S.No.

City/State

Syestem

Date of
Operation

24-Oct-84
Kolkata

Kolkata Metro

1-Nov-95
Chennai

Chennai MRTS

24-Dec-02
Delhi NCR

Delhi Metro

20-Oct-11
Bangalore

Namma Metro

14-Nov-13
Gurgaon

Rapid MetroRail Gurgaon

8-Jun-14
Mumbai

Mumbai Metro

666

3-Jun-15
Jaipur

Jaipur Metro

29-Jun-15
Chennai

Chennai Metro

Under construction
9

Jun-16
Hyderabad

Hyderabad Metro

Page 1

S.No.

City/State

Syestem

10

Nov-16
Kochi

Kochi Metro

11

Mar-17
Lucknow

Lucknow Metro

12

May-17
Noida

Noida Metro

13

Jul-17
Navi Mumbai

Navi Mumbai Metro

14

2019
Nagpur

15

Date of
Operation

Ahmedabad &
Gandhinagar

Nagpur Metro

MetroLink Express Gandhinagar


and Ahmedabad (MEGA)

2020

In Planning
16

2021
Kanpur

Kanpur Metro

17

2021
Meerut

Meerut Metro

18

2021
Patna

Patna Metro

Page 2

S.No.

City/State

Syestem

19

2018
Vijayawada

20

Vijayawada Metro

Thiruvananthapur Thiruvananthapuram Light


am
Metro

21
Visakhapatnam

2027

Visakhapatnam Metro(Vizag
Metro)

22

2025
Kozhikode

Kozhikode Light Metro

23

2021
Guwahati

Guwahati Metro

24

2024
Bhopal

Bhopal Metro

25

2025
Indore

26

Date of
Operation

National Capital
Region

Indore Metro
2025
National Capital Region Metro

27

2022
Chandigarh Tricity Chandigarh Metro

Page 3

S.No.

City/State

Syestem

28

2028
Agra

Agra Metro

Varanasi

Varanasi Metro

Allahabad

Allahabad Metro

29

30

31

Pune Metro
Pune

32
Gwalior
33

Gwalior Metro

Bhubaneswar &
Cuttack
Bhubaneswar Metro

34

Date of
Operation

Dehradun Rishikesh Haridwar

Dehradun Metro

Proposed but not Planned


35
Surat

Surat Metro

Nasik

Greater Nasik Metro

36

Page 4

S.No.

City/State

Syestem

37
Srinagar

Srinagar Metro

Mumbai

Western railway elevated


corridor

38

Page 5

Date of
Operation

System Length
In Operation

Planned

Under
Construction

Lines

Stations

28.4km

120.25km

90km

24

19.34km

24.235km

4.5km

17

213km

126.547km

122.205km

6
160

31.52km

72km

10.78km

2
30

5.1km

7km

12

11.4km

105.5km

9.2km

32.5km

2.4km

10.100km

63km

35km

92km

71.6km

Page 6

System Length
In Operation

Planned

Under
Construction

Lines

Stations

22

25.6km

36km

29.7km

106.4km

38.2km

37.766km

84km

30km

60km

Page 7

System Length
In Operation

Planned

Under
Construction

26km[35]

22km

39km

22km

44.2km

85km

107km

381km

37.5km

Page 8

Lines

Stations

System Length
In Operation

Planned

Under
Construction

27km

25km

25km

30km

Page 9

Lines

Stations

System Length
In Operation

Planned

Under
Construction

63.27km

Page 10

Lines

Stations

Voltage

750 V DC Third
rail

25kV AC OHE

25kV AC OHE

750 V DC Third
rail

750 V DC Third
rail

Remarks

First mass rapid transit


system in India and the 17th
zone of the Indian Railways.
It is planned for the MRTS to
be taken over by the
Chennai Metro Rail Limited.

India's first modern rapid


transit system.
First metro in India to
introduce Wi-Fi onboard
trains.
India's first fully privately
financed metro,[16] and the
first metro system in the
country to auction naming
rights for its stations.[17]

25kV AC OHE

rf

Double-storey elevated road


and Metro track project for
the first time in the country.

25kV AC OHE

25kV AC OHE

India's first metro to have


CBTC and integrated
telecommunications and
supervision systems, i.e.
driver less metro.

Page 11

Voltage

750 V DC Third
rail

Remarks

Kochi is the first Tier-II city in


India to be granted a metro
under the Central
Government's plan to allow
cities having population
more than 20 lakhs to have
a metro rail system.[21]

25kV AC OHE

N/A

25kV AC OHE

Construction began on 30
May 2015.[26]

750 V DC Third
rail

N/A

DPR approved by State


Cabinet. Construction is
expected to begin in Dec
2016.[29]

N/A
DPR being prepared.[31]
N/A
DPR being prepared.[32]

Page 12

Voltage

N/A

Remarks

DPR Approved by AP
Cabinet,Construction works
are yet to start,First Phase
scheduled to run from
August 2018 [36] Construction
work starts by June 2015[33]
[37][38][39]

N/A

N/A

N/A

DPR approved and submitted


by DMRC; awaiting cabinet
approval[42]
Construction of Phase-1 to
be completed by December
2018.[43] DPR prepared and
to be submitted .[33][44][45]
DPR approved and submitted
by DMRC on October 2014;
awaiting cabinet
approval[48]

N/A
DPR being prepared.[9][49]

25kV AC

25kV AC

DPR being prepared[52]


DPR Approved, funds have
also been granted by a
Japanese company JICA,
construction to begin from
April 2016.[55]

25kV AC
N/A

DPR already prepared and


submitted[58]

Page 13

Voltage

N/A

N/A

Remarks

DPR being prepared for


submission[60]

DPR awaiting approval from


State Cabinet.[62]

N/A
DPR being prepared[64]

N/A

Construction to start in
2017[66]

N/A
DPR being prepared[68]
N/A
DPR submitted[70]

N/A

N/A

Under feasibility study by


MEGA.[71]
Proposed Metro line which
will connect Igatpuri, Deolali,
Nasik Road, Nasik Central
and Ojhar Airport.[72]

Page 14

Voltage

Remarks

N/A

N/A

Page 15

S.No.

City/State

Syestem

Proposed
Date of
Operation

In Planning
1

Kanpur

Kanpur Metro

2021

Meerut

Meerut Metro

2021

Patna

Patna Metro

2021

Vijayawada

Vijayawada Metro

2018

Thiruvananthapur Thiruvananthapuram Light


am
Metro

Visakhapatnam

Visakhapatnam Metro(Vizag
Metro)

Kozhikode

Kozhikode Light Metro

2025

Guwahati

Guwahati Metro

2021

Page 16

2027

S.No.

City/State

Syestem

Proposed
Date of
Operation

Bhopal

Bhopal Metro

2024

10

Indore

Indore Metro

2025

11

National Capital
Region

National Capital Region Metro

2025

12

Chandigarh Tricity Chandigarh Metro

2022

13

Agra

Agra Metro

2028

14

Varanasi

Varanasi Metro

15

Allahabad

Allahabad Metro

16

Pune

Pune Metro

Page 17

S.No.

City/State

Syestem

17

Gwalior

Gwalior Metro

18

Bhubaneswar &
Cuttack

Bhubaneswar Metro

19

Dehradun Rishikesh Haridwar

Dehradun Metro

20

Huda City Centre


to Old Faridabad

Govt. of Haryana

21

Huda City Centre


to Old Gurgaon

Govt. of Haryana

22

Narela (Delhi) to
Kundli (Sonipat,
Karyana)

Govt. of Haryana

Proposed but not Planned


23

Surat

Surat Metro

24

Nasik

Greater Nasik Metro

Page 18

Proposed
Date of
Operation

S.No.

City/State

Syestem

25

Srinagar

Srinagar Metro

26

Mumbai

Western railway elevated


corridor

Page 19

Proposed
Date of
Operation

System Length

84km

Remarks

DPR approved by State


Cabinet. Construction is
expected to begin in Dec
2016.

30km
DPR being prepared.
60km
DPR being prepared.

26km[35]

22km

39km

22km

DPR Approved by AP
Cabinet,Construction works
are yet to start,First Phase
scheduled to run from
August 2018 Construction
work starts by June 2015.
DPR approved and submitted
by DMRC; awaiting cabinet
approval
Construction of Phase-1 to
be completed by December
2018.[43] DPR prepared and
to be submitted .
DPR approved and submitted
by DMRC on October 2014;
awaiting cabinet approval

44.2km
DPR being prepared.

Page 20

System Length

Remarks

85km
DPR being prepared.

107km

DPR Approved, funds have


also been granted by a
Japanese company JICA,
construction to begin from
April 2016.

381km

37.5km

27km

25km

DPR already prepared and


submitted.

DPR being prepared for


submission.

DPR awaiting approval from


State Cabinet.

25km
DPR being prepared
31.515 km (phase 1)

Page 21

System Length

Remarks

Construction to start in
2017.
30km
DPR being prepared.

DPR submitted.
DMRC is conducting the
feasibilty report for the
proposed alignment
DMRC is conducting the
feasibilty report for the
proposed alignment
DMRC is conducting the
feasibilty report for the
proposed alignment

Under feasibility study by


MEGA.

Proposed Metro line which


will connect Igatpuri, Deolali,
Nasik Road, Nasik Central
and Ojhar Airport.

Page 22

System Length

Remarks

63.27km

Page 23

S.No.

City/State

Syestem

Date of
Operation

Under construction

Hyderabad

Hyderabad Metro

Jun-16

Kochi

Kochi Metro

Nov-16

Lucknow

Lucknow Metro

Mar-17

Noida

Noida Metro

May-17

Navi Mumbai

Navi Mumbai Metro

Jul-17

Nagpur

Nagpur Metro

2019

Page 24

S.No.

City/State

Ahmedabad &
Gandhinagar

Syestem

Date of
Operation

MetroLink Express Gandhinagar


and Ahmedabad (MEGA)

2020

In Planning
8

Kanpur

Kanpur Metro

2021

Meerut

Meerut Metro

2021

10

Patna

Patna Metro

2021

11

Vijayawada

Vijayawada Metro

2018

12

Thiruvananthapur Thiruvananthapuram Light


am
Metro

13

Visakhapatnam

Visakhapatnam Metro(Vizag
Metro)

Page 25

2027

S.No.

City/State

Syestem

Date of
Operation

14

Kozhikode

Kozhikode Light Metro

2025

15

Guwahati

Guwahati Metro

2021

16

Bhopal

Bhopal Metro

2024

17

Indore

Indore Metro

2025

18

National Capital
Region

National Capital Region Metro

2025

19

Chandigarh Tricity Chandigarh Metro

2022

20

Agra

Agra Metro

2028

21

Varanasi

Varanasi Metro

Page 26

S.No.

City/State

Syestem

22

Allahabad

Allahabad Metro

23

Pune

Pune Metro

24

Gwalior

Gwalior Metro

25

Bhubaneswar &
Cuttack

Bhubaneswar Metro

26

Dehradun Rishikesh Haridwar

Dehradun Metro

27

Huda City Centre


to Old Faridabad

Govt. of Haryana

28

Huda City Centre


to Old Gurgaon

Govt. of Haryana

29

Narela (Delhi) to
Kundli (Sonipat,
Karyana)

Govt. of Haryana

Proposed but not Planned

Page 27

Date of
Operation

S.No.

City/State

Syestem

30

Surat

Surat Metro

31

Nasik

Greater Nasik Metro

32

Srinagar

Srinagar Metro

33

Mumbai

Western railway elevated


corridor

Page 28

Date of
Operation

System Length
In Operation Planned

92km

Under
Construction

Lines

Stations

22

71.6km

25.6km

36km

29.7km

106.4km

38.2km

Page 29

System Length
In Operation Planned

Under
Construction

37.766km

84km

30km

60km

26km[35]

22km

39km

Page 30

Lines

Stations

System Length
In Operation Planned

Under
Construction

22km

44.2km

85km

107km

381km

37.5km

27km

25km

Page 31

Lines

Stations

System Length
In Operation Planned

Under
Construction

25km

31.515 km
(phase 1)

30km

Page 32

Lines

Stations

System Length
In Operation Planned

Under
Construction

63.27km

Page 33

Lines

Stations

Voltage

Remarks

25kV AC OHE

India's first metro to have


CBTC and integrated
telecommunications and
supervision systems, i.e.
driver less metro.

750 V DC Third
rail

Kochi is the first Tier-II city in


India to be granted a metro
under the Central
Government's plan to allow
cities having population
more than 20 lakhs to have
a metro rail system.

25kV AC OHE

N/A

25kV AC OHE

Construction began on 30
May 2015.

Page 34

Voltage

Remarks

750 V DC Third
rail

N/A

DPR approved by State


Cabinet. Construction is
expected to begin in Dec
2016.

N/A
DPR being prepared.
N/A
DPR being prepared.

N/A

N/A

N/A

DPR Approved by AP
Cabinet,Construction works
are yet to start,First Phase
scheduled to run from
August 2018 Construction
work starts by June 2015.
DPR approved and submitted
by DMRC; awaiting cabinet
approval
Construction of Phase-1 to
be completed by December
2018.[43] DPR prepared and
to be submitted .

Page 35

Voltage

N/A

Remarks

DPR approved and submitted


by DMRC on October 2014;
awaiting cabinet approval

N/A
DPR being prepared.

25kV AC

DPR being prepared.

25kV AC

DPR Approved, funds have


also been granted by a
Japanese company JICA,
construction to begin from
April 2016.

25kV AC
N/A

N/A

N/A

DPR already prepared and


submitted.

DPR being prepared for


submission.

DPR awaiting approval from


State Cabinet.

Page 36

Voltage

Remarks

N/A
DPR being prepared
25 kV AC through
overhead
catenary

N/A

Construction to start in
2017.

N/A
DPR being prepared.
N/A
DPR submitted.
DMRC is conducting the
feasibilty report for the
proposed alignment
DMRC is conducting the
feasibilty report for the
proposed alignment
DMRC is conducting the
feasibilty report for the
proposed alignment

Page 37

Voltage

N/A

N/A

Remarks

Under feasibility study by


MEGA.

Proposed Metro line which


will connect Igatpuri, Deolali,
Nasik Road, Nasik Central
and Ojhar Airport.

N/A

N/A

Page 38

S.No. Name and Address of the Company

Meka Group
304 Shiv Smriti Chambers,
49 Dr. A B Rd, Worli,
Mumbai, Maharashtra, India
Tel :
+91 22 40890000
Fax :
+91 22 40890001

Srishaila Constructions.
#515, 4th
Main, 1st cross,
1st stage, 4th block,
HBR Layout, Kalyan Nagar, Bangalore - 560043 Tel: 080 25440520
080 25437285 Fax: 080 25440520 info@srishailaconstructions.com
rajendra@srishailaconstructions.com

Continental Construction Corp. Ltd


'Continental House' ,#28-29, Nehru Place, New Delhi-110 019 (INDIA)
Phone: 011-41604966, 40687192
Fax : +91 11 66542999 info@cccorpn.com

Ratnashree Construction Company C-9, 3:14, Sukhsagar CHS, Sec. 48,


Nerul, Navi Mumbai
E-mail: rccshinde@gmail.com, rccshinde@rediffmail.com
Mobile: 9920177743 / 9869365947 / 9270450160

Yojaka Marine Products Pvt. Ltd


D.No.3-28/43,
II Floor, ABCO Trade Centre,
NH-66, Kottara Chowki,
Mangalore - 575 006, Karnataka, India.
Ph: +91 824 2457173 / 2458764.
Fax: +91 824 2451844
Email: corporate@yojaka.co.in, info@yojaka.co.in Mr.Vinay Kumar,
Mob: +91 9448497252
Email:vinaykumar@yojaka.co.in
Mr.Niranjan,
Mob: +91 9448497255
Email:niranjan@yojaka.co.in

DBM Geotechnics & Constructions Pvt Ltd. B/301, Centaur House,


Shantinagar Industrial Estate, Vakola, Santacruz (E),
Mumbai 400 055, India.
Tel: +91-22-49663500
Fax: +91-22-49663605
Email: dbm@dbm.in

Web Address

http://www.meka.com/

www.srishailaconstructions.com

http://www.cccorpn.com/

http://ratnashreeconstructioncompany.com/

http://www.yojaka.co.in/

http://www.dbm.in/

City

System

Mumbai

Mumbai Monorail

Chennai
Kolkata
Coimbatore
Ranchi
Allahabad
Bangalore
Delhi
Indore
Kanpur
Navi Mumbai
Patna
Pune
Ahmedabad
Aizawl
Jodhpur
Kota
Nagpur
Nashik

Chennai Monorail
Kolkata Monorail
Coimbatore Monorail
Ranchi Monorail
Allahabad Monorail
Bangalore Monorail
Delhi Monorail
Indore Monorail
Kanpur Monorail
Navi Mumbai Monorail
Patna Monorail
Pune Monorail
Ahmedabad Monorail
Aizawl Monorail
Jodhpur Monorail
Kota Monorail
Nagpur Monorail
Nashik Monorail

Operations
began

System
length (km)

2-Feb-14

8.26

2018 57km
72km
25km
70.4km
60km
90km
63km
36.82km
32km
52km
30km

50km
130km

Lines

Stations
1

3
2
2
2
2

Notes

7
Centre approved Chennai monorail project
37 to be implemented under DBFOT model.

33

6
3
2
4
2
4

DPR is being Prepared


DPR is being Prepared