CERTIFICATE
Candidates observation
Sheet
Place inspected: FAZAL Steel (Pvt.) Ltd. Islamabad, Pakista Date of inspection: 26/January/2015
INTERNATIONAL GENERAL
CERTIFICATE
Observations
Candidates observation
Control measures
Immediate and longer term
actions
Timescale
Immediate action:
Give instructions about the
safe methods of manual load
handling.
Installation
of
Pictogram
boards of safe techniques of
manual handling.
Immediately
Long-term actions:
Over-head crane should use
to unload the billets from truck
to the conveyor belt.
4-5 Weeks
Immediate action:
Mark the path using lime
powder.
Immediately
4-5 Days
Long-term actions:
Permanent colour marking of
the tracks by paints and
keeps it permanent by timely
re-colouring.
Immediate action:
Cordon off the stairs and use
ladder to reach on the top.
Observation:
No proper marking or any designated routes for the
safe movement of loading trucks and pedestrians.
Observation:
Flow pipe line for supplying cold water from Water
Turbine Unit to TMT was passing from the stairs of
Turbine unit which has lessen the space on the stairs
for the worker and was an obstruction.
Hazards and consequences:
The worker can fall on the ground as well as in the
tanks of hot water coming out from the re-rolling unit
for cooling which may result in fracture of bone in case
of falling on the ground as well as severe burning in
Long-term actions:
Move the pipe line away from
the stairs.
3-4 Days
Immediately
1-2 Weeks
INTERNATIONAL GENERAL
CERTIFICATE
Candidates observation
Sheet
Place inspected: FAZAL Steel (Pvt.) Ltd. Islamabad, Pakista Date of inspection: 26/January/2015
case of falling in the tank.
Immediate action:
Carry on the good practice.
4. Location: Control booth, Re-rolling mill
Observation:
Emergency Stop buttons for every single machine
were present and were prominent as well as clearly
displayed which are helpful to stop the process in case
of any emergency situation
Ongoing
Monitoring
Long-term actions:
Carry on the good practice.
Immediately
Long-term actions:
Check the guard before
starting the machine.
Keep the maintenance of the
machine and always.
Everyday
3-4 Days
Immediate action:
Posting proper fire exit sign
boards with proper lighting.
Observation:
There was no fire exit present in the whole Steel Rerolling Mill and no identified sign boards regarding the
fire exit was present
Long-term actions:
Keep the check of fire exit
sign boards and maintain it.
Managing fire drills.
1 Week
1 Month
2-3 Months
Immediate action:
Place the barrier and no entry
tape on the paths towards the
tanks
Long-term actions:
Immediately
INTERNATIONAL GENERAL
CERTIFICATE
Candidates observation
Sheet
Place inspected: FAZAL Steel (Pvt.) Ltd. Islamabad, Pakista Date of inspection: 26/January/2015
and recycling of hot water for TMT unit which are
uncovered to cool down the water by expansion in
fresh air, no protected grill or any kind of guardrail was
present around the tanks.
Hazards and consequences:
The absence of guardrail may result in fall of the
worker in the hot water which can be a very severe
burn or even death due to the presence of hot water,
and fall hazard in the absence of water resulting
fracture.
2-3 Weeks
Immediate action:
Carry on the good practice.
Ongoing
Monitoring
Long-term actions:
Carry on the good practice.
Observation:
Properly managed and fully equipped first aid box was
present for the provision of first aid to the worker in
case of any emergency situation.
Hazards and consequences: N/A
Immediate action:
Stop the work and fix the side
guards.
Immediately
Everyday
Long-term actions:
Before starting the mill, check
out the side guards.
Immediate action:
Immediately provide the
goggles/ face protector to the
worker
Immediately
Long-term actions:
Provide Instructions and
information.
1 Week
INTERNATIONAL GENERAL
CERTIFICATE
Candidates observation
Sheet
Place inspected: FAZAL Steel (Pvt.) Ltd. Islamabad, Pakista Date of inspection: 26/January/2015
Equipment for their eyes.
Hazards and consequences:
Absence of Goggles or any such PPE may cause
Retinal burn and development of eye contracts over
time.
Observation:
Water cooler and glass was very dirty, contaminated
with oily and greasy material because of the workers
polluted gloves/hands.
Hazards and consequences:
Drinking oil and grease contaminated water may cause
cancer incidence, pulmonary ailments, and
psychological, reproductive, and dermatologic health
problems.
2-3 Weeks
Immediately
1 Day
Long-term actions:
Wash the cooler and keep it
clean.
Immediate action:
Carry on the good practice.
Ongoing
Monitoring
Long-term actions:
Carry on the good practice.
Observation:
The overall housekeeping of the whole steel re-rolling
was good, the floor was clean; there was no spillage of
any oil etc. As well as no contamination on the surface
of floor.
Hazards and consequences: N/A
Immediate action:
Posting No smoking sign
boards in the mill area.
Long-term actions:
Should take strict action
against smoking in No
Smoking zone.
2-3 Days
1 Week
INTERNATIONAL GENERAL
CERTIFICATE
Candidates observation
Sheet
Place inspected: FAZAL Steel (Pvt.) Ltd. Islamabad, Pakista Date of inspection: 26/January/2015
as of workers
Immediate action:
Provide adjustable and
moveable chair with proper
back rest.
3-4 Days
Long-term actions:
Maintain the chair in good
condition or replace it with
new one depending on its
condition.
3-4 Months
Immediate action:
Provide a toilet in the mill/
near the mill area with hand
wash basin and soap.
1-2 Weeks
Long-term actions:
Keep the toilet adequately
clean.
Twice a day
Immediate action:
Carry on the good practice.
Ongoing
Monitoring
Long-term actions:
Carry on the good practice.
INTERNATIONAL GENERAL
CERTIFICATE
Candidates observation
Sheet
Place inspected: FAZAL Steel (Pvt.) Ltd. Islamabad, Pakista Date of inspection: 26/January/2015
Immediate action:
Provide ears muffs or ear
plugs to the workers.
Immediately
1-2 Days
Long-term actions:
Keep the ear muffs clean and
free of contaminants.
Maintenance and provision of
insulation and isolation to the
machine producing noise to
minimize it.
Immediate action:
Put the cover on the
uncovered area.
Observation:
The cover over underground control wires which are
connected under the ground towards the control room
was not present.
Long-term actions:
Always check the cover
before starting the mill and
after the maintenance
process.
3-4 Weeks
Immediately
Everyday
Immediate action:
Install exhaust fan for the
circulation of fresh air.
Long-term actions:
Install Air Conditioner to keep
the huge PLCs units cool as
well as the environment of the
control room fresh.
1-2 Days
3-4 Weeks
INTERNATIONAL GENERAL
CERTIFICATE
Candidates observation
Sheet
Place inspected: FAZAL Steel (Pvt.) Ltd. Islamabad, Pakista Date of inspection: 26/January/2015
Immediate action:
Provide adequate number of
fire extinguishers on
prominent places.
2-3 Days
Long-term actions:
a. Inspection of fire
extinguishers.
b. Conduct fire drill exercises
periodically.
a. Year
Immediate action:
Out of Bound signs for
unauthorised person should
be pasted on the door of the
control room.
Immediately
Long-term actions:
Fitting of new locks.
The keys of the locks should
be in control of the
responsible person to avoid
misuse.
Immediate action:
Carry on the good practice.
b. 2-3 Months
3-4 Days
Ongoing
Monitoring
Long-term actions:
Carry on the good practice.
Immediate action:
2-3 Days
INTERNATIONAL GENERAL
CERTIFICATE
Candidates observation
Sheet
Place inspected: FAZAL Steel (Pvt.) Ltd. Islamabad, Pakista Date of inspection: 26/January/2015
23. Location: Steel Re-rolling mill
Observation:
The workers working in the mill were paid per hour/ per
ton of the production work instead of paying per day.
Hazards and consequences:
Workers will prefer to work more to earn more money
and will give less priority to safe working which results
in increase in accident rate, also its mental fatigue for
the workers.
3-4 Weeks
Long-term actions:
Pay the work per day instead
of paying per hour / per ton.
Promote safety culture.
Immediate action:
Stop the work and keep the
cylinder in upright direction.
Observation:
There was some maintenance work ongoing in the mill
and the workers were doing hydrogen gas welding
there without considering any safety precautions. The
cylinder was laid down and was not in upright direction
and there was no proper lifting cradle for its
movement.
Long-term actions:
Always use cradle for the
movement of cylinder instead
of rolling.
Strict action against the
violence of rules.
Immediately
3-4 Days
Immediate action:
Postage of hazard signs as
well as machine safe using
techniques sign boards
should installed on the
appropriate places.
Long-term actions:
a. Provide Information and
instructions to the worker to
work safely.
b. Periodic inspection of the
sign boards.
Immediate action:
2-3 Days
a. 1 Week
b. 2-3 Months
Ongoing
INTERNATIONAL GENERAL
CERTIFICATE
Candidates observation
Sheet
Place inspected: FAZAL Steel (Pvt.) Ltd. Islamabad, Pakista Date of inspection: 26/January/2015
26. Location: Steel Mill
Observation:
There was proper life insurance policy for every worker
working in the Mill.
Long-term actions:
Carry on the good practice.
Monitoring
Immediate action:
Provide hard shoes
gloves.
and
Observation:
Workers are not wearing hard shoes and gloves during
the cutting operation of steel bars.
1 Day
Weekly
Long-term actions:
Conduct timely survey to
ensure the usage of Personal
Protective Equipment by the
workers.
Immediate action:
Carry on the good practice.
Ongoing
Monitoring
Long-term actions:
Carry on the good practice.
.
Immediate action:
Provide hard helmets to the
workers
Never allow the workers to
worker when crane is exactly
over them.
Immediately
Long-term actions:
Daily
INTERNATIONAL GENERAL
CERTIFICATE
Candidates observation
Sheet
Place inspected: FAZAL Steel (Pvt.) Ltd. Islamabad, Pakista Date of inspection: 26/January/2015
Immediate action:
Use emergency lights in the
night shift.
Make the light in work order
Long-term actions:
Periodic maintenance of the
lights and maintain the
appropriate light lux level in
the mill.
Immediately
2-3 Weeks
INTERNATIONAL GENERAL
CERTIFICATE
Candidates observation
Sheet
Place inspected: FAZAL Steel (Pvt.) Ltd. Islamabad, Pakista Date of inspection: 26/January/2015
(2011 specification)
sheet