PTT Exploration and Production Public Company Limited

PTTEP Engineering General Specification


PEGS

Model Review Check List


Document No: PEGS-0710-ADM-008

Revision No: 0-0

Revision Date: February 2012

PTT Exploration and Production Public Company Limited

Revision History
Rev

Description of Revision

0-0

New Document

February 2012 Rev.0-0

Authorised
by

Date

Registry
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

TABLE OF CONTENTS
1.0

Purpose................................................................................................................... 1

2.0

Scope ...................................................................................................................... 1

3.0

Definitions .............................................................................................................. 2

3.1
3.2
3.3

Language ............................................................................................................................. 2
Terminology ......................................................................................................................... 2
Common Acronyms .............................................................................................................. 3

4.0

References.............................................................................................................. 4

4.1
4.2
4.3

PTTEP Internal References .................................................................................................. 5


International Standards ........................................................................................................ 5
Industry Codes and Standards ............................................................................................. 5

5.0

TOOLS..................................................................................................................... 6

5.1
5.2
5.3
5.4
5.5

Support Documents and Drawings ....................................................................................... 6


3D Model Check List ............................................................................................................ 6
Model Review .................................................................................................................... 19
Responsibilities .................................................................................................................. 29
Comment Tagging .............................................................................................................. 29

6.0

APPENDICES ........................................................................................................ 30

Appendix 1.

3D Model Review Comments.................................................................................... 30

February 2012 Rev.0-0

TOC
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

1.0

PEGS-0710-ADM-008

PURPOSE

The purpose of this specification is to provide the minimum requirements for model review
check list for checking 3D CAD models for both offshore and onshore facilities on a
continuous basis and during formal model review. The checklist is general in nature and may
require modifications for specific project requirements.
2.0

SCOPE

The 3D Model Review is intended to provide a complete review of all modelled items,
including the following:
1. Check Equipment Arrangement.
2. Check that all disciplines design input is in accordance with project requirements /
COMPANY specification including safety, operability and maintainability.
3. Check Constructability, Operability and Maintainability aspects.
4. Verify that piping design arrangements/routing are consistent with process
requirements.

February 2012 Rev.0-0

Page 1 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

3.0

PEGS-0710-ADM-008

DEFINITIONS

A number of different terms are commonly used to describe the work stages, processes, and
approvals which take place during the early stages of a development. This can often be a
source of confusion so the following section is intended to show the PTTEP preferred
terminology as used in this document.
3.1

LANGUAGE

In this document, the words should and shall have the following meanings:

3.2

Should

Indicates a preferred course of action. Should is a non-mandatory word and


is not forbidden, but use in the body of the text should be the exception.
Where none mandatory terms are used, each paragraph within these clauses
shall also have an associated commentary paragraph that provides the
rationale for why the stated choices and modifications are appropriate and
circumstance under which the stated choices and modifications might be
different.

Shall

Indicates a course of action with a mandatory status. The term shall shall
be used if a requirement is considered to be necessary to claim compliance
with a PEGS document.

TERMINOLOGY
Terminology

3D CAD Model

Action List Log


Approval

Description
An overall project three dimension computer model comprising of piping
equipment (including safety equipment), structural, electrical, instrument and
civil design including infrastructures
Document that contains a list of comments/actions to the 3D CAD model
during the review
The authorization in writing given by the COMPANY to the Contractor on a
procedure or to proceed with the performance of a specific part of the work
without releasing in any way the Contractor from any of his obligations to
conform with the technical specifications, requisitions, etc. The words
Approve, Approved and Approval shall be construed accordingly

AutoPLANT

Bentleys 3D Design Computer Software

COMPANY

PTT Exploration and Production Public Company Limited

Contract Documents

The material requisitions, material specifications, etc. issued by the COMPANY


and attached to the Contract or the Purchase Order

Contractor

Per contract: Contractor The contractor who is a PARTY to this CONTRACT


and where the context so requires, any and all SUBCONTRACTORS utilised
by CONTRACTOR for the performance of the WORK

Model File

A neutral file exported from PDMS which will be used for Review Reality
Software to generate the3D model. Or a neutral file exported from AutoPLANT,
which will be used for Navisworks review software to generate the 3D model

Navisworks

Bentleys proprietary computer software that enable the review files for
AutoPLANT 3D CAD Model

PDMS

Avevas Vantage Plant Design Management System proprietary computer


software

February 2012 Rev.0-0

Page 2 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

Terminology

PEGS-0710-ADM-008

Description

Review Reality

Avevas proprietary computer software that enables the review of a PDMS 3D


CAD Model.

Status File

A file that stores the colour definitions, Walk-Through animations (if any),
Camera definitions etc.,

3.3

COMMON ACRONYMS

Set out below in alphabetical order are common acronyms as found within this document:
AFC

Approved For Construction

API

American Petroleum Institute

ASME

American Society of Mechanical Engineers

ASTM

American Society for Testing and Materials

AutoPLANT

Bentley 3D Design Software

CAD

Computer Aided Design

CAPEX

Capital Expenditure

EPIC

Engineering design, procurement, installation and construction

HVAC

Heating Ventilation and Air Conditioning

ISO

International Standards Organisation

ISO/TC67

ISO Technical Committee 67

OPEX

Operational Expenditure

P&ID

Process and Instrument Diagram

PDMS

Plant Design Management System

PEGS

PTTEP Engineering and General Specification

PMT

Project Management Team

PPS

Project Particular Specification

PS

Pipe Support

PTTEP

PTT Exploration and Production Company Limited

QMS

Quality Management System

February 2012 Rev.0-0

Page 3 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

4.0

PEGS-0710-ADM-008

REFERENCES

The reference documents listed below, including Industry Codes and Standards and PTTEP
specifications, form an integral part of this Engineering General Specification.

Unless

otherwise stipulated, the applicable version of these documents, including relevant


appendices and supplements, is the latest revision published on the effective date of a
contract.
The overall order of precedence of the applicable documents shall be:
1. Applicable Laws, Rules and Regulations
2. International Rules, Codes, and Regulations
3. Purchase Order/ Service Order/ Contract Documents (Only applicable for direct
purchase by COMPANY)
4. Project Particular Specification (PPS)
5. COMPANY General Specification
6. Codes and Standards in reference
Any conflict between any of the Contract Documents, or between this specification and any
other Contract Document, shall be reported to PTTEP for decision. In such a case, and
unless otherwise agreed or decided by PTTEP, it is understood that the more stringent
requirement shall apply. Exceptions to, or deviations from this specification are not permitted
unless previously accepted in writing by PTTEP. For this purpose, requests for substitutions
or changes of any kind shall be complete with all pertinent information required for PTTEP
assessment. PTTEPs approval, nevertheless, will not, in any way, relieve the responsibility of
the Contractor to meet the requirements of the industry Codes and Standards referred to and
amended herein, in the event of conflict.

February 2012 Rev.0-0

Page 4 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

4.1

PEGS-0710-ADM-008

PTTEP INTERNAL REFERENCES

Internal documents applicable to this document are indicated in the table below.
Document Number

4.2

Document Title

PEGS-1015-SAF-001

Layout

PEGS-1015-SAF-005

Escape, Evacuation and Rescue from Fixed Installations

PEGS-0710-ADM-007

PDMS Standards and Procedures

PEGS-0710-PIP-001

Piping Design, Fabrication and Installation

INTERNATIONAL STANDARDS

International standards applicable to this document are indicated in the table below i.e. ISO,
IEC or ITU.
Document Number

Quality Management System Guidelines for Quality Plans

ISO 10005

4.3

Document Title

INDUSTRY CODES AND STANDARDS

Industry codes, standards and regional legislation applicable to this document are indicated in
the table below.
Document Number

Document Title

API RP 14J

Recommended Practice for Design and Hazards Analysis for


Offshore Production Facilities

API RP 500

Classification of location for Electrical Installation at Petroleum


Facilities

CAP 437

Offshore Helicopter Landing Areas Guidance on Standard

NFPA 13

Standard for the Installation of Sprinkler System

NFPA 30

Flammable and Combustible Liquids Code

February 2012 Rev.0-0

Page 5 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

TOOLS

5.0

The following listed below are the main software to be used for the internal group and client
model reviews
1. Averas PDMS or Review Reality
2. Bentleys AutoPLANT or Navisworks
Note: The COMPANY will designate the 3D CAD software to be utilised before the commence
of the project.
Reference items, reserved volume, etc, and an operator of the same scale as the model under
review, will be available. This model operators dimensions will be representative of the
applicable population.
5.1

SUPPORT DOCUMENTS AND DRAWINGS

Prior to model reviews, the following documents of latest revisions shall be prepared and will
be made available during the model review session. These will be marked as Model Review
Master.
1. P&ID
2. Equipment Layouts
3. Escape Route Layouts
4. Equipment List
5. Line List
6. Previous model review action list (as applicable).
The following documents and drawings will be made available during the model review, upon
request:
1. Equipment dimensional details.
2. Instrument Index.
3. Fire Fighting Equipment Layouts.
4. Safety Equipment Layouts (including main escape route and muster area)
5. Mechanical Handling Study.
5.2

3D MODEL CHECK LIST

5.2.1

Safety

1. Any special or specific safety requirements.


2. Adequacy of coverage and avoidance of dead ends on main access/escape routes.
3. Emergency exits from rooms and platforms (staircases or ladders), hand railing.
February 2012 Rev.0-0

Page 6 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

4. Location of fire pumps, hydrants, monitor and hose reels, and fire hose cabinets.
Equipment shall be easily accessible and installed in a position / orientation to enable
quick operation e.g., opening of cabinet door will not obstruct the access to hydrant.
5. Emergency shutdown valve locations to optimize the isolated sections.
6. Spillage containment/collection.
7. Rain water drainage systems.
8. Escape routes to muster areas/Boat landing
9. Area adequacy and equipment arrangement around lifeboat / life raft embarkations to
prevent obstruction and optimise embarkation time.
10. Safety shower and eye wash locations.
11. Location of safety/portable fire fighting equipment. Equipment shall be clearly visible
and easily accessible.
12. Deluge and back-up valve station locations.
13. Fire Truck Station (onshore).
14. Flare stack, burn pit vocation and sterile zone.
15. Obstruction or infringement of escape route width or head clearance by structure
(bracing, beams, piping / cable tray support, etc.) or any equipment (e.g. junction
boxes, instrument, cable tray, etc.).
16. Spray/sprinkler nozzle orientation around equipment.
5.2.2

General Layout and Maintenance

1. Location of the Vents/ Exhausts in safe area.


2. Escape routes / maintenance and operations access routes for all equipment
3. Safety distances between equipments.
4. Platform arrangement to optimize operational maintenance requirements and provide
good access and working room around all equipment.
5. Platform arrangement to optimize adequate and easy access ways for fire fighting
equipment.
6. Clearances for operation, maintenance and removal of electrical equipment and
transformers from each room.
7. Future expansion provision for future equipment and piping (space and access).
8. Check valve accessibility both from operation and maintenance point of view. Ensure
that valves (specifically small bore drain valves) are not located such that, it becomes

February 2012 Rev.0-0

Page 7 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

liable to be damaged or poses a tripping hazard specific requirement are detailed in


the engineering standards applicable to the project.
9. Provision of access / clearance between skid mounted packages or equipment to
allow for dismantling of any part, special tools or consumables to be used for
maintenance.
10. Dropped object protection, equipment or piping containing hydrocarbons below crane
sweeps.
11. Hazardous area classification / Non classified equipment.
12. Fire and gas detectors locations, orientation and coverage.
13. Over all plant layout and facilities, (utilities, process, storage, loading and unloading
station, Buildings, Jetties and marine), effluent and waste water treatment and flare
stock area.
14. Pipe rack and pipeway layout.
15. Main and secondary access roads.
16. Road crossing, trenches and culverts
5.2.3

Accessibility / Operability / Maintenance

1. Use of platforms, catwalks stair and fixed ladder.


2. Use of movable / temporary means: platform, self-elevated platforms and etc.
3. Compliance with Material Handling Philosophy.
4. Crane access
5. Lay down area
6. Tube bundle removal area
7. Catalyst and chemical loading area
8. Cartridge / filter handling, removal and replacement
5.2.4

Package Units

Package Units are not normally modelled in detail and are usually shown as a block. Ensure
the package does not infringe into escape routes or fire / safety equipment. Ensure adequate
space is available for access and for removal of components of the package units.
5.2.5

Model Layout

1. Check that model shows economic and efficient use of the platform area.
2. Check that electrical equipment is located in accordance with area hazard
classification.

February 2012 Rev.0-0

Page 8 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

3. Check that access ways, maintenance areas and operation areas are within the
required minimum dimension. These include main escape routes and muster point
volumes, withdrawal space and equipment/material handling area.
4. Check location of particularly noisy equipment, valves etc. in relation to the frequency
of visits by operating and maintenance personnel to the area.
5. Check the overall plant layout including unit location between ISBL (Inside Battery
Limit) and OSBL (Outside Battery Limit)
6. Check road and road crossing layout
7. Check drainage system
5.2.6

Heat Exchangers

1. Check that the number of shells matches the P&IDs.


2. Check the arrangement of exchangers and associated piping.
3. Check if adequate space is allowed for bundle removal and that lifting beam, devits
and pull beams are provided as necessary. Check that flangeless butterfly valve still
isolate on tube pulling.
4. If a vent is required on the exchanger for periodically purging non-condensable
vapours, it should be readily accessible. The vent should be shown in the model.
5. Piping for a true counter-current exchanger must be properly shown as countercurrent.
6. If different shells of multi shell exchanger have different metallurgies, check if shells
are properly arranged and labelled.
7. For air cooler, both single and mixed phase, in service where it is important that the
outlet temperature be maintained, the piping arrangement must be symmetrical. For
air cooled condensers, pockets must be avoided in the outlet piping and hot vapour
by-pass lines. See that elbows rather than tees are used at the ends of the headers.
Dead legs in capped headers should be reduced to a minimum. Check configuration
against Process Department Specification and Licensors requirements.
8. Temperature sensing point for exchangers with hot gas by-pass is to be located in
the combined process stream outlet manifold.
9. Check adequate clearance and maintenance access is provided for motors, fan belts
and A/V hub of air coolers.
10. Check access for plug removal and tube-cleaning on air coolers.
11. Check hot equipment/line under air coolers, e.g. fire risk from hot pump, hot lines
which could affect air temperature to bundle.
12. Check crane access for removal of bundles.
February 2012 Rev.0-0

Page 9 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

13. Check escape routes from each bank of air coolers are consistent.
14. Consider access ways between air cooler platforms and adjacent structures to safe
operators time climbing ladders and provide a safe means of escape.
15. Check location of break flange on piping at shell and tube exchangers and air coolers
to facilitate bundle removal.
5.2.7

Fired Heaters

1. For fired heaters that have removal spool pieces, temperatures indicators must be
placed upstream of the removal spool piece on the header outlet side and
downstream of the removal spool piece on header inlet side.
2. Check that the correct number of passes are shown and if necessary, check that they
are symmetrical.
3. Check that all auxiliary lines are shown and that they are accessible to the operators.
4. Check that all fined header instrumentation is shown.
5. For reboilers that are fired headers, check that the total pressure drop in the reboiler
return line does not exceed the pressure drop that was originally allowed.
6. In vacuum units, the vacuum transfer line shown on the model must be checked
against the original layout issued to Process for final hydraulic check.
7. Check that burner firing valves are located such that burner flames can be observed.
8. Check adequate escape routes.
9. Check clearance for burner gun removal.
10. Check to eliminate dead-legs in heavy fuel oil lines and waste gas lines.
5.2.8

Vessels

1. Check that the vessel, including its support, ladders and platforms, is correctly
modelled.
2. Check for correct nozzle orientation.
3. Check attached piping, structures and equipment regarding vessels design loading.
4. Tangent line elevation is not shown on the model but can be roughly measured.
Check for consistency with elevation shown on the P&IDs.
5. Check methods of access to manways and handholes. Should manways be hinged?
Check direction of cover swing. Beware of adjacent instruments.
6. Check erection aspects of the vessel. Will it arrive at site in one or more pieces? How
will it be fitted into any structure? Are lifting attachments adequate and correctly
positioned?
February 2012 Rev.0-0

Page 10 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

7. Level gauges and other instruments must be readable from either grade or platform
and where necessary, readable from a globe or control valve. Check access is
provided for isolating valves. Check relative elevations of LG, LC, LAH and LAL.
8. Drums, which have a water boot, must be sloped towards the boot. This is indicated
by a slope label. Check that location of the boot is opposite from the feed inlet on the
vessel.
9. For horizontal vessels, check which is sliding and fixing saddle and relationship with
main nozzles.
10. Check if the vessel can be conveniently drained. Check that outlet valves are located
outside the vessels skirt.
11. Check that adequate access and escape routes are provided on vessels platforms.
12. Check location of vent in relation to manhole and steam-out to permit vapour to be
swept out.
13. Ensure fuel gas connections are above high liquid level.
14. Ensure adequate platform area is at location where vessel internals or packing is
loaded.
15. Check insulation requirement and thickness.
16. Check designated laydown areas for chemical / catalyst loading requirements.
5.2.9

Pumps

1. Pumps and their spares or common spares should be arranged together in a group
and should be located reasonably close to the vessel supplying the suction.
2. Suction line length to be a minimum, with no pockets.
3. Check location and orientation of valves, not return valves and fire isolation valve in
suction and discharge line.
4. Check inlet configuration for double suction pumps to ensure equal distribution of flow
to both suctions.
5. Check symmetry of piping on pumps operating in parallel.
6. Check adequate drains are provided on suction and discharge line and/or pump. Pay
particular attention to light end/corrosives pumps and allow for safe removal of
drained material.
7. Check permanent strainers are correctly located and sufficient clearance allowed for
cleaning. Check that removable spools and correct support locations are provided on
temporary strainers.

February 2012 Rev.0-0

Page 11 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

8. Check that all instrumentation associated with pumps is, shown is accessible and
readable.
9. Check NPSH on pumps where this is critical.
10. Check cleaning, flushing, warm up and recirculation facilities.
11. Check accessibility to the pump for maintenance. Check any special lifting tackle
required.
12. Check consistency of piping configuration at pumps throughout the plant.
13. Check for pump suction line straight length requirements.
5.2.10 Compressors
1. Liquid in compressors suction lines must be avoided. Suction lines should have no
pockets. The suction line should be self-draining back to the knockout drum if
possible. Where pockets are unavoidable, provisions must be made for automatic
draining of the liquid.
2. Check atmospheric suction intake location regarding hazard, contamination,
reliability, area classification, temperature, etc.
3. On reciprocating compressors, safety valves must be located upstream of discharge
block valve.
4. On reciprocating compressors, pulsation dampeners should be shown on the model.
5. Check location and orientation of swages, valves, non-return valves and fire isolation
valves in suction and discharge lines.
6. Check adequate drains are provided on suction and discharge line and machine.
7. Check suction and discharge line tracing, acoustic insulation and etc.
8. Check instrumentation including panel associated with machine.
9. Check suction and discharge filter, strainers, etc.; location and access for operation
and maintenance.
10. Check anti-surge and recycle lines, blow-off line and silencer.
11. Check machine location in relation to other operating or spare machinery and to its
control panel.
12. Check layout or auxiliary systems and pipe work such as Lube Oil, seal oil, filtration,
cooling water and instrument panels in relation to adjacent equipment, structures,
pipe work, duct work, underground system, etc.
13. Check space, headroom and lifting tackle for maintenance of the machine and its
auxiliary equipment.
14. Check acoustic hoods, enclosures, silencers and their removal.
February 2012 Rev.0-0

Page 12 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

5.2.11 Other Mechanical Equipment


For other types of mechanical equipment, it is not possible to be specific on the type of checks
to be carried out on the model. For some equipment, e.g. blowers, some or all of the checks
listed under pumps and compressors will apply. For other more specialist equipment, the
model should be reviewed bearing in mind the function of the equipment and considering
operation, maintenance, access and safety aspects of the design.
5.2.12 Piping Layout
1. All process lines on the model must be checked to see that they agree with the latest
issue of the P&IDs.
2. In the critical services listed below, it may be necessary to conduct a detailed
hydraulic check of the model to ensure against excessive pressure drop. These
checks must be made initially on layouts and the model reviewed for conformity to the
approved layout:
a.

Pump Suction Lines

b.

Compressor Recycle Loops

c.

Inlet Lines to Safety Valves

d.

Other critical systems where allowable pressure drop may be limited.

3. Although several pipe fittings may at times be required for thermal expansion, be alert
to check for cases where it may be possible to reduce what appears to be an
excessive amount of pipe fittings. Optimise fittings in suction lines.
4. Special attention must be given to vapour-liquid mix points in compressor systems.
Piping must be arranged to avoid backflow of liquid to the compressor. A
recommended procedure is to have the vapour line taken off the top of the liquid pipe.
5. Special attention must be given to process lines that require no pockets such as
two-phase flow, flurry or overhead vapour lines.
6. Check access to valves and blinds in accordance with frequency of operation and the
project standards. Where possible, make all valves and blinds accessible from grade
or platforms.
7. Check that literal translation of P&IDs has not produced excessive pipe lengths.
8. A tundish and piping to drain is necessary for some process materials from vents and
drains, as specified on P&IDs.
9. Check that piping does not constitute trip or head hazard, nor does it block access as
far as practical.
10. Special areas requiring detailed attention:
a.

Slurry lines

February 2012 Rev.0-0

Page 13 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

b.

Corrosive fluids

c.

Fluids which freeze or become very viscous at ambient temperature

d.

Flammable hydrocarbons above their boiling point

e.

Fluids close to crystallisation point

f.

Two phase flow, especially in vertical lines

11. Check that a suitable length of pipe is provided where adequate mixing is required.
(chemical injection)
12. Review start-up recirculation lines to ensure valving is reasonably adjacent.
13. Check that all atmospheric vents and manhole vents have been piped safe location.
14. Check that sample points are accessible from deck or a platform. Check also for
dead legs.
15. Check that geographic arrangement of lines agrees with P&IDs.
16. Check location and adequacy of flushing, oil and slop oil. Avoid dead legs where
practical.
17. Review location of control valves; particularly, check that:
a.

Control valves not normally operating are free draining

b.

Valves in flashing services are close to downstream equipment, i.e. minimum


length of larger bore piping

c.

Valves which would cause major process upset if they failed are at deck or
platform.

18. Check that flanged connections required for dismantling and maintenance are
provided and are accessible.
19. Check location of fire-fighting hydrants, monitors and hose reels.
20. Review utility piping, especially distribution systems from common headers with
particular reference to valving of sub-headers and take-offs to ensure an economical
and practical arrangement is provided. Agree standard hook-ups for utility stations at
an early stage of the model. Ensure utility headers are independent for independent
units.
21. Check hose connection locations and access, especially those handling hazardous
materials.
22. Check that hazardous materials lines have minimum number of flanges.
23. Check that blinds are on the correct side of the valve and accessible.

February 2012 Rev.0-0

Page 14 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

5.2.13 Instrument
1. P&IDs checks
Check that all instruments shown on the P&IDs are present on the model and
identified by tags number (except for TIs and PIs indicated by coloured tag only).
Apart from identifying presence of instrumentation, the points covered by the
following paragraphs should be considered.
2. Accessibility
Ensure that all instruments shown are accessible both from an operators point of
view and that of a maintenance engineer. Ensure instruments are not located such
that they are liable to be damaged or form a tripping hazard. Specific requirements
are detailed in the Engineering Standard applicable to the Project.
3. Orifice Flange Sets and In-line Equipment
Check that Orifice Flange Sets are in the correct line and accessible. Orifice sets with
close coupled transmitters should be accessible from grade, platform or by ladder.
Access height above grade or platform may be determined by the Project
Specification. If the access is by temporary ladder, check that the area beneath the
orifice assembly is not too congested. Review the straight runs provided for orifice
plates. If flange sets are in vertical runs, check that the flow direction is correct.
Check orientation and piping connections for rotameters. Ensure all other in-line
instrument equipment is correctly orientated and is accessible.
4. Level displacers
Check the orientation of Level Displacers and Level Gauge Glasses with respect to
access/platforms or ladders. Where possible, access to level displacers should be
from a platform. If an access ladder is provided, check that the instruments are visible
and serviceable from the ladder.
Check the height of platforms relative to displacer cases, bearing in mind that the
instrument case associated with a rotatable head displacer is approximately 30 cm
above the top side connection of a displacer. Mark up Materials Requisitions for
instrument orientation i.e. L.H. (left hand) or R.H. (right hand) and the orientation of
the connection on the displacer chamber.
5. Temperature and Pressure Tappings
Check the location of TWs and PIs for accessibility and TI removal. Location of these
instruments on top of tall columns should be avoided if possible. Check location
against vessels data sheet.
6. Control valves
Check that control valves are installed in the correct line and check their location.
Control valves should preferably be installed at deck and access platform with the
pneumatic operator in a vertical position.
February 2012 Rev.0-0

Page 15 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

7. Flow meters
Check the upstream and downstream straight length requirements. Check access,
maintenance, calibration and monitoring requirements.
5.2.14 Structural Steel
1. Clearance between piping and steel structure should be checked.
2. Final deck penetration.
3. Ensure that all bracing shown on structural drawings is shown on the model and that
piping, equipment, access ways and maintenance areas are clash free.
5.2.15 PSVs
1. PSV will usually be provided on the discharge line from turbines and reciprocating
equipment upstream of any block valves to protect the casing. Check requirements
with P&IDs.
2. All PSV discharge lines going to flare must be self-draining to the flare header, which
may be indicated by an arrow. The length of the discharge line should not be
excessive.
3. For safety purposes and for consistency between equipment design pressure and
PSV set pressure, the PSV must be located reasonably close to the primary item that
it is protecting.
4. Check all PSV inlet lines for pressure drop and conformity to the 3 Percent Rule
given in API RP 520. For situations, which may appear to be very tight, it may be
necessary to perform a detailed piping take-off of the model in which each length of
line is measured and every fitting is accounted for.
5. Check that all PSV discharging to the atmosphere are vented in a safe location. Drain
(weep) holes to be provided on atmospheric discharges where liquid can accumulate.
Consider piping drain to safe location.
6. In an all-liquid system, the set pressure of the safety valve is determined by its actual
location relative to grade. If the valve is located close to grade, the set pressure will
be higher than if it is mounted high in the air. The model should be checked for
consistency between the PSV location and its set pressure.
7. Where PSV is relieving hazardous (hot, corrosive, noxious) material to atmosphere,
be very careful in defining safe location and consider effect on area classification.
8. Check line size where several PSV discharges are combined into one sub-header.
9. Check platform access is provided for operation and maintenance of PSVs. Ensure
davits are provided for heavy PSVs at elevated positions. Ensure space available for
drop out at grade.
February 2012 Rev.0-0

Page 16 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

5.2.16 Utilities
1. Check the Utility Systems shown on the model against Project standards and Utilities
P&IDs latest masters. This includes PID notes and standard assembly drawings /
symbols.
2. Review the routing of exotic, hazardous and large diameter utility lines.
3. Check utilities/instruments location and access
4. Check utilities valves type, location and access.
5. Check access to utility equipment.
6. Check location of utility stations relative to user points.
5.2.17 Civil
1. Check access road and road crossing layout.
2. Check pipe rack and pipeways location.
3. Check rain water drainage, pit, and catch basin.
4. Check building location / area.
5. Check underground facilities and trenches.
6. Check perimeter fence layout
7. Check culvert location / area.
8. Check Interceptors and effluent treatment facilities.
9. Check foundations and pedestal volumes / elevation.
5.2.18 Storage tanks (Intermediate / Product / Feed stack Tank Farms)
1. Check bund wall requirements area / volume.
2. Check drainage system, including rain water and accidentally oily contaminated water
(AOC).
3. Check tank to tank spacing requirements and orientation, including sphere and bullet
tanks.
4. Check pipeways spacing (location and routing).
5. Check tank foundation elevation.
6. Check transfer pump location and suction nozzle elevation.
7. Check battery limit valve and actuated control valve location and access.
8. Check tank access including staircase and platforms
9. Check instrument location and access.
February 2012 Rev.0-0

Page 17 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

10. Check maintenance access, including ramp location (if applicable).


11. Check bund wall penetration and location.
12. Check tank farm minimum spacing requirement with reference to plant overall layout.
5.2.19 Truck loading / unloading station
1. Check road layout including turning curve and radius.
2. Check spacing, for multiple loading / unloading bays.
3. Check loading arm access, platforms, staircase and vertical ladders.
4. Check vents line routing.
5. Check structure headroom requirements.
6. Check Truck loading / unloading minimum spacing requirement with reference to
plant overall layout.
5.2.20 Infrastructure (administration building / laboratory / warehouse / central control
room / electrical room / maintenance shop
1. Check building location with reference to plant overall layout.
2. Check allocated area / volume with reference to space requirements.
3. Check utilities requirements.
5.2.21 Underground Facilities
1. Check foundation area, volume and layout.
2. Check culvert and trench location, slope requirements.
3. Check storm drain pit and catch basin location and elevation.
4. Check underground pipe routing (closed / open drain) including slope / free draining
requirements.
5. Check underground electrical / instrument cable routing.
6. Check spacing requirements and elevations between piping, electrical, instrument
and other facilities.
7. Check valve pit location and elevation.
8. Check underground vessels (open / closed drain) location with reference to overall
plot layout.
9. Check underground vessels (open / closed drain) elevation.
5.2.22 Miscellaneous
1. Review extent of fireproofing and consider any effects on adjacent piping or
equipment
February 2012 Rev.0-0

Page 18 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

2. Review locations of electrical/instrument cable trays and consider their effect on


adjacent equipment.
3. Check insulation requirements (thickness) represented as volumes on equipments,
piping and instruments.
4. Check pipe shoe type for hot and cold insulated lines.
5.3

MODEL REVIEW

5.3.1

Model Review Purpose

The purpose of this document is to provide guidelines on when and how to conduct 3D Model
Reviews. Formal model reviews will be to ensure that the equipment, piping layout,
accessibility, maintainability, operations and all other aspects of the design is satisfactory to
COMPANY requirements. It also enables the COMPANY to review the design in 3D visual
reality, thus reducing the time for review of 2D general arrangement drawings during the
detailed modelling phase. Formal Model Reviews will be conducted on a specific design area
at a schedule time outlined by the project management team. Prior to a formal COMPANY
model reviews an internal model review shall be conducted with all discipline leads to ensure
that the design is challenged and that any areas of concern or COMPANY specific issues are
presented during the formal model review for discussion and acceptance.
5.3.2

Model Review Participants

The Contractor shall be responsible for notifying COMPANY and all disciplines of the time and
venue of the model reviews.
Each Model Review session will be attended by the following:
COMPANY Representatives
1. Process

full time

2. Maintenance

full time

3. Construction

full time

4. Operations

full time

5. Project Engineer(s)

full time

6. Other Disciplines

full time/on call

Contractor Representatives
1. Project Manager / Engineer(s)

full time

2. PDMS / AutoPLANT Administrator

full time

3. Lead Piping Engineer(s)

full time (Unit lead(s) - as required)

4. Process Engineer(s)

full time for process related/on call

February 2012 Rev.0-0

Page 19 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

5. Mechanical Engineer(s)

on call

6. Instrument/Electrical Engineer(s)

on call

7. Structural Engineer(s)

on call

8. Safety Engineers(s)

full time

9. HVAC

on call

10. Civil Engineer(s)

on call

Lead Piping Engineer will act as the Model Review Leader. He will direct the Model Review
and lead the Model Review Team through each unit, highlighting the features of the unit.
The Lead Piping Engineer, Process Engineer and the other Discipline Engineers (on call
basis) will assist in the Technical Aspects of the Model Review and will explain the design
considerations employed and answer questions from the COMPANY.
The PDMS / AutoPLANT Administrator will act as the Model Review Operator. He will handle
the computer aspects of the Model Review, navigating around each area during the review
sessions as instructed by the Model Review Leader.
5.3.3

Review Milestone Stages

Unless otherwise specified by COMPANY, there will be 3 model reviews conducted at


milestones of 3D model development as below.
1st Stage: At approx. 30 % Model progress - 30 % Model Review
2nd Stage: At approx. 60 % Model progress - 60 % Model Review
3rd Stage: At approx. 90 % Model progress - 90 % Model Review
5.3.4

Model Review Aspects

The overview content of the review will be:1. Safety


2. Operations
3. Process compliance
4. Maintenance
5. Constructability
6. Accessibility
The content and the items to be reviewed at each stage are detailed below.
5.3.5

30 % Model Review

The Objective of the 30 % Model Review;

February 2012 Rev.0-0

Page 20 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

1. To agree the layout of the platform (offshore facilities) / plant (onshore facilities)
meets the base hazard recommendations, and requirements of the project.
2. To freeze the location of the main equipment information available.
3. To identify the primary Operability / Accessibility / Maintainability
4. To Identify Improvements / Modifications to meet the predominantly the safety and
Operational Aspects.
The content of the model will include the following:
Safety
1. Safety egress routing volume.
2. Primary escape routes defined and marked (including secondary where required).
3. Safety distance between equipment.
4. HAZID comments
5. Location of the flares / vents / exhausts in a safe area.
6. Fire hazard zone / restricted area / impacted area.
7. Arrangement of the plant to optimize operational maintenance requirements and
provide good access and working room around all equipment.
8. Overall plant layout
9. Location of Fire Truck Station (onshore)
10. Safe location of Temporary Refuge (TR), Muster Area (on/offshore), Lifeboat
embarkation area (offshore)
Structural
1. All primary and secondary steel framing.
2. Intermediate platform
3. Main access stairs
4. Architectural Items including shelter / stores / technical building / blast wall /
workshops/ equipment rooms.
5. Boat landing location
6. Riser / J tube locations
7. Miscellaneous jacket / riser protection
8. Major piperacks
Mechanical
1. Location of all major process and utility equipment including HVAC (to data available)
February 2012 Rev.0-0

Page 21 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

2. Crane reach and handling


3. Platform crane
4. Monorails and Davits (to Data available)
5. Location and orientation of all equipment and other space consuming Items (to data
available)
6. Package Unit Location and orientation (to data available)
7. Equipment withdrawal / Handling areas
8. Primary Laydown areas / Access Hatches.
9. Primary Operating Platforms for Valves, Equipment and Maintenance.
10. Designated laydown areas for chemical / catalyst loading requirements.
11. The detailing of equipment packages will be in basic block format.
Piping
1. Majority of large bore critical process lines, and utility lines.
Electrical / Instruments
1. Major Electrical Equipment
2. Preliminary Main Electrical and Instrument Cable Ladder Routes
3. Location and Volume of Electrical and Control Rooms
Reserve Volumes
1. Primary and Secondary Safety Routes
2. Maintenance Areas
3. Access around all equipment
4. Withdrawal Areas / Handling Areas.
5. Future Equipment
Civil
1. Main and secondary access road layout, including road crossing structures and
culvert
2. Crane access for both construction and maintenance activities
3. Infrastructure volumes Administration building, Laboratory, Central control room,
Electrical room, Warehouse, Maintenance shop etc.
4. Pipe rack and pipeway layout
5. Location of interceptors and effluent treatment facilities
February 2012 Rev.0-0

Page 22 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

6. Equipments support, foundations and pedestal


5.3.6

60 % Model Review

The Objective of the 60 % Model Review.


1. To identify if any layout modifications have impact on the safety philosophies and
requirements as previously agreed in the 30 % Model review.
2. To review the location of secondary fire / safety equipment
3. To identify if the location of the Main Equipment has been updated
4. To review the location of Minor equipment.
5. To review the secondary Operability / Accessibility / Maintainability to the different
areas.
6. To Identify Improvements / Modifications to meet the requirement of the project,
mainly the safety operational aspect.
The content of the model will include the following:
General
1. All 30 % Model Review comments have been incorporated.
Safety
1. Safety Egress Routing Volume (Previous comments and changed item only).
2. Primary Escape Routes defined and Marked (Previous comments and changed item
only).
3. Secondary Escape Routes defined and Marked. Ensure escape routes are provided
at all area, including internal area of large process block, elevated access platforms.
4. Safety distance between Equipment (Previous comments and changed item only).
5. Location of Life Boats / Muster Areas / Temporary Refuge (Previous comments and
changed item only).
6. Location of the Vents / Exhausts in a Safe Area (Previous comments and changed
item only).
7. Fire hazard Zone / Restricted Area / Impacted Area (Previous comments and
changed item only).
8. Eye Wash, Safety Shower and all Safety (life saving) Equipment Locations.
9. Location and review of adequate and easy Access Ways for Fire Fighting Equipment.
10. Arrangement of the Plant to Optimize Operational Maintenance requirements and
Provide Good Access and Working Room Around all Equipment.

February 2012 Rev.0-0

Page 23 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

11. Fire water hydrants, monitors, hose reels, cabinets, pumps and deluge valve
locations and orientation to optimise quick access and deployment of equipment.
Structural
1. All Primary and Secondary Steel Framing. (Previous comments and changed Items
only)
2. Intermediate Platform(Previous comments and changed Items only)
3. Main Access Stairs (Previous comments and changed Items only)
4. Architectural Items Including Shelter / Technical Building / Blast Wall. (Previous
comments and changed Items only)
5. Boat Landing Location (Previous comments and changed Items only)
6. Riser / J Tube Locations (Previous comments and changed Items only)
7. Miscellaneous Jacket / riser protection (Previous comments and changed Items only)
8. Access Ladders
9. Miscellaneous Access / Maintenance Platforms
10. Support Structures.
11. Hand Railing.
12. Deck penetration
13. Major and minor pipe racks.
Mechanical
1. Location of all major process and Utility Equipment including HVAC equipment and
ducting. (Previous comments and changed Items only)
2. Mechanical Handling Equipment. (Previous comments and changed Items only)
3. Platform Crane / Davit / Monorail. (Previous comments and changed Items only)
4. Package Unit Location and Orientation. (Previous comments and changed Items
only)
5. Alignment with initial Materials Handling Study.
6. Equipment Withdrawal / Handling Areas (Previous comments and changed Items
only)
7. Primary Laydown areas / Access Hatches. (Previous comments and changed Items
only)
8. Primary Operating Platforms for Valves, Equipment and Maintenance. (Previous
comments and changed Items only)
February 2012 Rev.0-0

Page 24 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

9. Secondary Operating Platforms for Valves, Equipment and Maintenance


10. Location of all secondary process and utility equipment, HVAC equipment and
Ducting.
11. Secondary mechanical handling items.
12. Laydown area for chemical / catalyst loading requirements.
Piping
1. Frozen primary Piping Routings (Large bore / Flow Lines / remaining stress critical
pipework)
2. Majority of small bore process lines and utility lines including inline instruments and
instrument tap points.
a.

All process lines (4 NB and Above)

b.

Utility lines (2 NB to 10 NB)

3. Major and General Pipe Supports to assist clash detection routines.


4. The detailing of pipe work will extend to showing all auxiliary Items included in the
P&ID for the specified line sizes.
5. Piping on pipe rack and pipe ways including expansion loop location.
Electrical / Instruments
1. Major Electrical Equipment (Previous comments and changed Items only)
2. Preliminary layout of overhead cable tray, LV bus duct, and main cable transit blocks
in each Electrical room.
3. Lighting for all room and for each deck level.
4. Packaged Equipment motors, electrical heater and control panels.
5. Preliminary Main Electrical and Instrument Cable Ladder Routes (Previous comments
and changed Items only)
6. Location and Volume of Electrical and Control Rooms (Previous comments and
changed Items only)
7. Main Cable Tray, ladder Routing
8. Main Junction Boxes.
9. Local Control Panel, Local Junction box and inline mounting instruments.
10. Field instrument with stanchion according to piping instrument tap point.
11. Instrument Stands (check for permanent accessibility of instruments)
12. Lighting
February 2012 Rev.0-0

Page 25 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

Reserve Volumes
1. Primary and secondary Escape Routes. (Previous comments and changed Items
only)
2. Maintenance Areas. (Previous comments and changed Items only)
3. Access way around all equipment. (Previous comments and changed Items only)
4. Withdrawal Areas. (Previous comments and changed Items only)
5. Flare Radiation Volume. (Previous comments and changed Items only)
6. Future Equipment (Previous comments and changed Items only)
7. Future Pipework (Limited to flow lines and major pipe runs)
Civil
1. Main and secondary access road layout, including road crossing structures and
culvert. (Previous comments and changed Items only)
2. Crane access for both construction and maintenance activities. (Previous comments
and changed Items only)
3. Infrastructure Administration building, Laboratory, Central control room, Electrical
room, Warehouse, Maintenance shop etc.
4. Pipe rack and pipeway layout. (Previous comments and changed Items only)
5. Location of interceptors and effluent treatment facilities. (Previous comments and
changed Items only)
6. Equipments support, foundations and pedestal. (Previous comments and changed
Items only)
7. Underground facilities.
8. Culvert location / area.
9. Storm drains, catch basin, and pit.
10. Trench layout and elevation.
11. Perimeter / Property fence layout.
5.3.7

90 % Model Review

The Objective of the 90 % Model Review;


1. To ensure final design acceptance by the COMPANY prior to publication of
construction drawings/documentation.
2. To ensure that all areas of Operability and accessibility are accepted by the
COMPANY operations team.
February 2012 Rev.0-0

Page 26 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

3. To ensure the constructability of all components of the project.


4. To ensure that all the Safety philosophies, safety studies recommendations and
HAZOP requirements have been incorporated prior to publication of construction
drawings/documentation.
5. To ensure that the model reflects project requirements i.e. Exhibit A Scope of Work.
The content of the model will include the following:
General
1. All 60 % Model Review comments have been incorporated.
Safety
1. Final Safety Egress Routing Volume (Previous comments and changed item only).
2. Final Escape Routes defined and Marked (Previous comments and changed item
only).
3. Final Safety distance between Equipment (Previous comments and changed item
only).
4. Frozen Location of the Flare in a Safe Area (Previous comments and changed item
only).
5. Final Fire hazard Zone / Restricted Area / Impacted Area (Previous comments and
changed item only).
6. Final Eye Wash, Safety Shower and all Safety (life saving) Equipment Locations
(Previous comments and changed item only).
7. Final review of adequate and easy Access Way for Fire Fighting Equipment (Previous
comments and changed item only).
8. Arrangement of the Plant to Optimize Operational Maintenance requirements and
Provide Good Access and Working Room Around all Equipment.
9. Fire and gas detectors locations, orientations and coverage check (Previous
comments and changed item only). Ensure small piping / equipment added during
90% development does not significantly obstruct F&G detector coverage.
10. All fire fighting equipment (Previous comments and changed item only) and
spray/sprinkler nozzle orientation on equipment to ensure full coverage on protected
equipment surface.
Mechanical
1. All process and Utility and HVAC Equipment. (Previous comments and changed
Items only)
2. Alignment with Final Materials Handling Study
February 2012 Rev.0-0

Page 27 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

3. Mechanical Handling Equipment. (Previous comments and changed Items only)


4. Platform Crane. (Previous comments and changed Items only)
5. The detailing of equipment packages will be in basic block format only and Nozzles of
diameter 2 NB and below will be modelled. Certified Vendor information should have
been available by then for inclusion in modelling
Piping
1. All Process piping as depicted on P&IDs.
2. All Utility piping as depicted on P&IDs.
3. All Pipe Supports.
4. All underground piping
5. All sampling connections, corrosion fittings, vents, drains. The detailing of pipe work
showing all auxiliary items included in the P&ID for the remaining line sizes.
Electrical / Instruments
1. Secondary Cable Tray Routing to include up to equipment termination boxes located
in the electrical rooms and on each Deck level.
2. Support for main & secondary cable tray.
3. All Electrical / Instrument Cable Trench
Reserve Volumes
1. Maintenance Areas. (Previous comments and changed Items only)
2. Withdrawal Areas. (Previous comments and changed Items only)
3. Future Equipment (Previous comments and changed Items only)
4. Future Pipe work (Previous comments and changed Items only)
Civil
1. All main road and secondary access road, including road crossing structures, bridge
and culvert.
2. All Infrastructure Buildings, Laboratory, Central control room, Electrical room,
Warehouse, Maintenance shop and Sheds.
3. All pipe rack structures and pipeways.
4. All civil structures Interceptors and effluent treatment facilities.
5. All major pipe supports, equipment supports, foundations and pedestal.
6. All underground facilities.
7. All culverts, storm drains, catch basin and pit.
February 2012 Rev.0-0

Page 28 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

8. All trench layouts.


9. Perimeter / Property Fence layout.
5.4

RESPONSIBILITIES

The 3D model review shall be facilitated by Contractor. Followings are the list of
responsibilities to be carried out for the review:
Schedule for model reviews

Project Manager

Prepare documents for Model Reviews

Project Engineer

Distribution of Review Documents, Agenda to the COMPANY Project Manager /


and Contractor Disciplines

Project Engineer

Organize Model Review Venue

Project Engineer

Review Tools and Create Model File

PDMS

AutoPLANT

Administrator

Report Status of 3D CAD Model

Lead Piping Engineers

Report of Hold Items List (if any)

Lead Piping Engineers

Coordination during model review

Project Engineer

Prepare and Summarize Action List Report

Project Engineer

Review, reconcile and distribute Action List Report

Project Manager

Follow up / update Action List Report

Project Engineer /
Lead Piping Engineer

Archive PDMS/ AutoPLANT Review Models and Status Files

PDMS

AutoPLANT

Administrator

5.5

COMMENT TAGGING

During the review session, all comments requiring resolution will be identified and recorded in
accordance with the checklist, exemplified in Appendix 1. All comments will be downloaded
and re-formatted in MS Excel for status reporting and control. This will be submitted to the
Project Manager for review and distribution to disciplines.
The model will be revised and checked by the responsible discipline and the status of the
action will be advised to the Model Review Coordinator/ Project Engineer for updating the
Action List Log. The Action List Log with filled-in correction and modification items regarding to
comments shall be submitted to COMPANY for approval via Project Engineer/Manager or
Lead Piping Engineer.
February 2012 Rev.0-0

Page 29 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

6.0

PEGS-0710-ADM-008

APPENDICES

Appendix 1.

3D Model Review Comments


MODEL REVIEW
COMMENT

PTTEP

Commenting
group

Engineer (s)
signature (s)

Date

Project Name

P&ID no

Sheet of

Notes:
1. Relate to the equipment no or rack Column no.
2. Tick further information is required from commenting
group before making change

Comment
no.

Line no.

Base no.

Location on
model
(note 1)

Comment

February 2012 Rev.0-0

Info.
(note 2)

Page 30 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

Model Review Check List

PEGS-0710-ADM-008

LAST PAGE INTENTIONALLY BLANK

February 2012 Rev.0-0

Page 31 of 31
UNCONTROLLED when printed, visit PTTEP Intranet for latest version

PTT Exploration and Production Public Company Limited

PEGS User Feedback Form


This section for feedback provider input only
Details of feedback provider
Name:

Click here to enter text.

Division/Dept:

Click here to enter text.

Location:

Click here to enter text.

Telephone:

Click here to enter text.

E-mail:

Click here to enter text.

Area of Concern:

PEGS Content

Others: (please specify)

PEGS Relevance

ISO standard

Other standards

Click here to enter text.

Document Title: Click here to enter text.

Document I/D:

Click here

Feedback details (when referring to documents, please state chapter and page number where appropriate.)
Click here to enter text.

(Please add attachments if required)

Doccument number PEGS-0710-ADM-008

Issued by: 0790

Rev: 0-0

Date of Issue: February 2012


PEGS User Feedback Form : 1/2

PTT Exploration and Production Public Company Limited

PEGS User Feedback Form


This section for PEGS Administrator use only

Enter a date.

Date received:
Received by:
Form receipt sent:

Enter date.

Feedback register updated:

Enter text

Feedback register updated by:

Enter date

Click here
PEGS-FB-00?

Feedback Reference #

Action taken
Click here to enter text.

Date
Click date

By Whom
name

Click here to enter text.

Click date

name

Deadline
Click

By Whom
name

Further Action
Recommended Action
Click here to enter text.

Verification of closure of Feedback


Click here to enter text.

By:

Click here

Title:

Click here

Dept.:

Click

Date:

Click

Please send this form to PEGS Administrator: Khun Pornpimol Kongkhan ( pornpimolk@pttep.com Ext. 4891)

Doccument number PEGS-0710-ADM-008

Issued by: 0790

Rev: 0-0

Date of Issue: February 2012


PEGS User Feedback Form : 2/2