demolicion maquinaria
eliminacion de desmonte
malla de seguridad
demolicino manual
1500
4500
4000
2400
3600
16000
1er piso
cantidad
medidas
losa
vigas
columnas
pared
pisos
volumen/area
120
60
25
100
80
precio u.
80 S/.
20.00
3.6 S/. 200.00
3.75 S/. 200.00
240 S/.
13.00
80 S/.
12.00
m2
m3
m3
m2
m2
precio u.
80 S/.
20.00
3 S/. 200.00
3.75 S/. 200.00
240 S/.
13.00
m2
m3
m3
m2
2do piso
cantidad
medidas
losa
vigas
columnas
pared
volumen
80
50
25
100
TOTAL
CAMIONES
MALLA
desmontaje
costo total
S/.
S/.
S/.
S/.
S/.
S/.
TOTAL
1,600.00
720.00
750.00
3,120.00
960.00
7,150.00
VOLUMEN TOTAL
16
3.6
3.75
2.6
12
37.95
S/.
S/.
S/.
S/.
TOTAL
1,600.00
600.00
750.00
3,120.00
16
3
3.75
2.6
S/. 6,070.00
25.35
M3
63.3
130.00
8,229.00
S/.13,220.00
TOTAL
S/.
S/.
S/. 2,734.56
S/.
500.00
S/. 1,500.00
CAMIONES
MALLA
desmontaje
S/.
S/.
S/.
2,734.56
1,500.00
12,463.56
prec m3 masivo
S/.17,954.6
M3
M3
dunia
cornejo
999045012