Vous êtes sur la page 1sur 10

From: (b) (6)

To: (b) (6)


Subject: FW: PF 225 Fence Selection Type
Date: Wednesday, February 27, 2008 1:14:58 PM

From: (b) (6)


Sent: Wednesday, February 27, 2008 12:43 PM
To: (b) (6)
Subject: PF 225 Fence Selection Type

Here it is.

(b) (6)
SBInet / TI
(b) (6)
PF 225 Fence Selections by Segment

PF 225 Fence Selections by Segment


(18' except when specified otherwise--*)

Personnel Personnel / Vehicle Vehicle Fence


(in miles) (in miles) (in miles)

Jersey w/ Mesh *Jersey


Project Fence Wrought Iron Bollard Bollard w/Panel Post & Rail Jersey (Mesh) Post & Rail Normandy
Sector Total Miles w/Bollard
ID Segment P-1 P-2 *P-3-15A P-3-18A PV-1-18 (mesh) PV-2-18 PV-3A V-1 V-2
P-3-15B
SDC A-1 SDC-BRF-1 3.58 3.58
1 A-2 SDC-BRF-2 0.77 0.77
1 A-2 SDC-ECJ-1 0.57 0.57
1 A-2 SDC-ECJ-2 0.58 0.58
1 A-2 SDC-ECJ-3 0.89 0.89
1 A-2 SDC-ECJ-4 0.12 0.12
1 A-2 SDC-ECJ-5 1.02 1.02
1 A-2 SDC-CAO-1 0.17 0.17
1 A-2 SDC-CAO-2 1.06 1.06
1 A-2 SDC-CAO-3 0.09 0.09
1 A-2 SDC-BLV-1 1.63 1.63
1 A-2 SDC-BLV-2 2.01 2.01
1 A-2 SDC-BLV-3 0.05 0.05
1 A-2 SDC-BLV-4 1.47 1.47
Summary of SDC 14.01 0.00 0.00 0.00 0.00 0.00 14.01 0.00 0.00 0.00 0.00

ELC B-2 ELC-ELS-3 2.36 2.36


B-4 ELC-CAX-1 8.59 8.59
B-5A ELC-CAX-3 19.16 19.16
2 B-5B ELC-CAX-2 2.85 Special Design
Summary of ELC 32.96 0.00 0.00 0.00 0.00 0.00 30.11 0.00 0.00 0.00 0.00

YUM YUM-CAX-
C-1 10.28 4.00 6.28
3 YUS-1
C-2B YUM-YUS-2 3.70 3.70
Summary of YUM 13.98 0.00 0.00 0.00 0.00 0.00 4.00 3.70 6.28 0.00 0.00

Page 1 of 9 Updated: 01/02/08


PF 225 Fence Selections by Segment

PF 225 Fence Selections by Segment


(18' except when specified otherwise--*)

Personnel Personnel / Vehicle Vehicle Fence


(in miles) (in miles) (in miles)

Jersey w/ Mesh *Jersey


Project Fence Wrought Iron Bollard Bollard w/Panel Post & Rail Jersey (Mesh) Post & Rail Normandy
Sector Total Miles w/Bollard
ID Segment P-1 P-2 *P-3-15A P-3-18A PV-1-18 (mesh) PV-2-18 PV-3A V-1 V-2
P-3-15B
TCA D-2 TCA-AJO-1 3.10 3.10
D-2 TCA-AJO-2 2.10 2.10
D-5A TCA-NGL-1 2.00 2.00
D-5B TCA-NGL-2 5.16 5.16
D-6 TCA-NGL-3 2.23 2.23
E-2A TCA-NCO-1A 6.44 6.44
E-2B TCA-NCO-1B 6.94 6.94
E-3 TCA-NCO-2 5.07 5.07
F-1 TCA-NCO-3 0.97 0.97
Summary of TCA 34.01 0.00 0.00 0.00 0.00 0.00 34.01 0.00 0.00 0.00 0.00

EPT H-2A EPT-DNM-3 14.11 14.11


4 I-1A EPT-DNM-2 2.56 2.56
EPT-
4 I-1B 9.89 9.89
DNM/STN-1
4 J-1 EPT-STN-1 1.15 1.15
4 J-1 EPT-STN-2 1.15 1.15
4 J-2 EPT-STN-4 3.49 3.49
4 J-3 EPT-STN-3 1.08 1.08
4 K-1 EPT-EPS-1 1.07 1.07
5 K-1 EPT-EPS-2 0.65 0.65
4 K-1 EPT-EPS-3 1.26 1.26
4 K-2A EPT-YST-2 9.60 9.60
4 K-2B/C EPT-YST-1 19.42 19.42
4 K-3 EPT-FBN-1 9.03 9.03
4 K-4 EPT-FBN-2 13.48 13.48
6 K-5 EPT-FHT-1 5.21 5.21
Summary fo EPT 93.15 0.00 0.00 0.65 1.26 0.00 0.00 91.24 0.00 0.00 0.00

MAR L-1 MAR-SBT-1 4.63 4.63


7 L-1A MAR-PRS-1 3.28 IBWC Option Only
7 L-1B MAR-PRS-2 2.87 IBWC Option Only
10.78 0.00 0.00 0.00 0.00 4.63 0.00 0.00 0.00 0.00 0.00

Page 2 of 9 Updated: 01/02/08


PF 225 F S l ti S t

Personnel Personnel / Vehicle Vehicle Fence


(in miles) (in miles) (in miles)

Jersey w/ Mesh *Jersey


Project Fence Wrought Iron Bollard Bollard w/Panel Post & Rail Jersey (Mesh) Post & Rail Normandy
Sector Total Miles w/Bollard
ID Segment P-1 P-2 *P-3-15A P-3-18A PV-1-18 (mesh) PV-2-18 PV-3A V-1 V-2
P-3-15B
DRT M-1 DRT-DRS-1 2.36 2.36
8 M-2A DRT-EGT-1 0.75 0.75
8 M-2B DRT-EGT-2 1.06 1.06
Summary of DRT 4.17 4.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
RGV O-1 RGV-RGC-1 3.76 1.00 2.52 0.24
9
10 O-2 RGV-RGC-2 8.75 1.00 7.56 0.19
11 O-3 RGV-MCS-1 1.85 1.79 0.06
O-4 RGV-MCS-2 4.35 4.35
O-5 RGV-MCS-3 1.73 1.73
12 O-6 RGV-MCS-4 3.86 3.82 0.04
13 O-7 RGV-MER-1 0.90 0.81 0.09
14 O-8 RGV-MER-2 3.24 1.00 2.24
15 O-9 RGV-MER-3 3.86 1.00 2.86
16 O-10 RGV-MER-4 2.33 1.00 1.30 0.03
17 O-11 RGV-HRL-1 2.33 1.81 0.52
18 O-12 RGV-HRL-2 0.96 0.58 0.38
O-13 RGV-HRL-3 1.59 1.59
19 O-14 RGV-HRL-4 3.59 1.00 2.59
O-15 RGV-HRL-5 1.93 1.93
O-16 RGV-HRL-6 2.45 2.45
20 O-17 RGV-BRP-1 1.63 1.21 0.42
21 O-18 RGV-BRP-2 3.58 3.58
22 O-19 RGV-BRP-3 3.37 3.18 0.19
23 O-20 RGV-BRP-4 0.91 0.91
24 O-21 RGV-FTB-2 12.98 10.45 2.53
Summary of RGV 69.95 14.69 47.98 0.00 0.00 7.28 0.00 0.00 0.00 0.00 0.00

Totals 273.01 18.86 47.98 0.65 1.26 11.91 82.13 94.94 6.28 0.00 0.00

264.01
# on Column A Denotes comments on pages four (4)
Denotes Contingency Miles for FP 225 Special Design
Denotes Phase I Miles: Contracts already awarded and under construction Would like Wrought Iron fence on Jersey Barrier

Page 3 of 9 Updated: 01/02/08


PF 225 Fence Selections by Segment

Notes
# Project
1 SDC SECTOR WIDE: All the projects for SDC will use PV-1 with the anti-climb plate.
Floating Fence: Special Design (not in toolbox) due to placement on top of sand dunes. Needs to stop ATVs and vehicles. Needs to be liftable by all-terrain forklift. ELC is requesting a
2 B-5B
design similar to their existing triangle pipe barrier to include pedestrian fence.
PV-1 =first 4 miles west from POE; PV-3A for the rest; concerns over deployment and maintenance due to shifting sand dunes. YUM has stated that they share terrain features with EL
3 C-1
with the sand dunes. They have stated that should an alternative barrier design be implemented in ELC, they too would like utilize that design.
4 EPT SECTOR WIDE: All the projects for EPT => 8.5" X 11" critter holes.
5 K-1 Project calls for free floating fence, but available vehicle barrier takes up too much available space on top of levee. Unacceptable alternatives.
6 K-5 Concerns with soil compositions .
7 L-1A / B Designs do not meet MAR operational requirments. MAR opted for the IBWC levee/fence combination (not in the toolbox).
SECTOR WIDE: All the projects for DRT will opt for aesthetic fence, but limited to 15 feet tall. DRT is concerned with aesthetics (too tall of a fence) and the transition when meeting with
8 DRT
POE fence (12ft. fence). DRT is still agreed to go with the Ameristar version at a height of 15 feet.
9 O-1 One mile aesthetic fence: .5 miles from each side of POE; floating fence w/bollards.
10 O-2 One mile aesthetic fence: .5 miles from each side of POE; floating fence w/bollards.
11 O-3 Mostly bollard fence; Small segment of Floating Fence w/ bollards.
12 O-6 Mostly bollard fence; Small segment of Floating Fence w/ bollards.
13 O-7 (.81) miles aesthetic fence on west side of POE; Small segment of Floating Fence w/ bollards.
14 O-8 One mile aesthetic fence on east side of POE.
15 O-9 One mile aesthetic fence on west side of POE.
16 O-10 One mile aesthetic fence on east side of POE; Small segment of Floating Fence w/ bollards.
17 O-11 Mostly bollard fence; Small segment of Floating Fence w/ bollards.
18 O-12 Mostly bollard fence; Small segment of Floating Fence w/ bollards.
19 O-14 Small segment of bollard fence; Mostly Floating Fence w/ bollards.
20 O-17 Mostly aesthetic fence; Floating Fence w/ aesthetic look to it (not listed in toolbox, but preferred to keep uniform look); will take floating fence with bollard if aesthetic is not an option.
21 O-18 All aesthetic fence.
22 O-19 Mostly aesthetic fence; Floating Fence w/ aesthetic look to it (not listed in toolbox, but preferred to keep uniform look); will take floating fence with bollard if aesthetic is not an option.
23 O-20 All aesthetic fence.
24 O-21 Mostly bollards; Historical buildings area needs to have Floating Fence w/ bollards.
25
26
27
28

Page 4 of 9 Updated: 01/02/08


PF 225 Fence Selections by Segment

Mileage Cross Check / Verification

Mileage Phae I Mileage Contingency Mileage

3.58
0.77
0.57
0.58
0.89
0.12
1.02
0.17
1.06
0.09
1.63
2.01
0.05
1.47
14.01 0 0
2.36
8.59
19.16
0.00
8.59 0 21.52

10.28

3.70
13.98 0 0

Page 5 of 9 Updated: 01/02/08


PF 225 Fence Selections by Segment

Mileage Cross Check / Verification

Mileage Phae I Mileage Contingency Mileage

3.10

2.00
5.16
2.23
6.44
6.94
5.07
0.97
31.91 0 0
14.11
2.56

9.89

1.15
1.15
3.49
1.08
1.07
0.65
1.26
9.60
19.42
9.03
13.48
5.21
49.73 5.94 37.48
4.63
0.00
0.00
4.63 0 0

Page 6 of 9 Updated: 01/02/08


PF 225 F S l ti S t

Mileage Cross Check / Verification

Mileage Phae I Mileage Contingency Mileage

2.36
0.75
1.06
4.17 0 0
3.76
8.75
1.85
4.35
1.73
3.86
0.90
3.24
3.86
2.33
2.33
0.96
1.59
3.59
1.93
2.45
1.63
3.58
3.37
0.91
12.98
69.95 0 0

196.97 5.94 59.00

261.91

Page 7 of 9 Updated: 01/02/08


PF 225 Fence Selections by Segment

Page 8 of 9 Updated: 01/02/08


PF 225 Contingency Miles
PF 225 Fence Selections by Segment
(18' except when specified otherwise--*)
Personnel Personnel / Vehicle Vehicle Fence Mileage Cross Check /
(in miles) (in miles) (in miles) Verification
Wrought Jersey w/ Mesh *Jersey Bollard Post & Jersey Post &
Fence Total Bollard Normandy Phae I Contingency
Sector Project ID Iron w/Bollard w/Panel Rail (Mesh) Rail Mileage
Segment Miles P-2 *P-3-15A P-3-18A P-3-15B V-2 Mileage Mileage
P-1 PV-1-18 (mesh) PV PV-3A V-1
ELC B-2 ELC-ELS-3 2.36 2.36 2.36
B-5A ELC-CAX-3 19.16 19.16 19.16
21.52 21.52 21.52

EPT H-2A EPT-DNM-3 14.11 14.11 14.11


EPT-
I-1B 9.89 9.89 9.89
DNM/STN-1
K-4 EPT-FBN-2 13.48 13.48 13.48
37.48 37.48 37.48

Vous aimerez peut-être aussi