No TB2-SDC-PEB-TE-0103
Document No.
Ref. No TB2-SDC-PEB-TE-0103
Rev
B
TB2-SDC-00100-M-M3-PFD-0001
No
TB2PEB's Comments
Title
Water Balance Diagram
Purpose
AP
Approval Status
In
Out
C
Contractor's Response
Item status
General Comment
1
2
3
Noted.
Noted.
Deatail Comment
Line No. 2 and No. 46. FGD waste water and Gymsump Slurry shall
be leaded to Ash slurry pump station not Ash pond. Please correct
Line No. 27. Please show the demin. Water line to H2 Generation
Station.
Noted
Please confirm that the Return water flow has been considerd
for Dry season in Thai Sinh Province
1 of 2
Thai Binh 2 Thermal Power Plant Project - PEB Comment for Transmittal Ref. No TB2-SDC-PEB-TE-0103
Comments marked up in Drawing
Noted.
Noted.
Please note that backwash water is from feedwater for ACF, so it does
not have to be indicated in this drawing.
Noted.
Refer to No. 4
2 of 2
Thai Binh 2 Thermal Power Plant Project - PEB Comment for Transmittal Ref. No TB2-SDC-PEB-TE-0103
Document No.
Rev
B
TB2-SDC-00100-M-M3-PFD-0001
No
1
Ref. No TB2-SDC-PEB-TE-0103
Owner/PMC's Comments
Title
Water Balance Diagram
Purpose
AP
Approval Status
In
Out
N/A
Contractor's Response
Item status
Please recheck flow capacity input and return water form Ash Pond
shall be equal
Noted
Please note that water for Air-Conditioner is not required. And Water for
Conveyer Spray System and General Services is already shown. The
purposes of waters and coordinates have been indicated to identity
easily.
Treated waste water shall be discharge to two ways: the first way is
directly discharge to Ash slurry pump station and another discharge
to Waste water canal. SDC to clarify
Legend
1 of 2
Thai Binh 2 Thermal Power Plant Project - PEB Comment for Transmittal Ref. No TB2-SDC-PEB-TE-0103
Contractor Purpose:
AP = For Approval
RE = For Reference
FC = For Construction
AB = As Built
INFO = For Information