MANSEHRA
TEHSIL:
MANSEHRA
U/C:
SACHAN
COMMUNITY:
KALSAN-II
BENEFICIARY H.H:
35 No.
D R IN K IN G WATER SU PP LY SC HE ME
KALSAN-II
ESTIMATED COST:
PKR:
545,945/(0.546M)
USD:
Date of Preparation: 15 AUG 2006
Date of submission:
DOCUMENT CONTROL
1
9,099/-
Document ID No.
CRS/PK/MA/OT/002
1. Attaullah Khan
Field Officer
2. Imtiaz Muhammad
Field Engineer
Field Officer
Imtiaz Muhammad
Field Engineer
3. Haroon-ur-Rashid
Field Engineer
Nadeem Ilyas
Senior Field
Engineer
2. Imtiaz Muhammad
Field Engineer
Technical Advisor
CRS-Mansehra
Program Manager
CRS-Pakistan
2
TABLE OF CONTENTS
SR.
NO.
1
PART- A
1.
PROJECT DESCRIPTION .
.
Name of Project.
1
1.
.
Location of
2
1.
Project
Introduction
3
1.
..
Relation of Project with Umbrella Program
4
1.
Document/Plan
Pre-Earth Quake facilities for drinking
5
1.
water..
Post-Earth Quake/ Present set up for drinking water
6
1.
..
Relation with CRS over all
7
1.
program............
Summary and Scope of
Project..
Gestation
1.
Period
3.
.
FUNDING
SOURCE..
JUSTIFICATION AND BENEFITS
ANALYSIS...
Broader objectives of the
1
3.
Project.
Community participation &
2
3.
contribution..
Environmental
considerations.
---
---
---
PAG
E
5
5
5
5
5
6
6
7
7
8
8
9
9
9
9
PART- B
4
4.
IMPLEMENTATION
PROVISION.
Sponsoring
---
11
11
4.
Executing
2
4.
Monitoring and
3
5.
Evaluation
OPERATION AND
AINTENANCE..
Post-Completion Monitoring and
1
5.
Evaluation..
Trainings to Water Management Committee..
O&M
5.
Training
3
5.
..
Management
Training...............
Hygiene
5.
Training
---
11
11
11
11
11
11
12
12
PART- C
6
6.
1
6.
costs..
Detail of Material Transportation
2
---
costs..
DESIGN
CONSIDERATIONS.
Design
15
7.
Criteria
15
1
7.
.
Design of RCC Roof Slab of storage
2
7.
tank.
Design considerations for SEISMIC
RESISTIVITY.
Hydraulic
7.
Statement
19
20
8.
.
DETAIL OF
ESTIMATES.
Source
Tank
---
---
13
14
17
18
20
..
Storage
8.
Tank
2
8.
Peet Valve
3
8.
Chamber.
Sluice Valve
Chamber..
Tap
8.
5
8.
6
8.
7
9
Fixtures
Accessories
9.
Plan
..
Source
9.
Tank
..
Storage
9.
Tank
3
9.
Peet Valve
4
9.
Chamber.
Sluice Valve
Chamber..
Tap
--A
B
C
23
24
25
.
Miscellaneous
---
23
..
Fittings &
9.
10
Stand
21
Stand
..
ANNEXURES
.
ERRA
NOC
.
Memorandum of Understanding with
ERRA
Water Quality Test
25
Report
Memorandum of Understanding with
Community
PART-A
1.
PROJECT DESCRIPTION
1.1
NAME OF PROJECT:
II.
1.2
This project has been named as DRINKING WATER SUPPLY SCHEME KALSAN-
LOCATION OF PROJECT:
KALSAN-II community lies in Union Council Sachan of Siran Valley in District
Mansehra. It is situated at a distance of approximately 45 km North of Mansehra
city. The community is accessed through black-top road which includes 28 km of
main Karakuram Highway up to Shinkiari. The black-top road beyond Shinkiari is
not in a very good condition and harsh weather and poor maintenance have taken
their toll. An eroded bumpy road emerging out of Karakuram Highway then
stretches up to the community. The community is close enough to the metalled
road with almost 5 minutes walking track leading to it.
1.3
INTRODUCTION:
N-W.F.P has one of the lowest human development indicators, as reflected by
areas high infant, child and maternal mortality rates. Even prior to the October 8
earth quake, there was a limited access to safe water and sanitation. The earth
quakes devastation has, therefore, intensified the already-dire situation. The
earth quake disaster has significantly affected the water and sanitation sector in
Siran valley of district Mansehra along with the other districts of N-W.F.P.
Rural drinking water supply schemes in these areas are usually sourced from
natural springs, streams and rivers and, through a lesser extent, through dug
wells and tube wells. Almost 75% of the rural water systems before the earth
quake were gravity schemes. Most of these water supply networks were in a poor
condition, which has been further exacerbated by the disaster. In most cases
existing water infrastructures have been completely destroyed by the earthquake,
aftershocks, and landslides.
1.4
1.5
1.6
The earth quake engraved its impact on existing water set up of KALSAN-II. Most
of the nearby springs sources initially used for water supply have either dried up
or their discharge have become too low to fulfill the increasing demands of
growing KALSAN-II population. As a result people have to look for some new
springs, which are at a greater distance from their houses. There are two sources,
both natural water springs, which lay outside the village at some distance.
Currently, these two springs are utilized for both the domestic and productive
water supply needs of households and the community. The pipe works carried out
earlier by TMA are not complete. There is no storage tank, instead the supply line
ends near the community with no proper collection points for the houses.
1.7
1.8
project
is
planned
on
need-based
participatory
approach,
involving
Adapted from the Sustainable Livelihood framework promoted by DfID and others, CRS IHD conceptual framework was developed by
CRS under an Institutional Capacity Building grant from USAID.
The main objective of the project is to ensure sustainable drinking water supply to
the population in required quantity and good quality. The implementation
approach conforms to the ERRAs over all strategy of BUILD BACK BETTER in
general and Reconstruction and Rehabilitation Strategy- WATER AND SANITATION
SECTOR in particular. CRS Water Supply Design Principles, which revolve around
SAFE, ADEQUATE AND DURABLE construction, have served as guide lines for
designing different components of project. The project will bring the following
main benefits to the community.
1. About 257 persons will get benefited directly form the project.
2. The work load of women, being more vulnerable component of community,
would definitely be reduced to a greater extent as, traditionally; they are the
ones mostly responsible for fetching water for their families.
3. It will contribute significantly towards improving the health and hygiene of the
people.
4. Construction of the project will involve local labor as much as possible thus
helping in their capacity building and improving their financial status.
1.9
GESTATION PERIOD
The estimated time for Implementation of the project and the facilities created
there under is 25 working days, subject to clear weather and favorable work
conditions.
2.
FUNDING SOURCE
All the funds required to complete the project shall be provided by CRS-Pakistan
3.
3.1
3.2
10
3.3
meets
WHO
guidelines
in
physical,
chemical
and
bacteriological
11
PART- B
4.
IMPLEMENTATION PROVISION
4.1
SPONSORING
Catholic Relief Services-Pakistan would be the Sponsoring Agency for this project.
4.2
EXECUTION
Catholic Relief Services-Pakistan would be responsible for the proper execution of
this project.
4.3
In
addition, CRS and partners intend to continue working with these communities to
further develop household and community livelihood schemes as part of the
larger overall CRS strategy.