CEYLON ELECTRICITY BOARD

STANDARD CONSTRUCTION COST

2014

CONTENTS
Page
General Information
01.

Cost per km. of LV New Lines/Conversions/Combine Runs.

02.

Cost per km. of ABC LV Lines.

03.

Cost per km. of MV Lines. (Single Circuit and Double Circuit)

04.

Cost of Out-door Type Distribution Substation

05.

Cost of Out-door Type Substations for Bulk Supply

06.

Cost of Augmentation of Outdoor Distribution Substations.

07.

Cost of Augmentation of Outdoor Bulk Supply Substations.

08.

Cost of Installation of Expulsion Fuses at MV Line.

09.

Cost of Installation of Load Break Switches

10.

Cost of Installation of Auto-reclosers

11.

Cost of Installation of MV Metering Equipment

12.

Cost of Installation of Guards

13.

Cost of Service Connections.

14.

Cost of Service Connections Underground

12

15.

Cost of change-over to the Time of Day Tariff

14

16.

Other Charges

15

17.

Colombo city capital charges for bulk supply services in Colombo city

17

STANDARD CONSTRUCTION COST 2014


Note: Value Added Tax (VAT) is exempted for the sale of electricity. Therefore all estimates issued for new
line and substation construction works should not be included with VAT. Non-core business activities are
liable for VAT. Therefore all estimates issued for Shifting of Poles, should be included with VAT.
1).

LV NEW LINES/CONVERSIONS/COMBINED RUNS


All the distribution feeders shall be of 3 phase construction. The maximum length of any
distribution feeder with Fly (7/3.4 mm) conductor shall not exceed 1.8 km from the respective
distribution substation.
a).

LV New Construction Cost per km.


Following rates are only applicable for LV lines funded through the Decentralized Budget
and Provincial Council Budget and all the LV lines shall be of three (3) phase
construction.

COST Rs.

FLY 7/3.40mm
7/.134 inches
3 Ph.
1,262,000.00

WASP 7/4.39mm
7/.173 inches
3 Ph.
1,325,000.00

ABC
70x3+50mm2
1,429,000.00

Following rates are applicable for Bulk suppliers, Property developers, etc., and all other third
parties.

COST Rs.

FLY 7/3.40mm
3 Ph.
1,337,000.00

WASP 7/4.39mm
3 Ph.
1,400,000.00

Note:The cost of construction of 1 ph. Fly (7/3.40mm) LV line for third parties shall be Rs. 1,028,000.00
b)

LV Line Conversion Cost per km.


FLY 7/3.40mm
(7/.134 Inches)

WASP 7/4.39mm
(7/.173 Inches)

CONDUCTOR

COST Rs.

1PH/3 PH.

2 PH/3 PH.

Changing Conductor 3PH.


Fly/Wasp

400,000.00

283,000.00

614,000.00

1
Ceylon Electricity Board

Standard Construction Rates-2014

c).

Combined run of LV Line on existing MV Line


Following rates are only applicable for LV lines funded through the Decentralized Budget
and Provincial Council Budget.

d)

CONDUCTOR

FLY 7/3.40mm
3 Ph.

WASP-7/4.39mm
3 Ph.

ABC
3Ph. 4 Wire

Combined Run on 11kV/33


kV line cost in Rs.

753,000.00

831,000.00

883,000.00

Combined run of LV Line on New MV Line


Following rates are only applicable for LV lines funded through the Decentralized Budget
and Provincial Council Budget.
CONDUCTOR

FLY 7/3.40mm
3 Ph.

WASP-7/4.39mm
3 Ph.

ABC
3Ph. 4 Wire

Combined Run on 11kV/33


kV line cost in Rs.

481,000.00

554,000.00

763,000.00

Note.
Span of MV lines are reduced to the span required for LV. Therefore no LV poles introduced in
between MV Poles.

Following rates are applicable for Bulk suppliers, Property developers, and other third parties.

e)

Combined run of LV Line on existing MV Line


CONDUCTOR

FLY 7/3.40mm
3 Ph.

WASP-7/4.39mm
3 Ph.

ABC
3Ph. 4 Wire

Combined Run on
11kV/33kV line cost in Rs.

828,000.00

906,000.00

958,000.00

The above costs include the cost of additional intermediate LV poles (8.3m) required to support the
LV feeder. However standard practice is to plant MV poles (10m or 11m) and construct the line on
LV span. The difference in cost has to be borne by the CEB.

2
Ceylon Electricity Board

Standard Construction Rates-2014

f)

Combined run of LV Line on New MV Line


CONDUCTOR

FLY 7/3.40mm
3 Ph.

WASP-7/4.39mm
3 Ph.

ABC
3Ph. 4 Wire

Combined Run on 11kV/33


kV line cost in Rs.

556,000.00

629,000.00

838,000.00

Note.
Span of MV lines are reduced to the span required for LV. Therefore no LV poles introduced in
between MV Poles.

2).

AERIAL BUNDLED CONDUCTORS LV LINE.


a).

ABC LV Line Cost per km.

CONCRETE POLE
70x3+50mm2
1,504,000.00
931,000.00

ABC Conductor
COST Rs.
COST Rs. (For the Second Circuit)

70x3+50+16mm2
1,618,000.00

3
Ceylon Electricity Board

Standard Construction Rates-2014

3).

MV LINE COST PER km. (These rates are only applicable for Pole Line Constructions)
Since LV span (45m) used in MV construction it may be economical to use 10.0 m (RC or PS) pole
in MV construction. PS (11.0m) poles may be used in special construction where clearance can not
be maintained by 10.0 m poles. (eg. Road crossings, urban areas)

CODE

11kV
7/4.09mm
37/2.79
RACOON
LYNX

Single Circuit
on 10m pole 2,310,000.00
Cost Rs.
Single Circuit
3,817,000.00
on 11m Pole 2,732,000.00
Cost Rs.
Single Circuit
4,472,000.00
on 13m Pole 2,834,000.00
Cost Rs.
Double
Circuit on
7,511,000.00
13m Pole
Cost Rs.
All values are in Rupees.

4)

19/3.76mm
ELM

7/4.09mm
RACOON

33kV
37/2.79
LYNX

19/3.76mm
ELM

2,634,000.00

3,251,000.00

2,949,000.00

4,015,000.00

3,435,000.00

4,100,000.00

3,215,000.00

4,729,000.00

4,134,000.00

6,306,000.00

7,946,000.00

6,826,000.00

COST FOR OUTDOOR TYPE DISTRIBUTION SUBSTATIONS.


kVA
11kV/LT Rs.
33kV/LT Rs.

100
1,484,000.00
1,604,000.00

160
1,676,000.00
1,778,000.00

250
1,947,000.00
2,060,000.00

The above costs include for followings:


i).
Three Nos. Pin Insulators, Tension Insulator Sets (on line side) and all other material costs.
ii).
Two Sets of Fuse Switch Disconnectors (3ph. Unit with neutral Link) on LV side for two
feeders.
iii).
PVC Tail Wires (80 meters long) from the T/F LV Terminal to Fuse Switch Disconnectors for
the two LV Feeders.
iv).
Connection Clamps (Crimp Type Sockets at the LV Terminal of the Transformer, Fuse
Switch Disconnectors and Bimetallic Clamps at the LV feeders).
v)
Substation metering set with metal enclosure.
vi)
Concrete Earthing Blocks (Four numbers) including earth rods, Exothermic Welding
materials, compression connectors, Earth mesh and 25m of 50 mm2 PVC Sheathed
conductors.
Therefore the costs for the above items need not be added to the Standard Costs when a quotation
for a Distribution Substation is prepared.
4
Ceylon Electricity Board

Standard Construction Rates-2014

5).

COST OF OUT-DOOR SUBSTATIONS (BULK SUPPLY)

kVA
63
100
160
250
400
11kVA/LV
735,000 1,340,000 1,546,000 1,946,000 2,377,000
Rs.
33kV/LV
788,000 1,463,000 1,667,000 2,025,000 2,638,000
Rs.

630

800

1000

3,361,000 3,915,000 4,518,000


3,641,000 4,064,000 4,739,000

The above schedule includes the cost of the following items:


i)
ii)
iii)
iv)
v)
vi)
vii)

Bulk Supply Meter Sets.


Current Transformers
MCCBs.
Crimp type Sockets (at the Transformer LV Terminals and MCCBs)
PVC insulated Cu Cables (10m distance from Transformer LV Terminals to the MCCB)
Bulk Supply Meter Box.
4 Nos. of Concrete Earthing System with 50 mm2 Cables (30m) with compression lugs,
Earth rods and Exothermic materials

In the event additional PVC Cables are required, the cost of such cables shall be added to the above
standard construction costs without adding extra labour and overhead costs.
The consumer shall provide the Transformer Plinth and Meter Cubicle for Housing Bulk Supply Meter Box &
MCCB. (Transformer plinth and the meter cubicle could either be a combined type or separate type as
required.)
6).

COST OF AUGMENTATION OF OUTDOOR DISTRIBUTION SUBSTATIONS (11kV/LV, 33kV/LV)

EXISTING TRANSFORMER KVA


RATING OF AUGMENTED
SS TRANSFORMER KVA
160
11kV
160
33kV
250
11kV
250
33kV
NOTE:

100

160

300,000.00
230,000.00
590,000.00
486,000.00

396,000.00
382,000.00

The above Standard Costs are computed allowing for a rebate (100%) on the existing
Transformer based on 2014 prices.

This cost includes the cost for augmentation of transformer, labour, transport, contingency and overhead,
charges.
If the available fuse switch cut-outs are not in working condition they shall be replaced and the cost of such
items shall be met from the maintenance vote.

5
Ceylon Electricity Board

Standard Construction Rates-2014

7).

COST OF AUGMENTATION OF OUTDOOR BULK SUPPLY SUBSTATIONS (11KV/LV 33KV/LV)

EXISTING
TRANSFORMER KVA
RATING OF
AUGMENTED
SUBSTATION
T/F KVA

63

100
11kV
605,000
100
33kV
676,000
160
11kV
782,000
160
33kV
809,000
250
11kV 1,156,000
250
33kV 1,168,000
400
11kV 1,597,000
400
33kV 1,783,000
630
11kV 2,581,000
630
33kV 2,813,000
800
11kV 2,894,000
800
33kV 3,273,000
1000
11kV 3,742,000
1000
33kV 3,870,000
All Values are in Rupees

100

160

250

400

630

800

311,000
312,000
685,000
671,000
1,126,000
1,286,000
2,111,000
2,316,000
2,423,000
2,775,000
3,271,000
3,373,000

484,000
467,000
925,000
1,084,000
1,910,000
2,115,000
2,222,000
2,574,000
3,070,000
3,171,000

520,000
758,000
1,505,000
1,788,000
1,817,000
2,247,000
2,665,000
2,845,000

1,129,000
1,175,000
1,441,000 551,000
1,634,000 697,000
2,290,000 1,399,000 979,000
2,231,000 1,294,000 825,000

NOTE: The above Standard Costs are computed allowing for a rebate (100 %) on the existing Transformer,
MCCB and Cables, based on 2014 prices (except in the case of augmenting 63kVA Substation).
The cost of meter sets shall be charged only if there is no Bulk Supply meter set at present.
The costs of New MCCBs, Connecting sockets, PVC Tail Wires/Cables, labour and overheads are
included in the above Standard Costs.

6
Ceylon Electricity Board

Standard Construction Rates-2014

8).

9).

COST OF INSTALLATION OF MV SPUR LINE TAPPING WITH EXPULSION FUSES ON DOUBLE


POLE STRUCTURE
i).

11kV

Rs. 256,000.00

ii).

33kV

Rs. 278,000.00

COST OF INSTALLATION OF LOAD BREAK SWITCH WITH LOAD INTERRUPTERS ON


DOUBLE POLE STRUCTURE
Air Insulated

10).

SF6 MANUAL

SF6 Remote Operation

i).

11kV

Rs. 647,000.00

760,000.00

Rs. 1,808,500.00

ii).

33kV

Rs. 728,500.00

1,128,500.00

Rs. 2,195,000.00

COST OF INSTALLATION OF AUTO-RECLOSERS


With Remote Operation.

11).

12).

I).

11kV

Rs. 1,690,500.00

ii)

33kV

Rs. 2,414,000.00

COST OF INSTALLATION OF MV METERING EQUIPMENT

i).

11kV

Rs. 1,138,500.00

ii).

33kV

Rs. 2,137,500.00

COST OF INSTALLATION OF GUARD


Cradle Guard 20m. Span with width 3m
1. 11 kV Rs. 85,000.00
2. 33 kV Rs. 95,000.00

Poles are not included in the Item 12.


7

Ceylon Electricity Board

Standard Construction Rates-2014

STANDARD CONSTRUCTION COST 2014


13).

SERVICE CONNECTIONS

a).

Overhead Service Connections


1. Single Phase Up to 50m
Type

Fixed Cost

30A

Rs. 17,000.00

2. Single Phase Beyond 50m and the maximum distance of service wire should not exceed
110m
Type

Fixed Cost

Variable Cost

Remarks

30A

Rs. 17,000.00

Rs. 1,200.00/meter

Variable cost is
for the length in
excess of 50m

Note: - Variable cost calculation is for the length in excess of 50m.


E.g. for 55m 17,000.00+ (55-50) x 1,200 = 17,000.00+5 x 1,200 =23,000.00

3. Three Phase Domestic/Industrial/Commercial General Purpose


The maximum distance of service wire should not exceed 110m.
Type
Fixed Cost
Variable Cost
30A
60A

Rs. 22,650.00
Rs. 23,500.00

Rs. 735.00/meter
Rs. 835.00/meter

Meter Enclosure and MCCB should be installed at all three phase connections.

4. Single phase to Three Phase conversion.


From Single Phase

To Three Phase

Fixed Cost

Variable Cost

30A
30A

30A
60A

Rs. 20,850.00
Rs. 21,000.00

Rs. 675.00/meter
Rs. 815.00/meter

Note: Above rate is applicable only for the conversion of service wire. If Conversion of bare
conductors / ABC is required it should be carried as per the conversion rates.

8
Ceylon Electricity Board

Standard Construction Rates-2014

5. Loop Services (Loop services are allowed to give from the Underground networks only)
Loop Services SINGLE PHASE SERVICE
Fixed Cost
15A
Rs. 5,300.00

from an existing 30A service only.


Permitted No. of Loops
1

THREE PHASE SERVICES

from existing 30A/60A service

Fixed Cost
15A
30A

Rs. 21,000.00
Rs. 21,000.00

Variable Cost
Rs 400.00
Rs.425.00

Permitted No. of Loops


From 30A Service
2
1

Fixed Costs
The fixed costs include the cost of MCCB or MCB, Meter Box, 5 m length of service wire & D-brackets
required on Consumers side.

Variable Costs.
Variable costs include the cost of the service wire and line material such as poles, D-brackets, Stays, Struts
etc., as applicable.
A suitable service bracket shall be provided and installed by the consumer.

9
Ceylon Electricity Board

Standard Construction Rates-2014

b).

Service Connection to Welding Plants, Metal Crushers, Saw Mills etc.

In providing service connections to installations having equipment such as welding plant, Metal Crushers,
Saw Mills etc., which could have adverse effects on the other consumers connected to the existing feeder. A
separate feeder has to be constructed and a capital cost has to be charged as per the table given below, in
addition to the cost of the normal service connection provided from the separate feeder. This is not
applicable to the normal 30A/60A suppliers where such equipment is not used.
A SEPARATE BUNDLE CONDUCTOR LINE (3x70mm2 + 1 x 50mm2 ) MAY BE DRAWN IN PARALLEL
WITH THE EXISTING DISTRIBUTION LINE WHEN PROVIDING SERVICE CONNECTIONS TO WELDING
PLANTS, METAL CRUSHERS, SAW MILLS ETC.
01.
02.
03.
04.

05.
06.

07.

The above service connections should not be given from normal consumer distribution lines.
** The distance limits for 3 phase, 30A and 60A connections is applicable as per the construction
standards ie. 800m and 400m respectively from the T/F.
A capital cost of the new line has to be shared by the consumers in addition to the service
connection charges.
When providing the connection to the First Consumer, CEB has to bare the balance cost of the
feeder as the consumer will pay only his share as given in the table below. The balance
expenditure may be charged to the System Augmentation Funds.
The capital cost for different categories of the service connections is given in the table below.
If service connection can not be given due to distance limits or voltage drop, that has to be
referred to the Planning Engineer to study and make an appropriate System Augmentation
proposal.
The costs indicated below are valid only for the feeder section constructed on the existing poles
parallel to an existing feeder. If it is required to install poles to get the connection off the existing
feeder or extend the existing feeder the length from the T-off or the point of extension to the
consumer point shall be charged under the relevant service connection rates.

Capital Costs.
Size of the service 60A 3 phase
connection
** Allowable distance 400m
from the Substation
No. of service connection 2
(allowable)
Capital cost per service
Rs.100,000.00
connection to be charged
from the consumer
** Note:

30A 3 phase

30A 1 phase

800m

1000m

4
Rs. 100,000.00

Rs.75,000.00

This is only a guide line to prepare the cost estimates. These limits could be changed by
considering the voltage drops, consumer growth etc only on personal approval of the
Provincial DGMM on case by case basis.

10
Ceylon Electricity Board

Standard Construction Rates-2014

Guidelines for Preparation of Estimates.


(i).

Measurement of the Service Connection Length.

The Service Connection Length is the Horizontal Distance (Ground Distance) from the Pole to the
Service Bracket at the consumers premises. No. allowance shall be added for the Sag or Down
Run.
However, lengths of Service Wire shall be issued on the basis of actual length required to construct
the Service Connection including Sag and the Down Run
Fixed cost charged from the Consumer includes the cost of the length of service Wire required for
Sag and the Down Run
(ii).

Insulated Wires for Three Phase Service Connections


Three Phase Service Connection shall be connected with
i).
ii).

One Flat Twin Core Service Main Wire (Black and Gray for two Phases) and
One normal Single Phase Service Main Wire (Insulated Conductor for third phase
[Brown] and other Conductor [Sheathed, Blue] for neutral).

If there is a shortage of Flat Twin Core Service Main Wire, Single Core Insulated Wire may
be used.
(iii).

Last Span
In all categories of service connections the last span shall generally not exceed 30m,
however in special circumstances it may be appropriate to change the last span slightly with
the approval of the Engineer concerned.

(iv).

Service Connection length exceeding 110m


When the Service length exceeds 110m, up to 110m Standard Construction Cost for Service
Connection shall be used. For the balance length, Standard Construction Cost for LV Lines
(as indicated below) shall be used for estimation purposes, but it is to be noted that the total
bare aluminum conductor line length shall not exceed 1.8km from the distribution substation.
i).

ii).

Construction cost per km. using FLY Conductor


(7/3.40mm) (7/.134 in)
1 Phase
3 Phases

: Rs. 1,028,000.00
: Rs. 1,337,000.00

Construction cost per km using ABC conductor (4 wires) : Rs. 1,504,000.00

(v).
Service Connections for Consumers beyond 1.8km from the Distribution Substation
Distribution feeders shall not be extended beyond 1.8km from the distribution substation to provide
Service connection utilizing bare aluminum conductors. In the event service connections are to be
provided from the feeder terminal point (1.8km from the dist. sub.) separate insulated service main
wires shall be used for each consumer up to a maximum distance of 110m. No bare conductors
shall be used to provide such service connections.
11
Ceylon Electricity Board

Standard Construction Rates-2014

14).

Under Ground Service Connection.


15 Amp.

1.

30 Amp.

60 Amp.

UNDERGROUND SERVICE SINGLE PHASE


a). Fixed cost for 3 way joint box
29,100.00
b). Variable cost 16mm2/2C Al. Cable per meter 3,500.00
length

2.

SHIFTING SERVICE (U.G.) SINGLE PHASE

Three Phase 30 A From LV underground


distributor
Termination Kit, XLPE, LT, 4C, 16mm2
Consumer contribution for mini feeder pillers.
Total Fixed Cost for 30A, 3ph.(Termination kit, 1/5 of
mini feeder piller, labour , transport and overhead)
Variable cost for 3ph 30A for 16mm2 XLPE, Al, Cable
per meter

29,100.00
3,500.00

Details estimate should be prepared.

77,100.00
4,000.00

Three Phase 60 A From LV underground


distributor
Termination kit XLPE, LT, 4C
Consumer contribution for mini feeder pillers.
Total Fixed cost for 60A, 3ph. (Termination kit, 1/4 of
86,400.00
mini feeder piller, labour , transport and overhead)
Variable cost for 3ph, 60A Al. Cable per meter
4,400.00
Note: According to the length of the service connection the size of the cable should be selected.

5.

SHIFTING SERVICE (U.G.) THREE PHASE

Detail estimate should be prepared.

6.

SINGLE PHASE LOOP SERVICE


a). Fixed Cost
b) Variable Cost

Rs. 5,300.00
Rs. 350/meter

THREE PHASE LOOP SERVICE


a). Fixed Cost
b) Variable cost

Rs. 21,000.00
Rs. 400/meter

7.

Rs. 21,000.00
Rs. 425/meter

12
Ceylon Electricity Board

Standard Construction Rates-2014

Policy for recovering cost in new three phase connection


When a three phase service is given from the UG network (Other than 15 A, 3P service from an existing
cable at the building) following capital costs (Mini feeder pillar and associated items) are charged from
consumers as follows.

Capital Cost
a) 30A, 3ph connection from existing UG network

Rs. 32,700.00

b) 60A, 3ph connection from existing UG network

Rs. 40,800.00

Remarks
1/5 of the total cost of MFP
1/4 of the total cost of MFP

MFP Mini Feeder Pillar


When providing the connection to the first consumer, the balance expenditure may be charged to the System
Augmentation Vote

13
Ceylon Electricity Board

Standard Construction Rates-2014

15)

STANDARD RATE FOR CHANGING OVER


TO THE TIME OF DAY TARIFF.
1.

Consumer metered at Medium Voltage


The existing single rate meter is to be replaced with Programmable 3 phase 3 wire
meter free of charge. Fixing charge and the transport are to be charged on actual.

14
Ceylon Electricity Board

Standard Construction Rates-2014

16)

OTHER CHARGES.

Other charges for miscellaneous services


No
1.
2.
3.
4.
5.
6.
7.
8.
9.

10.
11.
12.
13.

Types of Charge

Charge (Rs.)

Disconnection at the customers request


1,000.00
Reconnection at the customers request
1,000.00
Reconnection after a statutory disconnection
1,000.00
Testing of an energy meter used at 230 V
1,500.00
Testing of an energy or energy/demand meter and associated
10,000.00
equipment used at 400 V
Testing of an energy or energy/demand meter associated equipment
10,000.00
(used at voltages higher than 400 V)
Installation testing
CCE
Changing an account name and/or the tariff category
250.00
Changing an energy or energy/demand meter
Free of charge for changing
defective meters. For other
cases CCE shall apply.
Provision of temporary electricity supply
Augmentation of an existing electricity supply
Shifting of poles/lines/transformer/any other electrical plant
Clearing of way leaves

14.
15.
16.
17.
18.

CCE
CCE
CCE
CCE
based
on
compensation
charges
decided
by
Divisional
Secretaries and cost of
removing way leaves.
Free of charge
Free of charge
CCE
CCE

Issuing a clearance report


Issuing a duplicate bill
Provision of net metering facility
Grid interconnection of generation facility
Delays in Payment Bulk Supply Consumers
After 15 days period of bill issued to the consumer, a monthly interest rate of 2% will be charged
to the bill from the 16th day onwards. If consumer fails to pay the bill and interest thereon within
30 days of issuing the bill, supply will be disconnected upon disconnection order. Reconnection
of the supply will be given upon the payment of outstanding amount together with 2% interest on
the outstanding amount until the day of reconnection and Reconnection processing fee.
19. Delays in Payment Ordinary Supply Consumers
After 30 days period, if a disconnection order is issued a monthly interest rate of 2% will be
charged from the consumer on the outstanding amount (The interest will be calculated on the
total outstanding amount for half the period of the bill is being outstanding). If supply is
disconnected, reconnection of the supply will be given upon the payment of outstanding amount
together with interest and a Reconnection processing fee.

15
Ceylon Electricity Board

Standard Construction Rates-2014

20. Repair of damages to Service connection wire


Responsibility of removing way leaves along the path of service
connection wire rests with the consumer. Cost of repair to
service wire damaged due to non-removing of way leaves is to
be charged from the respective consumers.

CCE

CCE Case by Case Estimation by the Licensee based on Standard Construction Cost 2014 and Price
List of Materials 2014 issued by CEB.

16
Ceylon Electricity Board

Standard Construction Rates-2014

17) COLOMBO CITY CAPITAL CHARGES FOR BULK SUPPLY SERVICES IN COLOMBO CITY FOR THE YEAR 2014

Rated
Capacities
of
connection
s
70kVA
112kVA
150kVA 1000kVA

Point of
Common
Coupling
Feeder Pillar
Bay
Feeder Pillar
Bay
LV busbar of
Satelite Sub

1MVA 10MVA

11kV busbar of
Ring & Radial
Sub

10MVA 32MVA

11kV busbar of
33/11kV
,Primary Sub or
132/11kV
Primary sub

Above 32
MVA

11kV or 22kV
busbar of
132/11kV or
22kV Primary
sub

Ceylon Electricity Board

Capacity Charge

Variable Cost *

Capital Charge of
Rs.602,255.00
Capital Charge of
Rs.963,608.00
Substation cost
Rs.1,462,280.00 +
Rs.10,000/kVA

LV cost from FP to
delivery point.
LV cost from FP to
deliver point.

Rs.12.5Million/MVA

Rs.20Million / MVA

LV cost up to delivery
point.
Cost of 11 kV works up to
metering panel ncluding
ring cables, radial & ring
panels and automation &
communication equipment
cost
Cost of 11 kV works up to
metering panel including
radial cables & panels
and automation &
communication equipment
cost

CMC/RDA
/Police
permits

Reinstateme
nt charges

Space to be provided by
applicant

Consumer

Consumer

Consumer

Consumer

Weather protected vertical wall


space to fix switchgear &
meters. Substation space to be
provided if required.

Consumer

Consumer

Consumer

Consumer

Consumer

Consumer

Substation space to be
provided and Substation room
has to be constructed as per
CEB's design & under CEB
supervision.

Land to be provided by the


developer for PSS if required
and radial substation room has
to be constructed as per CEB's
design & under CEB
supervision.

Case by case with concurrence from Transmission Division

1
17

Standard Construction Rates-2014

Time
Frame
Required
Supply
already
available
only
installation
time
required

1 years

3 years