AUTOMOTIVE SECTOR-
SECTOR- PLANT I
NASHIK
C E R T I F I C A T I O N
Occupati onal Heal th & Safety
Env ironment
Quality
Infor mati on
Security
OHSAS
18001:2007
ISO 14001:2004
ISO TS 16949
ISO/IEC 27001-
27001 - 2005
1
Water saving projects Process flow
Pre ss
Shop
Body
Shop
Customer
Di spat ch
Paint
Shop
A sse mbly
ETP STP
Garden
430 400
2
Water audits
1. For total plant audit by CII in 2006
3
Water saving projects
Specific water reduction by process optimization
ED B50 STAGE ELIMINATION
ED B50
BEFORE: stage DI
Spray rinse
X XX X X X X XX X
was running
X XX X X X X
X XX X X X XX X X X X XX X X
X
X XX X X XX X X X X XX X
X X X
X XX X X XX X X X X XX X
X X X
X XX X X XX X X X X XX X X
X X
X X X
X X
UF spray UF spray DI
PT Electrocoating UF D ip
Rinse Rinse Spray
B ODIE S Dip tank Rinse tank
1 2 Rinse Fr esh D I
ENTE RING E LE CTROCOAT PROCESS Spr ay also
was running
AFTER:
X XX X X
X X XX X X
X ED B50
X XX X X X
X
X X XX X X stage &
XX X X X XX X X
X XX X X
X
X
X F resh spray
X X XX X X
X XX X X X XX X X ar e Kept
X X
X
X
X X OFF
X
UF s pray UF spr ay
PT Electroco ating U F Dip DI
Rinse Rinse
B ODIE S D ip tank Rinse tank Spray
1 2
ENTE RING Rinse
E LE CTROCOAT PROCESS
Pain t S ho p
Sof t Wat er Ta nk
C ollecti on Ta nk
4
Water saving projects
Rain Water Harvesting Project for cooling tower ponds
Compressor cooling tower Body-shop tower
Before After
Variable Pressure Uniform pressure
12 Pumps 2 Pumps
Savings- 1.15 lac Kwh/annum
Water Savings : 30000 m3/ Annum
Investment : 30 lacks
5
Water saving projects
Optimizing the painting process by combining cab & cargo on
single fixture.
Before
After
Two fix tures required
Single fix ture
Electricity – 207 kWH/body - 167 kWh/ body
LPG – 26 kgs/body - 13 kgs/body
Before
Before After
3.22 Lacs Units/Year 1.60 Lacs Units/Year
Water Savings /annum 1500 m 3
Investment Rs.14.5 Lacks
6
Water saving projects
Fire hydrant line above the ground
Before After
Specific Water
Consum ption Ford India- Renault-
0
M3/vehicle 0.67 0.5
*:- Source from CII, Hydera ba d.
**: Mahar ashtra Po lluti on C ontrol B oard
7
Per Capita consumption
Improvement by 43 % Better
187
2 00 180
1 48
1 50
121
*4%
10 7
M /Capita
21%
1 00
35%
3
43%
50
0
2004 2005 2006 2007 2008
Sustainability
F Daily input and output water monitoring.
8
Treated Water Balance CMD
830
430 400
•Treated water reuse for the Press shop car body panel
washing.
• Investment: Zero
• Water Saving: 1560 m 3/annum
• Implemented in Nov 2008
• Investment: Zero
• Water Saving: 120 m 3/annum
• Implemented in Oct 2007
9
Recycling of treated water
Raw water inlet
R aw w at er
Recycle
Recycle
3
3 000 0 m
consumption
Water
M3
3
15 600 m
Befo re After
In-
In -house Project.
Project.
Monitoring system
10
Monitoring system
Monitoring &Reporting
Ø Water meters at user
interface
11
Green Areas in Nashik Plant
12
Awareness & Involvement within the Plant
ØCelebration of Water Conservation week-24th to 30th
March
13
Preservation Towards Environment
Environmental projects
14
Environmental projects