Simulation in Logistics

Prof. Dr.-Ing. Bernd Noche

Exercise-4
M.Sc Mandar Jawale

Fakultt fr Ingenieurwissenschaften
Abteilung Maschinenbau
Transportsysteme und -logistik
Keetmanstrae 3-9
47058 Duisburg

Telefon: 0203 379-2785


Telefax: 0203 379-3048
E-Mail: bernd.noche@uni-due.de

Five types of object (a, b, c, d, e)are generated (frequency 1:1:1:1:1) every 10 seconds.
These object are distributed to two workstations through an accumulator based on minimum
relative occupancy strategy. The working time for each objects are given in the table. Further
these objects are assembled with an assembly object at assembly stations. The objects are
assembled with quantities as in assembly table. After assembly, objects are transported with
help of 3 transporters. The objects a, c & e are unloaded at Unloading point 1 object b & d
are unloaded at Unloading point 2. These object undergo disassembly. The quantity and
type of disassembled object generated are given in the disassembly table.
There is failure at Workstation 1, Assembly station 2 and Disassembly station 1. (Refer
failure table)
A single worker is assigned for the repair.
Please build the simulation model with given layout.
Simulation time : 8 hours
Please use quick table for:
work time at workstation,
assembly quantities at assembly station,
quantities of disassembled objects generated at disassembly.

08.06.2016

Object type at
workstation

Distribution

Object type at
Assembly station

Assembled
quantities

Uniform

5 min

Fixed

Normal

8 mean

Fixed

Fixed

Work time in seconds


8 max

3 (dev)

Object type at
disassembly

Disassembled
objects

D1 D2 D3

D1 D2 D3

D1 D2

D2 D3

D1

Disassembled
Object quantity

Time in
seconds

MTBF

MTTR

Workstation1

Normal 300 (dev 20)

60

Assembly1

Exponential 350

60

Disassembly1

Uniform ( 240, 400)

60

Accumulator Cap: 5 Length 5 Speed. 1m/s

08.06.2016

Layout

Track

Exit

Acc 2

15 m
Work station 1

Assembly 1

Disassembly 1

UNLOA 1

LOA
10 m

Entrance

5m

Exit

Acc 3

Acc 1
UNLOA 2

5m

Disassembly 2

LOA
Work station 2

Assembly 2

Acc: Accumulator
LOA: Loading station
Cap: 5 Length 5 Speed. 1m/s

15 m

UNLOA: Unloading

Material flow

Crossing

08.06.2016

THANK YOU

08.06.2016