July 20, 2016

APEC SCHOOLS
1801, 18TH Floor Pearl Bank Bldg.
Valero St., Makati City

ATTENTION :

MRS. ROSALLIE DIMAANO


CFO-APEC

SUBJECT

REPLACEMENT OF FEEDERLINE FOR THE APEC CAINTA LOCATED


AT ORTIGAS AVE. EXT. CAINTA, RIZAL

Madam:
We are pleased to submit our proposal for the above subject Electrical Works in the amount as
follows:
Material Cost for Copperwire 60mm2 THHN
80 mts x 347.00

P 27,760.00

Labor, Profit and Overhead

P 9,716.00

TOTAL COST

P 37,476.00

Very truly yours,


VOLTECH ELECTRICAL CONST.
By: _________________________
ENGR. ROMEO MATIAS
General Manager