Design Class Detail

Utilities Cooling Systems

PROJECT

Date

Capacity
Design
Item

Design Class
Class 1

Class 2

Class 3

Once through
Cooling water
system
Design cooling
duty

Cooling duty at the


design conditions
+ 0% margin

Cooling duty at the


design conditions
+ 10% margin

Cooling duty at the


design conditions
+ 20% margin

Cooling water
design flow,
hydraulics

Cooling water flow


based on the design
cooling duty
+ 0% hydraulic margin

Cooling water flow based


on the design cooling
duty
+ 10% hydraulic margin

Cooling water flow


based on the design
cooling duty
+ 15% hydraulic
margin

CW pumps
sparing

Pump sparing = N+0

Pump sparing = N+1

Pump sparing = N+2

Chlorination
system

Capacity based on
2ppm continuous
dozing. 5ppm
intermittent shock
dosing capability with
extra capacity from
storage tank.

Capacity based on 2ppm


continuous dozing.
5ppm intermittent shock
dosing capability with
extra capacity from
storage tank.

Capacity based on
2ppm continuous
dozing.
5ppm intermittent
shock dosing capability
with extra capacity
from storage tank.

2 x 100% system

1 x 100% system

2 x 130% system
(allowance for sea
water fouling)

Chilling system

Chiller duty

Chilling duty based on


the design duty
+ 0% margin

Chilling duty based on


the design duty at the
premised conditions
+ 10% margin

Chilling duty based on


the design duty
+ 20% margin

Chiller sparing

Chiller sparing = N+0

Chiller sparing = N+1

Chiller sparing = N+1

Expandability
Design Class

DEP 00.00.07.92-Gen. September 2011

Page 1 of

Design Class Detail


Utilities Cooling Systems

Design
Item

PROJECT

Date

Class 1

Class 2

Class 3

Future expansion
provision of once
through cooling
water system

No future expansion
provision in the layout
header extension / tiein

Intake facilities based on


20% extra capacity with
space for one CW pump,
one screen.

Intake facilities based


on at least 30% extra
capacity with space for
two CW pumps, two
screens.

Future expansion
provision of once
through chilling
system

No future expansion
provision in the layout
header extension /
tie-in

Provision in the layout


header extension / tie-in

Space for one


additional chiller

Operability & Maintainability


Design
Item

Design Class
Class 1

Class 2

Class 3

Sea water supply


and return
headers

Single header with


design flow
(1 x 100%)

Single header with


design flow plus 10%
(1 x 100%)

Dual headers with


design flow plus 20%.
(2 x 100% or 2 x 75%)

CW pump drive
(not applicable
when power
system is highly
reliable)

Steam drive on at
least one pump based
on critical cooling
demand.

Steam drives on N
pumps
Motor drives on spare
pumps

Steam drives on all the


pumps.

DEP 00.00.07.92-Gen. September 2011

Page 2 of

Design Class Detail


Utilities Cooling Systems

PROJECT

Date

Energy Efficiency
Design
Item

Design Class
Class 1

Class 2

Class 3

Outflow line with


restriction orifice and
back pressure device.

Outflow weir system


avoiding subatmospheric
pressures at the highest
point.

Syphonic recovery
Use spare pump during
start up.

Process chilling up
to 7C (45F)

Compression
refrigeration chillers

Absorption chilling unit


using LP steam or other
waste heat sources
subject to availability,
single stage

Absorption chilling unit


using LP steam or
other waste heat
sources subject to
availability, double
stage

Process chilling
<7C (45F)

Not considered.

Compression
refrigeration chillers
Air cooled

Compression
refrigeration chillers
Water cooled

CW outfall design

Chiller energy
source

DEP 00.00.07.92-Gen. September 2011