Abstract:
This short course shall give an introduction in respect to proper foundation design of reciprocating
compressors, gas-engines and the auxiliary equipment.
Reciprocating compressors and gas engines are found in many industries including gas, oil and
petrochemical production, transmission and storage. Operationally they generate very large gas and
inertia forces.
Their mounting systems must manage and transmit weight loads, vertical and horizontal gas and
inertia loads, vertical anchor bolt forces, and the forces of thermal growth. The effectiveness and
integrity of their installation is therefore crucial.
This short course addresses the best practices related to installation techniques, component design, and
materials used in the mounting of large reciprocating compressors and gas-engines including:
Equipment Preparation
Foundation & Mat
Anchor Bolts & Sleeves
Grouting & Chocking
Page
Table
of
Contents
Best Practices in Compressor and Gas-Engine Mounting .......................................................... 1
Abstract: ...................................................................................................................................... 1
1.
Introduction ......................................................................................................................... 2
2.
Best Practices Related To Foundation Design .................................................................... 3
3.
Best Practices Related to Frame, Rail, and Sole Plate ........................................................ 4
4.
Best Practice Related To Anchor Bolt Holes / Sleeves / Covering / Sealing ...................... 4
5.
Best Practices Related To Expansion Joints........................................................................ 5
6.
Best Practices Related To Alignment Tools........................................................................ 5
7.
Best Practices Related to Anchor Bolts............................................................................. 56
8.
Best Practices Related to Epoxy Grout & Epoxy Chocks ................................................... 7
9.
Best Practices Related To Epoxy Grout & Chocks ............................................................. 8
10.
Best Practices Related To Coating and Sealing the Foundation...................................... 9
11.
Conclusion ....................................................................................................................... 9
12.
References.................................................................................................................... 910
1. Introduction
Large reciprocating compressors are found in a number of industries including gas, oil and petrochemical
production, transmission and storage. Operationally they generate very large gas and inertia forces. Their
mounting systems must manage and transmit weight loads, vertical and horizontal gas and inertia loads, vertical
anchor bolt forces, and the forces of thermal growth. The effectiveness of the mounting system and integrity of
its installation are therefore crucial.
The purpose of the mounting system on a reciprocating gas compressor is simple. The mounting system must do
three things:
1.
2.
3.
Position and support the compressor, its driver and related equipment. Hold the compressor and driver
in perfect alignment while accommodating all of the loads applied to it including horizontal gas and inertia
loads, weight loads, anchor bolt loads and loads due to thermal growth and frame distortion.
Effectively transmit the vibration produced by dynamic forces down through the foundation while
reducing or eliminating the harmful effects of those vibrations.
Accomplish items #1 and #2 above for 30 years or more.
While the purpose of a compressors mounting system is simple, its construction is not. Reliable, long-term
reciprocating compressor operation depends on the quality of the design and construction of the compressor
mounting system and and the integrity its foundation. Degradation of the foundation or loss of the mounting
systems integrity can cause excessive frame vibration and misalignment, and eventually crankshaft failure.
The primary problem making compressor mounting systems difficult
to design and install is vibration. A compressor can vibrate in six
different ways or modes three in translation (vertical, lateral,
longitudinal) and three in rotation (pitching / yawing, torsional,
rocking).
All these modes of vibration have their own natural frequencies
where resonance can occur. In addition, one mode of vibration can
be either coupled or connected to other modes and drive them.
Finally, vibrations can be transmitted in series or in parallel from
one component to the next. A well designed and constructed
foundation will not only accommodate all of the loads applied to it
including horizontal gas and inertia loads, weight loads, anchor bolt
loads and loads due to thermal growth and frame distortion, but it will act to reduce then effectively pass those
vibrations down to the soil below.
The complexity of analyzing and mitigating the negative effects of vibrations in a compressor installation is
difficult and complex. The only way to properly analyze and design a good foundation is with the aid of such
tools as Finite Element Analysis (FEA) and foundation design programs. In addition to these tools, there are
Page 2
also many practical design and installation rules of thumb that should be used. Unfortunately, many of these
are only learned through years of experience. They are the small things that are often left off of the installation
drawings and specifications but have a big impact on the longevity of a foundation.
This paper will focus on those rules of thumb practices or techniques used in compressor installation design
and installation that directly influence the quality of construction and integrity of the foundation and how both of
these directly affect vibration attenuation. It will not address the interaction of the foundation and the soil.
To achieve a strong, high-quality yet cost-effective installation it is important to recognize two very important
elements in the design of the mounting system:
The compressor and its foundation must form a tightly integrated structure. Vibration energy travels
in the form of waves down and out through the foundation where the soil can absorb it. Breaks, cracks or
separations in the integrated compressor / foundation structure will prevent the vibration waves from
traveling downward.
The one best word to describe what it means to "form a tight integrated structure" is
Monolithic. A monolithic structure is one that is cast as a massive, seamless,
uniform, and rigid piece. The design objective behind a compressor installation is
therefore to create a monolithic structure that clamps the series of interacting pieces
together (the compressor and its driver to a well designed concrete foundation) with
enough size and mass to separate the dynamic response frequencies from the
excitation frequencies. This means that the mat, concrete foundation, grout and
machinery must become one.
can help carry the load by increasing the tensile strength of the material.
2.5. Concrete curing - Do not allow any grout to be installed until the concrete is fully cured. Improperly
cured concrete can have its design strength reduced by as much as 50%. Good curing practice means
keeping the concrete damp enough and at a uniform temperature long enough so it can reach its desired
compressive and tensile strengths. The key factors in curing are 1) shrinkage complete, 2) full tensile
strength and 3) water content reduced.
2.6. Concrete placement and consolidation - Best practice is to limit the time delay between layers of
concrete to no more than 25 to 30 minutes. However, breaks in concrete placement of as little as 15
minutes can result in a cold joint separation between layers. Also, do not add water to the concrete mix
at the site as it will reduce the compressive strength, the modulus of elasticity, and tensile strength of
the concrete.
2.7. Foundation design Best practice is to remove all sharp corners, points, internal or re-entrant
corners in the foundation to reduce built-in stress. In other words, anything that can act as a stress riser
inside the concrete must be softened or removed. Instead, round sharp corners and points. Install a
large radius on any internal angles in the foundation. Apply a large radius to everything that penetrates
concrete. Also, anchor bolt holes should be round and not square and grout pockets recessed into the
concrete foundation should be avoided. Install troughs around the unit to take away oil
2.8. Vertical connections - There should be no vertical connections between different materials in a
foundation. For example, there should be not be a vertical connection between concrete and grout.
Connections should be horizontal only. Also, do not install keys or lips as they cannot restrain thermal
growth forces.
2.9. Rebar specification Best practice is #6 (3/4) rebar on 6 centers. Second best is #8 (1) rebar on
8 centers. Dense placement in the upper 1/3rd of the foundation block and lighter density in the lower
2/3rds of the foundation. Look for and eliminate stress risers that could potentially be created in the
concrete which could be caused by the ends of rebar. Also, eliminate possible stress points in the
concrete by installing rebar so it crosses at all internal corners of foundation.
2.10. Surface Preparation - Chip off the surface of the concrete foundation removing all laitance and
expose 50% chipped and broken aggregate. This will provide a structurally solid surface to transfer
vertical and horizontal loads down through the grout and into the concrete.
If a primer is required on steel to prevent it from rusting prior to installation, that primer must be a
straight epoxy primer (NO ZINC) and it must be applied no more than 2 to 3 mils (0.076mm) thick.
7.2. The static loading on the epoxy chocks or grout should be under 6.9 MPa (1,000 psi) to minimize
creep. Static loading is made up of a combination of deadweight loading and the loading caused by the
tensile stress on the anchor bolts. This should be a sufficient to firmly anchor the compressor and its
driver. It also provides a 14 to 16 X Safety Factor to manage any dynamic loads before the
compressive strength of the grout is reached.
7.3. On new installations, terminate the anchor bolts half way into the mat. This combined with heavy
rebar connecting the mat to the foundation will help hold the layers together.
7.4. Increase the portion of the anchor bolt that is being stretched. The anchor bolts are essentially springs
that stretch and apply a clamping load. To create an effective clamping force, an anchor bolt must
stretch over about 50% of its length.
7.5. To mitigate horizontal vibration, increase the Coefficient
of Friction (COF) of the layers. It is the Coefficient of
Friction created by the anchor bolts that prevent sideways
or lateral vibrations and movement. Anchor bolts create
the Normal Force that, in conjunction with a high COF
creates a very high Resistive Force that absorbs the
shaking force and prevents movement. A high COF is
caused by the intimate fit of epoxy to steel because it fills
every little scratch, sandblast divot and machining mark
on the bottom of a compressor / driver. Resistive Force is
found by multiplying Normal Force pushing down by the
Coefficient of Friction.
7.6. The number one reason for foundation failure is cracking, and the number one cause of cracking is
improperly designed and installed anchor bolts. Anchor bolts cannot be eliminated so the quality of
their installation must be increased and their negative affects must be mitigated.
7.7. Anchor Bolt Grade & Materials For reciprocating compressor mounting the anchor bolts must be
made from 4140 ASTM A193 B7 material. Nuts should be 2H.
7.8. Anchor Bolt Types There are
many different anchor bolt designs.
The primary difference is the
design of their termination or
bottom end. Free-standing bolts
are a best practice because they can
easily be moved and positioned
without putting a strain on the bolt
or concrete. They have advantages
over embedded bolts because the
holding force is governed by the
bolts tensile strength rather than
the concretes tensile strength. If
bolts are to be cast into the
foundation do not cast them into
the foundation until the compressor
is set in place.
7.9. Anchor Bolt Terminations If free-standing bolts are not used, then any other long bolt can be
used, but as a best practice its terminations must be round. This not only means that the plate at the
bottom of the anchor bolt should be round, but the plate itself must have round edges. The diameter
of the plate should be 3 to 4 times bolt diameter so that the tensile forces on the concrete are pushed
further out from the bolt. Also, the thickness of the plate should be 1.5 x bolt diameter.
7.10. Free-stretch - No matter the style or type of anchor bolt, the bolt itself must be prevented from
touching epoxy grout over the upper half of its length. This allows the bolt to free-stretch. To
accomplish this, the upper half to the bolt must be wrapped with tape or covered with pipe insulation
foam. Wrapping a bolt also provides the bolt with a large thread clearance which allows the nut to
rock slightly on the bolt thread reducing the bending stress that will be imposed on the bolt thread.
7.11. Tension monitoring - It is also a best practice to install anchor bolts with a built-in tension
monitoring device.
Page
7.12. Anchor bolt length - It is best practice to make anchor bolts as long as possible and to terminate the
anchor bolts half way into the mat. Longer bolts reduce loss in tension resulting from creep and
reduce stress in concrete at their termination point. In addition, long bolts separate the stress area
from the source of oil. At a minimum the anchor bolts should be 1.2 m (48) in length.
7.13. Spherical washers The use of spherical washers is a best practice. Spherical washers allow the
tension on the bolt to be spread uniformly around the anchor bolt rather than on just one side. This is
very important because nut face angularity of 1 to 2 degrees can have a significant effect of the
fatigue life of a bolt.
7.14. Nuts Anchor bolt nuts should be ASTM 2H or A-194 high strength nuts. They must be lubricated
so the torque is not wasted in friction between the threads or between the nut and washer. Super nuts
are a very good practice but can be expensive.
7.15. Bolt torque & tension The nuts on all anchor bolts should be hand-tool tight while the grout is
being installed. After the grout has hardened and the jacking screws are fully released, the anchor
bolts should be tensioned per the equipment manufacturers instructions. For a tight foundation and
mounting system, the preload on the anchor bolts should be as high as possible, but not higher than
70% of tensile strength of bolt.
7.16. Bolt tensioning The only accurate way to tighten an anchor bolt is to stretch it. Twisting or
torquing a bolt can be very inaccurate because torque is often wasted on friction between the threads
of the nut and bolt and between the bottom face of the nut and the washer. Therefore the use of a
hydraulic bolt tensioner is a best practice. It is also a best practice to re-tighten anchor bolts after
compressor and driver have come up to temperature.
Resistance to cracking
Imperviousness to attack by oil and chemicals.
8.2. Grout - The best practice is to cover the foundation with a full bed of grout then to mount the
compressor and driver on individual chocks. The full bed of epoxy grout not only helps to support the
machinery it seals and protects the concrete foundation. Because individual chocks are separated by a
gap, air can easily flow under and around compressors and drivers. Chocks also allow the recess in the
foundation for the pan to be built shallower to reduce the weakness in this area of the block that was
prone to cracking.
8.3. Chocks - Individual chocks can be either the poured-in-place type or the pre-manufactured adjustable
type chocks. Both are good practice. The adjustable chocks must be installed on a sole plate while the
poured-in-place type chocks can be placed either directly on top of the grout or on sole plates.
8.4. How to choose - Poured-in-place chocks can be made from either 3-component epoxy grout or 2component epoxy chocking compounds. The best practice regarding which product to use is based on
size of the chock. With any single chock over 610 mm (24 inches) in length or 75 mm (3 inches) in
depth it is best to use an epoxy grout rather than a chocking compound.
8.5. Edge-lifting Edge-lifting is a common
problem on many installations. It is a debonding of the concrete just below the epoxy
concrete bond line. It can occur when large
there are wide open areas where epoxy grout
covers the foundation but does not support any
equipment.
There are three methods of
preventing edge-lifting: 1) Round the outer
edge of the concrete foundation, 2) Pin the edge
of the foundation using 12 mm () rebar set
into a 24 mm (1) hole every 30 cm (12) along
the edge of the foundation.
3) Install
mechanical anchors in the surface of the
concrete. These are rebar staples or wickets that improve the bond of the grout to the concrete.
11. Conclusion
The only sure way to actively manage vibrations in a compressor and foundation system is by understanding the
entire system as whole using FEA and working to effectively control all aspects of the installation at the design
stage. However, all this work can be for nothing if the simple yet crucial best practices for installing the
compressor and driver are not followed. The above paper was not intended to be a complete list of Best
Practices. Installation Best Practices should be accumulated, confirmed and applied by every company
involved in reciprocating compressor foundation design and installation.
12. References
1.
Prakash, S. and V.K. Puri, Foundations for Vibrating Machines, Journal of Structural Engineering, April
May 2006.
2.
ACI 351.3R-04 Foundations for Dynamic Equipment, Reported by ACI Committee 351, James P. Lee,
Chair and Yelena S. Gold, Secretary.
3.
Shear Strength of Steel Fiber Reinforced Concrete Beams Without Stirrups, Yoon-Keun Kwak, Marc O.
Eberhard, Woo-Suk Kim and Jumbum Kim, ACI Structural Journal, Technical Paper Title No. 99-S55
http://faculty.washington.edu/eberhard/publications/kwak-eberhard_aci-journal_jul02.pdf
4.
Smalley, A.J., P.J. Pantermuehl, R.M. Lewis and E.A. Johnson, Design of Reciprocating Compressor
Mounting Systems and Foundations for Integrity and Reliability, 1996 PRCR Gas Machinery Conference,
1996.
5.
Mandke, Javant S. and Anthony J. Smalley, Parameter Studies for Enhanced Integrity of Reciprocating
Compressor Foundation Blocks, Pipeline and Compressor research Council Technology Assessment,
September 1994.
6.
7.
Smalley, A.J. and P.J. Pantermuehl, Foundation Guidelines, Gas Machinery Research Council Report No.
TR-97-2, January 1997.
Page
8.
9.
Recommended Practices for Machinery Installation and Installation Design, American Petroleum
Institute, Practice 686, April, 1996.
Integral
10. Harrison, Don, The Grouting Handbook, Gulf Publishing Co. Houston, TX, 2000
Page