
-2,00%
0,00%
2,00%
5,60%
5,60%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-6,00%
-6,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
6,00%
6,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-6,00%
-6,00%
-2,00%

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

10

11

12

13

2+204.74m
2+213.83m
2+261.44m
2+270.53m
2+279.62m
2+297.80m
2+353.37m
2+371.55m
2+380.64m
2+389.73m
2+452.87m
2+461.96m
2+471.05m
2+483.78m
2+547.36m
2+560.08m
2+569.18m
2+578.27m
2+689.32m
2+698.41m
2+707.50m
2+721.14m
2+747.55m
2+761.19m
2+770.28m
2+779.38m
2+903.70m
2+912.79m
2+921.89m
2+935.52m
3+010.23m
3+023.87m
3+032.96m
3+042.05m
3+176.84m
3+185.93m
3+195.03m
3+210.48m
3+227.75m
3+243.20m
3+252.30m
3+261.39m
3+277.12m
3+286.21m
3+295.30m
3+312.57m
3+339.63m
3+356.91m
3+365.99m
3+375.08m
3+506.69m
3+515.78m
3+524.87m
3+538.51m
3+563.97m
3+577.61m
3+586.70m
3+595.79m

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown

56

0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-6,00%
-6,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
4,80%
4,80%
2,00%
0,00%
-2,00%
-2,00%
0,00%
2,00%
5,00%
5,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-5,00%
-5,00%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-5,40%
-5,40%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
5,80%
5,80%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-5,00%
-5,00%
-2,00%
-2,00%
-2,00%

-2,00%
-2,00%
-2,00%
0,00%
2,00%
6,00%
6,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-4,80%
-4,80%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-5,00%
-5,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
5,00%
5,00%
2,00%
0,00%
-2,00%
-2,00%
0,00%
2,00%
5,40%
5,40%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-5,80%
-5,80%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
5,00%
5,00%
2,00%
0,00%
-2,00%

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas
3+743.10m
3+752.19m
3+761.28m
3+779.46m
3+823.82m
3+842.00m
3+851.09m
3+860.18m
3+885.88m
3+894.97m
3+904.06m
3+922.24m
3+953.64m
3+971.82m
3+980.91m
3+990.00m
4+029.29m
4+038.38m
4+047.47m
4+059.29m
4+314.06m
4+325.88m
4+334.97m
4+344.06m
4+532.75m
4+541.85m
4+550.94m
4+556.40m
4+611.86m
4+617.32m
4+626.41m
4+635.51m
4+855.08m
4+864.17m
4+873.26m
4+891.44m
4+947.49m
4+965.67m
4+974.76m
4+983.85m

14

15

16

17

18

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown

-2,00%
-2,00%
-2,00%
-6,00%
-6,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
6,00%
6,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-4,60%
-4,60%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-3,20%
-3,20%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
6,00%
6,00%
2,00%
0,00%
-2,00%

-2,00%
0,00%
2,00%
6,00%
6,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-6,00%
-6,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
4,60%
4,60%
2,00%
0,00%
-2,00%
-2,00%
0,00%
2,00%
3,20%
3,20%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-6,00%
-6,00%
-2,00%
-2,00%
-2,00%

Tabla 32.Resumen peralte 40km/h y peralte 8%


ID
CURVA

Start
Station
0+348.49m
0+355.78m
0+363.07m
0+381.30m
0+411.35m
0+429.58m
0+436.87m
0+444.16m
0+522.76m
0+530.05m
0+537.35m
0+555.57m

Superelevation Curve
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super

57

Left Outside
Lane
-2,00%
-2,00%
-2,00%
-7,00%
-7,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
7,00%

Right Outside Lane


-2,00%
0,00%
2,00%
7,00%
7,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-7,00%

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

0+581.17m
0+599.40m
0+606.69m
0+613.98m
0+763.53m
0+771.79m
0+780.06m
0+796.58m
0+853.47m
0+870.00m
0+878.26m
0+886.52m
1+096.62m
1+103.91m
1+111.21m
1+127.97m
1+155.52m
1+172.28m
1+179.58m
1+186.87m
1+308.84m
1+316.13m
1+323.43m
1+343.11m
1+369.04m
1+388.73m
1+396.02m
1+403.31m
1+478.22m
1+485.52m
1+492.81m
1+514.69m
1+598.82m
1+620.70m
1+627.99m
1+635.28m
1+665.34m
1+672.64m
1+679.93m
1+701.81m
1+763.97m
1+785.84m
1+793.14m
1+800.43m
2+314.86m
2+322.15m
2+329.44m
2+351.32m
2+378.12m
2+400.00m
2+407.29m
2+414.58m
2+463.91m
2+471.20m
2+478.49m
2+500.37m
2+527.91m
2+549.79m

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown

58

7,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-6,00%
-6,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
6,60%
6,60%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-7,40%
-7,40%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%

-7,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
6,00%
6,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-6,60%
-6,60%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
7,40%
7,40%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

10

11

12

13

14

15

16

2+557.08m
2+564.38m
2+889.18m
2+896.47m
2+903.76m
2+925.64m
2+964.62m
2+986.50m
2+993.79m
3+001.09m
3+035.67m
3+042.78m
3+049.88m
3+070.49m
3+097.50m
3+118.10m
3+125.21m
3+132.31m
3+285.23m
3+292.52m
3+299.82m
3+321.69m
3+354.44m
3+376.32m
3+383.61m
3+390.90m
3+400.41m
3+407.70m
3+414.99m
3+436.87m
3+457.80m
3+479.68m
3+486.97m
3+494.26m
3+500.86m
3+508.16m
3+515.45m
3+537.33m
3+557.29m
3+579.16m
3+586.46m
3+593.75m
3+606.31m
3+613.60m
3+620.89m
3+642.77m
3+678.88m
3+700.76m
3+708.05m
3+715.34m
3+723.09m
3+730.38m
3+737.67m
3+759.55m
3+807.57m
3+829.45m
3+836.74m
3+844.03m

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown

59

-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-7,80%
-7,80%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%

0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
7,80%
7,80%
2,00%
0,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

17

18

19

20

21

22

23

24

3+851.34m
3+858.63m
3+865.92m
3+887.80m
3+947.81m
3+969.68m
3+976.98m
3+984.27m
3+999.68m
4+006.97m
4+014.27m
4+036.14m
4+110.32m
4+132.20m
4+139.49m
4+146.78m
4+168.60m
4+175.89m
4+183.19m
4+205.06m
4+219.52m
4+287.75m
4+323.18m
4+345.05m
4+352.35m
4+359.64m
4+362.83m
4+370.12m
4+377.41m
4+399.29m
4+459.42m
4+481.30m
4+488.59m
4+495.88m
4+513.16m
4+520.45m
4+527.74m
4+549.62m
4+568.78m
4+590.66m
4+597.95m
4+605.24m
4+651.99m
4+659.28m
4+666.57m
4+687.72m
4+715.53m
4+736.68m
4+743.97m
4+751.26m
5+266.75m
5+274.05m
5+281.34m
5+302.49m
5+329.06m
5+350.21m
5+357.50m
5+364.79m

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown
End Normal Crown
Level Crown
Reverse Crown
Begin Full Super
End Full Super
Reverse Crown
Level Crown
Begin Normal Crown

60

-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-2,00%
-7,80%
-7,80%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
7,80%
7,80%
2,00%
0,00%
-2,00%

-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-8,00%
-8,00%
-2,00%
-2,00%
-2,00%
-2,00%
0,00%
2,00%
8,00%
8,00%
2,00%
0,00%
-2,00%
-2,00%
0,00%
2,00%
7,80%
7,80%
2,00%
0,00%
-2,00%
-2,00%
-2,00%
-2,00%
-7,80%
-7,80%
-2,00%
-2,00%
-2,00%

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 33.Resumen peralte 40km/h y 7% de peralte.


ID CURVA

Station

Superelevation Curve

Left Outside Lane

Right Outside Lane

0+156.91m

End Normal Crown

-2.00%

-2.00%

0+167.24m

Level Crown

-2.00%

0.00%

0+177.57m

Reverse Crown

-2.00%

2.00%

0+198.24m

Begin Full Super

-6.00%

6.00%

0+225.90m

End Full Super

-6.00%

6.00%

0+246.56m

Reverse Crown

-2.00%

2.00%

0+256.90m

Level Crown

-2.00%

0.00%

0+267.23m

Begin Normal Crown

-2.00%

-2.00%

0+482.47m

End Normal Crown

-2.00%

-2.00%

0+492.81m

Level Crown

0.00%

-2.00%

0+503.16m

Reverse Crown

2.00%

-2.00%

0+522.81m

Begin Full Super

5.80%

-5.80%

0+545.66m

End Full Super

5.80%

-5.80%

0+565.31m

Reverse Crown

2.00%

-2.00%

0+575.66m

Level Crown

0.00%

-2.00%

0+586.00m

Begin Normal Crown

-2.00%

-2.00%

0+686.90m

End Normal Crown

-2.00%

-2.00%

0+697.23m

Level Crown

-2.00%

0.00%

0+707.57m

Reverse Crown

-2.00%

2.00%

0+728.23m

Begin Full Super

-6.00%

6.00%

0+746.91m

End Full Super

-6.00%

6.00%

0+767.58m

Reverse Crown

-2.00%

2.00%

0+777.91m

Level Crown

-2.00%

0.00%

0+788.25m

Begin Normal Crown

-2.00%

-2.00%

0+990.60m

End Normal Crown

-2.00%

-2.00%

1+000.96m

Level Crown

-2.00%

0.00%

1+011.32m

Reverse Crown

-2.00%

2.00%

1+029.96m

Begin Full Super

-5.60%

5.60%

1+052.99m

End Full Super

-5.60%

5.60%

1+071.63m

Reverse Crown

-2.00%

2.00%

1+081.99m

Level Crown

-2.00%

0.00%

1+092.35m

Begin Normal Crown

-2.00%

-2.00%

1+406.43m

End Normal Crown

-2.00%

-2.00%

1+416.76m

Level Crown

0.00%

-2.00%

1+427.09m

Reverse Crown

2.00%

-2.00%

1+447.76m

Begin Full Super

6.00%

-6.00%

1+510.75m

End Full Super

6.00%

-6.00%

61

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

10

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
1+531.41m

Reverse Crown

2.00%

-2.00%

1+541.75m

Level Crown

0.00%

-2.00%

1+552.08m

Begin Normal Crown

-2.00%

-2.00%

1+667.72m

End Normal Crown

-2.00%

-2.00%

1+678.05m

Level Crown

-2.00%

0.00%

1+688.38m

Reverse Crown

-2.00%

2.00%

1+709.05m

Begin Full Super

-6.00%

6.00%

1+739.09m

End Full Super

-6.00%

6.00%

1+759.76m

Reverse Crown

-2.00%

2.00%

1+770.09m

Level Crown

-2.00%

0.00%

1+780.42m

Begin Normal Crown

-2.00%

-2.00%

2+214.84m

End Normal Crown

-2.00%

-2.00%

2+225.18m

Level Crown

0.00%

-2.00%

2+235.51m

Reverse Crown

2.00%

-2.00%

2+256.18m

Begin Full Super

6.00%

-6.00%

2+291.83m

End Full Super

6.00%

-6.00%

2+312.49m

Reverse Crown

2.00%

-2.00%

2+322.83m

Level Crown

0.00%

-2.00%

2+333.16m

Begin Normal Crown

-2.00%

-2.00%

2+408.91m

End Normal Crown

-2.00%

-2.00%

2+419.24m

Level Crown

-2.00%

0.00%

2+429.58m

Reverse Crown

-2.00%

2.00%

2+450.24m

Begin Full Super

-6.00%

6.00%

2+507.58m

End Full Super

-6.00%

6.00%

2+528.25m

Reverse Crown

-2.00%

2.00%

2+538.58m

Level Crown

-2.00%

0.00%

2+548.91m

Begin Normal Crown

-2.00%

-2.00%

2+695.09m

End Normal Crown

-2.00%

-2.00%

2+705.42m

Level Crown

0.00%

-2.00%

2+715.75m

Reverse Crown

2.00%

-2.00%

2+736.42m

Begin Full Super

6.00%

-6.00%

2+758.57m

End Full Super

6.00%

-6.00%

2+779.24m

Reverse Crown

2.00%

-2.00%

2+789.57m

Level Crown

0.00%

-2.00%

2+799.91m

Begin Normal Crown

-2.00%

-2.00%

2+918.24m

End Normal Crown

-2.00%

-2.00%

2+928.57m

Level Crown

0.00%

-2.00%

2+938.90m

Reverse Crown

2.00%

-2.00%

2+959.57m

Begin Full Super

6.00%

-6.00%

2+981.88m

End Full Super

6.00%

-6.00%

62

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

11

12

13

14

15

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
3+002.55m

Reverse Crown

2.00%

-2.00%

3+012.88m

Level Crown

0.00%

-2.00%

3+023.21m

Begin Normal Crown

-2.00%

-2.00%

3+220.02m

End Normal Crown

-2.00%

-2.00%

3+230.35m

Level Crown

-2.00%

0.00%

3+240.69m

Reverse Crown

-2.00%

2.00%

3+261.35m

Begin Full Super

-6.00%

6.00%

3+308.65m

End Full Super

-6.00%

6.00%

3+329.32m

Reverse Crown

-2.00%

2.00%

3+339.65m

Level Crown

-2.00%

0.00%

3+349.99m

Begin Normal Crown

-2.00%

-2.00%

3+786.70m

End Normal Crown

-2.00%

-2.00%

3+797.04m

Level Crown

0.00%

-2.00%

3+807.37m

Reverse Crown

2.00%

-2.00%

3+828.04m

Begin Full Super

6.00%

-6.00%

3+858.16m

End Full Super

6.00%

-6.00%

3+878.82m

Reverse Crown

2.00%

-2.00%

3+889.16m

Level Crown

0.00%

-2.00%

3+899.49m

Begin Normal Crown

-2.00%

-2.00%

3+929.90m

End Normal Crown

-2.00%

-2.00%

3+940.23m

Level Crown

-2.00%

0.00%

3+950.56m

Reverse Crown

-2.00%

2.00%

3+971.23m

Begin Full Super

-6.00%

6.00%

4+023.61m

End Full Super

-6.00%

6.00%

4+044.27m

Reverse Crown

-2.00%

2.00%

4+054.61m

Level Crown

-2.00%

0.00%

4+064.94m

Begin Normal Crown

-2.00%

-2.00%

4+232.38m

End Normal Crown

-2.00%

-2.00%

4+242.71m

Level Crown

0.00%

-2.00%

4+253.04m

Reverse Crown

2.00%

-2.00%

4+273.71m

Begin Full Super

6.00%

-6.00%

4+300.34m

End Full Super

6.00%

-6.00%

4+321.01m

Reverse Crown

2.00%

-2.00%

4+331.34m

Level Crown

0.00%

-2.00%

4+341.68m

Begin Normal Crown

-2.00%

-2.00%

4+449.23m

End Normal Crown

-2.00%

-2.00%

4+459.57m

Level Crown

-2.00%

0.00%

4+469.90m

Reverse Crown

-2.00%

2.00%

4+490.57m

Begin Full Super

-6.00%

6.00%

4+518.16m

End Full Super

-6.00%

6.00%

63

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

16

17

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
4+538.83m

Reverse Crown

-2.00%

2.00%

4+549.16m

Level Crown

-2.00%

0.00%

4+559.50m

Begin Normal Crown

-2.00%

-2.00%

4+598.48m

End Normal Crown

-2.00%

-2.00%

4+608.83m

Level Crown

-2.00%

0.00%

4+619.19m

Reverse Crown

-2.00%

2.00%

4+637.83m

Begin Full Super

-5.60%

5.60%

4+660.71m

End Full Super

-5.60%

5.60%

4+679.36m

Reverse Crown

-2.00%

2.00%

4+689.71m

Level Crown

-2.00%

0.00%

4+700.07m

Begin Normal Crown

-2.00%

-2.00%

5+163.25m

End Normal Crown

-2.00%

-2.00%

5+173.58m

Level Crown

0.00%

-2.00%

5+183.92m

Reverse Crown

2.00%

-2.00%

5+204.58m

Begin Full Super

6.00%

-6.00%

5+240.37m

End Full Super

6.00%

-6.00%

5+261.04m

Reverse Crown

2.00%

-2.00%

5+271.37m

Level Crown

0.00%

-2.00%

5+281.71m

Begin Normal Crown

-2.00%

-2.00%

6. Resumen de Curvas Verticales


A continuacin se presenta a modo de resumen cada una de las curvas verticales de cada trazado.
Tabla 34.Resumen curvas verticales 50km/h y peralte

6%.

64

Tabla 35. Resumen curvas verticales 40km/h y peralte 8%


No.

P.K de VAV

Elevacin de VAV

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

-0+001.04m
0+138.96m
0+260.35m
0+333.41m
0+483.96m
0+668.96m
0+893.96m
0+936.33m
1+038.96m
1+091.51m
1+453.96m
1+545.70m
1+658.96m
1+693.96m
1+773.96m
1+793.96m
1+874.61m
1+948.96m
2+258.96m
2+428.96m
2+563.96m
2+993.05m
3+068.71m
3+199.38m
3+242.63m
3+340.72m
3+504.83m
3+676.43m
4+034.03m
4+257.22m
4+578.89m
4+701.82m
4+814.15m
5+193.24m
5+247.31m
5+364.91m

1249.187m
1248.790m
1258.362m
1257.975m
1260.549m
1271.896m
1271.015m
1276.549m
1276.015m
1279.870m
1279.870m
1284.015m
1284.015m
1286.015m
1287.015m
1289.015m
1290.007m
1295.015m
1295.015m
1300.015m
1298.137m
1311.133m
1309.607m
1314.959m
1320.389m
1320.028m
1346.528m
1348.520m
1365.185m
1382.571m
1380.689m
1371.151m
1375.129m
1365.421m
1333.010m
1333.140m

Inclinacin de
rasante T.E
-0,28%
7,89%
-0,53%
1,71%
6,13%
-0,39%
13,06%
-0,52%
7,34%
0,00%
4,52%
0,00%
5,71%
1,25%
10,00%
1,23%
6,74%
0,00%
2,94%
-1,39%
3,03%
-2,02%
4,10%
12,56%
-0,37%
16,15%
1,16%
4,66%
7,79%
-0,59%
-7,76%
3,54%
-2,56%
-59,94%
0,11%

Inclinacin de
rasante T.S
-0,28%
7,89%
-0,53%
1,71%
6,13%
-0,39%
13,06%
-0,52%
7,34%
0,00%
4,52%
0,00%
5,71%
1,25%
10,00%
1,23%
6,74%
0,00%
2,94%
-1,39%
3,03%
-2,02%
4,10%
12,56%
-0,37%
16,15%
1,16%
4,66%
7,79%
-0,59%
-7,76%
3,54%
-2,56%
-59,94%
0,11%

A (Cambio de
pendiente)

Tipo de curva
de perfil

Longitud de
curva de perfil

Valor de K

Radio de curva

8,17%
8,42%
2,24%
4,42%
6,53%
13,45%
13,58%
7,86%
7,34%
4,52%
4,52%
5,71%
4,46%
8,75%
8,77%
5,50%
6,74%
2,94%
4,33%
4,42%
5,05%
6,11%
8,46%
12,92%
16,52%
14,99%
3,50%
3,13%
8,37%
7,17%
11,30%
6,10%
57,38%
60,05%

Cncavo

150.000m

18,361

1836.150m

Cncavo
Cncavo
Convexo
Cncavo
Convexo
Cncavo
Convexo
Cncavo
Convexo
Cncavo
Convexo
Cncavo
Convexo
Cncavo
Convexo
Cncavo
Convexo
Cncavo
Convexo
Cncavo
Cncavo
Convexo
Cncavo
Convexo
Cncavo
Cncavo
Convexo
Convexo
Cncavo
Convexo
Convexo
Cncavo

0.051m
150.000m
149.982m
53.871m
23.814m
34.332m
60.342m
72.964m
30.725m
30.756m
27.393m
23.302m
14.462m
18.400m
30.449m
31.031m
55.802m
21.473m
61.168m
34.743m
30.385m
27.205m
56.489m
59.112m
28.254m
27.077m
108.305m
104.072m
63.937m
128.852m
65.149m
40.617m

0,023
33,908
22,986
4,004
1,753
4,37
8,226
16,147
6,799
5,382
6,136
2,663
1,649
3,342
4,521
10,551
12,88
4,858
12,123
5,684
3,592
2,105
3,42
3,944
8,074
8,651
12,932
14,508
5,658
21,116
1,135
0,676

2.286m
3390.847m
2298.576m
400.411m
175.323m
437.005m
822.579m
1614.724m
679.947m
538.236m
613.611m
266.308m
164.906m
334.245m
452.080m
1055.060m
1288.021m
485.817m
1212.341m
568.402m
359.183m
210.517m
342.039m
394.433m
807.440m
865.141m
1293.199m
1450.804m
565.820m
2111.565m
113.539m
67.638m

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
Tabla 36.Resumen curvas verticales 40km/h y peralte 7%

No.

P.K de VAV

Elevacin de
VAV

Inclinacin de
rasante T.E

0+000.00m

1255.339m

0+180.95m

1249.692m

-3,12%

0+516.89m

1269.105m

0+630.00m

1269.913m

0+903.25m

6
7

Inclinacin de
rasante T.S

A (Cambio de
pendiente)

Tipo de curva
perfil

Longitud de
curva de perfil

Valor de K

Radio de curva

5,78%

8,90%

Cncavo

51.000m

5,731

573.064m

5,78%

0,71%

5,06%

Convexo

31.000m

6,121

612.137m

0,71%

2,00%

1,28%

Cncavo

69.000m

53,839

5383.948m

1275.367m

2,00%

1,17%

0,82%

Convexo

24.000m

29,204

2920.424m

1+295.37m

1279.971m

1,17%

0,04%

1,14%

Convexo

51.000m

44,902

4490.151m

1+540.00m

1280.064m

0,04%

3,84%

3,81%

Cncavo

46.000m

12,084

1208.419m

1+800.00m

1290.061m

3,84%

1,84%

2,01%

Convexo

24.000m

11,951

1195.111m

2+340.00m

1299.980m

1,84%

6,13%

4,30%

Cncavo

24.000m

5,587

558.683m

10

2+406.30m

1304.046m

6,13%

3,05%

3,08%

Convexo

51.000m

16,536

1653.572m

11

2+641.53m

1311.216m

3,05%

2,20%

0,85%

12

2+995.00m

1319.000m

2,20%

4,46%

2,25%

Cncavo

24.000m

10,646

1064.610m

13

3+205.00m

1328.359m

4,46%

5,01%

0,55%

Cncavo

24.000m

43,646

4364.629m

14

3+634.58m

1349.865m

5,01%

4,83%

0,17%

Convexo

24.000m

137,974

13797.417m

15

4+017.79m

1368.383m

4,83%

1,39%

3,44%

Convexo

24.000m

6,981

698.072m

16

4+297.68m

1372.286m

1,39%

-3,82%

5,22%

Convexo

28.000m

5,369

536.865m

17

4+730.00m

1355.766m

-3,82%

-1,53%

2,30%

Cncavo

24.000m

10,455

1045.531m

18

5+280.17m

1347.373m

-1,53%

-3,12%

66

7. Seccin transversal tpica utilizada


De acuerdo con el Artculo 15 de la Ley 105 de 1993 para el diseo de vas nacionales se deben cumplir con
los siguientes requerimientos mnimos:

Ancho de carril: 3.65 metros.


Ancho de berma: 1.80 metros.
Mximo porcentaje de zonas restringidas para adelantar: 40 por ciento.
Rugosidad mxima del pavimento 2.5 IRI (ndice de Rugosidad Internacional).

Segn el manual de diseo de vas, se obtiene la tabla mostrada a continuacin la cual contiene el ancho de la
calzada el en funcin de la categora de la carretera, del tipo de terreno y de la Velocidad de diseo del tramo
homogneo (VTR). En carreteras de una sola calzada el ancho mnimo de sta debe ser de siete metros (7 m)
con el propsito de permitir el cruce de dos vehculos de diseo que viajen en sentido contrario (INVIAS, 2008)
Tabla 37.Ancho de calzada Manual de diseo

En la siguiente tabla se presenta el ancho de berma y ancho de cuneta, estos dependen de la categora de la
carretera, el tipo de terreno y la velocidad de diseo del tramo homogneo (VTR). (INVIAS, 2008)

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
Tabla 38.Anchos de Bermas Manual de diseo

Segn lo especificado en clase los parmetro definidos para el proyecto fueron los siguientes:

Ancho de carril: 3.65 m


Ancho de berma: 1.8 m
Capa asfltica: 0.1 m
Base granular: 0.2 m
Sub-base granular: 0.3 m

8. Resumen de Volmenes de Movimiento de Tierras


Los volmenes de tierra representan uno de los porcentajes ms altos del presupuesto de una va. Por esta
razn en mltiples ocasiones, se plantea la opcin de desarrollar tneles y puentes en el trayecto de la va para
reducir en una forma importante los costos. Los puentes son estructuras las cuales son construidas cuando los
volmenes de corte y relleno son muy grandes, ya que estos volmenes deben soportar la va y deben tener
estructuras complementarias que ayuden a este tipo de estabilidad. Los puentes se construirn sobre la va en
momentos donde el trazado se encuentre superior al terreno o cuando el muro de contencin que se tenga que
construir tenga una altura mayor a nueve metros. Los puentes son viables siempre y cuando el puente cumpla
con las dimensiones, pendientes y peraltes establecidas en el trazado de la va.
Los tneles dan como opcin disminuir volmenes de corte. Son estructuras que se encuentran por debajo del
suelo, en caso que la pendiente del terreno sea muy pronunciada o la topografa del terreno no sea fcil se
trazan este tipo de estructuras iniciando en una cota y terminando en la misma. Tambin se puede presentar
que el tnel tenga una pendiente pero no puede ser mayor a la pendiente de diseo que se estableci al inicio
del proyecto.
Cabe aclarar que la opcin de incluir un tnel o un puente en el proyecto depende exclusivamente de la
magnitud del volumen que desea cortar y rellenar, ya que si nos son volmenes grandes estas opciones
pueden no resultar viables debido a que sus costos son ms altos.
68

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Por lo general los volmenes de corte sirven para suplir la demanda de volmenes de relleno. Sin embargo,
cabe resaltar que no todos los volmenes de corte sirven como volmenes de relleno para un tramo de la va.
Los volmenes de descapote, que representan toda la capa vegetal de la zona con un espesor de 50 cm, son
volmenes que no hacen parte de los volmenes de rellenos pero si de los volumen de corte.
A continuacin se realiza un inventario de las estructuras que fueron incluidas en el proyecto. Se muestran
para los tres trazados realizados :
PUENTES:
Tabla 39.Inventario puentes 50 km/h peralte 6%

#
1

Inventario Puentes 50 km/h peralte 6%


Inicio
Final
K4+860
K4+960

Longitud (m)
100

Tabla 40.Inventario puentes 40 km/h peralte 8%

#
1

Inventario Puentes 40 km/h peralte 8%


Inicio
Final
K3+420
K3+480

Longitud (m)
60

Tabla 41.Inventario puentes 40 km/h peralte 7%

#
1

Inventario Puentes 40 km/h peralte 7%


Inicio
Final
K3+3350
K3+3660

Longitud (m)
300

TUENELES:
Tabla 42.Inventario tneles 50 km/h peralte 6%

#
1

Inventario Tneles 50 km/h peralte 6%


Inicio
Final
K4+100
K4+280

Longitud (m)
180

DESCAPOTE
El descapote es una composicin de tierra orgnica que se encuentra en la parte superior del terreno, esta
composicin de tierra no tiene propiedades de resistencia y por esto es necesaria su remocin tanto en las
secciones de corte y en las secciones de relleno. En este caso el equipo de diseo decidi segn el estudio de
suelo en el que se encuentra y la zona geolgica que la altura de descapote para este tramo de va ser 0.5m.

69

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

MOVIMIENTO DE TIERRAS
Debido al diseo geomtrico que la va presenta se tienen unas secciones donde se debe cortar el terreno y
otras secciones donde se debe rellenar para tener un diseo ideal de la va. Los movimientos de tierra son
calculados por medio de los volmenes, se calcula el volumen de relleno y de corte por medio de dos reas
consecutivas por una distancia que las separa. Esto genera un trapecio donde por medio del promedio de las
reas y la longitud que las separa se obtiene el volumen ya sea de corte o de relleno, dependiendo de la
ubicacin en la que se encuentre sobre el diseo de la va. Este volumen es un volumen de tierra que se puede
ser reutilizado. A continuacin se muestra su respectiva ecuacin:

Se tiene que tener en cuenta el volumen del descapote, ya que esta composicin de suelo no aporta a la
estabilidad de la va, entonces se debe recalcular el volumen que se debe traer o quitar.

DIAGRAMA DE MASAS
Teniendo en cuenta las anteriores consideraciones con respecto al volumen de corte, relleno y descapote, es
posible realizar el diagrama de masas para cada uno de los diseos realizados.
El diagrama de masas se obtiene a partir del volumen acumulado de todo el proyecto para cada una de las
abscisas del proyecto. Con la siguiente ecuacin se obtiene lo deseado:

En cuanto al diagrama de masas es necesario resaltar que se tiene en cuenta el descapote, adems es
necesario ajustar los volmenes tanto para el volumen de corte como el de relleno para obtener volmenes en
banco, pues son todos movimientos de tierras se realizan por medio de volquetas.
Si el diagrama de masas aumenta, significa que hay un corte, mientras si disminuye se presenta un relleno. Es
necesario tener en cuenta tambin algunas consideraciones sobre las propiedades del diagrama de masas:

Puntos de inflexin en el diagrama indican zonas de corte y relleno.


Cualquier lnea horizontal que intersecte 2 puntos del diagrama muestra una zona de compensacin de
volmenes.
La distancia entre centrides de las zonas de compensacin es la distancia media de acarreo entre dichas
zonas.
En cualquier punto del diagrama se observa el volumen acumulado.
A partir de todas estas consideraciones realiz el diagrama de masas para cada uno de los diseos de va
realizados. A continuacin se muestran estos diagramas:

70

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 24.Grfica diagrama de masas velocidad 50 Km/h peralte6%.

Ilustracin 25. Grfica diagrama de masas velocidad 40 Km/h peralte 8%.

71

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 26. Grfica diagrama de masas velocidad 40 Km/h peralte 7%.

9. Criterios y diseo de Sealizacin


Los criterios de sealizacin empleados en el desarrollo del proyecto corresponden a la aplicacin de los
lineamientos y consideraciones descritas en el Manual de Sealizacin Vial (INVIAS, 2004).

9.1.

Aspectos Generales

9.1.1.
Funcin
Los elementos de sealizacin y dispositivos para la regulacin del trnsito tienen como propsito alertar a los
usuarios (conductores y peatones), acerca de las precauciones que se deben tener en consideracin, as como
las limitaciones que gobiernan los diferentes tramos que componen un corredor vial. Adicionalmente, hay
marcas y sealizacin de carcter informativo, que presentan la informacin adicional necesaria para el usuario
de la va.
9.1.2.
Visibilidad
Con el fin de garantizar la correcta visualizacin de todos los elementos de sealizacin y dispositivos de
regulacin del trnsito, se debe asegurar que la informacin asociada a cada dispositivo sea transmitida al
usuario de la va tanto en el da como en la noche, por lo cual es necesario que los elementos de sealizacin
estn fabricados con materiales reflectivos que cumplan dicho propsito, sin generar deslumbramiento en los
usuarios cuando utilizan el corredor vial en horas de baja luminosidad (noche, condiciones de neblina, etc.) y
que la ubicacin de las seales est correctamente iluminada.
9.1.3.
Uso
Para garantizar el cumplimiento de la funcin de los dispositivos de regulacin del trnsito, se han establecido
regulaciones acerca de la simbologa, diseo y localizacin de los elementos de sealizacin, para que el

72

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

propsito especfico de cada elemento de sealizacin sea representado de forma unificada en todo el territorio
nacional, permitiendo a los usuarios la comprensin de la informacin contenida en cada uno de ellos.
9.1.4.
Conservacin
Este elemento hace referencia a las condiciones en las que se deben mantener todos los dispositivos de
regulacin del trnsito durante su vida til. Cada elemento debe permanecer en una correcta posicin y deben
mantenerse limpias y legibles. Esto claramente para garantizar la capacidad de cada elemento de sealizacin
de cumplir la funcin para la que fue diseado y ubicado en la va.

9.2.

Sealizacin Vertical

9.2.1.
Generalidades
Este tipo de seales est constituida por placas fijadas en postes o estructuras que se ubican en la regin
adyacente a la va. Sus funciones especficas determinan su clasificacin, sin embargo en trminos generales,
las seales verticales cumplen el propsito de alertar a los usuarios sobre las condiciones particulares que se
presentarn ms adelante en la va, reglamentar el uso del corredor vial por el que se transita y por ltimo
brindar informacin necesaria para guiar a los usuarios de dicho corredor.
9.2.2.

Colocacin de las Seales

9.2.2.1. Ubicacin Lateral


Todas las seales deben ser colocadas en el costado derecho de la va, teniendo en cuenta el sentido del
trnsito y que el plano frontal de la seal debe ser en la medida de lo posible perpendicular al eje de la va, se
establece una tolerancia para esta configuracin, de tal forma que el ngulo formado
cumpla la siguiente
restriccin:

En vas multicarril y cuando las condiciones de la va as lo requieran, ser posible complementar la


sealizacin usando el costado izquierdo (segn sentido de trnsito) para instalar elementos de sealizacin
adicionales o faltantes en el costado derecho.
Para las vas rurales (Carretera), las configuraciones de ubicacin lateral se esquematizan en la Error! No se
encuentra el origen de la referencia., en la cual se detallan las distancias reglamentarias de separacin del
costado de la va, as como las alturas requeridas con el fin de lograr una adecuada visualizacin de la seal,
tanto para la condicin de terrapln como de corte.

73

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 27.Configuracin de Ubicacin Lateral - Carretera.

9.2.2.2. Ubicacin Longitudinal


Existen criterios individuales para la localizacin longitudinal de las seales de acuerdo a su clasificacin, sin
embargo, en casos especiales, en donde la distancia libre disponible para la ubicacin de seales no es
suficiente para ubicar dos de ellas, ser posible ubicar dos seales en una misma estructura de soporte
ubicadas a una distancia longitudinal que depende de la velocidad de operacin de la va. Las distancias se
presentan en la Error! No se encuentra el origen de la referencia..
Tabla 43.Distancia Mnima para la colocacin de seales dobles (INVIAS, 2004).

9.2.2.3. Altura
Las disposiciones a este aspecto indican que la altura mnima para vas rurales (Carretera), no debe ser
inferior a
medidos desde la parte inferior del tablero de la seal, hasta la lnea que representa la capa
de rodadura de la va. En este tem, el manual contiene inconsistencias en la representacin visual usada para
resumir las distancias laterales, en donde tambin se incluye el valor de altura mnima, sin embargo en este
informe se presenta una versin corregida de esta representacin, de acuerdo a las disposiciones descritas.
(Error! No se encuentra el origen de la referencia.)
9.2.3.

Clasificacin

9.2.3.1. Seales Preventivas


Las seales preventivas son aquellas cuyo propsito especfico es el de advertir al usuario sobre condiciones
peligrosas que se encuentran ms adelante segn el sentido del desplazamiento del usuario, incluyendo
adems detalles acerca de la naturaleza o tipo de dicha condicin.
74

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Las seales preventivas, en trminos generales se colocan sobre un tablero en forma de rombo equiltero,
salvo algunas excepciones y se emplean los colores amarillo: para el fondo de la seal y negro: para los
smbolos y mrgenes, en carretera se ubican de acuerdo a la velocidad de diseo del corredor vial.
Tabla 44.Distancias para la Ubicacin de seales Preventivas - Carretera. (INVIAS, 2004)

Dentro de los anexos del documento se presenta el resumen de las seales preventivas del Anexo A-1 del
Manual de Sealizacin (INVIAS, 2004), con el fin de ilustrar las diferentes seales que componen esta
categora.
9.2.3.2. Seales Reglamentarias
Las seales reglamentarias tiene como funcin indicar a los usuarios de los corredores viales las limitaciones,
prohibiciones y restricciones sobre el uso de dicho corredor, debido a la naturaleza restrictiva de las mismas,
su incumplimiento implica sanciones que han sido definidas dentro del Cdigo Nacional de Trnsito Terrestre.
En general se ubican sobre tableros circulares, exceptuando la seal de Pare (SR-01), que tiene base
octagonal, y la seal de Ceda el Paso, cuya base es un tringulo equiltero con una punta hacia abajo. Los
colores usados son: blanco para el fondo, rojo para mrgenes y lneas diagonales, y negro para el contenido
(flechas, nmeros, representaciones de vehculos, etc.).
La ubicacin de cada seal reglamentaria coincide con el lugar en el cual la limitacin o prohibicin que
expresa se hace aplicable.
Se incluye el resumen de seales reglamentarias que hace parte del Anexo A-2 contenido en el Manual de
Sealizacin (INVIAS, 2004).
9.2.3.3. Seales Informativas
Estas seales, como su nombre lo indica, tienen por propsito el de proveer informacin adicional a los
usuarios de las vas, con la cual poder guiarse acerca de localidades, destinos, sitios de inters turstico y
geogrfico, intersecciones, distancias por recorrer y prestacin de servicios, entre los ms importantes.
En la seccin de Anexos del documento, se incluye el resumen de seales informativas que hace parte del
Anexo A-3 del Manual de Sealizacin (INVIAS, 2004).

75

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

9.3.

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Sealizacin Horizontal

9.3.1.
Generalidades
La sealizacin horizontal corresponde a marcas viales, compuestas por: lneas, flechas, smbolos y letras que
se ubican sobre la superficie misma del pavimento, bordillos o sardineles, as como en los objetos colocados
sobre la superficie de rodadura, con el fin de canalizar el trnsito e indicar acerca de la presencia de obstculos
en la va que requieren del usuario especial atencin o una reaccin anticipada para su evasin.
9.3.2.
Materiales y Colores
Las seales horizontales deben realizarse haciendo uso de pinturas, que pueden aplicarse en fro o en
caliente, que cumplan con los requerimientos de Visibilidad, con la restriccin de no generar superficies
deslizantes.
Como complemento a las lneas longitudinales, se podrn emplear tachas que sobresalgan menos de 2.5 cm
de la capa de rodadura, y que cumplan las condiciones de visibilidad, a travs de materiales reflectivos en
correspondencia con los colores de las lneas. Para la demarcacin de sardineles podrn emplearse elementos
como tachas, boyas, etc., que sobresalgan de la superficie hasta los 10 cm de altura. Los lineamientos
especficos para lneas y elementos adicionales se describen en detalle en las normas tcnicas colombianas
NTC-1360-1 y NTC-4745 respectivamente.
Los colores empleados para la demarcacin sern blanco o amarillo dependiendo del uso, lneas longitudinales
amarillas representan la separacin del trnsito en diferente sentido y lneas blancas para separar el trnsito
den el mismo sentido.
9.3.3.

Clasificacin

9.3.3.1. Marcas Longitudinales


Esta categora est dividida en subcategoras ms especficas, de las cules se describirn los lineamientos
asociados a las carreteras rurales, enfticamente las que apliquen dentro de vas de un solo carril por sentido
de desplazamiento.

Lneas Centrales: Para vas rurales (Carretera), las lneas centrales sern amarillas, para marcar los carriles
de trnsito en sentidos opuestos y blancas para marcar carriles en el mismo sentido. La lnea debe tener un
ancho de
y sern intermitentes con la siguiente especificacin: Longitud pintada
, longitud sin
pintar

Lneas de Borde de Pavimento: Es la lnea continua que se encarga de separar la berma del carril, de
circulacin, debe ser de color blanco y debe tener un ancho de
.

Demarcacin de Zonas de Adelantamiento prohibido: Deben demarcarse estas zonas para tramos de
recta, curvas horizontales y verticales, en donde la distancia de visibilidad de adelantamiento resulte inferior a
la disponible para efectuar la maniobra. La longitud mnima de la lnea de prohibicin y la longitud de visibilidad
dependen de la velocidad de diseo como se muestra en la Error! No se encuentra el origen de la
referencia.. Como consideraciones adicionales se debe tener en cuenta que la altura del ojo del conductor
para curvas verticales, se mide a
del pavimento, y la visual del conductor para curvas horizontales se
encuentra a

del eje de la va, en cada sentido de desplazamiento.


76

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 45.Distancias mnimas de visibilidad, para demarcacin de zonas de prohibido adelantamiento. (INVIAS, 2004)

Se presentan adicionalmente las representaciones grficas de las condiciones de adelantamiento prohibido


tanto en planta como en alzado.

Ilustracin 28. Esquema demarcacin de zonas de adelantamiento prohibido - Curvas Verticales (Planta) (INVIAS, 2004)

Ilustracin 29. Esquema demarcacin de zonas de adelantamiento prohibido - Curvas Verticales (Alzado)

77

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 30. Esquema de demarcacin de zonas de adelantamiento prohibido - Curva Horizontal

9.3.3.2. Marcas Trasversales


Estas marcas estn compuestas principalmente por lneas de pare ante elementos de trnsito como semforos
y seales verticales de ceda el paso, entre otras. Adicionalmente, dentro de estas categoras se incluyen las
flechas de giros y cambios de canalizacin en el trnsito. Sin embargo para vas rurales sin intersecciones no
se consideran estas marcas transversales.
9.3.3.3. Marcas de Bordillos y Sardineles
Estn compuestas por marcas de advertencia acerca de los bordillos que representen un riesgo, o que
generen cambios en el encausamiento del trnsito hacia carriles salientes. (Y). La tcnica de demarcacin
consiste en cubrir la superficie del elemento a sealizar con pintura amarilla. Dentro de las vas rurales sin
obstculos en su trazado no aplican.
9.3.3.4. Marcas de Objetos
Se deben marcar todos los obstculos que se encuentren dentro del trazado del corredor vial (ejemplo: Pilas
de puentes) Usando bandas negras y amarillas alternadas sobre la superficie misma del obstculo.

10.

Resumen del Diseo de Sealizacin

A continuacin se presenta las abscisas con el tipo de demarcacin horizontal correspondiente para cada una de las
vas propuestas.
Tabla 46. Tipo de lnea

Lnea T.1
Lnea T. 2
Lnea T.3
Lnea T.4

Continua
Continua adelantamiento N-S
Continua adelantamiento S-N
Discontinua
78

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 47. Sealizacin horizontal 40km/h peralte 8%.

Lnea T.1
Abscisa
inicial

Abscisa final

Longitud

K0+000

K0+355

355.298

K0+355

K0+381

26

K0+381

K0+411

30

K0+411

K0+437

26

K0+437

K0+530

92

K0+530

K0+555

25.5

K0+555

K0+581

25

K0+581

K0+606

25

K0+606

K0+690

84

K0+690

K0+771

81

K0+771

K0+796

24

K0+796

K0+853

56

K0+853

K0+878

24

K0+878

K0+950

72

K0+950

K1+103

53

K1+103

K1+127

25

K1+127

K1+155

27

K1+155

K1+179

24

K1+179

K1+316

136

K1+316

K1+343

26

K1+343

K1+369

25

K1+369

K1+396

26

K1+396

K1+485

89

K1+485

K1+514

29

K1+514

K1+598

84

K1+598

K1+627

29

K1+627

K1+672

44

K1+672

K1+701

29

K1+701

K1+763

62

K1+763

K1+793

29

K1+793

K1+980

529

K1+980

K2+322

342

K2+322

K2+351

29

K2+351

K2+378

43

K2+378

K2+407

29

Lnea. 2

Lnea T.3

Lnea T.4

x
x

x
x

x
x

79

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

K2+407

K2+450

43

K2+450

K2+471

21

K2+471

K2+500

29

K2+500

K2+527

43

K2+527

K2+557

29

K2+557

K2+896

339

K2+896

K2+925

29

K2+925

K2+964

38

K2+964

K2+993

29

K2+993

K3+020

27

K3+020

K3+041

21

K3+041

K3+070

29

K3+070

K3+097

27

K3+097

K3+126

29

K3+126

K3+291

165

K3+291

K3+321

29

K3+321

K3+354

32

K3+354

K3+384

29

K3+384

k3+407

23

k3+407

K3+436

29

K3+436

K3+457

20

K3+457

k3+486

29

x
x

k3+486

K3+508

21

K3+508

K3+537

29

K3+537

K3+557

19

K3+557

K3+586

29

K3+586

K3+ 613

29

K3+ 613

k3+678

36

k3+678

K3+708

29

K3+708

k3+730

22

k3+730

k3+759

29

k3+759

K3+807

48

K3+807

K3+836

29

K3+836

K3+887

30

K3+887

k3+947

60

k3+947

k3+976

43

k3+976

K4+006

30

K4+006

K4+036

30

K4+036

K4+110

74

K4+110

K4+139

30

80

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

K4+139

K4+175

36

K4+175

k4+205

29

k4+205

k4+219

14

k4+219

k4+248

29

k4+248

k4+358

k4+358

k4+287

29

k4+287

k4+323

35

k4+323

k4+352

29

k4+352

k4+370

17

k4+370

k4+399

30

k4+399

k4+459

60

k4+459

k4+488

29

k4+488

k4+520

31

k4+520

k4+549

29

k4+549

k4+568

19

k4+568

k4+597

29

k4+597

k4+659

61

k4+659

k4+687

28

k4+687

k4+715

27

k4+715

k4+743

28

k4+743

K5+274

530

K5+274

k5+329

26

k5+329

k5+357

28

k5+357

k5+365

Tabla 48.Sealizacin horizontal 40km/h peralte 7%.

Tipo Lnea
Abscisa Inicio

Abscisa Final

Longitud

K0+000.000

K0+155.450

155.45

K0+155.450

K0+265.895

110.45

K0+265.895

K0+491.814

225.92

K0+491.814

K0+664.500

172.69

K0+664.500

K0+697.233

32.73

K0+697.233

K0+777.915

80.68

K0+777.915

K0+998.962

221.05

K0+998.962

K1+320.870

321.91

K1+320.870

K1+416.760

95.89

K1+416.760

K1+541.740

124.98

K1+541.740

K1+678.050

136.31

Lnea T.1 Lnea T.2 Lnea T.3 Lnea T.4


x
x
x
x
x
x
x
x
x
x
x

81

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

K1+678.050

K1+812.000

133.95

K1+812.000

K2+225.175

413.18

K2+225.175

K2+352.000

126.83

K2+352.000

K2+380.800

28.80

K2+380.800

K2+538.581

157.78

K2+538.581

K2+705.419

166.84

K2+705.419

K2+789.572

84.15

K2+789.572

K2+928.571

139.00

K2+928.571

K3+012.879

84.31

K3+012.879

K3+193.000

180.12

K3+193.000

K3+308.653

115.65

K3+308.653

K3+579.450

270.80

K3+579.450

K3+889.156

309.71

K3+889.156

K3+940.228

51.07

K3+940.228

K4+054.608

114.38

K4+054.608

K4+242.711

188.10

K4+242.711

K4+331.342

88.63

K4+331.342

K4+459.546

128.20

K4+459.546

K4+540.165

80.62

K4+540.165

K4+606.883

66.72

K4+606.883

K4+691.715

84.83

K4+691.715

K4+718.000

26.28

K4+718.000

K4+752.000

34.00

K4+752.000

K5+173.850

421.85

K5+173.850

K5+271.372

97.52

K5+271.372

K5+275.000

3.63

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

A continuacin se presenta las abscisas con el tipo de demarcacin vertical para los proyectos.
Tabla 49.Demarcacin vertical carril izquierdo.

Tipo de Seal

Carril Izquierdo (N-S)


Seal Vertical

Abscisa

Preventiva Reglamentaria

K0+010

Reglamentaria

K0+300

82

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Preventiva

K0+710

Preventiva

K1+105

Preventiva

K1+483

Reglamentaria

K1+560

Preventiva

K2+012

Preventiva

K2+388

Preventiva

K2+619

Preventiva

K2+837

Preventiva

K3+109

Preventiva

K3+437

Preventiva

K3+674

Preventiva Reglamentaria

K4+030

Preventiva

K4+775

83

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
Tabla 50. Demarcacin vertical carril derecho.

Tipo de Seal

Carril Derecho (S-N)


Seal Vertical

Abscisa

Preventiva

K5+053

Reglamentaria

K4+700

Preventiva Reglamentaria

K4+418

Preventiva

K4+119

Preventiva

K3+665

Preventiva

K3+443

Preventiva

K3+108

Preventiva

K2+859

Preventiva

K2+643

Preventiva

K2+458

Reglamentaria

K2+040

Preventiva

K1+355

Preventiva

K0+960

Preventiva

K0+367

84

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

11.

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Presupuesto
Tabla 51.Presupuesto 50 km/h peralte 6%.

tem

Unidad

Cantidad

Precio Unitario

Costo total

1. Explanacin
Descapote

Ha

0.30200209

1800000 $

543,603.76

Cortes de Material comn

m3

73056.4911

6500 $

474,867,192.08

Cortes de Roca

m3

31309.9248

28500 $

892,332,855.44

Terraplenes

m3

884308.129

6180 $

5,465,024,237.31

Derrumbes (10% material corte)

m3

10436.6416

6000 $

62,619,849.50

6,895,387,738.09

m3-km 8780628.26

800 $

7,024,502,610.86

Aca.Mat. Prstamo SubBaseGranu m3-km 10466.1606

800 $

8,372,928.48

Aca.Mat.Pres. Base Granular

m3-km

7286.419

800 $

5,829,135.20

Aca.Mat. Asfalticos

m3-km

3643.2095

800 $

2,914,567.60

Aca. Mat. Sobrantes

m3-km 9242766.59

800 $

7,394,213,274.59

14,435,832,516.74

Total
2. Transporte
Aca.Mat. Prstamo Terrapln

Total
3 Pavimentos
Sub base granular

m3

10466.1606

95000 $

994,285,257.00

base granular

m3

7286.419

75000 $

546,481,425.00

imprimacin

m2

20.61696

2500 $

concreto asfaltico

m3

3643.2095

450000 $

1,639,444,275.00

3,180,262,499.40

total

51,542.40

4 Obras arte
Alcantarilla dimetro 0.9m

ml

41.76

320000 $

13,363,200.00

muros de concreto

m3

10879.375

425000 $

4,623,734,375.00

cuneta revestida

ml

10549.542

270000 $

2,848,376,340.00

filtros

ml

207.36

75000 $

15,552,000.00

acero refuerzo grado 60

kg

12.1849

32000 $

389,916.80

total

7,501,415,831.80

5 Puente y o Tneles
Puentes

ml

30000000 $

Tneles

ml

180

40000000 $

7,200,000,000.00

7,200,000,000.00

Total

85

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

6 Obras varias
Cercas

ml

9607.772

20000 $

192,155,440.00

Seales verticales Preventivas

25

180000 $

4,500,000.00

Seales verticales Reglamentarias u

180000 $

1,260,000.00

Seales verticales informativas

180000 $

Lneas demarcacin continua

ml

2990.3316

2100 $

6,279,696.36

Lneas demarcacin discontinua

ml

1993.5544

2100 $

4,186,464.24

Tachas Reflectivas

416

11500 $

4,784,000.00

Poste Kilometraje

40000 $

160,000.00

213,325,600.60

5000 $

1,495,165,800.00

0 $

2,864,497,299.06

4,359,663,099.06

4,378,588,728.57

Total

4,378,588,728.57

Total Construccin Proyecto

48,164,476,014.26

Total

7 Predios y manejo ambiental


Predios

m2

299033.16

Manejo ambiental(7% Proyecto)

Global

Total
8 Interventora
Interventora (apx 10% del proy)

Global

Longitud de proyecto

5.2

Costo Total por Km: $millones /KM

Costo en Dlares/km: U$ /km

9,262,399,233.51
4,874,946.97

Tabla 52.Presupuesto 40 km/h peralte 8%.

tem
1.

Unidad

Cantidad

Precio Unitario

Descapote

Ha

0.09654466

1800000

173,780.39

Cortes de Material comn

m3

105131.0977

6500

683,352,134.85

Cortes de Roca

m3

45056.18472

28500

1,284,101,264.40

Terraplenes

m3

12513.11999

6180

77,331,081.56

Derrumbes (10% material corte)

m3

15018.72824

6000

90,112,369.43

2,135,070,630.64

9,014,376.00

Explanacin

Total
2.

Costo total

Transporte
Aca.Mat. Prstamo Terraplen

m3-km

86

800

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Aca.Mat. Prstamo SubBaseGranu m3-km

11267.97

800

9,014,376.00

Aca.Mat.Pres. Base Granular

m3-km

7511.98

800

6,009,584.00

Aca.Mat. Asfalticos

m3-km

3755.99

800

3,004,792.00

Aca. Mat. Sobrantes

m3-km 1626592.694

800

1,301,274,155.06

1,328,317,283.06

Total
3

Pavimentos
Sub base granular

m3

11267.97

95000

1,070,457,150.00

base granular

m3

7511.98

75000

563,398,500.00

imprimacin

m2

751.198

2500

1,877,995.00

concreto asfaltico

m3

3755.99

450000

1,690,195,500.00

3,325,929,145.00

13,363,200.00

total
4

Obras arte
Alcantarilla dimetro 0.9m

ml

41.76

320000

muros de concreto

m3

425000

cuneta revestida

ml

10731.4

270000

2,897,478,000.00

filtros

ml

8241.993216

75000

618,149,491.20

acero refuerzo grado 60

kg

32000

total
5

Puentes

ml

80

30000000

Tneles

ml

40000000

3,528,990,691.20

2,400,000,000.00

2,400,000,000.00

Obras varias
Cercas

ml

5285.881

20000

105,717,620.00

Seales verticales Preventivas

24

180000

4,320,000.00

Seales verticales Reglamentarias

180000

1,620,000.00

Seales verticales informativas

180000

900,000.00

Lneas demarcacin continua

ml

1895.881

2100

3,981,350.10

Lneas demarcacin discontinua

ml

3470

2100

7,287,000.00

Tachas Reflectivas

447.15675

11500

5,142,302.63

Poste Kilometraje

40000

200,000.00

129,168,272.73

1,609,764,300.00

Total
7

Puente y o Tneles

Total
6

Predios y manejo ambiental


Predios

m2

321952.86

87

5000

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Manejo ambiental

Global

Total
8

751,024,612.77

2,360,788,912.77

1,520,826,493.54

1,520,826,493.54

Interventora
Interventora (apx 10% del proy)

Global

Total
Total Construccin Proyecto

$ 16,729,091,428.93

Longitud de proyecto

5.30

Costo Total por Km: $millones /KM

3,156,432,345.08

Costo en Dlares/km: U$ /km

1,661,280.18

Tabla 53.Presupuesto 40 km/h peralte 7%.

tem

Unidad Cantidad

Precio Unitario Costo total

1. Explanacin
Descapote

Ha

0.23831228

1800000 $

Cortes de Material comn

m3

250304.28

6500 $

1,626,977,818.50

Cortes de Roca

m3

107273.263

28500 $

3,057,287,988.61

Terraplenes

m3

493337.853

6180 $

3,048,827,931.48

Derrumbes (10% material corte)

m3

35757.7543

6000 $

214,546,525.52

7,948,069,226.20

889893.23

800 $

711,914,584.22

Aca.Mat. Prstamo SubBaseGranu m3-km 11077.0191

800 $

8,861,615.28

Aca.Mat. Pres. Base Granular

m3-km

7384.6794

800 $

5,907,743.52

Aca.Mat. Asfalticos

m3-km

3692.3397

800 $

2,953,871.76

Aca. Mat. Sobrantes

m3-km

1533464.8

800 $

1,226,771,836.61

1,956,409,651.40

Total

428,962.10

2. Transporte
Aca.Mat. Prstamo Terrapln

m3-km

Total
3 Pavimentos
Sub base granular

m3

11077.0191

95000 $

1,052,316,814.50

base granular

m3

7384.6794

75000 $

553,850,955.00

imprimacin

m2

738.46794

2500 $

1,846,169.85

concreto asfaltico

m3

3692.3397

450000 $

1,661,552,865.00

3,269,566,804.35

total

88

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

4 Obras arte
Alcantarilla dimetro 0.9m

ml

41.76

320000 $

13,363,200.00

muros de concreto

m3

5192.91667

425000 $

2,206,989,583.33

cuneta revestida

ml

10549.542

270000 $

2,848,376,340.00

filtros

ml

138.24

75000 $

10,368,000.00

acero refuerzo grado 60

kg

5.81606667

32000 $

186,114.13

total

5,079,283,237.47

9,000,000,000.00

5 Puente y o Tneles
Puentes

ml

300

30000000 $

Tneles

ml

40000000 $

Total

9,000,000,000.00

10039.546

20000 $

200,790,920.00

6 Obras varias
Cercas

ml

Seales verticales Preventivas

17

180000 $

3,060,000.00

Seales verticales Reglamentarias u

11

180000 $

1,980,000.00

180000 $

1,080,000.00

Seales verticales informativas

Lneas demarcacin continua

ml

915

2100 $

1,921,500.00

Lneas demarcacin discontinua

ml

4360

2100 $

9,156,000.00

Tachas Reflectivas

363

11500 $

4,174,500.00

Poste Kilometraje

40000 $

200,000.00

222,362,920.00

5000 $

1,582,431,300.00

0 $

2,034,068,619.76

3,616,499,919.76

3,109,219,175.92

Total

3,109,219,175.92

Total Construccin Proyecto

34,201,410,935.09

Total
7 Predios y manejo ambiental
Predios

m2

Manejo ambiental(7% Proyecto)

Global

316486.26

Total
8 Interventora
Interventora (apx 10% del proy)

Global

Longitud de proyecto

5.2

Costo Total por Km: $millones /KM

Costo en Dlares/km: U$ /km

89

6,577,194,410.59
3,461,681.27

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
Tabla 54.Presupuesto 40 km/h peralte 7%.

12.

Cronograma de Ejecucin y Flujo de Caja

13.1. Duracin de Actividades y Diagrama Temporal


A continuacin se presenta el cronograma de ejecucin del proyecto. Este cronograma no tiene ninguna
dependencia de acuerdo al trazado, es decir es generado como un documento estndar para cualquiera de las
tres alternativas. Estas actividades hacen parte de las grandes partidas de pago, no incluye el detalle de cada
una. Para la definicin de la duracin de las actividades se tomaron los rendimientos de cada una y de acuerdo
a esto se estableci lo siguiente.

Tabla 55. Duracin, tiempo de inicio y tiempo de fin de cada actividad

Actividad
Duracin [Meses] tmpe
Explanacin
35
0
Transporte
70
0
Pavimento
40
15
Obras de Arte
35
30
Tuneles/Puentes
30
30
Obras Varias
20
50
Predios y Manejo Ambiental
70
0
Interventoria
70
0

tmpt
35
70
55
65
60
70
70
70

A partir de la informacin de la tabla anterior se gener un diagrama temporal que muestra de manera
grfica la duracin de cada una de las actividades. Este diagrama de Gantt pone en evidencia que existe un
momento importante en el proyecto y que a partir de su ejecucin se pueden realizar las dems
actividades. Esta actividad es la de explanacin de la cual dependen las actividades de pavimento, obras
de arte, tneles/ puentes, obras varias. Por su parte, las actividades restantes, transporte, predios y manejo
ambiental e interventora, son actividades que se realizan durante el tiempo total de duracin del proyecto.
El proyecto tiene una duracin total de 70 meses. Se espera que su finalizacin se cumpla en el tiempo
estimado, y para esto se ha trabajado bajo los principios de Lean Construction.

90

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12
Diagrama Temporal del Proyecto
Tiempo (Meses)

10

20

30

40

50

60

70

Explanacin
Transporte

Ac vidad

Pavimento
Obras de Arte
Tuneles/Puentes
Obras Varias
Predios y Manejo Ambiental
Interventoria

Ilustracin 31. Diagrama temporal del proyecto a partir de las actividades de grandes partidas de pago.

13.2. Flujo de Caja y Porcentaje de Completacin


En los siguientes cuadras e ilustraciones se presenta la informacin correspondiente al flujo de caja por
mes y su respectivo porcentaje de completacin. A partir de esta informacin se puede delimitar la inversin
necesaria que se debe hacer para cada uno de los setenta perodos mensuales que dura el proyecto. Es
importante aclarar que, a pesar de lo que se mencion en el numeral anterior diciendo que la duracin y la
temporalidad de cada actividad es estndar para cada una de las tres alternativas, el costo presupuestal y
la inversin mensual cambia segn la necesidad o no de desarrollar cada una de las actividades. Es decir,
que para cada alternativa se proceder de una manera distinta de acuerdo a las caractersticas del trazado
en su ejecucin pero no en su programacin.

91

80

Tabla 56. Flujo de caja velocidad 40km/h peralte 8%.

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Tabla 57.Presupuesto 40 km/h peralte 7%.

93

Ilustracin 32. Curva S velocidad 50 Km/h peralte 6%.

Ilustracin 33.Curva S velocidad 40 Km/h peralte 8%.

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 34.Curva S velocidad 40 Km/h peralte 7%.

95

13.

Conclusiones, Recomendaciones y Sugerencias

La regin del eje cafetero es una zona de alto trnsito de carga as como de turistas. El transporte se hace por
medio de carreteras las cuales en los ltimos aos han visto un aumento significativo en los volumenes de trnsito.
Por ser esta una zona de alta actividad agrcola tiene varios e importantes centros urbanos en un rea muy pequea
lo que ha llevado a que la zona concentre un nmero importante de vas construdas. Naturalmente los caminos que
comunican a Manizales con Pereira presentan un trnsito importante de vehculos, motivo por el cual es necesario la
construccin, mejoramiento y mantenimiento de las vas que comunican a estos dos centros urbanos del oeste del
pas. Adicionalmente, la va es la misma que comunica centros importantes como Medelln y Cali.
De acuerdo con la informacin que se ha desarrollado a lo largo de este informe, se ha encontrado que la va que
comunica a Pereira y Manizales pasando por Chinchin ha alcanzado un nivel de servicio que tiende a disminuir con
el paso de los aos. Este es un motivo importante para contemplar el desarrollo de un nuevo proyecto de carretera.
Con las proyecciones realizadas se observ que estas presentaron valores de r cuadrado inferiores a 0.4, lo cual
pone en duda el nivel de confiabilidad de las mismas. Sin embargo, la informacin de proyecciones a partir del
inters compuesto no arrojaron unos resultados reales, arrojaron una sobrestimacin. Ante esta situacin se decidi
tomar los valores de las proyecciones de las regresiones como el estimativo a seguir.
En relacin al presupuesto se han obtenido valores esperados. Es decir, se esperaba que el proyecto ms costoso
fuera el que tuviera mayor radio de curvatura mnimo y el de menor el que tuviera menor nmero para este item. En
parte, el costo del tnel y el puente encarecen la obra para el trazado de 50km/h, situacin normal dadas las
condiciones de diseo. Adicionalmente, sobre el movimiento de tierras, es necesario hacer grandes movimientos de
excavacin para el trazado de 40km/h y peralte de 8%; en cambio para el trazado de 50km/h y peralte 6% es
necesario hacer ms relleno. Por su parte el proyecto intermedio es el de velocidad de 40km/h y peralte 7%.
Finalmente, como recomendaciones se puede decir que se esperara un manejo de obra adecuado en donde los
tiempos se cumplan de manera satisfactoria. Un proyecto que cumple con estndares de calidad altos, an si esto
implica mayores costos, es un proyecto exitoso. Para esto es necesario que el equipo de trabajo desde el obrero
hasta el que hace el diseo de la carretera estn trabajando conjuntamente de manera colaborativa y aplicada.

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Referencias
Carmona Alzate, J. H. (2004). Balance Hdrico y Clasificacin Climtica para el departamento de Caldas. Ventana
Informtica,
11,
51-68.
Obtenido
de
http://www.umanizales.edu.co/publicaciones/campos/ingenieria/ventana_informatica/html/ventana11/Balanc
eHidricoClasificacionClimatica.pdf
Corporacin Autnoma Regional de Caldas. (2013). DIAGNSTICO AMBIENTAL DE CALDAS PLAN DE ACCION
2013 - 2015. Manizales: Corporacin Autnoma Regional de Caldas.
INVIAS.

(2004). Manual de Sealizacin Vial. Recuperado el 15 de 11


http://www.invias.gov.co/index.php/hechos-de-transparencia/informacion-financiera-ycontable/doc_download/982-manual-de-senalizacion-vial

de

2014,

de

INVIAS. (2008). Manual de Diseo Geomtrico de Carreteras. Recuperado el 25 de 09 de 2014, de


http://www.invias.gov.co/index.php/hechos-de-transparencia/informacion-financiera-ycontable/doc_download/985-manual-de-diseno-geometrico
Lpez Ocampo, O. L. (2012). Anlisis de Vulnerabilidad de la cuenca del ro Chinchin para condiciones
estacionarias y de cambio climtico. Universidad Nacional de Colombia, Manizales. Obtenido de
http://www.bdigital.unal.edu.co/6100/3/8109507.2012_Parte1.pdf
Rivera, A. (2012). Los Climas de la Tierra. Recuperado el 20 de 11 de 2014, de EL TIEMPO - Las Provincias.es:
http://eltiempo.lasprovincias.es/las-cosas-del-clima/los-climas-tierra
Tafur Snchez, F. (2011). Diseo de vas. Apuntes de clase. Bogot: Universidad de los Andes.

97

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Anexos

Ilustracin 35: Resumen de Seales Preventivas

98

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 36: Resumen de Seales Reglamentarias

99

Universidad de Los Andes


Facultad de Ingeniera
Diseo Geomtrico de Vas

Departamento de Ingeniera Civil y Ambiental


Proyecto Final Grupo 12

Ilustracin 37: Resumen de Seales Informativas

100