PREFACE
This is the first revision of Arahan Teknik (Jalan) 6/85 on 'Guideline for Presentation
of Engineering Drawings'. Although it is basically similar in essence and format to the one
published in 1985, various modifications have been made to suit current JKR requirements.
These guidelines should be followed for the presentation of engineering drawings for all road
projects under Cawangan Jalan, Ibu Pejabat J.K.R.
This Arahan Teknik will continue to be updated from time to time and in this respect, any
feedback regarding these guide lines will be most welcome. All comments should be
sent to Cawangan Jalan, Ibu Pejabat JKR, Malaysia.
Page 1
1. INTRODUCTION
The following guidelines have been prepared
in order to standardise the presentation of
engineering design drawings for road projects
undertaken by JKR.
The objectives of setting these guidelines are :
(a) to maintain a consistent standard in the
production of engineering drawings that
will clearly and concisely describe the
works to be carried out;
2. DRAWINGS REQUIREMENT
All drawings (master tracings) are to be A1
size, 594mm, by 841mm with a 10mm, 12mm
and 21mm border. The title block as shown in
Model Drawings No.1A should be used for all
drawings. No deviation from this is allowed.
General notes and legends are to be located on
the right hand side of the title block.
Page 2
6. CONTENTS OF DRAWINGS
6.1 Cover or Title Page
Page 3
6.7
6.6
Page 4
6.9
Plan Profile
Page 5
Page 6
Page 7
(f) Beams
These should include sectional, longitudinal
and plan details indicating all dimensions
and cable profiles. The reinforcement
and end block details may be on the same
or different drawings.
The notes should include among other
things the design criteria, ultimate bending
moment resistance and shear capacity,
brief material specifications etc.
(g) Diaphragms
These may be included in the drawings for
beams or together with details of deck
slab.
(h) Deck Slabs
These should include plan and sectional
details and reinforcement detail complete
with relevant notes.
(i) Handrails/Parapet and Expansion Joints
(c) Piles
This should include pile details and joints.
The numbers and types of piles for
abutment and piers and their capacities and
estimated lengths should be tabulated.
The notes should include the materials,
type of piles, (e.g. frictional or end
bearing), working loads, test loads and
other relevant information.
6.16.2
suitable scale
Page 8
(d) abutment-concrete
1:20, 1:25,1:30,1:40
details butment-reinforcement
details
ditto
(e) pier-concrete details
ditto
pier- reinforcement
details
ditto
(h) handrails/parapet
and expansion joints ,
1:2.5, 1:5,1:20
1:1, 1:7.5,1:25
Page 9
Page 10
(vii) PP - perparitan
represents drainage plans including
subsoil drain, drains, culverts etc.
(viii)ST - struktur
represents structural plans including
bridges, flyovers, grade-separated
interchange, retaining walls etc.
(ix) KA - kemudahan awam
represents public utilities plans.
(x) LL - lain-lain
represents miscellaneous plans include
soil investigation subsoil profile, street
lighting etc.
(f) The tenth space is for the series of drawings
for the particular detail as described in 7.1
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 27
Page 28