Vous êtes sur la page 1sur 8

From: (b) (6)

To: (b) (6)


Cc: (b) (6)
Subject: Real Estate Update
Date: Tuesday, March 04, 2008 1:22:59 PM

Here you go! In the future, we’ll make sure you guys get this every time we get an update.

(b) (6)
Business Manager, Operations and Reporting
SBI - Tactical Infrastructure Program (PF225, VF300)
U.S. Customs and Border Protection
(b) (6)

PLEASE NOTE NEW EMAIL ADDRESS ****


Warning: This document is FOR OFFICIAL USE ONLY. It contains information that may be exempt from public release under the
Freedom of Information Act (5U.S.C. 552). This document is to be controlled, handled, transmitted, distributed, and disposed of in
accordance with DHS policy relating to Sensitive But Unclassified (SBU) information and is not to be released to the public or other
personnel who do not have a valid "need-to-know" without prior approval from the originator. If you are not the intended recipient ,
please contact the originator for disposition instructions.
SBI Tactical Infrastructure

Real Estate Status Briefing


March 3rd, 2008

For
F r Official
Of cia Use
e Only
On y
PF225 DT Processing Status
Reported by DOJ as of 02/29/08
# of DT COMMENTS
ROE
O DT
T STATUS
TATU
Actions
ctio s

Total Remaining ROE Condemnations 77

At Corps of Engineers (COE) being


0
Processed

Pending CBP/DOJ Legal Review 0


-One DT in CA will be reworked as Owner was
Signed by CBP-OFAM & Transmitted discovered to be deceased – Case was filed, but
77 will be reworked & re-filed as an amended DT.
to DOJ for Filing -DT against Cameron Co. Property was ‘On-Hold’,
but is scheduled to be filed this week
17 of 18 – CA (one being re-filed)
11 of 11 – AZ
Filed by AUSA as of last report from 47 of 48 – TX (one was on hold; to be filed soon)
DOJ on 02/22/08 75*
*Was 87 filings, but 11 TX cases were withdrawn
(for those listed as signed above) after filing as owner signed ROE and One case
will be re-filed.
9 – CA
Possession Granted as of 02/06/08 34
11 – AZ
14 – TX (1 in Eagle Pass + 13 in Cameron Co.)
(for those listed as filed above)
DT – Declaration of Taking
ROE – Right of Entry For Official Use Only
PF225 ROE Condemnations
OBP Sector – as of 02/29/08

SDC ELC YUM TCA EPT MAR DRT LRT RGV Total
# DT Packages
25 3 0 11 0 0 4 0 105 148
as of 12/07/07
12/ /0
# DT
Packages 16 2 0 11 0 0 1 0 47 77
NOW

FILED 15 2 0 11 0 0 1 0 46 75

POSESSION
GRANTED 7 2 0 11 0 0 1 0 13 34
Of those FILED
Estimated Fence
Miles 0 0 0 0 0 0 0 0 10.1 10.1
Not in Possession
Estimated
Acres** 16.3 0 0 0 0 0 0 0 1970.5 1986.8
Not in Possession

* Not all condemned properties are reflected in fence miles as some lie on roads/staging areas needed for access to the proposed fence alignment
** Acres & Parcels reflect total property condemned for temporary rights of entry – not the amount of land needed for construction; Acres &
Parcels are evolving as land records are researched in the field and unknown owners are identified

For Official Use Only


VF300 Real Estate Status
– El Centro (One Segment formerly PF225 project B-1)
• 10.3 Miles in Roosevelt Reservation (RR)
• 3 private owners across 1 mile non-RR (two signed ROE, one Condemned – possession granted)
– Yuma (2 Segments)
• 10 miles on RR
• 4.4 miles on BLM
• 11 miles on Cocopah,
• 0.4 miles held by 2 private owners
• Need BLM for access road ROE’s
– Tucson (6 of 8 Segments still need Real Estate Certified)
• 8 miles on RR
• 30+ miles on Tohono Oodham Nation
• 5 private owners across 1 mile non-RR
• BLM, State of AZ & 5 private owners needed for access road ROE’s
– El Paso – (6 of 7 Segments still need Real Estate Certified)
• 55.9 miles on RR
• 0.3 miles on IBWC land; ROE Granted
• 3 miles on State of NM land – existing ROE expires in June 2008
• BLM, State of NM, City of El Paso and multiple private owners needed for Access Road ROE’s
For Official Use Only
Condemnations for Final Construction Rights
Status as of 02/29/08 - COB

1. Columbus Cattle Company, Columbus, NM: (PF225)


-Package expected to reach SBI for review by 03/05/08.
-COE presented condemnation ‘Notification Letter’ to owner on 02/05/08
-COE forwarded an ‘Offer to Sell’ to CCC on 02/22/08; if CCC signs,
condemnation process will be terminated, otherwise it will proceed as scheduled
2. San Luis, AZ:
-Order of Immediate Possession not yet granted; Declaration for Immediate
Possession is Moot since there is a tenant who requires 60 more days prior to
mandatory eviction by law; he was notified 30 days ago.
-Majority of TI is complete except 1100 feet remaining to complete road,
secondary fence and tertiary fence
3. Smuggler’s Gulch, San Diego, CA: (BIS – Amended DT filing for access roads)
-Order of Possession Granted
4. Monument Mesa, San Diego, CA: (BIS)
(b) (5)
-

For Official Use Only


Back-up

For Official Use Only


PF225 ROE Condemnations
As of 02/29/08

# of DT
T COMMENTS
COM E TS
ROE TYPE
Actions
ROE DT’s Reported when Letters Mailed 149 Reported on 12/7, but 1 was for Final DT –
12/07/07
148 Columbus Cattle Co.

DT’s added due to resolved property ownership


OR multiple jurisdictions covered by properties
ROE DT’s Added since 12/07/07 4* owned by 1 entity
* (Was A, now B & C)

Resolved property not actually required for fence


ROE DT’s Cancelled since 12/07/07 (3) construction

DT’s merged due to resolved property ownership


– formerly unknown or incorrect owner named
ROE DT’s Combined since 12/07/07 (11)** OR Co-owner identified
** (Was A & B, now C)

Includes 11 ROE’s signed after Condemnation


ROE’s Signed since 12/07/07 (61) cases were filed – hence cases were dismissed.

TOTAL REMAINING CONDEMNATIONS


(Sum of Above)
77 Number will continue to change as ROE’s signed,
and land/ownership becomes better defined

DT – Declaration of Taking
ROE – Right of Entry For Official Use Only