Vous êtes sur la page 1sur 1

CONTROLLED

COPY

Edition No.
3

Revision No.
0

Revision Date:
1.1.2011

Approved by:
Managing Director

Section 6
Workboat Operation Procedure
Table of Contents

Pages No.

1.0 General

2.0 Workboat Operation-Mooring

3.0 Worboat Operation-Palnning Workboat Moves


2
3.1 Anchor Pattern
2
3.2 Planning of Soft Mooring to Platforms
2
3.3 Minimum Anchoring Distances from Piplelines and other
Sub Sea Structures
5
4.0 Anchor Mooring Operations-2 Point Spread
4.1 General
4.2 Running and Recovering Anchors
4.3 Maximum Permissible Working Tensions

6
6
11
13

5.0 Anchor Mooring Operations-4 point Spread

14

5.1 General

14

6.0 Offshore Gangway Operations


6.0.1 General
6.0.2 Responsibilities
6.0.3 Guidelines

21
21
21
21

6.1 Provisional Platform Gangway Rigging Procedures


6.1.1 General
6.1.2 Toolbox Talk
6.1.3 Equipment Inspection
6.1.4 Preparations
6.1.5 Banksman
6.1.6 Lifting Precautions
6.1.7 Safety Equipment Required for Gangway use
6.1.8 Gangway watchman duties

22
22
23
23
23
24
25
27
27

6.2 Gangway Down Rigging


6.2.1 General
6.2.2 Summary

28
28
29

Lantana Instruction Manual