Sr. No.
1 Excavation
Description
Unit Measure
a- ordinary soil
b- gravelly soil
c- Boulder mix soil
per cft
per cft
per cft
(1:2:4)
(1:4:8)
per cft
per cft
per cft
per cft
per sft
per sft
per kg
per cft
per cft
Man-days
Skilled unskilled
-
0.016
0.022
0.031
2 PCC
3
4
5
6
7
8
9
RCC (1:2:4)
Stone Masonry
Plaster
Pointing
Steel work for RCC
Shingle work
Centring and shuttering for RCC work
0.031
0.031
0.047
0.04
0.013
0.018
0.02
0.113
0.113
0.095
0.09
0.02
0.028
0.01
0.015
0.01
WATSAN
Operational Team
STAND POST
(1.5' X 1.5'X 2.25')
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Breadth
in ft
Depth/Ht
in ft
No of
Units
Pad
4.50
4.50
1.00
1.00
20.25
Cft
stand post
0.75
0.42
1.00
1.00
0.32
Cft
5.41
1.00
1.00
1.00
5.41
Cft
25.98
Cft
Pad
4.50
4.50
0.33
1.00
6.68
Cft
stand post
0.75
0.42
0.33
1.00
0.10
Cft
5.41
1.00
0.33
1.00
1.79
Cft
Sand
(cft)
Gravel/
Crush
(cft)
Shingle
Unskilled
Labour
Men-days Men-days
0.57
8.57
Cft
8.57
0.13
4.50
4.50
0.33
1.00
6.68
Cft
stand post
0.75
0.42
0.33
1.00
0.10
Cft
5.41
1.00
0.33
1.00
1.79
Cft
8.57
Cft
Total
4
Cement
(Bags)
Shingle bed
Total
3
Unit
Total
2
Quantity
Labour
Skilled
Labour
0.90
4.50
9.00
0.27
0.97
2.60
6.50
13.00
0.39
1.42
0.20
0.40
0.86
3.49
4.00
4.00
0.33
1.00
5.28
Cft
stand post
0.75
0.75
3.42
1.00
1.92
Cft
6.00
1.00
0.58
1.00
3.48
Cft
4.50
0.25
0.58
2.00
1.31
Cft
3.25
0.25
0.48
1.00
0.39
Cft
(Drain side)
3.00
0.25
0.48
1.00
0.36
Cft
1.00
1.00
0.50
1.00
0.50
Cft
13.24
Cft
Seat pad
Total
deduct for drain flow
Net Total
6.00
0.33
0.33
1.00
0.65
Cft
12.59
Cft
10.00
Rft
No.
No.
No.
3.50
11.00
22.00
8.57
WATSAN
Operational Team
CRS-Mansehra
17.50
55.00
110.00
42.86
4.28
17.45
KALSAN- 1
U/C SACHAN
VALVE CHAMBER
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Breadth
in ft
Depth/Ht
in ft
No of
Units
Quantity
Unit
4.00
4.00
2.50
1.00
40.00
Cft
4.00
4.00
0.25
1.00
4.00
Cft
3.50
1.00
2.25
2.00
15.75
Cft
Short Wall
1.50
1.00
2.25
2.00
6.75
Cft
22.50
Cft
6.75
Cft
Total
30% (1:3) CSM
Stone
4
Sand
(cft)
1.87
2.50
15.75
Cft
1.00
4.00
Cft
3.50
1.00
0.16
2.00
1.12
Cft
1.50
1.00
0.16
2.00
0.48
Cft
1.60
Cft
0.20
1.00
13.50
Sft
3.73
14.00
2.25
Sft
1.50
1.50
1.50
2.25
4.00
Stone
(cft)
Unskilled
Labour
Men-days Men-days
5.00
0.12
0.45
0.90
2.03
0.05
0.18
0.18
0.27
7.00
0.25
Gravel/
Crush
(cft)
Labour
Skilled
Labour
0.88
0.50
4.00
Cement
(Bags)
4.00
Total
15.75
2.00
0.06
6.30
24.50
7.00
15.75
1.31
3.81
WATSAN
Opertaional Team
SOURCE TANK
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Breadth
in ft
Depth/Ht
in ft
No of
Units
Quantity
Unit
6.50
6.50
2.00
84.50
Cft
6.50
6.50
0.50
21.13
Cft
6.00
1.50
4.00
72.00
Cft
Short Wall
3.00
1.50
4.00
36.00
Cft
Total
108.00
Cft
32.40
Cft
Stone
75.60
Cft
2.25
Cft
3.00
3.00
8.1
3.00
0.25
16
24.30
kg
4.00
48.00
6.00
2.75
6.50
6.50
0.33
2.00
2.00
0.33
5.00
Net Total
8.2
Sand
(cft)
Gravel/
Crush
(cft)
2.10
10.50
21.00
9.07
34.00
Cement
(Bags)
Stone
(cft)
Steel
#4 bars
(kg)
Labour
Skilled
Steel
Binding Labour
#3 bars
wire (kg)
(kg)
Men-days
0.65
4.32
75.60
0.60
1.50
3.00
0.07
Sft
0.80
3.00
0.62
66.00
Sft
0.17
0.41
1.19
13.94
Cft
1.32
Cft
12.62
Cft
2.60
6.50
30.00
0.24
13.00
0.59
Steel
(#3 @ 6" c/c as main steel)
7.00
13
15.50
kg
7.00
10.70
kg
26.20
kg
Total
9
13.94
Cft
0.28
3.00
Rft
0.06
12
6.00
Rft
0.12
13
5.00
Rft
0.10
14
GI Plug 1"
1.00
No
15
4.00
Sft
CRS-Mnasehra
2.00
6.50
2.00
0.33
0.26
10
6.50
30.00
0.10
15.33
55.91
37.00
75.60
30.00
30.00
0.51
8.11
WATSAN
Opertaional Team
Labour
Unskilled
Labour
Men-days
2.62
2.39
9.72
0.25
0.24
0.96
1.85
1.20
0.26
0.14
0.12
0.24
0.20
20.19
CRS-Mnasehra
SOURCE TANK
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Breadth
in ft
Depth/Ht
in ft
No of
Units
Quantity
Unit
7.00
7.00
1.50
73.50
Cft
7.00
7.00
0.50
24.50
Cft
7.00
1.50
3.50
73.50
Cft
Short Wall
2.00
1.50
3.50
21.00
Cft
94.50
Cft
28.35
Cft
Stone
66.15
Cft
4.00
Cft
20
45.50
kg
Total
4.00
4.00
0.25
7.50
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Steel
#4 bars
(kg)
Labour
Steel
#3 bars
(kg)
Skilled
Unskilled
Binding Labour
Labour
wire
(kg)
Men-days Men-days
2.28
2.50
7.73
12.50
25.00
0.76
2.77
3.78
8.51
0.12
0.45
29.00
66.15
1.00
2.50
5.00
50.00
0.46
0.46
4.00
3.50
56.00
Sft
0.93
3.50
0.73
1.12
7.00
2.25
63.00
Sft
0.16
0.39
1.13
1.76
7.56
7.50
0.33
18.71
Cft
4.00
10.00
0.88
1.78
2.00
2.00
0.33
1.32
Cft
17.39
Cft
8.1
Net Total
8.2
20.00
Steel
(#3 @ 6" c/c as main steel)
7.56
15
19.30
kg
7.50
10
12.80
kg
32.10
kg
18.71
Cft
Total
9
10
Binding wire
2.33
kg
11
3.00
12
13
14
GI Plug 1"
15
7.56
2.00
7.50
2.00
0.33
38.00
0.32
0.32
0.37
0.19
Rft
0.06
0.12
6.00
Rft
0.12
0.24
5.00
Rft
0.10
0.20
1.00
No
4.00
Sft
0.10
16.32
57.89
50.00
66.15
50.00
38.00
0.78
8.16
20.19
SOURCE TANK
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Breadth
in ft
Depth/Ht
in ft
No of
Units
Quantity
Unit
8.50
8.50
2.00
1.00
144.50
Cft
8.50
8.50
0.50
1.00
36.13
Cft
8.00
1.50
4.00
2.00
96.00
Cft
Short Wall
5.00
1.50
4.00
2.00
60.00
Cft
156.00
Cft
46.80
Cft
Total
30% (1:3) CSM
Stone
4
5.00
8.1
5.00
Stone
(cft)
Labour
Steel
#3 bars
(kg)
Binding
wire
(kg)
Skilled
Labour
Unskilled
Labour
Men-days Men-days
4.48
3.60
18.00
13.07
49.00
1.40
3.50
36.00
1.12
4.08
6.24
14.04
0.19
0.71
109.20
Cft
6.25
Cft
20.00
30.30
kg
4.00
80.00
Sft
1.33
5.00
1.04
1.60
2.75
4.00
88.00
Sft
0.22
0.55
1.58
2.46
0.33
1.00
23.84
Cft
0.33
1.00
4.60
11.50
1.06
2.14
0.25
4.00
8.00
8.50
8.50
2.00
2.00
5.00
109.20
7.00
35.00
0.30
0.30
1.32
Cft
22.52
Cft
34.00
49.20
kg
1.00
23.84
Cft
0.48
0.24
23.00
Steel
(#3 @ 6" c/c both ways)
Sand
(cft)
Steel
#4 bars
(kg)
1.00
5.00
Net Total
8.2
Cement
(Bags)
Gravel/
Crush
(cft)
8.50
8.50
8.50
0.33
55.00
0.49
0.49
10
3.00
Rft
0.06
0.12
12
6.00
Rft
0.12
0.24
13
5.00
Rft
0.10
0.20
14
GI Plug 1"
1.00
No
15
4.00
Sft
2.00
2.00
0.10
24.22
87.55
66.00
109.20
35.00
55.00
0.80
12.09
31.10
Detail of Mater
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Breadth
in ft
Depth/Ht
in ft
No of
Units
Quantity
Front Wall
6.00
2.00
2.00
1.00
24.00
Cft
Wing Walls
4.50
4.50
2.00
2.00
81.00
Cft
105.00
Cft
Sand
(cft)
6.00
2.00
0.50
1.00
6.00
Cft
Wing Walls
4.50
2.00
0.50
2.00
9.00
Cft
15.00
Cft
Total
3
Cement
(Bags)
Total
2
Unit
2.00
10.00
8.00
30.00
6.00
1.63
3.50
1.00
34.23
Cft
Wing Walls
4.50
1.63
3.50
2.00
51.35
Cft
85.58
Cft
25.67
Cft
Stone
59.90
Cft
Total
7.00
2.75
0.50
1.00
9.63
Cft
0.70
3.50
15.00
1.25
0.17
1.00
3.19
Cft
0.80
2.00
7.00
2.75
2.00
1.00
38.50
Cft
11.50
45.50
6' LONG
Detail of Materials
Gravel/
Crush
(cft)
Stone
(cft)
Labour
Dry
Boulders
(cft)
Skilled
Labour
Unskilled
Labour
Men-days Men-days
3.26
20.00
0.47
1.70
3.42
7.70
7.00
0.30
1.09
4.00
0.10
0.36
59.90
38.50
0.39
31.00
59.90
38.50
4.29
14.48
Detail of Mater
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Breadth
in ft
Depth/Ht
in ft
No of
Units
Quantity
Front Wall
9.00
2.00
2.00
1.00
36.00
Cft
Wing Walls
4.50
4.50
2.00
2.00
81.00
Cft
117.00
Cft
Sand
(cft)
9.00
2.00
0.50
1.00
9.00
Cft
Wing Walls
4.50
2.00
0.50
2.00
9.00
Cft
18.00
Cft
Total
3
Cement
(Bags)
Total
2
Unit
2.50
12.50
9.33
35.00
9.00
1.63
3.50
1.00
51.35
Cft
Wing Walls
4.50
1.63
3.50
2.00
51.35
Cft
102.69
Cft
30.81
Cft
Stone
71.88
Cft
Total
10.50
2.75
0.50
1.00
14.44
Cft
1.80
9.00
18.00
1.25
0.17
1.00
3.83
Cft
1.00
2.50
10.50
2.75
2.00
1.00
57.75
Cft
14.63
59.00
9' LONG
Detail of Materials
Gravel/
Crush
(cft)
Stone
(cft)
Labour
Dry
Boulders
(cft)
Skilled
Labour
Unskilled
Labour
Men-days Men-days
3.63
25.00
0.56
2.03
4.11
9.24
18.00
0.45
1.63
5.00
0.12
0.43
71.88
57.75
0.58
48.00
71.88
57.75
5.23
17.54
Detail of Mater
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Breadth
in ft
Depth/Ht
in ft
No of
Units
Quantity
Front Wall
20.00
2.00
2.00
1.00
80.00
Cft
Wing Walls
4.50
4.50
2.00
2.00
81.00
Cft
161.00
Cft
Sand
(cft)
20.00
2.00
0.50
1.00
20.00
Cft
Wing Walls
4.50
2.00
0.50
2.00
9.00
Cft
29.00
Cft
Total
3
Cement
(Bags)
Total
2
Unit
3.00
15.00
13.33
50.00
20.00
1.63
3.50
1.00
114.10
Cft
Wing Walls
4.50
1.63
3.50
2.00
51.35
Cft
165.45
Cft
49.63
Cft
Stone
115.81
Cft
Total
22.00
2.75
0.50
1.00
30.25
Cft
3.20
16.00
29.00
1.25
0.17
1.00
6.16
Cft
1.40
3.50
22.00
2.75
2.00
1.00
121.00
Cft
20.93
84.50
20' LONG
Detail of Materials
Gravel/
Crush
(cft)
Stone
(cft)
Labour
Dry
Boulders
(cft)
Skilled
Labour
Unskilled
Labour
Men-days Men-days
4.99
30.00
0.90
3.28
6.62
14.89
32.00
0.94
3.42
7.00
0.19
0.70
115.81
121.00
1.21
69.00
115.81
121.00
8.65
28.48
50 ksi
max =
r pcc =
r Steel=
Long span = L =
Short span =W=
Wall thickness=
fy
0.021
W
L
0.15 k/cft
490 lb/cft
18 ft
18 ft
1.5 ft
13
72
hmin
(in)
4.8
Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
6
4.5
5
1.5 14.5 13.38 14.5 13.42 15
self wt./ft
(k/ft)
0.075
Asmin
0.002bh =
As
(sq.in)
0.12
a
(in)
0.2
a/2
(in)
0.1
As
(sq.in)
0.12
a
(in)
0.2
max
a/2
(in)
0.1
d=
5 in
1.236 sq.in
Asmax =
0.144 sq.in
d=
Remarks
Greater than Mu=23.63 k-in
Proposed
Remarks
Greater than Mu=22.08 k-in
Proposed
4.5 in
bd =
1.112 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
4.4
23.76
W=
18 ft
Bar length
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.12
0.12
3
4
0.11
0.196
1.1
0.6
2
1
L=
36
18
0.12
0.12
3
4
0.11
0.196
1.1
0.6
2
1
36
18
110
98
Bar length=
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
18 ft
wt. of
steel
(kg)
648
324
18 ft
wt. of
steel
(kg)
648
324
220 kg
48 kg
172 kg
180 kg
110
98
= L
Remarks
Proposed
(#3 bars @ 6" c/c)
18 ft
= W
Remarks
Proposed
(#3 bars @ 6" c/c)
Design Le
(ft)
along
W
14.5
Proposed
Proposed
Remarks
sed
bars @ 6" c/c)
Remarks
sed
bars @ 6" c/c)
50 ksi
max =
r pcc =
r Steel=
Long span = L =
Short span =W=
Wall thickness=
fy
0.021
W
L
0.15 k/cft
490 lb/cft
16 ft
16 ft
1.5 ft
11
64
hmin
(in)
4.27
Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
5
3.5
4
1.5 12.5 11.29 12.5 11.33 13
self wt./ft
(k/ft)
0.063
Asmin
0.002bh =
As
(sq.in)
0.12
a
(in)
0.2
a/2
(in)
0.1
As
(sq.in)
0.12
a
(in)
0.2
max
a/2
(in)
0.1
d=
4 in
0.989 sq.in
Asmax =
0.12 sq.in
d=
Remarks
Greater than Mu=14.91 k-in
Proposed
Remarks
Greater than Mu=13.78 k-in
Proposed
3.5 in
bd =
0.865 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
3.4
18.36
W=
16 ft
Bar length
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.12
0.12
3
4
0.11
0.196
1.1
0.6
2
1
L=
32
16
0.12
0.12
3
4
0.11
0.196
1.1
0.6
2
1
32
16
87
78
Bar length=
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
16 ft
wt. of
steel
(kg)
512
256
16 ft
wt. of
steel
(kg)
512
256
174 kg
37 kg
137 kg
150 kg
87
78
= L
Remarks
Proposed
(#3 bars @ 6" c/c)
16 ft
= W
Remarks
Proposed
(#3 bars @ 6" c/c)
Design Le
(ft)
along
W
12.5
Proposed
Proposed
Remarks
sed
bars @ 6" c/c)
Remarks
sed
bars @ 6" c/c)
50 ksi
max =
r pcc =
r Steel=
Long span = L =
Short span =W=
Wall thickness=
fy
0.021
W
L
0.15 k/cft
490 lb/cft
14.17 ft
14.17 ft
1.5 ft
10
56.68
hmin
(in)
3.78
Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
4
2.5
3
1.5 11.5 10.21 11.5 10.25 12
self wt./ft
(k/ft)
0.0495
Asmin
0.002bh =
As
(sq.in)
0.096
a
(in)
0.16
a/2
(in)
0.08
As
(sq.in)
0.096
a
(in)
0.16
max
a/2
(in)
0.08
d=
3 in
0.742 sq.in
Asmax =
0.096 sq.in
d=
Remarks
Greater than Mu=9.98 k-in
Proposed
Remarks
Greater than Mu=9.16 k-in
Proposed
2.5 in
bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45
W=
14.17 ft
Bar length
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
3
4
0.11
0.196
0.9
0.5
2
1
28
14
3
4
0.11
0.196
0.9
0.5
2
1
28
14
68
60
wt. of
steel
(kg)
397
198
136 kg
29 kg
107 kg
115 kg
68
60
= L
Remarks
Proposed
(#3 bars @ 6" c/c)
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
14.17 ft
wt. of
steel
(kg)
397
198
L= 14.17 ft
= W
Remarks
Proposed
(#3 bars @ 6" c/c)
Design Le
(ft)
along
W
11.5
Proposed
Proposed
Remarks
sed
bars @ 6" c/c)
Remarks
sed
bars @ 6" c/c)
50 ksi
max =
r pcc =
r Steel=
Long span = L =
Short span =W=
Wall thickness=
fy
0.021
W
L
0.15 k/cft
490 lb/cft
13.17 ft
13.17 ft
1.5 ft
52.68
hmin
(in)
3.51
Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
4
2.5
3
1.5 10.5 9.21 10.5 9.25
11
self wt./ft
(k/ft)
0.0495
Asmin
0.002bh =
As
(sq.in)
0.096
a
(in)
0.16
a/2
(in)
0.08
As
(sq.in)
0.096
a
(in)
0.16
max
a/2
(in)
0.08
d=
3 in
0.742 sq.in
Asmax =
0.096 sq.in
d=
Remarks
Greater than Mu=8.39 k-in
Proposed
Remarks
Greater than Mu=7.64 k-in
Proposed
2.5 in
bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45
W=
13.17 ft
Bar length
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
3
4
0.11
0.196
0.9
0.5
2
1
26
13
3
4
0.11
0.196
0.9
0.5
2
1
26
13
58
52
wt. of
steel
(kg)
342
171
116 kg
25 kg
91 kg
95 kg
58
52
= L
Remarks
Proposed
(#3 bars @ 6" c/c)
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
13.17 ft
wt. of
steel
(kg)
342
171
L= 13.17 ft
= W
Remarks
Proposed
(#3 bars @ 6" c/c)
Design Le
(ft)
along
W
10.5
Proposed
Proposed
Remarks
sed
bars @ 6" c/c)
Remarks
sed
bars @ 6" c/c)
50 ksi
max =
r pcc =
r Steel=
Long span = L =
Short span =W=
Wall thickness=
fy
0.021
W
L
0.15 k/cft
490 lb/cft
12.67 ft
12.67 ft
1.5 ft
8.5
50.68
hmin
(in)
3.38
Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
4
2.5
3
1.5
10 8.71
10
8.75
10
self wt./ft
(k/ft)
0.0495
Asmin
0.002bh =
As
(sq.in)
0.096
a
(in)
0.16
a/2
(in)
0.08
As
(sq.in)
0.096
a
(in)
0.16
max
a/2
(in)
0.08
d=
3 in
0.742 sq.in
Asmax =
0.096 sq.in
d=
Remarks
Greater than Mu=6.93 k-in
Proposed
Remarks
Greater than Mu=6.93 k-in
Proposed
2.5 in
bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45
W=
12.67 ft
Bar length
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
3
4
0.11
0.196
0.9
0.5
2
1
25
13
3
4
0.11
0.196
0.9
0.5
2
1
25
13
54
50
wt. of
steel
(kg)
317
165
108 kg
23.2 kg
84.8 kg
90 kg
54
50
= L
Remarks
Proposed
(#3 bars @ 6" c/c)
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
12.67 ft
wt. of
steel
(kg)
317
165
L= 12.67 ft
= W
Remarks
Proposed
(#3 bars @ 6" c/c)
Design Le
(ft)
along
W
10
Proposed
Proposed
Remarks
sed
bars @ 6" c/c)
Remarks
sed
bars @ 6" c/c)
WATSAN
Operational Team
50 ksi
max =
r pcc =
r Steel=
Long span = L =
Short span =W=
Wall thickness=
fy
0.021
0.15 k/cft
490 lb/cft
12.17 ft
12.17 ft
1.5 ft
48.68
hmin
(in)
3.25
Effective
wall
depths
Design Le
Proposed
thickn
(in)
Clear lengths Le
(ft)
(ft)
h (in)
ess
along L
along W
along along (ft)
along
L
W
(1)
(2)
(1)
(2)
L
4
2.5
3
1.5
9.5 8.21 9.5 8.25
9.5
self wt./ft
(k/ft)
0.0495
Asmin
0.002bh =
As
(sq.in)
0.096
a
(in)
0.16
a/2
(in)
0.08
As
(sq.in)
0.096
a
(in)
0.16
CRS-Mansehra
max
a/2
(in)
0.08
d=
3 in
0.742 sq.in
Asmax =
0.096 sq.in
d=
Remarks
Greater than Mu=6.25 k-in
Proposed
Remarks
Greater than Mu=6.25 k-in
Proposed
2.5 in
bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45
WATSAN
Operational Team
W=
12.17 ft
Bar length
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
3
4
0.11
0.196
0.9
0.5
2
1
24
12
3
4
0.11
0.196
0.9
0.5
2
1
24
12
CRS-Mansehra
50
44
wt. of
steel
(kg)
292
146
50
44
= L
Remarks
Proposed
(#3 bars @ 6" c/c)
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
12.17 ft
wt. of
steel
(kg)
292
146
L= 12.17 ft
= W
Remarks
Proposed
(#3 bars @ 6" c/c)
100 kg
21.5 kg
78.5 kg
85 kg
WATSAN
Operational Team
Design Le
(ft)
along
W
9.5
Proposed
Proposed
CRS-Mansehra
WATSAN
Operational Team
Remarks
sed
bars @ 6" c/c)
Remarks
sed
bars @ 6" c/c)
CRS-Mansehra
fy
r pcc =
r Steel=
50 ksi
max =
0.021
0.15 k/cft
490 lb/cft
hmin
(in)
45
Effective
depths
Design Le
wall
Proposed
(in)
Clear
lengths
Le
(ft)
(ft)
thickn
h (in)
along
L
along
W
along along ess
along along
L
W
(ft)
(1)
(2)
(1)
(2)
L
W
4
2.5
3
1.5
9.5 8.21 7.5 6.25
9.5
7.5
self wt./ft
(k/ft)
0.0495
Asmin
0.002bh =
=
Along Short span (main steel)
Asmax =
bd =
max
As
(sq.in)
0.096
a
(in)
0.16
a/2
(in)
0.08
Asmax =
As
(sq.in)
0.096
a
(in)
0.16
max
a/2
(in)
0.08
0.096 sq.in
d=
3 in
0.742 sq.in
d=
Remarks
Greater than Mu=6.25 k-in
Proposed
Remarks
Greater than Mu=3.9 k-in
Proposed
2.5 in
bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45
W=
10.25 ft
Bar length
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
3
4
0.11
0.196
0.9
0.5
2
1
21
10
3
4
0.11
0.196
0.9
0.5
2
1
25
12
44
37
wt. of
steel
(kg)
256
123
88 kg
95 kg
44
37
= L
Remarks
Proposed
bars @ 6" c/c)
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
12.25 ft
wt. of
steel
(kg)
257
123
L= 12.25 ft
(#3
= W
Remarks
Proposed
bars @ 6" c/c)
(#3
WATSAN
Operational Team
KALSAN-I
U/C
max =
gpcc =
r Steel=
50 ksi
Long span = L =
Short span =W=
Wall thickness=
fy
SACHAN
0.021
0.15 k/cft
W
490 lb/cft
12.25 ft
9.75 ft
1.5 ft
5.5
44
hmin Proposed
h (in)
(in)
2.93
Effective
depths
(in)
Design Le
wall
(ft)
(ft)
thickn Clear lengths Le
along L
along W
along along ess
along along
L
W
(ft)
(1)
(2)
(1)
(2)
L
W
2.5
3
1.5
9.5 8.21
7
5.75
9.5
7
self wt./ft
(k/ft)
0.0495
Asmin =
0.002bh =
Along Short span (main steel)
Asmax =
As
(sq.in)
0.096
max
a
(in)
0.16
a/2
(in)
0.08
0.096 sq.in
d=
3 in
bd =
0.742 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.92
12.61
Asmax =
As
(sq.in)
0.096
max
a
(in)
0.16
a/2
(in)
0.08
As
Area of bar Ab
(sq.in) Bar No.
(sq.in)
3
4
W=
0.9
0.5
0.096
0.096
3
4
0.11
0.196
9.75 ft
2
1
Proposed
Bar length
20
10
42
37
wt. of
steel
(kg)
2 24.5 238.88
1 12.25 119.44
=
12.25 ft
41
36
= L
Remarks
Proposed
bars @ 6" c/c)
#
length
#
bars
of
# bars in propo in full bars
1ft span
sed span
(ft)
0.9
0.5
wt. of
steel
(kg)
245
122.5
L= 12.25 ft
Remarks
Greater than Mu=3.4 k-in
#
length
#
bars
of
# bars in propo in full bars
1ft span
sed span
(ft)
0.11
0.196
As
Area of bar Ab
(sq.in) Bar No.
(sq.in)
Proposed
2.5 in
bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45
0.096
0.096
d=
Remarks
Greater than Mu=6.25 k-in
(#3
= W
Remarks
Proposed
bars @ 6" c/c)
(#3
83 kg
Engr. Amir Jamal Qureshi
WATSAN
Operational Team
SAY
CRS-Mansehra
90 kg
fy
max =
r pcc =
r Steel=
50 ksi
0.021
0.15 k/cft
490 lb/cft
6.5
40
Effective
depths
Design Le
wall
hmin Proposed
(in)
Clear
lengths
Le
(ft)
(ft)
thickn
h (in)
(in)
along
L
along
W
along along ess
along along
L
W
(ft)
(1)
(2)
(1)
(2)
L
W
2.67
4
2.5
3
1.5
8 6.71
8
6.75
8
8
self wt./ft
(k/ft)
0.0495
Asmin
0.002bh =
=
Along Short span (main steel)
Asmax =
bd =
max
As
(sq.in)
0.096
a
(in)
0.16
a/2
(in)
0.08
Asmax =
As
(sq.in)
0.096
a
(in)
0.16
max
a/2
(in)
0.08
0.096 sq.in
d=
3 in
0.742 sq.in
d=
Remarks
Greater than Mu=4.44 k-in
Proposed
Remarks
Greater than Mu=4.44 k-in
Proposed
2.5 in
bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45
W=
10 ft
Bar length
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
3
4
0.11
0.196
0.9
0.5
2
1
L=
20
10
0.096
0.096
3
4
0.11
0.196
0.9
0.5
2
1
20
10
34
30
Bar length=
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
10 ft
wt. of
steel
(kg)
200
100
10 ft
wt. of
steel
(kg)
200
100
68 kg
75 kg
34
30
= L
Remarks
Proposed
bars @ 6" c/c)
10 ft
(#3
= W
Remarks
Proposed
bars @ 6" c/c)
(#3
fy
r pcc =
r Steel=
50 ksi
max =
0.021
0.15 k/cft
490 lb/cft
5.25
32.8
hmin
(in)
2.19
Effective
depths
Design Le
wall
Proposed
(in)
Clear
lengths
Le
(ft)
(ft)
thickn
h (in)
along
L
along
W
along along ess
along along
L
W
(ft)
(1)
(2) (1)
(2)
L
W
4
2.5
3
1.5
6.75 5.46 6.75 5.5
6.75 6.75
self wt./ft
(k/ft)
0.0495
Asmin
0.002bh =
=
Along Short span (main steel)
Asmax =
bd =
max
As
(sq.in)
0.096
a
(in)
0.16
a/2
(in)
0.08
Asmax =
As
(sq.in)
0.096
a
(in)
0.16
max
a/2
(in)
0.08
0.096 sq.in
d=
3 in
0.742 sq.in
d=
Remarks
Greater than Mu=3.16 k-in
Proposed
Remarks
Greater than Mu=3.61 k-in
Proposed
2.5 in
bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45
W=
8.2 ft
Bar length
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
3
4
0.11
0.196
0.9
0.5
2
1
L=
16
8
3
4
0.11
0.196
0.9
0.5
2
1
16
8
22
20
wt. of
steel
(kg)
131
66
44 kg
50 kg
22
20
= L
Remarks
Proposed
bars @ 6" c/c)
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
8.2 ft
wt. of
steel
(kg)
131
66
8.2 ft
(#3
= W
Remarks
Proposed
bars @ 6" c/c)
(#3
fy
r pcc =
r Steel=
50 ksi
max =
0.021
0.15 k/cft
490 lb/cft
5.25
32.8
hmin
(in)
2.19
Effective
depths
Design Le
wall
Proposed
(in)
Clear
lengths
Le
(ft)
(ft)
thickn
h (in)
along
L
along
W
along along ess
along along
L
W
(ft)
(1)
(2) (1)
(2)
L
W
4
2.5
3
1.5
6.75 5.46 6.75 5.5
6.75 6.75
self wt./ft
(k/ft)
0.0495
Asmin
0.002bh =
=
Along Short span (main steel)
Asmax =
bd =
max
As
(sq.in)
0.096
a
(in)
0.16
a/2
(in)
0.08
Asmax =
As
(sq.in)
0.096
a
(in)
0.16
max
a/2
(in)
0.08
0.096 sq.in
d=
3 in
0.742 sq.in
d=
Remarks
Greater than Mu=3.16 k-in
Proposed
Remarks
Greater than Mu=3.61 k-in
Proposed
2.5 in
bd =
0.618 sq.in
(d-a/2) Design moment Md
(in)
(k-in)
2.42
10.45
W=
8.2 ft
Bar length
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
3
4
0.11
0.196
0.9
0.5
2
1
L=
16
8
3
4
0.11
0.196
0.9
0.5
2
1
16
8
22
20
wt. of
steel
(kg)
131
66
44 kg
55 kg
22
20
= L
Remarks
Proposed
bars @ 6" c/c)
#
length
#
bars
of
As
Area of bar Ab # bars in propo in full bars
(sq.in) Bar No.
(sq.in)
1ft span
sed span
(ft)
0.096
0.096
8.2 ft
wt. of
steel
(kg)
131
66
8.2 ft
(#3
= W
Remarks
Proposed
bars @ 6" c/c)
(#3
STORAGE TANK:
500 US GALLONS
Detail of Materials
Detail of Quantities
Sub
Head
No
2
3
4
5
5.1
5.2
5.3
6
7
8
8.1
8.2
Description
Length
in ft
9.65
4.65
12.25
4.65
Total
Shingle as in Bed
5.2
P/L PCC (1:4:8) as in Foundation
Long Wall
9.65
Short Wall
4.65
Plinth/Apron
9.65
Bed
5.2
Total
P/L PCC (1:2:4) as in Bed
5.2
Ring Beam (24"X12")
RCC (1:2:4)
Long sides
9.15
Short sides
5.2
Total
Steel
Main steel (4, #4 bars) 160
Shear stirrups (#3@ 12" c/c)
5.5
Centring and shuttering
14.35
CR Stone Masonry in (1:6) CSM
Long Wall
1st Step
9.15
2nd Step
8.15
3rd Step
7.65
Short Wall
1st Step
5.2
2nd Step
5.2
3rd Step
5.2
Total
Deduct for 1st seismic band
Deduct for 2nd seismic band
Net Total
30% (1:6) CSM
Stone
Vertical Reinforcement in walls
(#4 @ 12" c/c) all around
11.25
Seismic Bands
@ 2'-3" from top of ring beam
RCC (1:2:4)
Long sides
9.15
short sides
5.5
Total
Steel
Main steel (2,#4) bars
58
Shear stirrups(#2 @ 12"c/c)
2.3
corner reinforcement (1,#4 bar 2'
ovelap with main steel)
6
@ 2'-3" from top of 1st seismic band
RCC (1:2:4)
Long sides
9.15
short sides
5.5
Total
Steel
Main steel (2,#3) bars
54
Shear stirrups(#2 @ 12"c/c)
1.5
corner reinforcement (1,#3 bar 2'
ovelap with main steel at each
corner)
Breadth
in ft
Depth/Ht
in ft
No of
Units
2.5
2.5
3
4.65
2
2
0.5
0.5
2
2
1
1
5.2
0.5
2.5
2.5
3
5.2
0.5
0.5
0.5
0.5
2
2
1
1
5.2
0.25
2
2
1
1
2
2
Shingle
(cft)
Labour
Steel
#2 Steel
#3 Steel
#4
Binding
bars (kg) bars (kg) bars (kg) wire
(kg)
Skilled
Labour
Unskilled
Labour
Men-days
Men-days
Cft
Cft
Cft
Cft
Cft
Cft
6.70
1.40
33.50
3.50
67.00
7.00
1.98
0.21
7.20
0.76
36.60
20.80
57.40
cft
cft
cft
11.40
28.50
57.00
2.70
5.45
48.50
33.70
28.70
kg
kg
Cft
0.57
0.49
0.34
0.29
118.95
24.45
38.25
67.60
15.60
26.00
290.85
19.34
14.81
256.70
77.01
179.69
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
10.27
23.10
32
109.10
kg
2
2
12.08
7.26
19.34
cft
cft
cft
36
17.60
6.40
kg
kg
7.30
kg
2
2
7.55
7.26
14.81
cft
cft
cft
36
9.20
4.20
kg
kg
3.40
kg
1
3.25
1
2
3.25
1
2
2
2
2
2
2
2
0.33
0.33
Stone
(cft)
24.13
11.63
14.48
13.52
63.75
6.76
2
1.5
1.25
2
1.5
1.25
1.25
2
Gravel/
Crush
(cft)
Cft
Cft
Cft
0.33
0.33
Unit
Sand
(cft)
96.50
46.50
18.38
10.81
172.19
13.52
36
1
2
2
Quantity
Cement
(Bags)
Cft
Cft
3.79
0.20
13.52
55.00
40.00
10.40
78.00
0.49
0.34
179.69
120.00
4.00
10.00
20.00
7.50
1.09
0.91
1.84
25.00
0.18
0.06
0.18
0.06
10.00
0.07
0.07
10.00
3.00
1.09
15.00
0.70
1.41
15.00
0.09
0.04
0.09
0.04
5.00
0.03
0.03
7.00
10
5.2
5.2
4.5
4.5
2
2
46.80
46.80
93.60
Sft
Sft
Sft
9.15
8.15
7.65
2.42
1
1.67
4
4
4
88.57
32.60
51.10
172.27
22.39
1.33
21.06
50.00
22.39
12
6
1
4.00
Sft
Sft
Sft
Sft
Cft
Cft
Cft
kg
Cft
Rft
Rft
No.
Sft
Total
11.1 P/L RCC (1:2:4) as in Slab
Decuction for manhole cover
11.2
12
13
14
15
Net Total
Steel (#3 @ 6" c/c) (as per detail)
Centring and shuttering
GI over flow pipe 1.5" dia.
GI wash out pipe 1.5" dia
GI Plug 1.5 "
Steel man hole cover (2'x2')
Quantities for 1 Tank
8.2
2
8.2
2
0.333
0.333
1
1
8.2
8.2
0.333
1.20
3.90
1.22
1.87
0.43
1.08
3.10
4.82
4.20
10.50
21.00
0.99
0.45
0.24
0.12
2.00
0.50
0.22
0.48
0.24
23.45
56.58
50.00
42.73
176.48
187.00
179.69
13.52
17.00
110.00
0.50
210.00
2.89
STORAGE TANK:
1000 US GALLONS
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length
in ft
10.67
5.67
10.17
8.17
Breadth
in ft
2
2
3
5.67
Depth/Ht
in ft
1
1
0.5
0.5
No of
Units
2
2
1
1
Total
Quantity
Unit
42.68
22.68
15.26
23.16
103.78
Cft
Cft
Cft
Cft
Cft
Shingle as in Bed
8.17
5.67
0.5
23.16
Cft
2
2
3
6.17
0.5
0.5
0.5
0.67
2
2
1
1
21.34
11.34
15.26
35.84
83.78
Cft
Cft
Cft
Cft
Cft
13.58
23.60
25.00
48.60
Cft
kg
kg
kg
35.01
18.51
53.52
cft
cft
cft
60.60
30.60
26.76
kg
kg
Cft
160.18
112.93
273.11
34.34
238.77
71.63
167.14
Cft
Cft
Cft
Cft
Cft
Cft
Cft
36
111.90
kg
2
2
10.07
7.10
17.17
cft
cft
cft
40
20.60
11.90
kg
kg
6.40
kg
2
2
10.07
7.10
17.17
cft
cft
cft
10.17
7.17
6.17
1.5
1.5
0.33
1
1
1
13
18
2
2
1.5
40
1
1.5
1.5
5.25
5.25
2
2
Total
Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
7
10.25
8
Seismic Bands
8.1 @ 2' from top of ring beam
8.11 RCC (1:2:4)
Long sides
short sides
10.17
7.17
1.5
1.5
0.33
0.33
Total
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)
Binding
wire
(kg)
Skilled
Labour
Unskilled
Labour
Men-days
Men-days
2.28
23.16
0.35
8.40
42.00
84.00
2.60
9.47
2.80
7.00
14.00
0.42
1.53
55.00
10.40
26.00
0.49
52.00
70.00
40.00
10.67
0.49
2.52
5.08
0.54
0.61
0.31
0.27
9.55
21.49
0.61
0.31
80.00
167.14
130.00
3.60
9.00
1.12
18.00
1.12
0.81
1.63
8.12 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)
68
1.75
1.5
1.5
0.33
0.33
27.00
0.21
0.12
0.21
0.12
10.00
0.06
0.06
15.00
3.60
9.00
18.00
0.81
1.63
STORAGE TANK:
1000 US GALLONS
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Breadth
in ft
Depth/Ht
in ft
No of
Units
Quantity
Unit
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)
Binding
wire
(kg)
Skilled
Labour
Unskilled
Labour
Men-days
Men-days
8.22 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)
68
1.75
5.25
40
20.60
11.90
kg
kg
6.40
kg
27.00
0.21
0.12
0.21
0.12
10.00
0.06
0.06
1.17
1.17
15.00
7.17
0.33
4.5
21.29
cft
Short wall
6.5
0.33
4.5
19.31
cft
40.60
cft
55.10
kg
Total
9.2 Steel
Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)
36
52
Total
10
11.2
12
13
14
15
61.90
kg
117.00
kg
10.17
4.58
186.31
Sft
10.67
2
10.67
2
0.333
0.333
1
1
37.91
1.33
36.58
75.00
37.91
12
6
1
4.00
Cft
Cft
Cft
kg
Cft
Rft
Rft
No.
Sft
Net Total
Steel (#3 @ 6" c/c) (as per detail)
Centring and shuttering
10.67
GI over flow pipe 1.5" dia.
GI wash out pipe 1.5" dia
GI Plug 1.5 "
Steel man hole cover (2'x2')
2
Quantities for 1 Tank
10.67
0.333
8.20
20.50
41.00
130.00
0.47
1.16
7.40
18.50
37.00
75.00
55.53
213.16
264.00
167.14
23.16
330.00
3.35
5.22
1.72
0.76
0.24
0.12
3.48
0.75
0.38
0.48
0.24
23.42
58.74
0.75
274.00
5.22
STORAGE TANK:
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Breadth
in ft
Depth/Ht
in ft
No of
Units
Quantity
Unit
10.67
6.67
10.17
6.7
2
2
3
6.1
1
1
0.5
0.5
2
2
1
1
42.68
26.68
15.26
20.44
105.05
Cft
Cft
Cft
Cft
Cft
Total
Cement
(Bags)
Shingle as in Bed
6.67
6.67
0.5
22.24
Cft
10.67
6.67
10.17
7.17
2
2
3
7.17
0.5
0.5
0.5
0.5
2
2
1
1
21.34
13.34
15.26
25.70
75.64
Cft
Cft
Cft
Cft
Cft
7.50
7.17
7.17
0.25
12.85
Cft
2.60
10.17
7.17
1.5
1.5
1
1
2
2
30.51
21.51
52.02
cft
cft
cft
10.40
5
Ring Beam (18"X12")
5.1 RCC (1:2:4)
Long sides
Short sides
Total
5.2 Steel
Main steel (4, #4 bars)
Shear stirrups (#3@ 12" c/c)
5.3 Centring and shuttering
6
200
4.5
17.34
60.60
30.60
52.02
kg
kg
Cft
1.5
40
2
10.17
7.17
1.5
1.5
6.25
6.25
2
2
190.69
134.44
325.13
34.34
290.79
87.24
203.55
Cft
Cft
Cft
Cft
Cft
Cft
Cft
36
122.80
kg
2
2
10.07
7.10
17.17
cft
cft
cft
kg
kg
kg
Total
Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
7
11.25
8
Seismic Bands
8.1 @ 2' from top of ring beam
8.11 RCC (1:2:4)
Long sides
short sides
10.17
7.17
1.5
1.5
0.33
0.33
Total
8.12 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)
corner reinforcement (1,#4 bar 2'
ovelap with main steel at each
corner)
8.2 @ 2' from top of 1st seismic band
68
1.75
40
20.60
11.90
5.25
6.40
10.67
3.60
10.17
7.17
1.5
1.5
0.33
0.33
2
2
Total
10.07
7.10
17.17
cft
cft
cft
kg
kg
3.60
8.22 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)
68
1.75
40
20.60
11.90
5.25
6.40
kg
7.17
0.33
5.5
26.03
cft
Short wall
6.5
0.33
5.5
23.60
cft
49.63
cft
Total
9.2 Steel
Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)
44
67.40
kg
52
70.80
kg
138.20
kg
12
11.25
cft
Total
10
10.00
2.5
1.5
0.25
7.83
12
16.00
kg
shear stirrups(#3)
Pointing (0.75") in (1:2) CSM
1.75
10.17
5.58
24
4
7.10
226.99
kg
Sft
10.67
10.67
0.333
37.91
Cft
2.40
0.57
12.2
13
14
15
16
10.67
10.67
0.333
0.333
1.33
36.58
75.00
37.91
12
6
1
4.00
Cft
Cft
kg
Cft
Rft
Rft
No.
Sft
7.40
58.73
1500 US GALLONS
Detail of Materials
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)
Binding
wire
(kg)
Skilled
Labour
Unskilled
Labour
Men-days
Men-days
2.31
22.24
0.33
37.50
75.00
2.34
8.55
6.50
13.00
0.40
1.45
26.00
52.00
2.44
4.94
65.00
35.00
0.61
0.31
1.04
0.61
0.31
0.52
11.63
26.17
80.00
203.55
130.00
9.00
1.23
18.00
1.23
0.81
1.63
27.00
0.21
0.12
0.21
0.12
10.00
0.06
0.06
15.00
9.00
18.00
0.81
27.00
0.21
0.12
0.21
0.12
10.00
0.06
0.06
15.00
25.00
50.00
2.33
130.00
6.00
1.42
1.63
1.38
12.00
4.71
1.38
0.53
1.07
20.00
0.16
0.16
10.00
0.07
0.07
6.36
4.09
18.50
37.00
1.72
0.76
0.24
0.12
3.48
0.75
0.38
0.48
0.24
29.26
69.53
75.00
218.92
275.00
203.55
22.24
300.00
269.00
4.53
WATSAN
Operational Team
KALSAN-I
U/C
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Breadth
in ft
Depth/Ht
in ft
No of
Units
Unit
Long Wall
12.17
48.68
Cft
5.67
22.68
Cft
Plinth/Apron
11.67
0.5
17.51
Cft
Shingle bed
12.17
5.67
0.5
34.50
Cft
123.37
Cft
Shingle as in Bed
12.17
5.67
0.5
34.50
Cft
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Unskilled
Labour
Men-days
2.71
34.50
0.52
Long Wall
12.17
0.5
24.34
Cft
Short Wall
5.67
0.5
11.34
Cft
Plinth/Apron
11.67
0.5
17.51
Cft
Bed
8.67
6.17
0.67
35.84
Cft
89.03
Cft
8.90
44.50
89.00
2.76
10.06
17.65
Cft
3.60
9.00
18.00
0.83
1.68
Total
P/L RCC (1:2:4) as in Bed
8.67
6.17
0.33
Steel
10.67
13
23.60
kg
8.17
18
25.00
kg
48.60
kg
Total
5
Quantity
Short Wall
Total
SACHAN
55.00
0.49
0.49
11.67
1.5
35.01
cft
Short sides
6.17
1.5
18.51
cft
53.52
cft
Total
10.80
27.00
54.00
2.52
5.08
5.2 Steel
Main steel (4, #4 bars)
200
4.25
60.60
kg
40
28.90
kg
17.84
1.5
53.52
Cft
Long Wall
11.67
1.5
6.83
239.12
Cft
Short Wall
6.17
1.5
6.83
126.42
Cft
Total
365.54
Cft
35.32
Cft
Net Total
330.22
Cft
99.07
Cft
Stone
231.16
Cft
38
138.20
kg
70.00
35.00
0.61
0.61
0.29
0.29
1.07
0.54
13.21
29.72
Seismic Bands
12
13.33
100.00
231.16
150.00
1.38
1.38
11.67
1.5
0.33
11.55
cft
short sides
6.17
1.5
0.33
6.11
cft
17.66
cft
Total
3.60
9.00
18.00
0.83
1.68
8.12 Steel
Main steel (2,#4) bars
72
21.80
kg
1.75
38
11.30
kg
corner reinforcement
(1,#4 bar 2' ovelap with main steel at each
corner)
5.25
6.40
kg
11.55
cft
25.00
15.00
10.00
0.22
0.22
0.11
0.11
0.06
0.06
CRS-Mansehra
11.67
1.5
0.33
WATSAN
Operational Team
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length
in ft
short wall
6.17
Breadth
in ft
1.5
Depth/Ht
in ft
No of
Units
Quantity
0.33
6.11
cft
17.66
cft
Total
Unit
Cement
(Bags)
3.60
Sand
(cft)
9.00
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Skilled
Steel
#3 Steel
#4
Binding wire Labour
bars (kg) bars (kg)
(kg)
Men-days
18.00
0.83
Unskilled
Labour
Men-days
1.68
8.22 Steel
Main steel (2,#4) bars
72
21.80
kg
1.75
38
11.30
kg
5.25
6.40
kg
25.00
15.00
10.00
0.22
0.22
0.11
0.11
0.06
0.06
8.67
0.33
40.06
cft
Short wall
5.5
0.33
25.41
cft
65.47
cft
Total
9.2 Steel
13.20
33.00
66.00
3.08
6.22
Horizontal(#3 @6"c/c)
along long wall
10
28
47.60
kg
7.5
28
35.70
kg
32
49.00
kg
22
33.70
kg
166.00
kg
Total
10
2.5
10.2 Steel
12
11.25
cft
7.83
1.5
0.25
12
16.00
kg
shear stirrups(#3)
1.75
24
Total
11
175.00
1.66
1.66
7.10
kg
23.10
kg
2.40
6.00
12.00
0.53
30.00
0.23
1.07
0.23
11.67
6.17
144.01
Sft
short walls
9.17
6.17
113.16
Sft
257.17
Sft
39.19
Cft
Total
12.1 P/L RCC (1:2:4) as in Slab
Decuction for manhole cover
12.17
9.67
0.333
0.333
Net Total
Steel (#3 @ 6" c/c) as per detail
12.2 Centring and shuttering
12.17
9.67
0.333
0.64
1.61
7.60
19.00
4.63
7.20
1.78
3.60
1.33
Cft
37.86
Cft
90.00
kg
39.19
Cft
0.78
0.39
38.00
90.00
0.90
0.90
13
12
Rft
0.24
0.48
14
Rft
0.12
0.24
15
No.
16
4.00
Sft
33.20
79.20
CRS-Mansehra
67.68
258.11
313.00
231.16
34.50
415.00
290.00
6.34
WATSAN
Operational Team
STORAGE TANK:
Description
Length
in ft
12.17
6.17
11.67
12.17
Breadth
in ft
2
2
3
6.17
Depth/Ht
in ft
1
1
0.5
0.5
No of
Units
2
2
1
1
Total
Detail of Materials
Quantity
Unit
48.68
24.68
17.51
37.54
128.41
Cft
Cft
Cft
Cft
Cft
Shingle as in Bed
12.17
6.17
0.5
37.54
Cft
12.17
6.17
11.67
8.67
2
2
3
6.67
0.5
0.5
0.5
0.67
2
2
1
1
24.34
12.34
17.51
38.75
92.93
Cft
Cft
Cft
Cft
Cft
19.08
25.40
26.60
52.00
Cft
kg
kg
kg
35.01
20.01
55.02
cft
cft
cft
61.80
31.80
55.02
kg
kg
Cft
256.62
146.67
403.30
35.32
367.98
110.39
257.58
Cft
Cft
Cft
Cft
Cft
Cft
Cft
151.60
kg
8.67
10.67
8.67
11.67
6.67
6.67
1.5
1.5
0.33
1
1
1
14
18
2
2
204
4.25
18.34
1.5
44
2
11.67
6.67
1.5
1.5
7.33
7.33
2
2
Total
Deduct for 2 seismic bands
Net Total
30% (1:6) CSM
Stone
7
2500 US GALLONS
Detail of Quantities
12.5
40
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Skilled
Steel
#3 Steel
#4 Binding Labour
bars (kg) bars (kg) wire
(kg)
Men-days
Unskilled
Labour
Men-days
2.83
37.54
0.56
9.30
46.50
93.00
2.88
10.50
3.80
9.50
19.00
0.90
1.81
58.00
11.00
27.50
0.52
55.00
70.00
35.00
14.80
0.52
2.59
5.23
1.10
0.62
0.32
0.55
14.72
33.12
0.62
0.32
111.00
257.58
155.00
1.52
1.52
8
Seismic Bands
8.1 @ 2'-3" from top of ring beam
8.11 RCC (1:2:4)
CRS-Mansehra
WATSAN
Operational Team
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length
in ft
Long sides
short sides
11.67
6.67
Breadth
in ft
1.5
1.5
Depth/Ht
in ft
No of
Units
0.33
0.33
2
2
Total
Quantity
Unit
11.55
6.60
18.15
cft
cft
cft
Cement
(Bags)
3.80
Sand
(cft)
9.50
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Skilled
Steel
#3 Steel
#4 Binding Labour
bars (kg) bars (kg) wire
(kg)
Men-days
19.00
0.85
Unskilled
Labour
Men-days
1.72
8.12 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)
corner reinforcement (1,#4 bar 2'
ovelap with main steel at each
corner)
8.2 @ 2'-3" from top of 1st seismic band
8.21 RCC (1:2:4)
Long wall
short wall
Total
8.22 Steel
Main steel (2,#4) bars
Shear stirrups(#3 @ 12"c/c)
corner reinforcement (1,#4 bar 2'
ovelap with main steel at each
corner)
74
1.75
40
22.40
11.90
kg
kg
5.25
6.40
kg
2
2
11.55
6.60
18.15
cft
cft
cft
11.67
6.67
1.5
1.5
0.33
0.33
74
1.75
40
22.40
11.90
kg
kg
5.25
6.40
kg
25.00
0.22
0.12
0.22
0.12
10.00
0.06
0.06
15.00
3.80
9.50
19.00
0.85
1.72
25.00
0.22
0.12
0.22
0.12
10.00
0.06
0.06
15.00
8.67
0.33
40.06
cft
Short wall
0.33
27.72
cft
67.78
cft
Total
9.2 Steel
13.60
34.00
68.00
3.19
6.44
Horizontal(#3 @6"c/c)
along long wall
10
30
51.00
kg
28
38.10
kg
9.5
32
51.70
kg
9.5
24
38.80
kg
179.60
kg
12
11.25
cft
Total
10
190.00
1.80
1.80
2.5
1.5
0.25
2.40
6.00
12.00
0.53
1.07
7.83
12
16.00
kg
20.00
0.16
shear stirrups(#3)
11 P/L Pointing (0.75") in (1:2) CSM
Long walls
short walls
Total
12.1 P/L RCC (1:2:4) as in Slab
1.75
24
7.10
kg
10.00
0.07
6.67
6.67
2
2
0.333
155.68
129.00
284.68
41.22
Sft
Sft
Sft
Cft
CRS-Mansehra
11.67
9.67
12.17
10.17
0.71
1.78
5.12
7.97
WATSAN
Operational Team
12.2
13
14
15
16
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Decuction for manhole cover
Net Total
Steel (#3 @ 6" c/c) (as per detail)
Centring and shuttering
GI over flow pipe 1.5" dia.
GI wash out pipe 1.5" dia
GI Plug 1.5 "
Steel man hole cover (2'x2')
Quantities for 1 Tank
CRS-Mansehra
Length
in ft
Breadth
in ft
12.17
10.17
Depth/Ht
in ft
No of
Units
0.333
0.333
Quantity
1.33
39.88
95.00
41.22
12
6
1
4.00
Unit
Cft
Cft
kg
Cft
Rft
Rft
No.
Sft
Cement
(Bags)
8.00
Sand
(cft)
20.00
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Skilled
Steel
#3 Steel
#4 Binding Labour
bars (kg) bars (kg) wire
(kg)
Men-days
40.00
1.87
95.00
71.21
275.28
325.00
257.58
37.54
438.00
6.53
Men-days
0.82
0.24
0.12
3.79
0.95
0.41
0.48
0.24
35.79
85.21
0.95
295.00
Unskilled
Labour
WATSAN
Operational Team
STORAGE TANK:
3000 US GALLONS
Detail of Materials
Detail of Quantities
Sub
Head
No
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Description
Depth/Ht
in ft
No of
Units
Quantity
Unit
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Labour
Shingle Steel
(cft)
#3 bars
(kg)
Steel
#4 bars
(kg)
Skilled Unskilled
Binding Labour Labour
wire
(kg)
Men-daysMen-days
12.17
232.53
Cft
Shingle as in Bed
12.17
0.5
58.13
Cft
12.17
116.27
Cft
10.70
53.50
107.00
3.60
13.14
8.67
10.67
0.33
1
18
19.47
32.70
Cft
kg
5.33
10.00
20.00
0.92
1.85
7.05
25.65
kg
kg
30
38
4.25
11.67
11.67
11.67
11.67
8.67
47.90
cft
8.67
2
2
30
1
18.20
23.00
21.70
47.90
kg
kg
kg
Cft
8.67
8.67
7.83
0.33
1
2
375.06
31.61
343.45
103.03
240.41
cft
Cft
Cft
Cft
Cft
30
113.70
kg
31.61
Cft
2
2
60
18.20
23.00
17.90
kg
kg
kg
74.52
Cft
27
17
78.10
kg
10
54
91.90
kg
170.00
kg
262.37
Sft
12.5
58.13
0.87
30.00
9.60
24.00
0.26
48.00
20.00
25.00
25.00
13.73
0.26
2.25
4.55
0.96
0.18
0.23
0.22
0.48
13.74
30.91
0.18
0.23
0.22
103.00
240.41
120.00
1.14
1.14
11.67
Horizontal(#3 @6"c/c)
8.67
0.33
30
38
1.75
8.67
8.5
Total
10
5.12
CRS-Mansehra
11.67
7.16
6.40
16.00
32.00
1.49
20.00
25.00
22.00
15.00
37.50
75.00
1.64
0.18
0.23
0.18
3.50
180.00
0.66
0.18
0.23
0.18
3.00
1.70
7.08
1.70
4.72
7.35
WATSAN
Operational Team
Description
Detail of Materials
Detail of Quantities
Sub
Head
No
Net Total
Steel (#3 @ 6" c/c) (as per detail)
Centring and shuttering
GI over flow pipe 1.5" dia.
GI wash out pipe 1.5" dia
GI Plug 1.5 "
Steel man hole cover (2'x2')
Quantities for 1 Tank
CRS-Mansehra
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
12.17
2
12.17
Depth/Ht
in ft
No of
Units
0.33
0.33
1
1
0.33
Quantity
38.37
1.32
37.05
85.00
38.37
12
6
1
4.00
Unit
Cft
Cft
Cft
kg
Cft
Rft
Rft
No.
Sft
Cement
(Bags)
7.40
Sand
(cft)
Gravel/
Crush
(cft)
18.50
37.00
Stone
(cft)
Labour
Shingle Steel
(cft)
#3 bars
(kg)
Steel
#4 bars
(kg)
1.74
85.00
68.82
264.14 319.00
Skilled Unskilled
Binding Labour Labour
wire
(kg)
Men-daysMen-days
240.41
58.13
342.00 210.00
0.77
0.24
0.12
3.52
0.85
0.38
0.48
0.24
34.05
84.13
0.85
5.16
WATSAN
Operational Team
3500 US GALLONS
Detail of Materials
STORAGE TANK:
Detail of Quantities
Sub
Head
No
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Description
Depth/Ht
in ft
No of
Units
Quantity
Unit
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Steel
#3 bars
(kg)
Steel
#4 bars
(kg)
Skilled
Unskilled
Binding Labour
Labour
wire
(kg)
Men-days Men-days
12.67
252.03
Cft
Shingle as in Bed
12.67
0.5
63.01
Cft
12.67
126.02
Cft
12.60
63.00
126.00
3.91
14.24
9.17
11.17
0.33
1
20
21.78
38.00
Cft
kg
5.87
11.00
22.00
1.02
2.07
8.18
29.82
kg
kg
12.17
9.17
50.26
cft
19.40
24.30
23.10
50.26
kg
kg
kg
Cft
418.63
33.17
385.46
115.64
269.82
cft
Cft
Cft
Cft
Cft
32
126.10
kg
33.17
Cft
2
2
64
19.40
24.30
19.10
kg
kg
kg
32
40
4.25
12.17
9.17
2
2
32
1
12.17
12.17
9.17
9.17
8.33
0.33
1
2
13
5.54
63.01
0.95
35.00
10.00
25.00
0.30
50.00
22.00
27.00
27.00
15.47
0.30
2.36
4.77
1.01
0.19
0.24
0.23
0.50
15.42
34.69
0.19
0.24
0.23
116.00
269.82
130.00
1.26
1.26
Total
9.17
0.33
32
40
1.75
9.17
Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)
CRS-Mansehra
12.17
83.64
Cft
29
8.5
18
88.80
kg
10.5
58
103.60
kg
192.40
kg
6.60
16.50
33.00
1.56
22.00
27.00
23.00
16.80
42.00
0.19
0.24
0.19
84.00
0.19
0.24
0.19
3.93
196.00
1.92
3.15
7.95
1.92
WATSAN
Operational Team
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Depth/Ht
in ft
No of
Units
7.67
0.33
0.33
1
1
1
Quantity
Unit
293.10
41.59
1.32
40.27
90.00
41.59
Sft
Cft
Cft
Cft
kg
Cft
12
CRS-Mansehra
12.17
12.67
2
12.67
0.33
Cement
(Bags)
Sand
(cft)
0.73
1.83
8.00
20.00
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Steel
#3 bars
(kg)
Steel
#4 bars
(kg)
Skilled
Unskilled
Binding Labour
Labour
wire
(kg)
Men-days Men-days
5.28
8.21
1.89
0.83
3.83
0.90
0.42
Rft
0.24
0.48
Rft
0.12
0.24
No.
4.00
Sft
37.57
92.71
40.00
90.00
76.07
295.33
355.00
269.82
63.01
371.00
0.90
228.00
5.68
WATSAN
Operational Team
STORAGE TANK:
Sub
Head
No
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Description
4000 US GALLONS
Detail of Materials
Detail of Quantities
Depth/Ht
in ft
No of
Units
Quantity
Unit
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Steel
#3 Steel
bars (kg) #4 bars
(kg)
Skilled
Binding Labour
wire
(kg)
Men-days
13.17
272.31
Cft
Shingle as in Bed
13.17
0.5
68.08
Cft
13.17
136.16
Cft
13.60
68.00
136.00
4.22
9.67
11.67
0.33
1
20
24.22
39.70
Cft
kg
6.40
12.00
24.00
1.14
8.53
31.17
kg
kg
12.67
9.67
52.61
cft
20.00
24.90
23.90
52.61
kg
kg
kg
Cft
438.25
34.72
403.52
121.06
282.47
cft
Cft
Cft
Cft
Cft
33
130.10
kg
34.72
Cft
2
2
66
20.00
24.90
19.70
kg
kg
kg
33
41
4.25
12.67
9.67
2
2
33
1
12.67
12.67
9.67
9.67
8.33
0.33
1
2
13
68.08
35.00
10.60
26.50
0.31
53.00
2.47
23.00
28.00
28.00
0.20
0.25
0.24
1.05
16.14
16.13
121.00
282.47
135.00
1.30
12.67
9.67
0.33
33
41
1.75
9.67
88.38
Cft
9.2 Steel
30.5
18
93.40
kg
10.5
61
109.00
kg
202.40
kg
Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)
Total
CRS-Mansehra
7.00
17.50
35.00
1.63
23.00
28.00
23.00
17.80
44.50
0.20
0.25
0.20
89.00
4.15
207.00
2.02
WATSAN
Operational Team
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Skilled
Binding Labour
wire
(kg)
Men-days
Quantity
7.67
305.14
Sft
0.76
1.91
0.33
0.33
1
1
44.93
1.32
43.61
95.00
44.93
Cft
Cft
Cft
kg
Cft
8.80
22.00
12
Rft
0.24
Rft
0.12
No.
4.00
Sft
CRS-Mansehra
12.67
13.17
2
13.17
0.33
Stone
(cft)
Labour
Steel
#3 Steel
bars (kg) #4 bars
(kg)
No of
Units
10
Sand
(cft)
Shingle
(cft)
Depth/Ht
in ft
Unit
Cement
(Bags)
Gravel/
Crush
(cft)
5.49
44.00
2.05
95.00
0.95
0.90
81.10
313.41
381.00
282.47
68.08
388.00
237.00
5.92
39.61
WATSAN
Operational Team
Labour
Unskilled
Labour
Men-days
5.99
1.02
15.39
2.30
0.31
5.00
0.20
0.25
0.24
0.53
36.32
1.30
3.30
0.20
0.25
0.20
8.40
2.02
CRS-Mansehra
WATSAN
Operational Team
Labour
Unskilled
Labour
Men-days
8.54
4.14
0.95
0.45
0.48
0.24
98.01
CRS-Mansehra
Operational Team
WATSAN
STORAGE TANK:
Sub
Head
No
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Description
Depth/Ht
No of
in
Units
ft
5000 US GALLONS
Detail of Materials
Detail of Quantities
Quantity
Unit
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Skilled
Steel
#3 Steel
#4 Binding Labour
bars (kg) bars (kg) wire
(kg)
Men-days
13.17
272.31
Cft
Shingle as in Bed
13.17
0.5
68.08
Cft
13.17
136.16
Cft
13.60
68.00
136.00
4.22
9.67
11.67
0.33
1
20
24.22
39.70
Cft
kg
6.40
12.00
24.00
1.14
8.53
31.17
kg
kg
12.67
9.67
52.61
cft
20.00
24.90
23.90
52.61
kg
kg
kg
Cft
543.47
34.72
508.75
152.62
356.12
cft
Cft
Cft
Cft
Cft
33
150.10
kg
34.72
Cft
2
2
66
20.00
24.90
19.70
kg
kg
kg
33
41
4.25
12.67
9.67
2
2
33
1
12.67
12.67
9.67
9.67
10.33
0.33
1
2
15
68.08
35.00
10.60
26.50
0.31
53.00
2.47
23.00
28.00
28.00
0.20
0.25
0.24
1.05
20.35
20.40
153.00
356.12
155.00
1.50
12.67
9.67
0.33
33
41
1.75
9.67
108.01
Cft
9.2 Steel
30.5
22
114.20
kg
12.5
61
129.70
kg
243.90
kg
Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)
Total
CRS-Mansehra
11
7.00
17.50
35.00
1.63
23.00
28.00
23.00
21.60
54.00
0.20
0.25
0.20
108.00
5.08
250.00
2.44
Operational Team
WATSAN
10
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
P/L Pointing (0.75") in (1:2) CSM
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Quantity
Unit
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Skilled
Steel
#3 Steel
#4 Binding Labour
bars (kg) bars (kg) wire
(kg)
Men-days
9.67
384.71
Sft
0.96
2.40
0.33
0.33
1
1
Cft
Cft
Cft
kg
Cft
8.80
22.00
44.93
1.32
43.61
95.00
44.93
10
6.00
kg
12
Rft
0.24
Rft
0.12
15 GI Plug 2 "
No.
4.00
Sft
CRS-Mansehra
12.67
Depth/Ht
No of
in
Units
ft
13.17
2
13.17
0.33
3.5
6.92
44.00
2.05
95.00
0.95
0.90
8.00
89.36
355.40
400.00
356.12
68.08
439.00
0.06
257.00
6.60
46.18
WATSAN
Operational Team
Labour
Unskilled
Labour
Men-days
5.99
1.02
15.39
2.30
0.31
5.00
0.20
0.25
0.24
0.53
45.79
1.50
3.30
0.20
0.25
0.20
10.26
2.44
CRS-Mansehra
WATSAN
Operational Team
Labour
Unskilled
Labour
Men-days
10.77
4.14
0.95
0.45
0.06
0.48
0.24
112.25
CRS-Mansehra
Operational Team
WATSAN
STORAGE TANK:
Sub
Head
No
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Description
Depth/Ht
in ft
No of
Units
6000 US GALLONS
Detail of Materials
Detail of Quantities
Quantity
Unit
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)
Binding
wire
(kg)
Skilled
Labour
Unskilled
Labour
Men-days
Men-days
14.17
315.24
Cft
Shingle as in Bed
14.17
0.5
78.81
Cft
14.17
157.62
Cft
15.80
79.00
158.00
4.89
17.81
10.67
12.67
0.33
1
22
29.49
47.40
Cft
kg
8.00
15.00
30.00
1.39
2.80
10.10
37.30
kg
kg
36
44
4.25
13.67
13.67
13.67
13.67
10.67
57.32
cft
10.67
2
2
36
1
21.80
26.70
26.00
57.32
kg
kg
kg
Cft
10.67
10.67
10.33
0.33
1
2
592.12
37.83
554.29
166.29
388.00
cft
Cft
Cft
Cft
Cft
36
163.70
kg
37.83
Cft
2
2
72
21.80
26.70
21.40
kg
kg
kg
119.59
Cft
34
22
127.30
kg
12.5
68
144.60
kg
271.90
kg
15
6.94
78.81
1.18
40.00
11.40
28.50
0.37
57.00
25.00
30.00
29.00
22.13
0.37
2.69
5.45
1.15
0.22
0.27
0.26
0.57
22.17
49.89
0.22
0.27
0.26
166.00
388.00
170.00
1.64
1.64
Horizontal(#3 @6"c/c)
Total
10.67
0.33
36
44
1.75
10.67
CRS-Mansehra
13.67
10
11
7.60
19.00
38.00
1.78
25.00
30.00
24.00
24.00
60.00
0.22
0.27
0.21
120.00
0.22
0.27
0.21
5.62
277.00
2.72
3.59
11.36
2.72
Operational Team
WATSAN
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Unit
Cement
(Bags)
Sand
(cft)
Men-days
12
Rft
0.24
0.48
Rft
0.12
0.24
15 GI Plug 2 "
No.
4.00
Sft
50.94
124.65
CRS-Mansehra
25.50
Men-days
kg
10.20
Unskilled
Labour
6.00
3.5
2.59
Skilled
Labour
10
0.33
1.04
Stone
(cft)
Binding
wire
(kg)
14.17
1
1
1
Quantity
Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)
Sft
Cft
Cft
Cft
kg
Cft
9.67
0.33
0.33
No of
Units
Shingle
(cft)
415.07
52.01
1.32
50.69
115.00
52.01
13.67
14.17
2
Depth/Ht
in ft
Gravel/
Crush
(cft)
51.00
115.00
7.47
11.62
2.38
4.82
1.15
0.52
1.15
1.04
8.00
100.17
395.59
454.00
388.00
78.81
493.00
0.06
280.00
7.38
0.06
Operational Team
WATSAN
STORAGE TANK
8000 US GALLONS
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Depth/Ht
in ft
No of
Units
Quantity
Unit
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)
Binding
wire
(kg)
Skilled
Labour
Unskilled
Labour
Men-days
Men-days
16
2.5
502.40
Cft
Shingle as in Bed
16
200.96
Cft
16
200.96
Cft
20.10
100.50
201.00
6.23
22.71
12
14
0.5
1
24
56.52
57.20
Cft
kg
15.20
28.50
57.00
2.66
5.37
12.30
44.90
kg
kg
15
12
63.59
cft
25.50
29.10
28.90
63.59
kg
kg
kg
Cft
731.23
63.59
667.64
200.29
467.35
cft
Cft
Cft
Cft
Cft
40
194.00
kg
63.59
Cft
2
2
78
25.50
29.10
23.20
kg
kg
kg
42
48
4.25
15
12
2
2
40
1
15
15
12
12
11.5
0.5
1
2
16
11.05
200.96
3.01
49.00
12.80
32.00
0.45
64.00
29.00
33.00
33.00
26.67
0.45
2.99
6.04
1.27
0.26
0.29
0.29
0.64
26.71
60.09
0.26
0.29
0.29
200.00
467.35
200.00
1.94
1.94
15
12
0.5
42
48
1.75
12
216.66
Cft
9.2 Steel
38
24
155.20
kg
13.67
75
174.40
kg
Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)
CRS-Mansehra
11
12
12.80
32.00
64.00
2.99
29.00
33.00
27.00
43.40
108.50
217.00
0.26
0.29
0.23
6.04
0.26
0.29
0.23
10.18
20.58
Operational Team
WATSAN
Detail of Materials
Detail of Quantities
Sub
Head
No
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Description
Depth/Ht
in ft
No of
Units
Quantity
Unit
Total
329.60
kg
659.20
9.3
12
9.4
10
15
670.00
6.59
44.00
0.39
Unskilled
Labour
Men-days
Men-days
6.59
Cft
kg
10.5
494.55
Sft
1.24
3.09
0.42
0.42
1
1
Cft
Cft
Cft
kg
Cft
16.60
41.50
84.40
1.68
82.72
150.00
84.40
10
6.00
kg
12
Rft
0.24
0.48
Rft
0.12
0.24
15 GI Plug 3 "
No.
4.00
Sft
68.75
173.13
CRS-Mansehra
16
0.42
3.5
19.00
Skilled
Labour
38.80
Net Total
11.2 Steel (#3 @ 6" c/c) (as per detail)
11.3 Centring and shuttering
9.50
Binding
wire
(kg)
18.84
3.80
Stone
(cft)
Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)
16
2
Sand
(cft)
Shingle
(cft)
38
Cement
(Bags)
Gravel/
Crush
(cft)
0.89
83.00
150.00
0.39
8.90
13.85
3.89
7.86
1.50
0.84
1.50
1.69
8.00
152.60
555.59
705.00
467.35
200.96
981.00
0.06
324.00
12.54
1.79
0.06
Operational Team
WATSAN
10,000 US GALLONS
STORAGE TANK:
Detail of Materials
Detail of Quantities
Sub
Head
No
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Description
Depth/Ht
in ft
No of
Units
Quantity
Unit
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)
Binding
wire
(kg)
Skilled
Labour
Unskilled
Labour
Men-days
Men-days
18
2.5
635.85
Cft
Shingle as in Bed
18
254.34
Cft
18
254.34
Cft
25.50
127.50
255.00
7.88
28.74
14
16
0.5
1
28
76.93
76.20
Cft
kg
20.53
38.50
77.00
3.62
7.31
16.38
59.82
kg
kg
17
14
73.01
cft
28.50
33.30
33.30
73.01
kg
kg
kg
Cft
839.56
73.01
766.55
229.97
536.59
cft
Cft
Cft
Cft
Cft
46
223.10
kg
73.01
Cft
2
2
92
28.50
33.30
27.40
kg
kg
kg
254.34
Cft
45
24
183.80
kg
13.67
88
204.70
kg
388.50
kg
47
55
4.25
17
14
2
2
46
1
17
17
14
14
11.5
0.5
1
2
16
13.99
254.34
3.82
65.00
14.60
36.50
0.60
73.00
32.00
37.00
37.00
30.67
0.60
3.43
6.94
1.46
0.29
0.33
0.33
0.73
30.66
68.99
0.29
0.33
0.33
230.00
536.59
230.00
2.23
2.23
Horizontal(#3 @6"c/c)
Vertical (#3 @6"c/c)
Total
CRS-Mansehra
17
14
0.5
47
55
1.75
14
13
12
14.60
36.50
73.00
3.43
33.00
38.00
32.00
50.80
127.00
254.00
0.29
0.33
0.27
6.94
0.29
0.33
0.27
11.95
24.16
Operational Team
WATSAN
Detail of Materials
Detail of Quantities
Sub
Head
No
Description
Length/ Length/
External Internal Breadth
dia
in dia
in
in ft
ft
ft
Depth/Ht
in ft
No of
Units
Quantity
Unit
Cement
(Bags)
Sand
(cft)
Gravel/
Crush
(cft)
Stone
(cft)
Shingle
(cft)
Labour
Steel
#3 Steel
#4
bars (kg) bars (kg)
Skilled
Labour
Unskilled
Labour
Men-days
Men-days
777.00
kg
21.98
Cft
44
44.90
kg
10.5
560.49
Sft
1.40
3.50
0.5
0.5
1
1
Cft
Cft
Cft
kg
Cft
25.00
62.50
127.17
2.00
125.17
180.00
127.17
10
6.00
kg
12
Rft
0.24
0.48
Rft
0.12
0.24
15 GI Plug 3 "
No.
4.00
Sft
82.35
208.02
9.3
14
9.4
10
17
CRS-Mansehra
18
2
18
0.5
3.5
785.00
Binding
wire
(kg)
4.40
11.00
7.77
22.00
7.77
1.03
50.00
0.45
125.00
180.00
0.45
10.09
15.69
5.88
11.89
1.80
1.27
1.80
2.54
8.00
187.50
673.00
879.00
536.59
254.34
1157.00
0.06
370.00
14.75
2.09
0.06
WATSAN
Operational Team
KALSAN-I
U/C SACHAN
20 years
DESIGN POPULATION
No. of persons/H.H for present population
Design growth rate
Design growth rate factor G.R.F
=
=
=
7.5
3%
1.8
SECTOR NO. 1
Present population
persons/
(July 2006)
G.R.F
H.H
Persons
7.5
128
1.8
330
1.8
90
1.8
150
1.8
113
1.8
0
811
Design
population
(July 2026)
Persons
230
594
162
270
203
0
1459
Present population
# of persons/
(July 2006)
Zone Name
H.Hs H.H
Persons
G.R.F
7.5
0
1.8
0
1.8
0
1.8
0
1.8
0
1.8
0
TOTAL
0
Design
population
(July 2026)
Persons
0
0
0
0
0
0
0
# of
H.Hs
17
44
12
20
15
SECTOR NO. 2
Sr. #
1
2
3
4
5
SECTOR NO. 3
Sr. #
1
2
3
4
5
Present population
# of persons/
(July 2006)
Zone Name
H.Hs H.H
Persons
G.R.F
7.5
0
1.8
0
1.8
0
1.8
0
1.8
0
1.8
0
TOTAL
0
Design
population
(July 2026)
Persons
0
0
0
0
0
0
0
SECTOR NO. 4
CRS-Mansehra
WATSAN
Sr. #
1
2
3
4
5
Operational Team
Present population
# of persons/
(July 2006)
Zone Name
H.Hs H.H
Persons
G.R.F
7.5
0
1.8
0
1.8
0
1.8
0
1.8
0
1.8
0
TOTAL
0
Design
population
(July 2026)
Persons
0
0
0
0
0
0
0
1459 Persons
1 Schools
NO.
# students in 2006
# students in
2026
taking half as
outsiders
0
TOTAL
1 Mosques
NO.
Population in 2026
# attending
mosques (10%)
Daily req. @ 3
gpcd GPD (Imp)
0
0
TOTAL
2 Animals
Large animals
Small animals
No.
No.
# in 2006
# in
2026
daily
requirement @
12 GPD (Imp)
00
# in 2006
# in
2026
daily
requirement @ 6
GPD (Imp)
00
0 GPD (Imp)
0 GPM (US)
GPM (US)
11.93 GPM (US)
CRS-Mansehra
WATSAN
Operational Team
KATHA
U/C
JABBAR DEVLI
TRANSPORTATION COST
TRANSPORTATION COST UP TO NEAREST ROAD SITE
Total
Sr.#
Item Description
quantity Unit Transp. Rate (PKR)
1 Cement
254
Bags
75 per bag
2 Sand
907
cft
per cft
3 Gravel
1173 cft
per cft
4 Steel & Binding wire
959
kg
5 per kg
5 Stone
572
cft
per cft
6 Pipe materials
1
LS
4500 per job
7 Steel manhole cover
No.
1 LS
5 No.
CRS-Mansehra
Amount
(PKR)
19050
0
0
4795
0
4500
Amount
(USD)
317.5
0
0
79.9
0
75
750
12.5
29095
484.92
Amount
(PKR)
0
14512
18768
0
0
0
0
Amount
(USD)
0
241.9
312.8
0
0
0
0
33280
555
Amount
(PKR)
15240
45350
58650
4795
0
0
0
124035
Amount
(USD)
254
755.8
977.5
79.9
0
0
0
2067
Amount
(PKR)
Amount
(USD)
8000
400
8400
133.3
6.7
140
194,810.00
3,246.83
Remarks
Will be arranged from siran
Will be arranged from siran
will be arranged locally
Remarks
Remarks
Remarks
5 trips per day of each 1cft
5 trips per day of each 1cft
5 trips per day of each 1cft
5 trips per day of each 1cft
WATSAN
Operational Team
19050
0
4795
0
4500
750
CRS-Mansehra
KATHA
U/C
JABBER DEVLI
1
2
3
4
5
6
7
9
10
11
12
13
12
Sr
#
1
2
3
4
Item Description
Total length
(RFt)
Qty/100
Rft (No.)
Total
Qty
(No.)
SUPPLY MAIN
4
158
1
3945
1
39
1
4
1
1
1
DISTRIBUTION SYSTEM
Sockets 1.25"
550
4
22
Unions 1".25
550
1
6
Sockets 1"
1560
4
62
Unions 1"
1560
1
16
Sockets 0.75"
4870
4
195
Unions 0.75"
4870
1
49
Sockets 0.5"
6775
4
271
Unions 0.75"
6775
1
68
GI T's (1.25"-1")
2
GI T's (1"-0.75")
6
GI T's (1"-0.5")
8
GI T's (0.75"-0.5")
16
Reducer (1"-0.75")
2
Reducer (0.75"-0.5")
1
GI valve 1"(out lets)
2
TAP STANDS
Qty/tap
Total
Total Tap
Item Description
stand
Qty
stands
(No.)
(No.)
GI pipe 1/2" dia
25
10
250
25
2
50
GI Elbows 0.5"(90 deg)
Sockets 1/2"
25
1
25
Brass Taps 1/2"
25
1
25
TOTAL FOR FITTINGS AND FIXTURES
Sockets 1.5"
Sockets1.5"(in wash out)
Unions 1.5"
Gate valve 1.5"
GI Elbows 1.5" ( 90 deg)
GI Plug 1.5" (wash out)
Strainer 2' dia
GI T 2"-1.5"(c o wall)
3945
SAY
(No.)
Unit cost
(PKR)
Total Cost
(PKR)
162
2
43
1
5
2
2
2
45
45
132
907
62
50
132
122
7290
90
5676
907
310
100
264
244
25
9
67
20
200
54
275
74
4
8
10
20
4
2
3
27
73
27
73
17
56
13
45
65
47
47
26
40
30
357
675
657
1809
1460
3400
3024
3575
3330
260
376
470
520
160
60
1071
SAY
(NO.)
Unit cost
(PKR)
Total Cost
(PKR)
255
55
30
30
32.75
13
13
85
8351.25
715
390
2550
47734.25
Total
Cost
(PKR)
397.95
563.4
ACCESSORIES DETAIL
Sr
#
Item Description
Location
Quantity
C.O.Wall
RFt
Unit
cost
(PKR)
132.65
source tank
RFt
93.9
unit
Remarks
source tank
RFt
62.35
311.75
No.
50
50
12
RFt
213.55
2562.6
main tank
wash out main
tank
source tank ,
main tank
RFt
213.55
1281.3
No.
60
60
No.
600
1200
Valve chamber
No.
350
700
wash out
source tank
main tank
source tank
100
Ft
3.35
TOTAL FOR ACCESSORIES
335
7462
A
1
2
3
4
5
6
7
8
9
10
Item Description
Quantity
CIVIL WORKS
Cement
254
Sand
907
Gravel
1173
Shingle
293
Stone
572
Dry Boulders
57
Steel ( #3 )
569
Steel ( #4)
380
Angle Iron Ladder
1
Steel Binding wire
10
SUB TOTAL - A
Unit
Bags
cft
cft
cft
cft
cft
kg
kg
No.
kg
PIPE WORKS
1 Supply main
1.5" dia
3945 Rft
2 Distribution mains
1.25" dia
550
Rft
1" dia
1560 Rft
3/4" dia
4870 Rft
1/2" dia
6775 Rft
Fitting & fixtures
3 (as per detail)
1
L.S.
4 Accessories (as per detail)
1
L.S.
SUB TOTAL- B
SUB TOTAL MATERIAL COST
Unit
Rate
(PKR)
Amount
(PKR)
Amount
(USD)
93980
0
0
0
0
0
27312
18240
500
850
140,882
1566.3333
0
0
0
0
0
455
304
8
14
2,347
93.9
370436
6174
78.1
62.35
42.9
32.75
42955
97266
208923
221881
716
1621
3482
3698
47048
7462
47048
7462
995,971
1,136,853
784
124
16,599
18,946
370
48
48
500
85
Remarks
TRANSPORTATION COST
Sr.#
1
2
3
4
5
6
8
Item Description
Cement
Sand
Gravel
Steel & Binding wire
Stone
Pipe materials etc
steel manhole covers
Donkey
carriage
(PKR)
15240
45350
58650
4795
0
0
0
Manual
carriage
(PKR)
0
0
0
0
0
8000
400
Total
Amount
(PKR)
34290
59862
77418
9590
0
12500
1150
194,810
LABOUR COST
Sr.#
Category
Quantity
unit
1 Unskilled Labor
277
man-days
2 Skilled Labour
97
man-days
3 Plumber
197
man-days
SUB TOTAL LABOR COST
Rate
(PKR)
250
450
450
Amount
(PKR)
69250
43650
88650
201,550
Amount
(USD)
1154
728
1478
3,360
Remarks
TOTAL COST
CONTINGENCIES CHARGES @ 2.5% OF TOTAL COST
PKR 1,533,213
PKR 38,330
USD
USD
25,554
639
GRAND TOTAL
PKR 1,571,543
USD
26,192
Amount
(USD)
572
998
1290
160
0
208
19
3,247