DETAIL OF MAN-DAYS FOR COST ESTIMATION

Sr. No.
1 Excavation

Description

Unit Measure

a- ordinary soil
b- gravelly soil
c- Boulder mix soil

per cft
per cft
per cft

(1:2:4)
(1:4:8)

per cft
per cft
per cft
per cft
per sft
per sft
per kg
per cft
per cft

Man-days
Skilled unskilled
-

0.016
0.022
0.031

2 PCC

3
4
5
6
7
8
9

RCC (1:2:4)
Stone Masonry
Plaster
Pointing
Steel work for RCC
Shingle work
Centring and shuttering for RCC work

0.031
0.031
0.047
0.04
0.013
0.018
0.02

0.113
0.113
0.095
0.09
0.02
0.028
0.01
0.015
0.01

WATSAN

Operational Team

Drinking Water Supply Scheme:

STAND POST
(1.5' X 1.5'X 2.25')
Detail of Materials

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Pad

4.50

4.50

1.00

1.00

20.25

Cft

stand post

0.75

0.42

1.00

1.00

0.32

Cft

dispose off drain

5.41

1.00

1.00

1.00

5.41

Cft

25.98

Cft

Pad

4.50

4.50

0.33

1.00

6.68

Cft

stand post

0.75

0.42

0.33

1.00

0.10

Cft

dispose off drain

5.41

1.00

0.33

1.00

1.79

Cft

Sand
(cft)

Gravel/
Crush
(cft)

Shingle

Unskilled
Labour

Men-days Men-days

0.57

8.57

Cft

8.57

0.13

P/L PCC (1:4:8)


Pad

4.50

4.50

0.33

1.00

6.68

Cft

stand post

0.75

0.42

0.33

1.00

0.10

Cft

dispose off drain

5.41

1.00

0.33

1.00

1.79

Cft

8.57

Cft

Total
4

Cement
(Bags)

Shingle bed

Total
3

Unit

Excavation (gravelly soil)

Total
2

Quantity

Labour
Skilled
Labour

0.90

4.50

9.00

0.27

0.97

2.60

6.50

13.00

0.39

1.42

0.20

0.40

0.86

3.49

P/L PCC (1:2:4)


Pad

4.00

4.00

0.33

1.00

5.28

Cft

stand post

0.75

0.75

3.42

1.00

1.92

Cft

dispose off drain

6.00

1.00

0.58

1.00

3.48

Cft

pad boundary projection Lond side

4.50

0.25

0.58

2.00

1.31

Cft

Short sides (stand post side)

3.25

0.25

0.48

1.00

0.39

Cft

(Drain side)

3.00

0.25

0.48

1.00

0.36

Cft

1.00

1.00

0.50

1.00

0.50

Cft

13.24

Cft

Seat pad
Total
deduct for drain flow
Net Total

6.00

0.33

0.33

1.00

0.65

Cft

12.59

Cft

GI Pipe 1/2 " dia

10.00

Rft

GI Socket 1/2" dia

No.

GI Elbow 1/2 " dia

No.

Brass tap 1/2"

No.

Quantities for 1 Tap Stand


CRS-Mansehra

3.50

11.00

22.00

8.57

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Quantities for 5 Tap Stand

CRS-Mansehra

17.50

55.00

110.00

42.86

4.28

17.45

Engr. Amir Jamal Qureshi

KALSAN- 1

Drinking Water Supply Scheme:

U/C SACHAN

VALVE CHAMBER

Detail of Materials

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

Excavation (gravelly soil)

4.00

4.00

2.50

1.00

40.00

Cft

P/L PCC (1:4:8) as in Foundation

4.00

4.00

0.25

1.00

4.00

Cft

Stone Masonry in (1:3) CSM


Long Wall

3.50

1.00

2.25

2.00

15.75

Cft

Short Wall

1.50

1.00

2.25

2.00

6.75

Cft

22.50

Cft

6.75

Cft

Total
30% (1:3) CSM
Stone
4

PCC (1:2:4) as coping


Long Wall
Short Wall

Sand
(cft)

1.87

2.50

15.75

Cft

1.00

4.00

Cft

3.50

1.00

0.16

2.00

1.12

Cft

1.50

1.00

0.16

2.00

0.48

Cft

1.60

Cft

0.20

1.00

13.50

Sft

3.73

14.00

2.25

Sft

1.50

Steel Man hole cover 1.5'x1.5' (16


Guage sheet)

1.50

1.50

2.25

4.00

Stone
(cft)

Unskilled
Labour

Men-days Men-days

5.00

0.12

0.45

0.90

2.03

0.05

0.18

0.18

0.27

7.00

0.25

P/L Plaster 3/4" thick in (1:3) CSM

Gravel/
Crush
(cft)

Labour
Skilled
Labour

0.88
0.50

4.00

Quantities for 1 Valve Chamber

Cement
(Bags)

4.00

Total

(1.5' X 1.5'X 2.25')

15.75

2.00

0.06
6.30

24.50

7.00

15.75

1.31

3.81

WATSAN

Opertaional Team

Drinking Water Supply Scheme:

SOURCE TANK

Detail of Materials

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

Excavation (in hard soil)

6.50

6.50

2.00

84.50

Cft

P/L PCC (1:4:8) as in Foundation

6.50

6.50

0.50

21.13

Cft

Stone Masonry in (1:3) CSM


Long Wall

6.00

1.50

4.00

72.00

Cft

Short Wall

3.00

1.50

4.00

36.00

Cft

Total

108.00

Cft

30% (1:3) CSM

32.40

Cft

Stone

75.60

Cft

2.25

Cft

P/L PCC (1:2:4) as in Bed

Vertical Reinforcement in walls

3.00

P/L Plaster 3/4" thick in (1:3) CSM

3.00

P/L Pointing 3/4" in (1:2) CSM


P/L RCC (1:2:4) as in Slab
Decuction for man hole cover

(#4 @ 12" c/c all around)

8.1

3.00

0.25

16

24.30

kg

4.00

48.00

6.00

2.75

6.50

6.50

0.33

2.00

2.00

0.33

5.00

Net Total
8.2

(3' X3'X 4')

Sand
(cft)

Gravel/
Crush
(cft)

2.10

10.50

21.00

9.07

34.00

Cement
(Bags)

Stone
(cft)

Steel
#4 bars
(kg)

Labour
Skilled
Steel
Binding Labour
#3 bars
wire (kg)
(kg)
Men-days

0.65

4.32
75.60
0.60

1.50

3.00

0.07

Sft

0.80

3.00

0.62

66.00

Sft

0.17

0.41

1.19

13.94

Cft

1.32

Cft

12.62

Cft

2.60

6.50

30.00

0.24

13.00

0.59

Steel
(#3 @ 6" c/c as main steel)

7.00

13

15.50

kg

(#3 @ 9" c/c as temp. steel)

7.00

10.70

kg

26.20

kg

Total
9

Centring and shuttring

13.94

Cft

0.28

GI strainer 2" dia

3.00

Rft

0.06

12

GI Over flow pipe 1.5" dia

6.00

Rft

0.12

13

GI wash out pipe 1" dia

5.00

Rft

0.10

14

GI Plug 1"

1.00

No

15

Steel Man hole cover (2'x2')

4.00

Sft

CRS-Mnasehra

2.00

6.50

2.00

0.33

0.26

10

Quantities for 1 Source Tank

6.50

30.00

0.10
15.33

55.91

37.00

75.60

30.00

30.00

0.51

8.11

Engr. Amir Jamal Qureshi

WATSAN

Opertaional Team

Labour
Unskilled
Labour
Men-days

2.62
2.39

9.72

0.25
0.24
0.96
1.85

1.20

0.26
0.14
0.12
0.24
0.20

20.19

CRS-Mnasehra

Engr. Amir Jamal Qureshi

Drinking Water Supply Scheme:

SOURCE TANK

Detail of Materials

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

Excavation (in hard soil)

7.00

7.00

1.50

73.50

Cft

P/L PCC (1:4:8) as in Foundation

7.00

7.00

0.50

24.50

Cft

Stone Masonry in (1:3) CSM


Long Wall

7.00

1.50

3.50

73.50

Cft

Short Wall

2.00

1.50

3.50

21.00

Cft

94.50

Cft

30% (1:3) CSM

28.35

Cft

Stone

66.15

Cft

4.00

Cft

20

45.50

kg

Total

P/L PCC (1:2:4) as in Bed

Vertical Reinforcement in walls

4.00

(#4 @ 12" c/c all around)

4.00

0.25

7.50

(4' X 4'X 3')

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Steel
#4 bars
(kg)

Labour
Steel
#3 bars
(kg)

Skilled
Unskilled
Binding Labour
Labour
wire
(kg)
Men-days Men-days

2.28
2.50

7.73

12.50

25.00

0.76

2.77

3.78

8.51

0.12

0.45

29.00
66.15

1.00

2.50

5.00
50.00

0.46

0.46

P/L Plaster 3/4" thick in (1:3) CSM

4.00

3.50

56.00

Sft

0.93

3.50

0.73

1.12

P/L Pointing 3/4" in (1:2) CSM

7.00

2.25

63.00

Sft

0.16

0.39

1.13

1.76

P/L RCC (1:2:4) as in Slab

7.56

7.50

0.33

18.71

Cft

4.00

10.00

0.88

1.78

Decuction for man hole cover

2.00

2.00

0.33

1.32

Cft

17.39

Cft

8.1

Net Total
8.2

20.00

Steel
(#3 @ 6" c/c as main steel)

7.56

15

19.30

kg

(#3 @ 9" c/c as temp. steel)

7.50

10

12.80

kg

32.10

kg

18.71

Cft

Total
9

Centring and shuttring

10

Binding wire

2.33

kg

11

GI strainer 2" dia

3.00

12

GI Over flow pipe 1.5" dia

13

GI wash out pipe 1" dia

14

GI Plug 1"

15

Steel Man hole cover (2'x2')


Quantities for 1 Source Tank

7.56

2.00

7.50

2.00

0.33

38.00

0.32

0.32
0.37

0.19

Rft

0.06

0.12

6.00

Rft

0.12

0.24

5.00

Rft

0.10

0.20

1.00

No

4.00

Sft

0.10
16.32

57.89

50.00

66.15

50.00

38.00

0.78

8.16

20.19

Drinking Water Supply Scheme:

SOURCE TANK

(5' X5'X 4')


Detail of Materials

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

Excavation (in hard soil)

8.50

8.50

2.00

1.00

144.50

Cft

P/L PCC (1:4:8) as in Foundation

8.50

8.50

0.50

1.00

36.13

Cft

Stone Masonry in (1:3) CSM


Long Wall

8.00

1.50

4.00

2.00

96.00

Cft

Short Wall

5.00

1.50

4.00

2.00

60.00

Cft

156.00

Cft

46.80

Cft

Total
30% (1:3) CSM
Stone
4

P/L PCC (1:2:4) as in Bed

Vertical Reinforcement in walls

P/L Plaster 3/4" thick in (1:3) CSM

5.00

P/L Pointing 3/4" in (1:2) CSM


P/L RCC (1:2:4) as in Slab
Decuction for man hole cover

(#4 @ 12" c/c all around)

8.1

5.00

Stone
(cft)

Labour
Steel
#3 bars
(kg)

Binding
wire
(kg)

Skilled
Labour

Unskilled
Labour

Men-days Men-days

4.48
3.60

18.00

13.07

49.00

1.40

3.50

36.00

1.12

4.08

6.24

14.04

0.19

0.71

109.20

Cft

6.25

Cft

20.00

30.30

kg

4.00

80.00

Sft

1.33

5.00

1.04

1.60

2.75

4.00

88.00

Sft

0.22

0.55

1.58

2.46

0.33

1.00

23.84

Cft

0.33

1.00

4.60

11.50

1.06

2.14

0.25

4.00

8.00

8.50

8.50

2.00

2.00

5.00

109.20
7.00
35.00

0.30

0.30

1.32

Cft

22.52

Cft

34.00

49.20

kg

1.00

23.84

Cft

0.48

0.24

23.00

Steel
(#3 @ 6" c/c both ways)

Sand
(cft)

Steel
#4 bars
(kg)

1.00

5.00

Net Total
8.2

Cement
(Bags)

Gravel/
Crush
(cft)

Centring and shuttring

8.50
8.50

8.50

0.33

55.00

0.49

0.49

10

GI strainer 2" dia

3.00

Rft

0.06

0.12

12

GI Over flow pipe 1.5" dia

6.00

Rft

0.12

0.24

13

GI wash out pipe 1" dia

5.00

Rft

0.10

0.20

14

GI Plug 1"

1.00

No

15

Steel Man hole cover (2'x2')

4.00

Sft

Quantities for 1 Source Tank

2.00

2.00

0.10
24.22

87.55

66.00

109.20

35.00

55.00

0.80

12.09

31.10

Drinking Water Supply Scheme:

CUT OFF WALL

Detail of Mater

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Front Wall

6.00

2.00

2.00

1.00

24.00

Cft

Wing Walls

4.50

4.50

2.00

2.00

81.00

Cft

105.00

Cft

Sand
(cft)

P/L PCC (1:4:8) as in Foundation


Front Wall

6.00

2.00

0.50

1.00

6.00

Cft

Wing Walls

4.50

2.00

0.50

2.00

9.00

Cft

15.00

Cft

Total
3

Cement
(Bags)

Excavation (in hard soil)

Total
2

Unit

2.00

10.00

8.00

30.00

Stone Masonry in (1:3) CSM


Front Wall

6.00

1.63

3.50

1.00

34.23

Cft

Wing Walls

4.50

1.63

3.50

2.00

51.35

Cft

85.58

Cft

30% (1:3) CSM

25.67

Cft

Stone

59.90

Cft

Total

P/L PCC (1:4:8) as in Bed

7.00

2.75

0.50

1.00

9.63

Cft

0.70

3.50

PCC (1:2:8) as in wall copping

15.00

1.25

0.17

1.00

3.19

Cft

0.80

2.00

Dry Boulders Filling

7.00

2.75

2.00

1.00

38.50

Cft

Quantities for 1 Cut off Wall

11.50

45.50

6' LONG
Detail of Materials
Gravel/
Crush
(cft)

Stone
(cft)

Labour
Dry
Boulders
(cft)

Skilled
Labour

Unskilled
Labour

Men-days Men-days

3.26

20.00

0.47

1.70

3.42

7.70

7.00

0.30

1.09

4.00

0.10

0.36

59.90

38.50

0.39

31.00

59.90

38.50

4.29

14.48

Drinking Water Supply Scheme:

CUT OFF WALL

Detail of Mater

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Front Wall

9.00

2.00

2.00

1.00

36.00

Cft

Wing Walls

4.50

4.50

2.00

2.00

81.00

Cft

117.00

Cft

Sand
(cft)

P/L PCC (1:4:8) as in Foundation


Front Wall

9.00

2.00

0.50

1.00

9.00

Cft

Wing Walls

4.50

2.00

0.50

2.00

9.00

Cft

18.00

Cft

Total
3

Cement
(Bags)

Excavation (in hard soil)

Total
2

Unit

2.50

12.50

9.33

35.00

Stone Masonry in (1:3) CSM


Front Wall

9.00

1.63

3.50

1.00

51.35

Cft

Wing Walls

4.50

1.63

3.50

2.00

51.35

Cft

102.69

Cft

30% (1:3) CSM

30.81

Cft

Stone

71.88

Cft

Total

P/L PCC (1:4:8) as in Bed

10.50

2.75

0.50

1.00

14.44

Cft

1.80

9.00

PCC (1:2:8) as in wall copping

18.00

1.25

0.17

1.00

3.83

Cft

1.00

2.50

Dry Boulders Filling

10.50

2.75

2.00

1.00

57.75

Cft

Quantities for 1 Cut off Wall

14.63

59.00

9' LONG
Detail of Materials
Gravel/
Crush
(cft)

Stone
(cft)

Labour
Dry
Boulders
(cft)

Skilled
Labour

Unskilled
Labour

Men-days Men-days

3.63

25.00

0.56

2.03

4.11

9.24

18.00

0.45

1.63

5.00

0.12

0.43

71.88

57.75

0.58

48.00

71.88

57.75

5.23

17.54

Drinking Water Supply Scheme:

CUT OFF WALL

Detail of Mater

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Front Wall

20.00

2.00

2.00

1.00

80.00

Cft

Wing Walls

4.50

4.50

2.00

2.00

81.00

Cft

161.00

Cft

Sand
(cft)

P/L PCC (1:4:8) as in Foundation


Front Wall

20.00

2.00

0.50

1.00

20.00

Cft

Wing Walls

4.50

2.00

0.50

2.00

9.00

Cft

29.00

Cft

Total
3

Cement
(Bags)

Excavation (in hard soil)

Total
2

Unit

3.00

15.00

13.33

50.00

Stone Masonry in (1:3) CSM


Front Wall

20.00

1.63

3.50

1.00

114.10

Cft

Wing Walls

4.50

1.63

3.50

2.00

51.35

Cft

165.45

Cft

30% (1:3) CSM

49.63

Cft

Stone

115.81

Cft

Total

P/L PCC (1:4:8) as in Bed

22.00

2.75

0.50

1.00

30.25

Cft

3.20

16.00

PCC (1:2:8) as in wall copping

29.00

1.25

0.17

1.00

6.16

Cft

1.40

3.50

Dry Boulders Filling

22.00

2.75

2.00

1.00

121.00

Cft

Quantities for 1 Cut off Wall

20.93

84.50

20' LONG
Detail of Materials
Gravel/
Crush
(cft)

Stone
(cft)

Labour
Dry
Boulders
(cft)

Skilled
Labour

Unskilled
Labour

Men-days Men-days

4.99

30.00

0.90

3.28

6.62

14.89

32.00

0.94

3.42

7.00

0.19

0.70

115.81

121.00

1.21

69.00

115.81

121.00

8.65

28.48

ROOF SLAB DESIGN (10,000 Gallon Tank)


fc =
compressive strength of concrete= =
3 ksi
Yield Strength of steel

Max. steel ratio

Specific weight of steel

50 ksi

max =

r pcc =
r Steel=

Specific weight of PCC

Long span = L =
Short span =W=
Wall thickness=

fy

0.021

W
L

0.15 k/cft
490 lb/cft

18 ft
18 ft
1.5 ft

Design depth of slab, effective depths and design effective lengths


clear
clear
Perime
span
span
ter P
along along W
(ft)
L (ft)
(ft)
13

13

72

hmin
(in)
4.8

Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
6
4.5
5
1.5 14.5 13.38 14.5 13.42 15

Ultimate Load and ultimate moment


depth h
(ft)
0.5

self wt./ft
(k/ft)
0.075

Ult. Load Ultimate moments Mu


(k-in)
Wu
(k/ft)
along L
along W
0.105
23.63
22.08

Design Steel Areas per 1 ft span of slab (b=12")

Asmin

0.002bh =

Along Long span (main steel)


Asmax =
bd =
max

As
(sq.in)
0.12

a
(in)
0.2

a/2
(in)
0.1

As
(sq.in)
0.12

a
(in)
0.2

max

a/2
(in)
0.1

d=
5 in
1.236 sq.in

(d-a/2) Design moment Md


(in)
(k-in)
4.9
26.46

Along Short span (transverse steel)

Asmax =

0.144 sq.in

d=

Remarks
Greater than Mu=23.63 k-in

Proposed

Remarks
Greater than Mu=22.08 k-in

Proposed

4.5 in

bd =
1.112 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
4.4
23.76

Rebar sizes and spacings


Along Short span (for main steel)

W=

18 ft

Bar length

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.12
0.12

3
4

0.11
0.196

1.1
0.6

Along Long span (for transverse steel)

2
1
L=

36
18

0.12
0.12

3
4

0.11
0.196

1.1
0.6

2
1

36
18

Total steel (#3 bars) required =


Deduct for circular slab
=
Net steel required
=
SAY

110
98
Bar length=

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)

18 ft

wt. of
steel
(kg)

648
324

18 ft

wt. of
steel
(kg)

648
324

220 kg
48 kg
172 kg
180 kg

110
98

= L

Remarks
Proposed
(#3 bars @ 6" c/c)

18 ft

= W

Remarks
Proposed
(#3 bars @ 6" c/c)

Design Le
(ft)
along
W
14.5

Proposed

Proposed

Remarks

sed
bars @ 6" c/c)

Remarks
sed
bars @ 6" c/c)

ROOF SLAB DESIGN (8000 Gallon Tank)


fc =
compressive strength of concrete= =
3 ksi
Yield Strength of steel

Max. steel ratio

Specific weight of steel

50 ksi

max =

r pcc =
r Steel=

Specific weight of PCC

Long span = L =
Short span =W=
Wall thickness=

fy

0.021

W
L

0.15 k/cft
490 lb/cft

16 ft
16 ft
1.5 ft

Design depth of slab, effective depths and design effective lengths


clear
clear
Perime
span
span
ter P
along along W
(ft)
L (ft)
(ft)
11

11

64

hmin
(in)
4.27

Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
5
3.5
4
1.5 12.5 11.29 12.5 11.33 13

Ultimate Load and ultimate moment


depth h
(ft)
0.42

self wt./ft
(k/ft)
0.063

Ult. Load Ultimate moments Mu


(k-in)
Wu
(k/ft)
along L
along W
0.0882
14.91
13.78

Design Steel Areas per 1 ft span of slab (b=12")

Asmin

0.002bh =

Along Long span (main steel)


Asmax =
bd =
max

As
(sq.in)
0.12

a
(in)
0.2

a/2
(in)
0.1

As
(sq.in)
0.12

a
(in)
0.2

max

a/2
(in)
0.1

d=
4 in
0.989 sq.in

(d-a/2) Design moment Md


(in)
(k-in)
3.9
21.06

Along Short span (transverse steel)

Asmax =

0.12 sq.in

d=

Remarks
Greater than Mu=14.91 k-in

Proposed

Remarks
Greater than Mu=13.78 k-in

Proposed

3.5 in

bd =
0.865 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
3.4
18.36

Rebar sizes and spacings


Along Short span (for main steel)

W=

16 ft

Bar length

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.12
0.12

3
4

0.11
0.196

1.1
0.6

Along Long span (for transverse steel)

2
1
L=

32
16

0.12
0.12

3
4

0.11
0.196

1.1
0.6

2
1

32
16

Total steel (#3 bars) required =


Deduct for circular slab
=
Net steel required
=
SAY

87
78
Bar length=

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)

16 ft

wt. of
steel
(kg)

512
256

16 ft

wt. of
steel
(kg)

512
256

174 kg
37 kg
137 kg
150 kg

87
78

= L

Remarks
Proposed
(#3 bars @ 6" c/c)

16 ft

= W

Remarks
Proposed
(#3 bars @ 6" c/c)

Design Le
(ft)
along
W
12.5

Proposed

Proposed

Remarks

sed
bars @ 6" c/c)

Remarks
sed
bars @ 6" c/c)

ROOF SLAB DESIGN (6000 Gallon Tank)


fc =
compressive strength of concrete= =
3 ksi
Yield Strength of steel

Max. steel ratio

Specific weight of steel

50 ksi

max =

r pcc =
r Steel=

Specific weight of PCC

Long span = L =
Short span =W=
Wall thickness=

fy

0.021

W
L

0.15 k/cft
490 lb/cft

14.17 ft
14.17 ft
1.5 ft

Design depth of slab, effective depths and design effective lengths


clear
clear
Perime
span
span
ter P
along along W
(ft)
L (ft)
(ft)
10

10

56.68

hmin
(in)
3.78

Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
4
2.5
3
1.5 11.5 10.21 11.5 10.25 12

Ultimate Load and ultimate moment


depth h
(ft)
0.33

self wt./ft
(k/ft)
0.0495

Ult. Load Ultimate moments Mu


(k-in)
Wu
(k/ft)
along L
along W
0.0693
9.98
9.16

Design Steel Areas per 1 ft span of slab (b=12")

Asmin

0.002bh =

Along Long span (main steel)


Asmax =
bd =
max

As
(sq.in)
0.096

a
(in)
0.16

a/2
(in)
0.08

As
(sq.in)
0.096

a
(in)
0.16

max

a/2
(in)
0.08

d=
3 in
0.742 sq.in

(d-a/2) Design moment Md


(in)
(k-in)
2.92
12.61

Along Short span (transverse steel)

Asmax =

0.096 sq.in

d=

Remarks
Greater than Mu=9.98 k-in

Proposed

Remarks
Greater than Mu=9.16 k-in

Proposed

2.5 in

bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45

Rebar sizes and spacings


Along Short span (for main steel)

W=

14.17 ft

Bar length

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

3
4

0.11
0.196

0.9
0.5

Along Long span (for transverse steel)

2
1

28
14

3
4

0.11
0.196

0.9
0.5

2
1

28
14

Total steel (#3 bars) required =


Deduct for circular slab
=
Net steel required
=
SAY

68
60

wt. of
steel
(kg)

397
198

136 kg
29 kg
107 kg
115 kg

68
60

= L

Remarks
Proposed
(#3 bars @ 6" c/c)

Bar length= 14.17 ft

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

14.17 ft

wt. of
steel
(kg)

397
198

L= 14.17 ft

= W

Remarks
Proposed
(#3 bars @ 6" c/c)

Design Le
(ft)
along
W
11.5

Proposed

Proposed

Remarks

sed
bars @ 6" c/c)

Remarks
sed
bars @ 6" c/c)

ROOF SLAB DESIGN (4000/5000 Gallon Tank)


fc =
compressive strength of concrete= =
3 ksi
Yield Strength of steel

Max. steel ratio

Specific weight of steel

50 ksi

max =

r pcc =
r Steel=

Specific weight of PCC

Long span = L =
Short span =W=
Wall thickness=

fy

0.021

W
L

0.15 k/cft
490 lb/cft

13.17 ft
13.17 ft
1.5 ft

Design depth of slab, effective depths and design effective lengths


clear
clear
Perime
span
span
ter P
along along W
(ft)
L (ft)
(ft)
9

52.68

hmin
(in)
3.51

Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
4
2.5
3
1.5 10.5 9.21 10.5 9.25
11

Ultimate Load and ultimate moment


depth h
(ft)
0.33

self wt./ft
(k/ft)
0.0495

Ult. Load Ultimate moments Mu


(k-in)
Wu
(k/ft)
along L
along W
0.0693
8.39
7.64

Design Steel Areas per 1 ft span of slab (b=12")

Asmin

0.002bh =

Along Long span (main steel)


Asmax =
bd =
max

As
(sq.in)
0.096

a
(in)
0.16

a/2
(in)
0.08

As
(sq.in)
0.096

a
(in)
0.16

max

a/2
(in)
0.08

d=
3 in
0.742 sq.in

(d-a/2) Design moment Md


(in)
(k-in)
2.92
12.61

Along Short span (transverse steel)

Asmax =

0.096 sq.in

d=

Remarks
Greater than Mu=8.39 k-in

Proposed

Remarks
Greater than Mu=7.64 k-in

Proposed

2.5 in

bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45

Rebar sizes and spacings


Along Short span (for main steel)

W=

13.17 ft

Bar length

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

3
4

0.11
0.196

0.9
0.5

Along Long span (for transverse steel)

2
1

26
13

3
4

0.11
0.196

0.9
0.5

2
1

26
13

Total steel (#3 bars) required =


Deduct for circular slab
=
Net steel required
=
SAY

58
52

wt. of
steel
(kg)

342
171

116 kg
25 kg
91 kg
95 kg

58
52

= L

Remarks
Proposed
(#3 bars @ 6" c/c)

Bar length= 13.17 ft

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

13.17 ft

wt. of
steel
(kg)

342
171

L= 13.17 ft

= W

Remarks
Proposed
(#3 bars @ 6" c/c)

Design Le
(ft)
along
W
10.5

Proposed

Proposed

Remarks

sed
bars @ 6" c/c)

Remarks
sed
bars @ 6" c/c)

ROOF SLAB DESIGN (3500 Gallon Tank)


fc =
compressive strength of concrete= =
3 ksi
Yield Strength of steel

Max. steel ratio

Specific weight of steel

50 ksi

max =

r pcc =
r Steel=

Specific weight of PCC

Long span = L =
Short span =W=
Wall thickness=

fy

0.021

W
L

0.15 k/cft
490 lb/cft

12.67 ft
12.67 ft
1.5 ft

Design depth of slab, effective depths and design effective lengths


clear
clear
Perime
span
span
ter P
along along W
(ft)
L (ft)
(ft)
8.5

8.5

50.68

hmin
(in)
3.38

Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
4
2.5
3
1.5
10 8.71
10
8.75
10

Ultimate Load and ultimate moment


depth h
(ft)
0.33

self wt./ft
(k/ft)
0.0495

Ult. Load Ultimate moments Mu


(k-in)
Wu
(k/ft)
along L
along W
0.0693
6.93
6.93

Design Steel Areas per 1 ft span of slab (b=12")

Asmin

0.002bh =

Along Long span (main steel)


Asmax =
bd =
max

As
(sq.in)
0.096

a
(in)
0.16

a/2
(in)
0.08

As
(sq.in)
0.096

a
(in)
0.16

max

a/2
(in)
0.08

d=
3 in
0.742 sq.in

(d-a/2) Design moment Md


(in)
(k-in)
2.92
12.61

Along Short span (transverse steel)

Asmax =

0.096 sq.in

d=

Remarks
Greater than Mu=6.93 k-in

Proposed

Remarks
Greater than Mu=6.93 k-in

Proposed

2.5 in

bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45

Rebar sizes and spacings


Along Short span (for main steel)

W=

12.67 ft

Bar length

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

3
4

0.11
0.196

0.9
0.5

Along Long span (for transverse steel)

2
1

25
13

3
4

0.11
0.196

0.9
0.5

2
1

25
13

Total steel (#3 bars) required =


Deduct for circular slab
=
Net steel required
=
SAY

54
50

wt. of
steel
(kg)

317
165

108 kg
23.2 kg
84.8 kg
90 kg

54
50

= L

Remarks
Proposed
(#3 bars @ 6" c/c)

Bar length= 12.67 ft

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

12.67 ft

wt. of
steel
(kg)

317
165

L= 12.67 ft

= W

Remarks
Proposed
(#3 bars @ 6" c/c)

Design Le
(ft)
along
W
10

Proposed

Proposed

Remarks

sed
bars @ 6" c/c)

Remarks
sed
bars @ 6" c/c)

WATSAN

Operational Team

ROOF SLAB DESIGN (3000 Gallon Tank)


fc =
compressive strength of concrete= =
3 ksi
Yield Strength of steel

Max. steel ratio

Specific weight of steel

50 ksi

max =

r pcc =
r Steel=

Specific weight of PCC

Long span = L =
Short span =W=
Wall thickness=

fy

0.021

0.15 k/cft

490 lb/cft

12.17 ft
12.17 ft
1.5 ft

Design depth of slab, effective depths and design effective lengths


clear
clear
Perime
span
span
ter P
along along W
(ft)
L (ft)
(ft)
8

48.68

hmin
(in)
3.25

Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
4
2.5
3
1.5
9.5 8.21 9.5 8.25
9.5

Ultimate Load and ultimate moment


depth h
(ft)
0.33

self wt./ft
(k/ft)
0.0495

Ult. Load Ultimate moments Mu


(k-in)
Wu
(k/ft)
along L
along W
0.0693
6.25
6.25

Design Steel Areas per 1 ft span of slab (b=12")

Asmin

0.002bh =

Along Long span (main steel)


Asmax =
bd =
max

As
(sq.in)
0.096

a
(in)
0.16

a/2
(in)
0.08

As
(sq.in)
0.096

a
(in)
0.16

CRS-Mansehra

max

a/2
(in)
0.08

d=
3 in
0.742 sq.in

(d-a/2) Design moment Md


(in)
(k-in)
2.92
12.61

Along Short span (transverse steel)

Asmax =

0.096 sq.in

d=

Remarks
Greater than Mu=6.25 k-in

Proposed

Remarks
Greater than Mu=6.25 k-in

Proposed

2.5 in

bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Rebar sizes and spacings


Along Short span (for main steel)

W=

12.17 ft

Bar length

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

3
4

0.11
0.196

0.9
0.5

Along Long span (for transverse steel)

2
1

24
12

3
4

0.11
0.196

0.9
0.5

2
1

24
12

Total steel (#3 bars) required =


Deduct for circular slab
=
Net steel required
=
SAY

CRS-Mansehra

50
44

wt. of
steel
(kg)

292
146

50
44

= L

Remarks
Proposed
(#3 bars @ 6" c/c)

Bar length= 12.17 ft

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

12.17 ft

wt. of
steel
(kg)

292
146

L= 12.17 ft

= W

Remarks
Proposed
(#3 bars @ 6" c/c)

100 kg
21.5 kg
78.5 kg
85 kg

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Design Le
(ft)
along
W
9.5

Proposed

Proposed

CRS-Mansehra

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Remarks

sed
bars @ 6" c/c)

Remarks
sed
bars @ 6" c/c)

CRS-Mansehra

Engr. Amir Jamal Qureshi

ROOF SLAB DESIGN (2500 Gallon Tank)


fc =
compressive strength of concrete= =
3 ksi
Yield Strength of steel

fy

Max. steel ratio

r pcc =
r Steel=

Specific weight of PCC


Specific weight of steel
Long span = L =
12.25 ft
Short span =W=
10.25 ft
Wall thickness=
1.5 ft

50 ksi

max =

0.021

0.15 k/cft
490 lb/cft

Design depth of slab, effective depths and design effective lengths


clear
clear
Perime
span
span
ter P
along along W
(ft)
L (ft)
(ft)
8

hmin
(in)

45

Effective
depths
Design Le
wall
Proposed
(in)
Clear
lengths
Le
(ft)
(ft)
thickn
h (in)
along
L
along
W
along along ess
along along
L
W
(ft)
(1)
(2)
(1)
(2)
L
W
4
2.5
3
1.5
9.5 8.21 7.5 6.25
9.5
7.5

Ultimate Load and ultimate moment


depth h
(ft)
0.33

self wt./ft
(k/ft)
0.0495

Ult. Load Ultimate moments Mu


(k-in)
Wu
(k/ft)
along L
along W
0.0693
6.25
3.9

Design Steel Areas per 1 ft span of slab (b=12")

Asmin

0.002bh =
=
Along Short span (main steel)
Asmax =
bd =
max

As
(sq.in)
0.096

a
(in)
0.16

a/2
(in)
0.08

(d-a/2) Design moment Md


(in)
(k-in)
2.92
12.61

Along Long span (transverse steel)

Asmax =
As
(sq.in)
0.096

a
(in)
0.16

max

a/2
(in)
0.08

0.096 sq.in
d=
3 in
0.742 sq.in

d=

Remarks
Greater than Mu=6.25 k-in

Proposed

Remarks
Greater than Mu=3.9 k-in

Proposed

2.5 in

bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45

Rebar sizes and spacings


Along Short span (main steel)

W=

10.25 ft

Bar length

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

3
4

0.11
0.196

0.9
0.5

Along Long span (transverse steel)

2
1

21
10

3
4

0.11
0.196

0.9
0.5

2
1

Total steel (#3 bars) required


SAY

25
12

44
37

wt. of
steel
(kg)

256
123

88 kg

95 kg

44
37

= L

Remarks
Proposed
bars @ 6" c/c)

Bar length= 10.25 ft

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

12.25 ft

wt. of
steel
(kg)

257
123

L= 12.25 ft

(#3

= W

Remarks
Proposed
bars @ 6" c/c)

(#3

WATSAN

Operational Team

Drinking Water Supply Scheme

KALSAN-I

U/C

ROOF SLAB DESIGN (2000 Gallon Tank)


fc =
compressive strength of concrete= =
3 ksi
Yield Strength of steel

max =

gpcc =
r Steel=

Specific weight of PCC


Specific weight of steel

50 ksi

Max. steel ratio

Long span = L =
Short span =W=
Wall thickness=

fy

SACHAN

0.021
0.15 k/cft
W

490 lb/cft

12.25 ft
9.75 ft
1.5 ft

Design depth of slab, effective depths and design effective lengths


clear
clear
Perime
span
span
ter P
along along W
(ft)
L (ft)
(ft)
8

5.5

44

hmin Proposed
h (in)
(in)
2.93

Effective
depths
(in)

Design Le
wall
(ft)
(ft)
thickn Clear lengths Le
along L
along W
along along ess
along along
L
W
(ft)
(1)
(2)
(1)
(2)
L
W
2.5
3
1.5
9.5 8.21
7
5.75
9.5
7

Ultimate Load and ultimate moment


depth h
(ft)
0.33

self wt./ft
(k/ft)
0.0495

Ult. Load Ultimate moments Mu


(k-in)
Wu
(k/ft)
along L
along W
0.0693
6.25
3.4

Design Steel Areas per 1 ft span of slab (b=12")

Asmin =
0.002bh =
Along Short span (main steel)

Asmax =
As
(sq.in)
0.096

max

a
(in)
0.16

a/2
(in)
0.08

0.096 sq.in
d=
3 in

bd =
0.742 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.92
12.61

Along Long span (transverse steel)

Asmax =
As
(sq.in)
0.096

max

a
(in)
0.16

a/2
(in)
0.08

As
Area of bar Ab
(sq.in) Bar No.
(sq.in)
3
4

W=

0.9
0.5

Along Long span (transverse steel)

0.096
0.096

3
4

0.11
0.196

9.75 ft

2
1

Proposed

Bar length

20
10

42
37

wt. of
steel
(kg)

2 24.5 238.88
1 12.25 119.44
=

12.25 ft

41
36

= L

Remarks
Proposed
bars @ 6" c/c)

Bar length= 9.75 ft

#
length
#
bars
of
# bars in propo in full bars
1ft span
sed span
(ft)
0.9
0.5

wt. of
steel
(kg)

245
122.5

L= 12.25 ft

Total steel (#3 bars) required


CRS-Mansehra

Remarks
Greater than Mu=3.4 k-in

#
length
#
bars
of
# bars in propo in full bars
1ft span
sed span
(ft)

0.11
0.196

As
Area of bar Ab
(sq.in) Bar No.
(sq.in)

Proposed

2.5 in

bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45

Rebar sizes and spacings


Along Short span (main steel)

0.096
0.096

d=

Remarks
Greater than Mu=6.25 k-in

(#3

= W

Remarks
Proposed
bars @ 6" c/c)

(#3

83 kg
Engr. Amir Jamal Qureshi

WATSAN

Operational Team

SAY

CRS-Mansehra

90 kg

Engr. Amir Jamal Qureshi

ROOF SLAB DESIGN (1000 & 1500 Gallon Tank)


fc =
compressive strength of concrete= =
3 ksi
L
Yield Strength of steel

fy

Max. steel ratio

max =

r pcc =
r Steel=

Specific weight of PCC


Specific weight of steel
Long span = L =
10 ft
Short span =W=
10 ft
Wall thickness=
1.5 ft

50 ksi

0.021

0.15 k/cft
490 lb/cft

Design depth of slab, effective depths and design effective lengths


clear
clear
Perime
span
span
ter P
along along W
(ft)
L (ft)
(ft)
6.5

6.5

40

Effective
depths
Design Le
wall
hmin Proposed
(in)
Clear
lengths
Le
(ft)
(ft)
thickn
h (in)
(in)
along
L
along
W
along along ess
along along
L
W
(ft)
(1)
(2)
(1)
(2)
L
W
2.67
4
2.5
3
1.5
8 6.71
8
6.75
8
8

Ultimate Load and ultimate moment


depth h
(ft)
0.33

self wt./ft
(k/ft)
0.0495

Ult. Load Ultimate moments Mu


(k-in)
Wu
(k/ft)
along L
along W
0.0693
4.44
4.44

Design Steel Areas per 1 ft span of slab (b=12")

Asmin

0.002bh =
=
Along Short span (main steel)
Asmax =
bd =
max

As
(sq.in)
0.096

a
(in)
0.16

a/2
(in)
0.08

(d-a/2) Design moment Md


(in)
(k-in)
2.92
12.61

Along Long span (transverse steel)

Asmax =
As
(sq.in)
0.096

a
(in)
0.16

max

a/2
(in)
0.08

0.096 sq.in
d=
3 in
0.742 sq.in

d=

Remarks
Greater than Mu=4.44 k-in

Proposed

Remarks
Greater than Mu=4.44 k-in

Proposed

2.5 in

bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45

Rebar sizes and spacings


Along Short span (main steel)

W=

10 ft

Bar length

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

3
4

0.11
0.196

0.9
0.5

Along Long span (transverse steel)

2
1
L=

20
10

0.096
0.096

3
4

0.11
0.196

0.9
0.5

2
1

Total steel (#3 bars) required


SAY

20
10

34
30
Bar length=

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)

10 ft

wt. of
steel
(kg)

200
100

10 ft

wt. of
steel
(kg)

200
100

68 kg

75 kg

34
30

= L

Remarks
Proposed
bars @ 6" c/c)

10 ft

(#3

= W

Remarks
Proposed
bars @ 6" c/c)

(#3

ROOF SLAB DESIGN (500 Gallon Tank)


fc =
compressive strength of concrete= =
3 ksi
Yield Strength of steel

fy

Max. steel ratio

r pcc =
r Steel=

Specific weight of PCC


Specific weight of steel
Long span = L =
8.2 ft
Short span =W=
8.2 ft
Wall thickness=
1.5 ft

50 ksi

max =

0.021

0.15 k/cft
490 lb/cft

Design depth of slab, effective depths and design effective lengths


clear
clear
Perime
span
span
ter P
along along W
(ft)
L (ft)
(ft)
5.25

5.25

32.8

hmin
(in)
2.19

Effective
depths
Design Le
wall
Proposed
(in)
Clear
lengths
Le
(ft)
(ft)
thickn
h (in)
along
L
along
W
along along ess
along along
L
W
(ft)
(1)
(2) (1)
(2)
L
W
4
2.5
3
1.5
6.75 5.46 6.75 5.5
6.75 6.75

Ultimate Load and ultimate moment


depth h
(ft)
0.33

self wt./ft
(k/ft)
0.0495

Ult. Load Ultimate moments Mu


(k-in)
Wu
(k/ft)
along L
along W
0.0693
3.16
3.16

Design Steel Areas per 1 ft span of slab (b=12")

Asmin

0.002bh =
=
Along Short span (main steel)
Asmax =
bd =
max

As
(sq.in)
0.096

a
(in)
0.16

a/2
(in)
0.08

(d-a/2) Design moment Md


(in)
(k-in)
2.92
12.61

Along Long span (transverse steel)

Asmax =
As
(sq.in)
0.096

a
(in)
0.16

max

a/2
(in)
0.08

0.096 sq.in
d=
3 in
0.742 sq.in

d=

Remarks
Greater than Mu=3.16 k-in

Proposed

Remarks
Greater than Mu=3.61 k-in

Proposed

2.5 in

bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45

Rebar sizes and spacings


Along Short span (main steel)

W=

8.2 ft

Bar length

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

3
4

0.11
0.196

0.9
0.5

Along Long span (transverse steel)

2
1
L=

16
8

3
4

0.11
0.196

0.9
0.5

2
1

Total steel (#3 bars) required


SAY

16
8

22
20

wt. of
steel
(kg)

131
66

44 kg

50 kg

22
20

= L

Remarks
Proposed
bars @ 6" c/c)

Bar length= 8.2 ft

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

8.2 ft

wt. of
steel
(kg)

131
66

8.2 ft

(#3

= W

Remarks
Proposed
bars @ 6" c/c)

(#3

ROOF SLAB DESIGN (500 Gallon Tank)


fc =
compressive strength of concrete= =
3 ksi
Yield Strength of steel

fy

Max. steel ratio

r pcc =
r Steel=

Specific weight of PCC


Specific weight of steel
Long span = L =
8.2 ft
Short span =W=
8.2 ft
Wall thickness=
1.5 ft

50 ksi

max =

0.021

0.15 k/cft
490 lb/cft

Design depth of slab, effective depths and design effective lengths


clear
clear
Perime
span
span
ter P
along along W
(ft)
L (ft)
(ft)
5.25

5.25

32.8

hmin
(in)
2.19

Effective
depths
Design Le
wall
Proposed
(in)
Clear
lengths
Le
(ft)
(ft)
thickn
h (in)
along
L
along
W
along along ess
along along
L
W
(ft)
(1)
(2) (1)
(2)
L
W
4
2.5
3
1.5
6.75 5.46 6.75 5.5
6.75 6.75

Ultimate Load and ultimate moment


depth h
(ft)
0.33

self wt./ft
(k/ft)
0.0495

Ult. Load Ultimate moments Mu


(k-in)
Wu
(k/ft)
along L
along W
0.0693
3.16
3.16

Design Steel Areas per 1 ft span of slab (b=12")

Asmin

0.002bh =
=
Along Short span (main steel)
Asmax =
bd =
max

As
(sq.in)
0.096

a
(in)
0.16

a/2
(in)
0.08

(d-a/2) Design moment Md


(in)
(k-in)
2.92
12.61

Along Long span (transverse steel)

Asmax =
As
(sq.in)
0.096

a
(in)
0.16

max

a/2
(in)
0.08

0.096 sq.in
d=
3 in
0.742 sq.in

d=

Remarks
Greater than Mu=3.16 k-in

Proposed

Remarks
Greater than Mu=3.61 k-in

Proposed

2.5 in

bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45

Rebar sizes and spacings


Along Short span (main steel)

W=

8.2 ft

Bar length

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

3
4

0.11
0.196

0.9
0.5

Along Long span (transverse steel)

2
1
L=

16
8

3
4

0.11
0.196

0.9
0.5

2
1

Total steel (#3 bars) required


SAY

16
8

22
20

wt. of
steel
(kg)

131
66

44 kg

55 kg

22
20

= L

Remarks
Proposed
bars @ 6" c/c)

Bar length= 8.2 ft

#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096

8.2 ft

wt. of
steel
(kg)

131
66

8.2 ft

(#3

= W

Remarks
Proposed
bars @ 6" c/c)

(#3

Drinking Water Supply Scheme:

STORAGE TANK:

500 US GALLONS
Detail of Materials

Detail of Quantities
Sub
Head
No

2
3

4
5
5.1

5.2

5.3
6

7
8
8.1

8.2

Description

Excavation (gravelly soil, not


requiring blasting)
Long Wall
Short Wall
Plinth/Apron
shingle bed

Length
in ft

9.65
4.65
12.25
4.65

Total
Shingle as in Bed
5.2
P/L PCC (1:4:8) as in Foundation
Long Wall
9.65
Short Wall
4.65
Plinth/Apron
9.65
Bed
5.2
Total
P/L PCC (1:2:4) as in Bed
5.2
Ring Beam (24"X12")
RCC (1:2:4)
Long sides
9.15
Short sides
5.2
Total
Steel
Main steel (4, #4 bars) 160
Shear stirrups (#3@ 12" c/c)
5.5
Centring and shuttering
14.35
CR Stone Masonry in (1:6) CSM
Long Wall
1st Step
9.15
2nd Step
8.15
3rd Step
7.65
Short Wall
1st Step
5.2
2nd Step
5.2
3rd Step
5.2
Total
Deduct for 1st seismic band
Deduct for 2nd seismic band
Net Total
30% (1:6) CSM
Stone
Vertical Reinforcement in walls
(#4 @ 12" c/c) all around
11.25
Seismic Bands
@ 2'-3" from top of ring beam
RCC (1:2:4)
Long sides
9.15
short sides
5.5
Total
Steel
Main steel (2,#4) bars
58
Shear stirrups(#2 @ 12"c/c)
2.3
corner reinforcement (1,#4 bar 2'
ovelap with main steel)
6
@ 2'-3" from top of 1st seismic band
RCC (1:2:4)
Long sides
9.15
short sides
5.5
Total
Steel
Main steel (2,#3) bars
54
Shear stirrups(#2 @ 12"c/c)
1.5
corner reinforcement (1,#3 bar 2'
ovelap with main steel at each
corner)

Breadth
in ft

Depth/Ht
in ft

No of
Units

2.5
2.5
3
4.65

2
2
0.5
0.5

2
2
1
1

5.2

0.5

2.5
2.5
3
5.2

0.5
0.5
0.5
0.5

2
2
1
1

5.2

0.25

2
2

1
1

2
2

Shingle
(cft)

Labour

Steel
#2 Steel
#3 Steel
#4
Binding
bars (kg) bars (kg) bars (kg) wire
(kg)

Skilled
Labour

Unskilled
Labour

Men-days

Men-days

Cft
Cft
Cft
Cft
Cft
Cft

6.70
1.40

33.50
3.50

67.00
7.00

1.98
0.21

7.20
0.76

36.60
20.80
57.40

cft
cft
cft

11.40

28.50

57.00

2.70

5.45

48.50
33.70
28.70

kg
kg
Cft

0.57

0.49
0.34
0.29

118.95
24.45
38.25
67.60
15.60
26.00
290.85
19.34
14.81
256.70
77.01
179.69

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

10.27

23.10

32

109.10

kg

2
2

12.08
7.26
19.34

cft
cft
cft

36

17.60
6.40

kg
kg

7.30

kg

2
2

7.55
7.26
14.81

cft
cft
cft

36

9.20
4.20

kg
kg

3.40

kg

1
3.25
1
2
3.25
1
2

2
2
2
2
2
2

0.33
0.33

Stone
(cft)

24.13
11.63
14.48
13.52
63.75
6.76

2
1.5
1.25
2
1.5
1.25

1.25
2

Gravel/
Crush
(cft)

Cft
Cft
Cft

0.33
0.33

Unit

Sand
(cft)

96.50
46.50
18.38
10.81
172.19
13.52

36
1

2
2

Quantity

Cement
(Bags)

Cft
Cft

3.79
0.20

13.52

55.00
40.00

10.40

78.00

0.49
0.34

179.69
120.00

4.00

10.00

20.00

7.50

1.09

0.91

1.84

25.00

0.18
0.06

0.18
0.06

10.00

0.07

0.07

10.00

3.00

1.09

15.00

0.70

1.41

15.00

0.09
0.04

0.09
0.04

5.00

0.03

0.03

7.00

10

P/L Plaster(0.5") in (1:3) CSMinternals walls


do
Total
P/L Pointing (0.75") in (1:2) CSM
1st Step
2nd Step
3rd Step

5.2
5.2

4.5
4.5

2
2

46.80
46.80
93.60

Sft
Sft
Sft

9.15
8.15
7.65

2.42
1
1.67

4
4
4

88.57
32.60
51.10
172.27
22.39
1.33
21.06
50.00
22.39
12
6
1
4.00

Sft
Sft
Sft
Sft
Cft
Cft
Cft
kg
Cft
Rft
Rft
No.
Sft

Total
11.1 P/L RCC (1:2:4) as in Slab
Decuction for manhole cover

11.2
12
13
14
15

Net Total
Steel (#3 @ 6" c/c) (as per detail)
Centring and shuttering
GI over flow pipe 1.5" dia.
GI wash out pipe 1.5" dia
GI Plug 1.5 "
Steel man hole cover (2'x2')
Quantities for 1 Tank

8.2
2

8.2
2

0.333
0.333

1
1

8.2

8.2

0.333

1.20

3.90

1.22

1.87

0.43

1.08

3.10

4.82

4.20

10.50

21.00

0.99
0.45
0.24
0.12

2.00
0.50
0.22
0.48
0.24

23.45

56.58

50.00

42.73

176.48

187.00

179.69

13.52

17.00

110.00

0.50

210.00

2.89

Drinking Water Supply Scheme:

STORAGE TANK:

1000 US GALLONS
Detail of Materials

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Excavation (gravelly soil, not


requiring blasting)
Long Wall
Short Wall
Plinth/Apron
Shingle bed

10.67
5.67
10.17
8.17

Breadth
in ft

2
2
3
5.67

Depth/Ht
in ft

1
1
0.5
0.5

No of
Units

2
2
1
1

Total

Quantity

Unit

42.68
22.68
15.26
23.16
103.78

Cft
Cft
Cft
Cft
Cft

Shingle as in Bed

8.17

5.67

0.5

23.16

Cft

P/L PCC (1:4:8) as in Foundation


Long Wall
10.67
Short Wall
5.67
Plinth/Apron
10.17
Bed
8.67
Total

2
2
3
6.17

0.5
0.5
0.5
0.67

2
2
1
1

21.34
11.34
15.26
35.84
83.78

Cft
Cft
Cft
Cft
Cft

13.58
23.60
25.00
48.60

Cft
kg
kg
kg

35.01
18.51
53.52

cft
cft
cft

60.60
30.60
26.76

kg
kg
Cft

160.18
112.93
273.11
34.34
238.77
71.63
167.14

Cft
Cft
Cft
Cft
Cft
Cft
Cft

36

111.90

kg

2
2

10.07
7.10
17.17

cft
cft
cft

40

20.60
11.90

kg
kg

6.40

kg

2
2

10.07
7.10
17.17

cft
cft
cft

P/L RCC (1:2:4) as in Bed


6.67
Steel
along long walls(#3@6"c/c) 10.67
along short walls(#3@6"c/c) 8.17
Total
5
Ring Beam (18"X12")
5.1 RCC (1:2:4)
Long sides
11.67
Short sides
6.17
Total
5.2 Steel
Main steel (4, #4 bars) 200
Shear stirrups (#3@ 12" c/c)
4.5
5.3 Centring and shuttering
17.84
6

CR Stone Masonry in (1:6) CSM


Long Wall
Short Wall

10.17
7.17

6.17

1.5
1.5

0.33

1
1

1
13
18

2
2

1.5

40
1

1.5
1.5

5.25
5.25

2
2

Total
Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
7

Vertical Reinforcement in walls


(#4 @ 12" c/c all around)

10.25

8
Seismic Bands
8.1 @ 2' from top of ring beam
8.11 RCC (1:2:4)
Long sides
short sides

10.17
7.17

1.5
1.5

0.33
0.33

Total

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)

Binding
wire
(kg)

Skilled
Labour

Unskilled
Labour

Men-days

Men-days

2.28
23.16

0.35

8.40

42.00

84.00

2.60

9.47

2.80

7.00

14.00

0.42

1.53

55.00

10.40

26.00

0.49

52.00
70.00
40.00

10.67

0.49

2.52

5.08

0.54

0.61
0.31
0.27

9.55

21.49

0.61
0.31

80.00
167.14

130.00

3.60

9.00

1.12

18.00

1.12

0.81

1.63

8.12 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)

68
1.75

corner reinforcement (1,#4 bar 2'


ovelap with main steel at each
corner)
5.25
8.2 @ 1'-9" from top of 1st seismic band
8.21 RCC (1:2:4)
Long wall
10.17
short wall
7.17
Total

1.5
1.5

0.33
0.33

27.00

0.21
0.12

0.21
0.12

10.00

0.06

0.06

15.00

3.60

9.00

18.00

0.81

1.63

Drinking Water Supply Scheme:

STORAGE TANK:

1000 US GALLONS
Detail of Materials

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)

Binding
wire
(kg)

Skilled
Labour

Unskilled
Labour

Men-days

Men-days

8.22 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)

68
1.75

corner reinforcement (1,#4 bar 2'


ovelap with main steel at each
corner)

5.25

40

20.60
11.90

kg
kg

6.40

kg

27.00

0.21
0.12

0.21
0.12

10.00

0.06

0.06

1.17

1.17

15.00

9.1 RCC (1:2:4) as in core wall


Long wall

7.17

0.33

4.5

21.29

cft

Short wall

6.5

0.33

4.5

19.31

cft

40.60

cft

55.10

kg

Total
9.2 Steel

Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)

36

52

Total
10

P/L Pointing (0.75") in (1:2) CSM

11.1 P/L RCC (1:2:4) as in Slab


Decuction for manhole cover

11.2
12
13
14
15

61.90

kg

117.00

kg

10.17

4.58

186.31

Sft

10.67
2

10.67
2

0.333
0.333

1
1

37.91
1.33
36.58
75.00
37.91
12
6
1
4.00

Cft
Cft
Cft
kg
Cft
Rft
Rft
No.
Sft

Net Total
Steel (#3 @ 6" c/c) (as per detail)
Centring and shuttering
10.67
GI over flow pipe 1.5" dia.
GI wash out pipe 1.5" dia
GI Plug 1.5 "
Steel man hole cover (2'x2')
2
Quantities for 1 Tank

10.67

0.333

8.20

20.50

41.00

130.00
0.47

1.16

7.40

18.50

37.00
75.00

55.53

213.16

264.00

167.14

23.16

330.00

3.35

5.22

1.72
0.76
0.24
0.12

3.48
0.75
0.38
0.48
0.24

23.42

58.74

0.75

274.00

5.22

Drinking Water Supply Scheme:

STORAGE TANK:
Detail of Quantities

Sub
Head
No

Description

Length
in ft

Excavation (gravelly soil, not


requiring blasting)
Long Wall
Short Wall
Plinth/Apron
shingle bed

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

10.67
6.67
10.17
6.7

2
2
3
6.1

1
1
0.5
0.5

2
2
1
1

42.68
26.68
15.26
20.44
105.05

Cft
Cft
Cft
Cft
Cft

Total

Cement
(Bags)

Shingle as in Bed

6.67

6.67

0.5

22.24

Cft

P/L PCC (1:4:8) as in Foundation


Long Wall
Short Wall
Plinth/Apron
Bed
Total

10.67
6.67
10.17
7.17

2
2
3
7.17

0.5
0.5
0.5
0.5

2
2
1
1

21.34
13.34
15.26
25.70
75.64

Cft
Cft
Cft
Cft
Cft

7.50

P/L PCC (1:2:4) as in Bed

7.17

7.17

0.25

12.85

Cft

2.60

10.17
7.17

1.5
1.5

1
1

2
2

30.51
21.51
52.02

cft
cft
cft

10.40

5
Ring Beam (18"X12")
5.1 RCC (1:2:4)
Long sides
Short sides
Total

5.2 Steel
Main steel (4, #4 bars)
Shear stirrups (#3@ 12" c/c)
5.3 Centring and shuttering
6

CR Stone Masonry in (1:6) CSM


Long Wall
Short Wall

200
4.5
17.34

60.60
30.60
52.02

kg
kg
Cft

1.5

40
2

10.17
7.17

1.5
1.5

6.25
6.25

2
2

190.69
134.44
325.13
34.34
290.79
87.24
203.55

Cft
Cft
Cft
Cft
Cft
Cft
Cft

36

122.80

kg

2
2

10.07
7.10
17.17

cft
cft
cft
kg
kg

kg

Total
Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
7

Vertical Reinforcement in walls


(#4 @ 12" c/c all around)

11.25

8
Seismic Bands
8.1 @ 2' from top of ring beam
8.11 RCC (1:2:4)
Long sides
short sides

10.17
7.17

1.5
1.5

0.33
0.33

Total
8.12 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)
corner reinforcement (1,#4 bar 2'
ovelap with main steel at each
corner)
8.2 @ 2' from top of 1st seismic band

68
1.75

40

20.60
11.90

5.25

6.40

10.67

3.60

8.21 RCC (1:2:4)


Long wall
short wall

10.17
7.17

1.5
1.5

0.33
0.33

2
2

Total

10.07
7.10
17.17

cft
cft
cft
kg
kg

3.60

8.22 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)

68
1.75

40

20.60
11.90

corner reinforcement (1,#4 bar 2'


ovelap with main steel at each
corner)

5.25

6.40

kg

9.1 RCC (1:2:4) as in core wall


Long wall

7.17

0.33

5.5

26.03

cft

Short wall

6.5

0.33

5.5

23.60

cft

49.63

cft

Total
9.2 Steel

Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)

44

67.40

kg

52

70.80

kg

138.20

kg

12

11.25

cft

Total

10

RCC corner strips (above and below


seismic bands)

10.1 RCC (1:2:4)


10.2 Steel
11

10.00

2.5

1.5

0.25

Main steel(#3 bars)

7.83

12

16.00

kg

shear stirrups(#3)
Pointing (0.75") in (1:2) CSM

1.75
10.17

5.58

24
4

7.10
226.99

kg
Sft

10.67

10.67

0.333

37.91

Cft

12.1 P/L RCC (1:2:4) as in Slab

2.40

0.57

12.2
13
14
15
16

Decuction for manhole cover


Net Total
Steel (#3 @ 6" c/c) (as per detail)
Centring and shuttering
GI over flow pipe 1.5" dia.
GI wash out pipe 1.5" dia
GI Plug 1.5 "
Steel man hole cover (2'x2')
Quantities for 1 Tank

10.67

10.67

0.333

0.333

1.33
36.58
75.00
37.91
12
6
1
4.00

Cft
Cft
kg
Cft
Rft
Rft
No.
Sft

7.40

58.73

1500 US GALLONS
Detail of Materials
Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)

Binding
wire
(kg)

Skilled
Labour

Unskilled
Labour

Men-days

Men-days

2.31
22.24

0.33

37.50

75.00

2.34

8.55

6.50

13.00

0.40

1.45

26.00

52.00

2.44

4.94

65.00
35.00

0.61
0.31
1.04

0.61
0.31
0.52

11.63

26.17

80.00
203.55

130.00

9.00

1.23

18.00

1.23

0.81

1.63

27.00

0.21
0.12

0.21
0.12

10.00

0.06

0.06

15.00

9.00

18.00

0.81
27.00

0.21
0.12

0.21
0.12

10.00

0.06

0.06

15.00

25.00

50.00

2.33

130.00

6.00

1.42

1.63

1.38

12.00

4.71

1.38

0.53

1.07

20.00

0.16

0.16

10.00

0.07

0.07
6.36

4.09

18.50

37.00

1.72
0.76
0.24
0.12

3.48
0.75
0.38
0.48
0.24

29.26

69.53

75.00

218.92

275.00

203.55

22.24

300.00

269.00

4.53

WATSAN

Operational Team

DRINKING WATER SUPPLY SCHEME

KALSAN-I
U/C
Detail of Quantities

Sub
Head
No

Description

Excavation (gravelly soil, not requiring blasting)

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Unit

Long Wall

12.17

48.68

Cft

5.67

22.68

Cft

Plinth/Apron

11.67

0.5

17.51

Cft

Shingle bed

12.17

5.67

0.5

34.50

Cft

123.37

Cft

Shingle as in Bed

P/L PCC (1:4:8) as in Foundation

12.17

5.67

0.5

34.50

Cft

MAIN STORAGE TANK


Detail of Materials
Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

2000 GALLON (US)


Labour
Skilled
Steel
#3 Steel
#4
Binding wire Labour
bars (kg) bars (kg)
(kg)
Men-days

Unskilled
Labour
Men-days

2.71
34.50

0.52

Long Wall

12.17

0.5

24.34

Cft

Short Wall

5.67

0.5

11.34

Cft

Plinth/Apron

11.67

0.5

17.51

Cft

Bed

8.67

6.17

0.67

35.84

Cft

89.03

Cft

8.90

44.50

89.00

2.76

10.06

17.65

Cft

3.60

9.00

18.00

0.83

1.68

Total
P/L RCC (1:2:4) as in Bed

8.67

6.17

0.33

Steel

along long walls(#3@6"c/c)

10.67

13

23.60

kg

along short walls(#3@6"c/c)

8.17

18

25.00

kg

48.60

kg

Total
5

Quantity

Short Wall

Total

SACHAN

55.00

0.49

0.49

Ring Beam (18"X12")

5.1 RCC (1:2:4)


Long sides

11.67

1.5

35.01

cft

Short sides

6.17

1.5

18.51

cft

53.52

cft

Total

10.80

27.00

54.00

2.52

5.08

5.2 Steel
Main steel (4, #4 bars)

200

Shear stirrups (#3@ 12" c/c)

4.25

5.3 Centring and shuttering


6

60.60

kg

40

28.90

kg

17.84

1.5

53.52

Cft

Long Wall

11.67

1.5

6.83

239.12

Cft

Short Wall

6.17

1.5

6.83

126.42

Cft

Total

365.54

Cft

Deduct for 2 seismic bands

35.32

Cft

Net Total

330.22

Cft

30% (1:6) CSM

99.07

Cft

Stone

231.16

Cft

38

138.20

kg

70.00
35.00

0.61

0.61

0.29

0.29
1.07

0.54

13.21

29.72

CR Stone Masonry in (1:6) CSM

Vertical Reinforcement in walls

Seismic Bands

(#4 @ 12" c/c all around)

12

13.33

100.00
231.16
150.00

1.38

1.38

8.1 @ 2'-2" from top of ring beam


8.11 RCC (1:2:4)
Long sides

11.67

1.5

0.33

11.55

cft

short sides

6.17

1.5

0.33

6.11

cft

17.66

cft

Total

3.60

9.00

18.00

0.83

1.68

8.12 Steel
Main steel (2,#4) bars

72

21.80

kg

Shear stirrups(#3 @ 12"c/c)

1.75

38

11.30

kg

corner reinforcement
(1,#4 bar 2' ovelap with main steel at each
corner)

5.25

6.40

kg

11.55

cft

25.00
15.00

10.00

0.22

0.22

0.11

0.11

0.06

0.06

8.2 @ 2' from top of 1st seismic band


8.21 RCC (1:2:4)
Long wall

CRS-Mansehra

11.67

1.5

0.33

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Detail of Materials

Detail of Quantities

Sub
Head
No

Description

Length
in ft

short wall

6.17

Breadth
in ft

1.5

Depth/Ht
in ft

No of
Units

Quantity

0.33

6.11

cft

17.66

cft

Total

Unit

Cement
(Bags)

3.60

Sand
(cft)

9.00

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Skilled
Steel
#3 Steel
#4
Binding wire Labour
bars (kg) bars (kg)
(kg)
Men-days

18.00

0.83

Unskilled
Labour
Men-days

1.68

8.22 Steel
Main steel (2,#4) bars

72

21.80

kg

Shear stirrups(#3 @ 12"c/c)


corner reinforcement (1,#4 bar 2' ovelap with
main steel at each corner)

1.75

38

11.30

kg

5.25

6.40

kg

25.00
15.00
10.00

0.22

0.22

0.11

0.11

0.06

0.06

9.1 RCC (1:2:4) as in core wall


Long wall

8.67

0.33

40.06

cft

Short wall

5.5

0.33

25.41

cft

65.47

cft

Total
9.2 Steel

13.20

33.00

66.00

3.08

6.22

Horizontal(#3 @6"c/c)
along long wall

10

28

47.60

kg

along short wall

7.5

28

35.70

kg

along long wall

32

49.00

kg

along short wall

22

33.70

kg

166.00

kg

Vertical (#3 @6"c/c)

Total
10

10.1 RCC (1:2:4)

2.5

10.2 Steel

12

11.25

cft

Main steel(#3 bars)

7.83

1.5

0.25

12

16.00

kg

shear stirrups(#3)

1.75

24

Total
11

175.00

1.66

1.66

RCC corner strips


(above and below seismic bands)

7.10

kg

23.10

kg

2.40

6.00

12.00

0.53

30.00

0.23

1.07

0.23

P/L Pointing (0.75") in (1:2) CSM


Long walls

11.67

6.17

144.01

Sft

short walls

9.17

6.17

113.16

Sft

257.17

Sft

39.19

Cft

Total
12.1 P/L RCC (1:2:4) as in Slab
Decuction for manhole cover

12.17

9.67

0.333

0.333

Net Total
Steel (#3 @ 6" c/c) as per detail
12.2 Centring and shuttering

12.17

9.67

0.333

0.64

1.61

7.60

19.00

4.63

7.20

1.78

3.60

1.33

Cft

37.86

Cft

90.00

kg

39.19

Cft

0.78

0.39

38.00
90.00

0.90

0.90

13

GI over flow pipe 1.5" dia.

12

Rft

0.24

0.48

14

GI wash out pipe 1.5" dia

Rft

0.12

0.24

15

GI Plug 1.5 "

No.

16

Steel man hole cover (2'x2')

4.00

Sft
33.20

79.20

Quantities for 1 Tank

CRS-Mansehra

67.68

258.11

313.00

231.16

34.50

415.00

290.00

6.34

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Drinking Water Supply Scheme:


Sub
Head
No

STORAGE TANK:

Description

Length
in ft

Excavation (gravelly soil, not


requiring blasting)
Long Wall
Short Wall
Plinth/Apron
Shingle bed

12.17
6.17
11.67
12.17

Breadth
in ft

2
2
3
6.17

Depth/Ht
in ft

1
1
0.5
0.5

No of
Units

2
2
1
1

Total

Detail of Materials
Quantity

Unit

48.68
24.68
17.51
37.54
128.41

Cft
Cft
Cft
Cft
Cft

Shingle as in Bed

12.17

6.17

0.5

37.54

Cft

P/L PCC (1:4:8) as in Foundation


Long Wall
Short Wall
Plinth/Apron
Bed
Total

12.17
6.17
11.67
8.67

2
2
3
6.67

0.5
0.5
0.5
0.67

2
2
1
1

24.34
12.34
17.51
38.75
92.93

Cft
Cft
Cft
Cft
Cft

19.08
25.40
26.60
52.00

Cft
kg
kg
kg

35.01
20.01
55.02

cft
cft
cft

61.80
31.80
55.02

kg
kg
Cft

256.62
146.67
403.30
35.32
367.98
110.39
257.58

Cft
Cft
Cft
Cft
Cft
Cft
Cft

151.60

kg

P/L RCC (1:2:4) as in Bed


Steel
along long walls(#3@6"c/c)
along short walls(#3@6"c/c)
Total
5
Ring Beam (18"X12")
5.1 RCC (1:2:4)
Long sides
Short sides
Total
5.2 Steel
Main steel (4, #4 bars)
Shear stirrups (#3@ 12" c/c)
5.3 Centring and shuttering
6

CR Stone Masonry in (1:6) CSM


Long Wall
Short Wall

8.67
10.67
8.67

11.67
6.67

6.67

1.5
1.5

0.33

1
1

1
14
18

2
2

204
4.25
18.34

1.5

44
2

11.67
6.67

1.5
1.5

7.33
7.33

2
2

Total
Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
7

2500 US GALLONS

Detail of Quantities

Vertical Reinforcement in walls


(#4 @ 12" c/c all around)

12.5

40

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Skilled
Steel
#3 Steel
#4 Binding Labour
bars (kg) bars (kg) wire
(kg)
Men-days

Unskilled
Labour
Men-days

2.83
37.54

0.56

9.30

46.50

93.00

2.88

10.50

3.80

9.50

19.00

0.90

1.81

58.00

11.00

27.50

0.52

55.00
70.00
35.00

14.80

0.52

2.59

5.23

1.10

0.62
0.32
0.55

14.72

33.12

0.62
0.32

111.00
257.58

155.00

1.52

1.52

8
Seismic Bands
8.1 @ 2'-3" from top of ring beam
8.11 RCC (1:2:4)
CRS-Mansehra

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Detail of Materials

Detail of Quantities

Sub
Head
No

Description

Length
in ft

Long sides
short sides

11.67
6.67

Breadth
in ft

1.5
1.5

Depth/Ht
in ft

No of
Units

0.33
0.33

2
2

Total

Quantity

Unit

11.55
6.60
18.15

cft
cft
cft

Cement
(Bags)

3.80

Sand
(cft)

9.50

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Skilled
Steel
#3 Steel
#4 Binding Labour
bars (kg) bars (kg) wire
(kg)
Men-days

19.00

0.85

Unskilled
Labour
Men-days

1.72

8.12 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)
corner reinforcement (1,#4 bar 2'
ovelap with main steel at each
corner)
8.2 @ 2'-3" from top of 1st seismic band
8.21 RCC (1:2:4)
Long wall
short wall
Total
8.22 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)
corner reinforcement (1,#4 bar 2'
ovelap with main steel at each
corner)

74
1.75

40

22.40
11.90

kg
kg

5.25

6.40

kg

2
2

11.55
6.60
18.15

cft
cft
cft

11.67
6.67

1.5
1.5

0.33
0.33

74
1.75

40

22.40
11.90

kg
kg

5.25

6.40

kg

25.00

0.22
0.12

0.22
0.12

10.00

0.06

0.06

15.00

3.80

9.50

19.00

0.85

1.72

25.00

0.22
0.12

0.22
0.12

10.00

0.06

0.06

15.00

9.1 RCC (1:2:4) as in core wall


Long wall

8.67

0.33

40.06

cft

Short wall

0.33

27.72

cft

67.78

cft

Total
9.2 Steel

13.60

34.00

68.00

3.19

6.44

Horizontal(#3 @6"c/c)
along long wall

10

30

51.00

kg

along short wall

28

38.10

kg

along long wall

9.5

32

51.70

kg

along short wall

9.5

24

38.80

kg

179.60

kg

12

11.25

cft

Vertical (#3 @6"c/c)

Total

10

190.00

1.80

1.80

RCC corner strips (above and below


seismic bands)

10.1 RCC (1:2:4)


10.2 Steel

2.5

1.5

0.25

2.40

6.00

12.00

0.53

1.07

Main steel(#3 bars)

7.83

12

16.00

kg

20.00

0.16

shear stirrups(#3)
11 P/L Pointing (0.75") in (1:2) CSM
Long walls
short walls
Total
12.1 P/L RCC (1:2:4) as in Slab

1.75

24

7.10

kg

10.00

0.07

6.67
6.67

2
2

0.333

155.68
129.00
284.68
41.22

Sft
Sft
Sft
Cft

CRS-Mansehra

11.67
9.67
12.17

10.17

0.71

1.78

5.12

7.97

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

12.2
13
14
15
16

Detail of Materials

Detail of Quantities

Sub
Head
No

Description
Decuction for manhole cover
Net Total
Steel (#3 @ 6" c/c) (as per detail)
Centring and shuttering
GI over flow pipe 1.5" dia.
GI wash out pipe 1.5" dia
GI Plug 1.5 "
Steel man hole cover (2'x2')
Quantities for 1 Tank

CRS-Mansehra

Length
in ft

Breadth
in ft

12.17

10.17

Depth/Ht
in ft

No of
Units

0.333

0.333

Quantity

1.33
39.88
95.00
41.22
12
6
1
4.00

Unit

Cft
Cft
kg
Cft
Rft
Rft
No.
Sft

Cement
(Bags)

8.00

Sand
(cft)

20.00

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Skilled
Steel
#3 Steel
#4 Binding Labour
bars (kg) bars (kg) wire
(kg)
Men-days

40.00

1.87
95.00

71.21

275.28

325.00

257.58

37.54

438.00

6.53

Men-days

0.82
0.24
0.12

3.79
0.95
0.41
0.48
0.24

35.79

85.21

0.95

295.00

Unskilled
Labour

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Drinking Water Supply Scheme:

STORAGE TANK:

3000 US GALLONS
Detail of Materials

Detail of Quantities

Sub
Head
No

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Description

Depth/Ht
in ft

No of
Units

Quantity

Unit

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Labour

Shingle Steel
(cft)
#3 bars
(kg)

Steel
#4 bars
(kg)

Skilled Unskilled
Binding Labour Labour
wire
(kg)
Men-daysMen-days

Excavation (gravelly soil, not requiring


blasting)

12.17

232.53

Cft

Shingle as in Bed

12.17

0.5

58.13

Cft

P/L PCC (1:4:8) as in Foundation

12.17

116.27

Cft

10.70

53.50

107.00

3.60

13.14

4.1 P/L RCC (1:1.5 :3) as in Bed


4.2 Steel
#3 @12"c/c both ways
deduct for circular
(@1.32 kg/cft for 5.34 cft)
Total
5
Circular Ring Beam (18"X12")
5.1 RCC (1:2:4)
5.2 Steel
Main steel inner (2, #4 bars)
Main steel outer (2, #4 bars)
Shear stirrups (#3@ 12" c/c)
5.3 Centring and shuttering

8.67
10.67

0.33

1
18

19.47
32.70

Cft
kg

5.33

10.00

20.00

0.92

1.85

7.05
25.65

kg
kg

30
38
4.25
11.67

11.67
11.67

CR Stone Masonry in (1:6) CSM


Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
Vertical Reinforcement in walls
(#4 @ 12" c/c all around)

11.67

8.67

47.90

cft

8.67

2
2
30
1

18.20
23.00
21.70
47.90

kg
kg
kg
Cft

8.67
8.67

7.83
0.33

1
2

375.06
31.61
343.45
103.03
240.41

cft
Cft
Cft
Cft
Cft

30

113.70

kg

31.61

Cft

2
2
60

18.20
23.00
17.90

kg
kg
kg

74.52

Cft

27

17

78.10

kg

10

54

91.90

kg

170.00

kg

262.37

Sft

12.5

58.13

0.87

30.00
9.60

24.00

0.26

48.00
20.00
25.00
25.00

13.73

0.26
2.25

4.55

0.96

0.18
0.23
0.22
0.48

13.74

30.91

0.18
0.23
0.22

103.00
240.41

120.00

1.14

1.14

Seismic Bands 2No.

@3' from top of ring beam &


@
2'-2" from top of 1st seismic band
8.1 RCC (1:2:4)
8.2 Steel
Main steel inner (1, #4 bars)
Main steel outer (1, #4 bars)
Shear stirrups(#3 @ 12"c/c)
9.1 RCC (1:2:4) as in core wall
9.2 Steel

11.67

Horizontal(#3 @6"c/c)

8.67

0.33

30
38
1.75
8.67

Vertical (#3 @6"c/c)

8.5

Total
10

5.12

P/L Pointing (0.75") in (1:2) CSM

CRS-Mansehra

11.67

7.16

6.40

16.00

32.00

1.49
20.00
25.00
22.00

15.00

37.50

75.00

1.64

0.18
0.23
0.18
3.50

180.00
0.66

0.18
0.23
0.18

3.00

1.70

7.08

1.70
4.72

7.35

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Description

11.1 P/L RCC (1:2:4) as in Slab


Decuction for manhole cover
11.2
11.3
12
13
14
15

Detail of Materials

Detail of Quantities

Sub
Head
No

Net Total
Steel (#3 @ 6" c/c) (as per detail)
Centring and shuttering
GI over flow pipe 1.5" dia.
GI wash out pipe 1.5" dia
GI Plug 1.5 "
Steel man hole cover (2'x2')
Quantities for 1 Tank

CRS-Mansehra

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

12.17
2

12.17

Depth/Ht
in ft

No of
Units

0.33
0.33

1
1

0.33

Quantity

38.37
1.32
37.05
85.00
38.37
12
6
1
4.00

Unit

Cft
Cft
Cft
kg
Cft
Rft
Rft
No.
Sft

Cement
(Bags)

7.40

Sand
(cft)

Gravel/
Crush
(cft)

18.50

37.00

Stone
(cft)

Labour

Shingle Steel
(cft)
#3 bars
(kg)

Steel
#4 bars
(kg)

1.74
85.00

68.82

264.14 319.00

Skilled Unskilled
Binding Labour Labour
wire
(kg)
Men-daysMen-days

240.41

58.13

342.00 210.00

0.77
0.24
0.12

3.52
0.85
0.38
0.48
0.24

34.05

84.13

0.85

5.16

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Drinking Water Supply Scheme:

3500 US GALLONS
Detail of Materials

STORAGE TANK:
Detail of Quantities

Sub
Head
No

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Description

Depth/Ht
in ft

No of
Units

Quantity

Unit

Cement
(Bags)

Sand

(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Steel
#3 bars
(kg)

Steel
#4 bars
(kg)

Skilled
Unskilled
Binding Labour
Labour
wire
(kg)
Men-days Men-days

Excavation (gravelly soil, not requiring


blasting)

12.67

252.03

Cft

Shingle as in Bed

12.67

0.5

63.01

Cft

P/L PCC (1:4:8) as in Foundation

12.67

126.02

Cft

12.60

63.00

126.00

3.91

14.24

4.1 P/L RCC (1:1.5 :3) as in Bed


4.2 Steel
#3 @12"c/c both ways
deduct for circular
(@1.37 kg/cft for 5.97 cft)
Total
5
Circular Ring Beam (18"X12")
5.1 RCC (1:2:4)
5.2 Steel
Main steel inner (2, #4 bars)
Main steel outer (2, #4 bars)
Shear stirrups (#3@ 12" c/c)
5.3 Centring and shuttering

9.17
11.17

0.33

1
20

21.78
38.00

Cft
kg

5.87

11.00

22.00

1.02

2.07

8.18
29.82

kg
kg

CR Stone Masonry in (1:6) CSM


Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
Vertical Reinforcement in walls
(#4 @ 12" c/c all around)

12.17

9.17

50.26

cft

19.40
24.30
23.10
50.26

kg
kg
kg
Cft

418.63
33.17
385.46
115.64
269.82

cft
Cft
Cft
Cft
Cft

32

126.10

kg

33.17

Cft

2
2
64

19.40
24.30
19.10

kg
kg
kg

32
40
4.25
12.17

9.17

2
2
32
1

12.17
12.17

9.17
9.17

8.33
0.33

1
2

13

5.54
63.01

0.95

35.00
10.00

25.00

0.30

50.00
22.00
27.00
27.00

15.47

0.30
2.36

4.77

1.01

0.19
0.24
0.23
0.50

15.42

34.69

0.19
0.24
0.23

116.00
269.82

130.00

1.26

1.26

Seismic Bands 2No.

@3' from top of ring beam &


@
2'-6" from top of 1st seismic band
8.1 RCC (1:2:4)
8.2 Steel
Main steel inner (1, #4 bars)
Main steel outer (1, #4 bars)
Shear stirrups(#3 @ 12"c/c)
9.1 RCC (1:2:4) as in core wall
9.2 Steel

Total

9.17

0.33

32
40
1.75
9.17

Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)

CRS-Mansehra

12.17

83.64

Cft

29

8.5

18

88.80

kg

10.5

58

103.60

kg

192.40

kg

6.60

16.50

33.00

1.56
22.00
27.00
23.00

16.80

42.00

0.19
0.24
0.19

84.00

0.19
0.24
0.19
3.93

196.00

1.92

3.15

7.95

1.92

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Detail of Materials

Detail of Quantities

Sub
Head
No

Description

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Depth/Ht
in ft

No of
Units

7.67
0.33
0.33

1
1
1

Quantity

Unit

293.10
41.59
1.32
40.27
90.00
41.59

Sft
Cft
Cft
Cft
kg
Cft

12 GI over flow pipe 1.5" dia.

12

13 GI wash out pipe 1.5" dia


14 GI Plug 1.5 "

10 P/L Pointing (0.75") in (1:2) CSM


11.1 P/L RCC (1:2:4) as in Slab
Decuction for manhole cover
Net Total
11.2 Steel (#3 @ 6" c/c) (as per detail)
11.3 Centring and shuttering

15 Steel man hole cover (2'x2')


Quantities for 1 Tank

CRS-Mansehra

12.17
12.67
2

12.67

0.33

Cement
(Bags)

Sand

(cft)

0.73

1.83

8.00

20.00

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Steel
#3 bars
(kg)

Steel
#4 bars
(kg)

Skilled
Unskilled
Binding Labour
Labour
wire
(kg)
Men-days Men-days

5.28

8.21

1.89
0.83

3.83
0.90
0.42

Rft

0.24

0.48

Rft

0.12

0.24

No.

4.00

Sft
37.57

92.71

40.00
90.00

76.07

295.33

355.00

269.82

63.01

371.00

0.90

228.00

5.68

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Drinking Water Supply Scheme:

STORAGE TANK:

Sub
Head
No

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Description

4000 US GALLONS
Detail of Materials

Detail of Quantities
Depth/Ht
in ft

No of
Units

Quantity

Unit

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Steel
#3 Steel
bars (kg) #4 bars
(kg)

Skilled
Binding Labour
wire
(kg)
Men-days

Excavation (gravelly soil, not requiring


blasting)

13.17

272.31

Cft

Shingle as in Bed

13.17

0.5

68.08

Cft

P/L PCC (1:4:8) as in Foundation

13.17

136.16

Cft

13.60

68.00

136.00

4.22

4.1 P/L RCC (1:1.5 :3) as in Bed


4.2 Steel
#3 @12"c/c both ways
deduct for circular
(@1.29 kg/cft for 6.63 cft)
Total
5
Circular Ring Beam (18"X12")
5.1 RCC (1:2:4)
5.2 Steel
Main steel inner (2, #4 bars)
Main steel outer (2, #4 bars)
Shear stirrups (#3@ 12" c/c)
5.3 Centring and shuttering

9.67
11.67

0.33

1
20

24.22
39.70

Cft
kg

6.40

12.00

24.00

1.14

8.53
31.17

kg
kg

CR Stone Masonry in (1:6) CSM


Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
Vertical Reinforcement in walls
(#4 @ 12" c/c all around)

12.67

9.67

52.61

cft

20.00
24.90
23.90
52.61

kg
kg
kg
Cft

438.25
34.72
403.52
121.06
282.47

cft
Cft
Cft
Cft
Cft

33

130.10

kg

34.72

Cft

2
2
66

20.00
24.90
19.70

kg
kg
kg

33
41
4.25
12.67

9.67

2
2
33
1

12.67
12.67

9.67
9.67

8.33
0.33

1
2

13

68.08

35.00
10.60

26.50

0.31

53.00

2.47
23.00
28.00
28.00

0.20
0.25
0.24
1.05

16.14
16.13

121.00
282.47

135.00

1.30

Seismic Bands 2No.

@3' from top of ring beam &


@
2'-6" from top of 1st seismic band
8.1 RCC (1:2:4)
8.2 Steel
Main steel inner (1, #4 bars)
Main steel outer (1, #4 bars)
Shear stirrups(#3 @ 12"c/c)

12.67

9.67

0.33

33
41
1.75

9.1 RCC (1:2:4) as in core wall

9.67

88.38

Cft

9.2 Steel

30.5

18

93.40

kg

10.5

61

109.00

kg

202.40

kg

Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)
Total

CRS-Mansehra

7.00

17.50

35.00

1.63
23.00
28.00
23.00

17.80

44.50

0.20
0.25
0.20

89.00

4.15

207.00

2.02

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Detail of Materials

Detail of Quantities

Sub
Head
No

Description

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Skilled
Binding Labour
wire
(kg)
Men-days

Quantity

7.67

305.14

Sft

0.76

1.91

0.33
0.33

1
1

44.93
1.32
43.61
95.00
44.93

Cft
Cft
Cft
kg
Cft

8.80

22.00

12 GI over flow pipe 1.5" dia.

12

Rft

0.24

13 GI wash out pipe 1.5" dia

Rft

0.12

14 GI Plug 1.5 "

No.

4.00

Sft

P/L Pointing (0.75") in (1:2) CSM

11.1 P/L RCC (1:2:4) as in Slab


Decuction for manhole cover
Net Total
11.2 Steel (#3 @ 6" c/c) (as per detail)
11.3 Centring and shuttering

15 Steel man hole cover (2'x2')


Quantities for 1 Tank

CRS-Mansehra

12.67
13.17
2

13.17

0.33

Stone
(cft)

Labour
Steel
#3 Steel
bars (kg) #4 bars
(kg)

No of
Units

10

Sand
(cft)

Shingle
(cft)

Depth/Ht
in ft

Unit

Cement
(Bags)

Gravel/
Crush
(cft)

5.49

44.00

2.05
95.00

0.95
0.90

81.10

313.41

381.00

282.47

68.08

388.00

237.00

5.92

39.61

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Labour
Unskilled
Labour
Men-days

5.99
1.02
15.39
2.30

0.31
5.00
0.20
0.25
0.24
0.53

36.32

1.30

3.30
0.20
0.25
0.20
8.40

2.02

CRS-Mansehra

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Labour
Unskilled
Labour
Men-days

8.54

4.14
0.95
0.45
0.48
0.24

98.01

CRS-Mansehra

Engr. Amir Jamal Qureshi

Operational Team

WATSAN

Drinking Water Supply Scheme:

STORAGE TANK:

Sub
Head
No

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Description

Depth/Ht
No of
in
Units
ft

5000 US GALLONS
Detail of Materials

Detail of Quantities
Quantity

Unit

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Skilled
Steel
#3 Steel
#4 Binding Labour
bars (kg) bars (kg) wire
(kg)
Men-days

Excavation (gravelly soil, not requiring


blasting)

13.17

272.31

Cft

Shingle as in Bed

13.17

0.5

68.08

Cft

P/L PCC (1:4:8) as in Foundation

13.17

136.16

Cft

13.60

68.00

136.00

4.22

4.1 P/L RCC (1:1.5 :3) as in Bed


4.2 Steel
#3 @12"c/c both ways
deduct for circular
(@1.29 kg/cft for 6.63 cft)
Total
5
Circular Ring Beam (18"X12")
5.1 RCC (1:2:4)
5.2 Steel
Main steel inner (2, #4 bars)
Main steel outer (2, #4 bars)
Shear stirrups (#3@ 12" c/c)
5.3 Centring and shuttering

9.67
11.67

0.33

1
20

24.22
39.70

Cft
kg

6.40

12.00

24.00

1.14

8.53
31.17

kg
kg

CR Stone Masonry in (1:6) CSM


Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
Vertical Reinforcement in walls
(#4 @ 12" c/c all around)

12.67

9.67

52.61

cft

20.00
24.90
23.90
52.61

kg
kg
kg
Cft

543.47
34.72
508.75
152.62
356.12

cft
Cft
Cft
Cft
Cft

33

150.10

kg

34.72

Cft

2
2
66

20.00
24.90
19.70

kg
kg
kg

33
41
4.25
12.67

9.67

2
2
33
1

12.67
12.67

9.67
9.67

10.33
0.33

1
2

15

68.08

35.00
10.60

26.50

0.31

53.00

2.47
23.00
28.00
28.00

0.20
0.25
0.24
1.05

20.35
20.40

153.00
356.12

155.00

1.50

Seismic Bands 2No.

@4' from top of ring beam &


@
3' from top of 1st seismic band
8.1 RCC (1:2:4)
8.2 Steel
Main steel inner (1, #4 bars)
Main steel outer (1, #4 bars)
Shear stirrups(#3 @ 12"c/c)

12.67

9.67

0.33

33
41
1.75

9.1 RCC (1:2:4) as in core wall

9.67

108.01

Cft

9.2 Steel

30.5

22

114.20

kg

12.5

61

129.70

kg

243.90

kg

Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)
Total

CRS-Mansehra

11

7.00

17.50

35.00

1.63
23.00
28.00
23.00

21.60

54.00

0.20
0.25
0.20

108.00

5.08

250.00

2.44

Engr. Amir Jamal Qureshi

Operational Team

WATSAN

10

Detail of Materials

Detail of Quantities

Sub
Head
No

Description
P/L Pointing (0.75") in (1:2) CSM

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Quantity

Unit

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Skilled
Steel
#3 Steel
#4 Binding Labour
bars (kg) bars (kg) wire
(kg)
Men-days

9.67

384.71

Sft

0.96

2.40

0.33
0.33

1
1

Cft
Cft
Cft
kg
Cft

8.80

22.00

44.93
1.32
43.61
95.00
44.93

10

6.00

kg

13 GI over flow pipe 2" dia.

12

Rft

0.24

14 GI wash out pipe 2" dia

Rft

0.12

15 GI Plug 2 "

No.

4.00

Sft

11.1 P/L RCC (1:2:4) as in Slab


Decuction for manhole cover
Net Total
11.2 Steel (#3 @ 6" c/c) (as per detail)
11.3 Centring and shuttering
12 Iron Ladder steps (#3 bar)

16 Steel man hole cover (2'x2')


Quantities for 1 Tank

CRS-Mansehra

12.67

Depth/Ht
No of
in
Units
ft

13.17
2

13.17

0.33

3.5

6.92

44.00

2.05
95.00

0.95
0.90

8.00

89.36

355.40

400.00

356.12

68.08

439.00

0.06

257.00

6.60

46.18

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Labour
Unskilled
Labour
Men-days

5.99
1.02
15.39
2.30

0.31
5.00
0.20
0.25
0.24
0.53

45.79

1.50

3.30
0.20
0.25
0.20
10.26

2.44

CRS-Mansehra

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Labour
Unskilled
Labour
Men-days

10.77

4.14
0.95
0.45
0.06
0.48
0.24

112.25

CRS-Mansehra

Engr. Amir Jamal Qureshi

Operational Team

WATSAN

Drinking Water Supply Scheme:

STORAGE TANK:

Sub
Head
No

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Description

Depth/Ht
in ft

No of
Units

6000 US GALLONS
Detail of Materials

Detail of Quantities
Quantity

Unit

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)

Binding
wire
(kg)

Skilled
Labour

Unskilled
Labour

Men-days

Men-days

Excavation (gravelly soil, not requiring


blasting)

14.17

315.24

Cft

Shingle as in Bed

14.17

0.5

78.81

Cft

P/L PCC (1:4:8) as in Foundation

14.17

157.62

Cft

15.80

79.00

158.00

4.89

17.81

4.1 P/L RCC (1:1.5 :3) as in Bed


4.2 Steel
#3 @12"c/c both ways
deduct for circular
(@1.26 kg/cft for 8 cft)
Total
5
Circular Ring Beam (18"X12")
5.1 RCC (1:2:4)
5.2 Steel
Main steel inner (2, #4 bars)
Main steel outer (2, #4 bars)
Shear stirrups (#3@ 12" c/c)
5.3 Centring and shuttering

10.67
12.67

0.33

1
22

29.49
47.40

Cft
kg

8.00

15.00

30.00

1.39

2.80

10.10
37.30

kg
kg

36
44
4.25
13.67

13.67
13.67

CR Stone Masonry in (1:6) CSM


Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
Vertical Reinforcement in walls
(#4 @ 12" c/c all around)

13.67

10.67

57.32

cft

10.67

2
2
36
1

21.80
26.70
26.00
57.32

kg
kg
kg
Cft

10.67
10.67

10.33
0.33

1
2

592.12
37.83
554.29
166.29
388.00

cft
Cft
Cft
Cft
Cft

36

163.70

kg

37.83

Cft

2
2
72

21.80
26.70
21.40

kg
kg
kg

119.59

Cft

34

22

127.30

kg

12.5

68

144.60

kg

271.90

kg

15

6.94
78.81

1.18

40.00
11.40

28.50

0.37

57.00
25.00
30.00
29.00

22.13

0.37
2.69

5.45

1.15

0.22
0.27
0.26
0.57

22.17

49.89

0.22
0.27
0.26

166.00
388.00

170.00

1.64

1.64

Seismic Bands 2No.

@4' from top of ring beam &


@
3' from top of 1st seismic band
8.1 RCC (1:2:4)
8.2 Steel
Main steel inner (1, #4 bars)
Main steel outer (1, #4 bars)
Shear stirrups(#3 @ 12"c/c)
9.1 RCC (1:2:4) as in core wall
9.2 Steel

Horizontal(#3 @6"c/c)
Total

10.67

0.33

36
44
1.75
10.67

Vertical (#3 @6"c/c)

CRS-Mansehra

13.67

10

11

7.60

19.00

38.00

1.78
25.00
30.00
24.00

24.00

60.00

0.22
0.27
0.21

120.00

0.22
0.27
0.21
5.62

277.00

2.72

3.59

11.36

2.72

Engr. Amir Jamal Qureshi

Operational Team

WATSAN

Detail of Materials

Detail of Quantities

Sub
Head
No

Description

10 P/L Pointing (0.75") in (1:2) CSM


11.1 P/L RCC (1:2:4) as in Slab
Decuction for manhole cover
Net Total
11.2 Steel (#3 @ 6" c/c) (as per detail)
11.3 Centring and shuttering

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Unit

Cement
(Bags)

Sand
(cft)

Men-days

13 GI over flow pipe 2" dia.

12

Rft

0.24

0.48

14 GI wash out pipe 2" dia

Rft

0.12

0.24

15 GI Plug 2 "

No.

4.00

Sft
50.94

124.65

Quantities for 1 Tank

CRS-Mansehra

25.50

Men-days

kg

16 Steel man hole cover (2'x2')

10.20

Unskilled
Labour

6.00

3.5

2.59

Skilled
Labour

10

0.33

1.04

Stone
(cft)

Binding
wire
(kg)

14.17

1
1
1

Quantity

Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)

Sft
Cft
Cft
Cft
kg
Cft

9.67
0.33
0.33

No of
Units

Shingle
(cft)

415.07
52.01
1.32
50.69
115.00
52.01

12 Iron Ladder steps (#3 bar)

13.67
14.17
2

Depth/Ht
in ft

Gravel/
Crush
(cft)

51.00
115.00

7.47

11.62

2.38

4.82
1.15
0.52

1.15
1.04

8.00

100.17

395.59

454.00

388.00

78.81

493.00

0.06

280.00

7.38

0.06

Engr. Amir Jamal Qureshi

Operational Team

WATSAN

Drinking Water Supply Scheme:

STORAGE TANK

8000 US GALLONS
Detail of Materials

Detail of Quantities

Sub
Head
No

Description

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)

Binding
wire
(kg)

Skilled
Labour

Unskilled
Labour

Men-days

Men-days

Excavation (gravelly soil, not requiring


blasting)

16

2.5

502.40

Cft

Shingle as in Bed

16

200.96

Cft

P/L PCC (1:4:8) as in Foundation

16

200.96

Cft

20.10

100.50

201.00

6.23

22.71

4.1 P/L RCC (1:1.5 :3) as in Bed


4.2 Steel
#3 @12"c/c both ways
deduct for circular
(@0.79 kg/cft for 15.48 cft)
Total
5
Circular Ring Beam (18"X12")
5.1 RCC (1:2:4)
5.2 Steel
Main steel inner (2, #4 bars)
Main steel outer (2, #4 bars)
Shear stirrups (#3@ 12" c/c)
5.3 Centring and shuttering

12
14

0.5

1
24

56.52
57.20

Cft
kg

15.20

28.50

57.00

2.66

5.37

12.30
44.90

kg
kg

CR Stone Masonry in (1:6) CSM


Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
Vertical Reinforcement in walls
(#4 @ 12" c/c all around)

15

12

63.59

cft

25.50
29.10
28.90
63.59

kg
kg
kg
Cft

731.23
63.59
667.64
200.29
467.35

cft
Cft
Cft
Cft
Cft

40

194.00

kg

63.59

Cft

2
2
78

25.50
29.10
23.20

kg
kg
kg

42
48
4.25
15

12

2
2
40
1

15
15

12
12

11.5
0.5

1
2

16

11.05
200.96

3.01

49.00
12.80

32.00

0.45

64.00
29.00
33.00
33.00

26.67

0.45
2.99

6.04

1.27

0.26
0.29
0.29
0.64

26.71

60.09

0.26
0.29
0.29

200.00
467.35

200.00

1.94

1.94

Seismic Bands 2No.

@4' from top of ring beam &


@
3'-6" from top of 1st seismic band
8.1 RCC (1:2:4)
8.2 Steel
Main steel inner (1, #4 bars)
Main steel outer (1, #4 bars)
Shear stirrups(#3 @ 12"c/c)

15

12

0.5

42
48
1.75

9.1 RCC (1:2:4) as in core wall (6" thick)

12

216.66

Cft

9.2 Steel

38

24

155.20

kg

13.67

75

174.40

kg

Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)

CRS-Mansehra

11

12

12.80

32.00

64.00

2.99
29.00
33.00
27.00

43.40

108.50

217.00

0.26
0.29
0.23

6.04
0.26
0.29
0.23

10.18

20.58

Engr. Amir Jamal Qureshi

Operational Team

WATSAN

Detail of Materials

Detail of Quantities

Sub
Head
No

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Description

Depth/Ht
in ft

No of
Units

Quantity

Unit

Total

329.60

kg

Total (for inner and outer face)

659.20

9.3

RCC (1:2:4) as in Fillet

12

9.4

Fillet Steel (#3@12" c/c)

10

P/L Pointing (0.75") in (1:2) CSM

15

670.00

6.59

44.00

0.39

Unskilled
Labour

Men-days

Men-days

6.59

Cft
kg

10.5

494.55

Sft

1.24

3.09

0.42
0.42

1
1

Cft
Cft
Cft
kg
Cft

16.60

41.50

84.40
1.68
82.72
150.00
84.40

10

6.00

kg

13 GI over flow pipe 3" dia.

12

Rft

0.24

0.48

14 GI wash out pipe 3" dia

Rft

0.12

0.24

15 GI Plug 3 "

No.

4.00

Sft
68.75

173.13

12 Iron Ladder steps (#3 bar)

16 Steel man hole cover (2'x2')


Quantities for 1 Tank

CRS-Mansehra

16

0.42

3.5

19.00

Skilled
Labour

38.80

Net Total
11.2 Steel (#3 @ 6" c/c) (as per detail)
11.3 Centring and shuttering

9.50

Binding
wire
(kg)

18.84

3.80

Stone
(cft)

Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)

16
2

Sand
(cft)

Shingle
(cft)

38

11.1 P/L RCC (1:2:4) as in Slab


Decuction for manhole cover

Cement
(Bags)

Gravel/
Crush
(cft)

0.89

83.00
150.00

0.39
8.90

13.85

3.89

7.86
1.50
0.84

1.50
1.69

8.00

152.60

555.59

705.00

467.35

200.96

981.00

0.06

324.00

12.54

1.79

0.06

Engr. Amir Jamal Qureshi

Operational Team

WATSAN

Drinking Water Supply Scheme:

10,000 US GALLONS

STORAGE TANK:

Detail of Materials

Detail of Quantities

Sub
Head
No

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Description

Depth/Ht
in ft

No of
Units

Quantity

Unit

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)

Binding
wire
(kg)

Skilled
Labour

Unskilled
Labour

Men-days

Men-days

Excavation (gravelly soil, not requiring


blasting)

18

2.5

635.85

Cft

Shingle as in Bed

18

254.34

Cft

P/L PCC (1:4:8) as in Foundation

18

254.34

Cft

25.50

127.50

255.00

7.88

28.74

4.1 P/L RCC (1:1.5 :3) as in Bed


4.2 Steel
#3 @12"c/c both ways
deduct for circular
(@0.78 kg/cft for 21 cft)
Total
5
Circular Ring Beam (18"X12")
5.1 RCC (1:2:4)
5.2 Steel
Main steel inner (2, #4 bars)
Main steel outer (2, #4 bars)
Shear stirrups (#3@ 12" c/c)
5.3 Centring and shuttering

14
16

0.5

1
28

76.93
76.20

Cft
kg

20.53

38.50

77.00

3.62

7.31

16.38
59.82

kg
kg

CR Stone Masonry in (1:6) CSM


Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
Vertical Reinforcement in walls
(#4 @ 12" c/c all around)

17

14

73.01

cft

28.50
33.30
33.30
73.01

kg
kg
kg
Cft

839.56
73.01
766.55
229.97
536.59

cft
Cft
Cft
Cft
Cft

46

223.10

kg

73.01

Cft

2
2
92

28.50
33.30
27.40

kg
kg
kg

254.34

Cft

45

24

183.80

kg

13.67

88

204.70

kg

388.50

kg

47
55
4.25
17

14

2
2
46
1

17
17

14
14

11.5
0.5

1
2

16

13.99
254.34

3.82

65.00
14.60

36.50

0.60

73.00
32.00
37.00
37.00

30.67

0.60
3.43

6.94

1.46

0.29
0.33
0.33
0.73

30.66

68.99

0.29
0.33
0.33

230.00
536.59

230.00

2.23

2.23

Seismic Bands 2No.

@4' from top of ring beam &


@
3'-6" from top of 1st seismic band
8.1 RCC (1:2:4)
8.2 Steel
Main steel inner (1, #4 bars)
Main steel outer (1, #4 bars)
Shear stirrups(#3 @ 12"c/c)
9.1 RCC (1:2:4) as in core wall (6" thick)
9.2 Steel

Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)
Total

CRS-Mansehra

17

14

0.5

47
55
1.75
14

13

12

14.60

36.50

73.00

3.43
33.00
38.00
32.00

50.80

127.00

254.00

0.29
0.33
0.27

6.94
0.29
0.33
0.27

11.95

24.16

Engr. Amir Jamal Qureshi

Operational Team

WATSAN

Detail of Materials

Detail of Quantities

Sub
Head
No

Description

Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft

Depth/Ht
in ft

No of
Units

Total (for inner and outer face)

Quantity

Unit

Cement
(Bags)

Sand
(cft)

Gravel/
Crush
(cft)

Stone
(cft)

Shingle
(cft)

Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)

Skilled
Labour

Unskilled
Labour

Men-days

Men-days

777.00

kg

21.98

Cft

44

44.90

kg

10.5

560.49

Sft

1.40

3.50

0.5
0.5

1
1

Cft
Cft
Cft
kg
Cft

25.00

62.50

127.17
2.00
125.17
180.00
127.17

10

6.00

kg

13 GI over flow pipe 3" dia.

12

Rft

0.24

0.48

14 GI wash out pipe 3" dia

Rft

0.12

0.24

15 GI Plug 3 "

No.

4.00

Sft
82.35

208.02

9.3

RCC (1:2:4) as in Fillet

14

9.4

Fillet Steel (#3@12" c/c)

10

P/L Pointing (0.75") in (1:2) CSM

17

11.1 P/L RCC (1:2:4) as in Slab


Decuction for manhole cover
Net Total
11.2 Steel (#3 @ 6" c/c) (as per detail)
11.3 Centring and shuttering
12 Iron Ladder steps (#3 bar)

16 Steel man hole cover (2'x2')


Quantities for 1 Tank

CRS-Mansehra

18
2

18

0.5

3.5

785.00

Binding
wire
(kg)

4.40

11.00

7.77

22.00

7.77
1.03

50.00

0.45

125.00
180.00

0.45
10.09

15.69

5.88

11.89
1.80
1.27

1.80
2.54

8.00

187.50

673.00

879.00

536.59

254.34

1157.00

0.06

370.00

14.75

2.09

0.06

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

DRINKING WATER SUPPLY SCHEME


DESIGN PERIOD
Design Period

KALSAN-I

U/C SACHAN

20 years

DESIGN POPULATION
No. of persons/H.H for present population
Design growth rate
Design growth rate factor G.R.F

=
=
=

7.5
3%
1.8

SECTOR NO. 1
Present population
persons/
(July 2006)
G.R.F
H.H
Persons
7.5
128
1.8
330
1.8
90
1.8
150
1.8
113
1.8
0
811

Design
population
(July 2026)
Persons
230
594
162
270
203
0
1459

Present population
# of persons/
(July 2006)
Zone Name
H.Hs H.H
Persons
G.R.F
7.5
0
1.8
0
1.8
0
1.8
0
1.8
0
1.8
0
TOTAL
0

Design
population
(July 2026)
Persons
0
0
0
0
0
0
0

Sr. # Zone Name


1 ZONE 1
2
3
4
5
TOTAL

# of
H.Hs
17
44
12
20
15

SECTOR NO. 2

Sr. #
1
2
3
4
5

SECTOR NO. 3

Sr. #
1
2
3
4
5

Present population
# of persons/
(July 2006)
Zone Name
H.Hs H.H
Persons
G.R.F
7.5
0
1.8
0
1.8
0
1.8
0
1.8
0
1.8
0
TOTAL
0

Design
population
(July 2026)
Persons
0
0
0
0
0
0
0

SECTOR NO. 4

CRS-Mansehra

Engr. Amir Jamal Qureshi

WATSAN

Sr. #
1
2
3
4
5

Operational Team

Present population
# of persons/
(July 2006)
Zone Name
H.Hs H.H
Persons
G.R.F
7.5
0
1.8
0
1.8
0
1.8
0
1.8
0
1.8
0
TOTAL
0

TOTAL DESIGN POPULATION =

Design
population
(July 2026)
Persons
0
0
0
0
0
0
0

1459 Persons

DESIGN WATER DEMAND


Water requirement of design population @ 10 gpcd =

14590 GPD (Imp)


12.16 GPM (US)

Additional water requirement

1 Schools

NO.

# students in 2006

# students in
2026

taking half as
outsiders
0

Daily req. @ 2.5


gpcd GPD (Imp)
0
0

TOTAL

1 Mosques

NO.

Population in 2026

# attending
mosques (10%)

Daily req. @ 3
gpcd GPD (Imp)
0
0

TOTAL
2 Animals
Large animals

Small animals

No.

No.

# in 2006

# in
2026

daily
requirement @
12 GPD (Imp)
00

# in 2006

# in
2026

daily
requirement @ 6
GPD (Imp)
00

Total additional water requirements =

0 GPD (Imp)
0 GPM (US)

Design Water Demand of community =

12.16 GPM (US)

FLOWS AND CONSUMPTIONS


Safe Yield of source(s)
=
Design water consumption =

GPM (US)
11.93 GPM (US)

MAIN STORAGE TANK CAPACITY


Design water consumption of community =
Total water storage per day =
Taking half day storage,
Design capacity of tank =

CRS-Mansehra

11.93 GPM (US)


17179 GPD (US)
17179 GALLONS (US)
8590 GALLONS (US)

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

DRINKING WATER SUPPLY SCHEME

KATHA

U/C

JABBAR DEVLI

TRANSPORTATION COST
TRANSPORTATION COST UP TO NEAREST ROAD SITE
Total
Sr.#
Item Description
quantity Unit Transp. Rate (PKR)
1 Cement
254
Bags
75 per bag
2 Sand
907
cft
per cft
3 Gravel
1173 cft
per cft
4 Steel & Binding wire
959
kg
5 per kg
5 Stone
572
cft
per cft
6 Pipe materials
1
LS
4500 per job
7 Steel manhole cover

No.

150 per No.


TOTAL

TRANSPORTATION COST OF JEEPABLE CARRIAGE


Total
Sr.#
Item Description
quantity Unit Transp. Rate (PKR)
1 Cement
254 Bags
per bag
2 Sand
907 cft
16 per cft
3 Gravel
1173 cft
16 per cft
4 Steel & Binding wire
959 kg
per kg
5 Stone
572 cft
per cft
6 Pipe materials
1 LS
per job
8 Steel manhole cover
5 No.
per No.
TOTAL
TRANSPORTATION COST OF DONKEY CARRIAGE
Total
quantity Unit Transp. Rate (PKR)
Sr.#
Item Description
1 Cement
254 Bags
60 per bag
2 Sand
907 cft
50 per cft
3 Gravel
1173 cft
50 per cft
4 Steel & Binding wire
959 kg
5 per kg
5 Stone
572 cft
per cft
6 Pipe materials
1 LS
per job
8 Steel manhole cover
5 No.
per No.
TOTAL
TRANSPORTATION COST OF MANUAL CARRIAGE
Total
quantity Unit Transp. Rate (PKR)
Sr.#
Item Description
1 Cement
254 Bags
per bag
2 Sand
907 cft
per cft
3 Gravel
1173 cft
per cft
4 Steel & Binding wire
959 kg
per kg
5 Stone
572 cft
per cft
6 Pipe materials
8 Steel manhole cover

1 LS
5 No.

TOTAL TRANSPORTATION COST

CRS-Mansehra

8000 per job


80 per No.
TOTAL

Amount
(PKR)
19050
0
0
4795
0
4500

Amount
(USD)
317.5
0
0
79.9
0
75

750

12.5

29095

484.92

Amount
(PKR)
0
14512
18768
0
0
0
0

Amount
(USD)
0
241.9
312.8
0
0
0
0

33280

555

Amount
(PKR)
15240
45350
58650
4795
0
0
0
124035

Amount
(USD)
254
755.8
977.5
79.9
0
0
0
2067

Amount
(PKR)

Amount
(USD)

8000
400
8400

133.3
6.7
140

194,810.00

3,246.83

Remarks
Will be arranged from siran
Will be arranged from siran
will be arranged locally

Remarks

Remarks

Remarks
5 trips per day of each 1cft
5 trips per day of each 1cft
5 trips per day of each 1cft
5 trips per day of each 1cft

Amir Jamal Qureshi

WATSAN

Operational Team

19050
0
4795
0
4500
750

CRS-Mansehra

Amir Jamal Qureshi

DRINKING WATER SUPLLY SCHEME

KATHA

U/C

JABBER DEVLI

FITTINGS AND FIXTURES DETAILS


NEW INSTALLATION
Sr
#
1
2
3
4
5
6
7
8

1
2
3
4
5
6
7
9
10
11
12
13
12
Sr
#
1
2
3
4

Item Description

Total length
(RFt)

Qty/100
Rft (No.)

Total
Qty
(No.)

SUPPLY MAIN
4
158
1
3945
1
39
1
4
1
1
1
DISTRIBUTION SYSTEM
Sockets 1.25"
550
4
22
Unions 1".25
550
1
6
Sockets 1"
1560
4
62
Unions 1"
1560
1
16
Sockets 0.75"
4870
4
195
Unions 0.75"
4870
1
49
Sockets 0.5"
6775
4
271
Unions 0.75"
6775
1
68
GI T's (1.25"-1")
2
GI T's (1"-0.75")
6
GI T's (1"-0.5")
8
GI T's (0.75"-0.5")
16
Reducer (1"-0.75")
2
Reducer (0.75"-0.5")
1
GI valve 1"(out lets)
2
TAP STANDS
Qty/tap
Total
Total Tap
Item Description
stand
Qty
stands
(No.)
(No.)
GI pipe 1/2" dia
25
10
250
25
2
50
GI Elbows 0.5"(90 deg)
Sockets 1/2"
25
1
25
Brass Taps 1/2"
25
1
25
TOTAL FOR FITTINGS AND FIXTURES
Sockets 1.5"
Sockets1.5"(in wash out)
Unions 1.5"
Gate valve 1.5"
GI Elbows 1.5" ( 90 deg)
GI Plug 1.5" (wash out)
Strainer 2' dia
GI T 2"-1.5"(c o wall)

3945

SAY
(No.)

Unit cost
(PKR)

Total Cost
(PKR)

162
2
43
1
5
2
2
2

45
45
132
907
62
50
132
122

7290
90
5676
907
310
100
264
244

25
9
67
20
200
54
275
74
4
8
10
20
4
2
3

27
73
27
73
17
56
13
45
65
47
47
26
40
30
357

675
657
1809
1460
3400
3024
3575
3330
260
376
470
520
160
60
1071

SAY
(NO.)

Unit cost
(PKR)

Total Cost
(PKR)

255
55
30
30

32.75
13
13
85

8351.25
715
390
2550
47734.25

Total
Cost
(PKR)
397.95
563.4

ACCESSORIES DETAIL
Sr
#

Item Description

1 GI strainer 2" dia


2 GI Over flow pipe 1.5" dia

Location

Quantity

C.O.Wall

RFt

Unit
cost
(PKR)
132.65

source tank

RFt

93.9

unit

Remarks

3 GI wash out pipe 1" dia


GI Plug 1"
4 GI Over flow pipe 3" dia
5 GI wash out pipe 3" dia
6 GI Plug 3"
Steel Man hole cover
7 (2'x2')
Steel Man hole cover
8 (1.5'x1.5')
9 Barbed wire

source tank

RFt

62.35

311.75

No.

50

50

12

RFt

213.55

2562.6

main tank
wash out main
tank
source tank ,
main tank

RFt

213.55

1281.3

No.

60

60

No.

600

1200

Valve chamber

No.

350

700

wash out
source tank
main tank

source tank

100
Ft
3.35
TOTAL FOR ACCESSORIES

335
7462

U/C JABBER DEVLI

DRINKING WATER SUPPLY SCHEME


SUMMARY OF OVER ALL PROJECT COST
MATERIAL COST
Sr.#

A
1
2
3
4
5
6
7
8
9
10

Item Description

Quantity

CIVIL WORKS
Cement
254
Sand
907
Gravel
1173
Shingle
293
Stone
572
Dry Boulders
57
Steel ( #3 )
569
Steel ( #4)
380
Angle Iron Ladder
1
Steel Binding wire
10
SUB TOTAL - A

Unit

Bags
cft
cft
cft
cft
cft
kg
kg
No.
kg

PIPE WORKS
1 Supply main
1.5" dia
3945 Rft
2 Distribution mains
1.25" dia
550
Rft
1" dia
1560 Rft
3/4" dia
4870 Rft
1/2" dia
6775 Rft
Fitting & fixtures
3 (as per detail)
1
L.S.
4 Accessories (as per detail)
1
L.S.
SUB TOTAL- B
SUB TOTAL MATERIAL COST

Unit
Rate
(PKR)

Amount
(PKR)

Amount
(USD)

93980
0
0
0
0
0
27312
18240
500
850
140,882

1566.3333
0
0
0
0
0
455
304
8
14
2,347

93.9

370436

6174

78.1
62.35
42.9
32.75

42955
97266
208923
221881

716
1621
3482
3698

47048
7462

47048
7462
995,971
1,136,853

784
124
16,599
18,946

370

48
48
500
85

Remarks

Will be arranged locally


Will be arranged locally
Will be arranged locally
Will be arranged locally
Will be arranged locally

TRANSPORTATION COST

Sr.#
1
2
3
4
5
6
8

Item Description
Cement
Sand
Gravel
Steel & Binding wire
Stone
Pipe materials etc
steel manhole covers

up to nearest road Jeepable carriage


site (PKR)
(PKR)
19050
0
14512
0
18768
4795
0
0
0
4500
0
750
0

Donkey
carriage
(PKR)
15240
45350
58650
4795
0
0
0

Manual
carriage
(PKR)
0
0
0
0
0
8000
400

SUB TOTAL TRANSPORTATION COST

Total
Amount
(PKR)
34290
59862
77418
9590
0
12500
1150
194,810

LABOUR COST
Sr.#
Category
Quantity
unit
1 Unskilled Labor
277
man-days
2 Skilled Labour
97
man-days
3 Plumber
197
man-days
SUB TOTAL LABOR COST

Rate
(PKR)
250
450
450

Amount
(PKR)
69250
43650
88650
201,550

Amount
(USD)
1154
728
1478
3,360

Remarks

TOTAL COST
CONTINGENCIES CHARGES @ 2.5% OF TOTAL COST

PKR 1,533,213
PKR 38,330

USD
USD

25,554
639

GRAND TOTAL

PKR 1,571,543

USD

26,192

Amount
(USD)
572
998
1290
160
0
208
19
3,247

Vous aimerez peut-être aussi