Vous êtes sur la page 1sur 5

Thai Binh 2 Thermal Power Plant Project - PEB Comment for Transmittal Ref.

No TB2-SDC-PEB-TE-0103

Document Review Comment Sheet


No.
1

Document No.

Ref. No TB2-SDC-PEB-TE-0103
Rev
B

TB2-SDC-00100-M-M3-PFD-0001

No

TB2PEB's Comments

Title
Water Balance Diagram

Purpose
AP

Approval Status
In
Out
C

Contractor's Response

Item status

General Comment

1
2
3

This document is "water banlance", so that for each system input


and output must be equal. Please re-check

Noted.

Please refer to attachment for futher/detail comments

Noted.

Deatail Comment

Please note that because of high concentration of chlorine, FGD waste


water is hard to be accepted in Ash slurry pump station. Hence, SDC
would like to design that FGD waste water is leaded to Ash pond
directly.
Please note that line no. 46 is not indicated gypsum slurry but sludge
from WWT. and the destination for this line is under discussion with
BWBC.

Line No. 2 and No. 46. FGD waste water and Gymsump Slurry shall
be leaded to Ash slurry pump station not Ash pond. Please correct

Line No. 27. Please show the demin. Water line to H2 Generation
Station.

Noted

The treated waste water discharge system shall be designed


to fully discharge to Water water canal or to Ash Slurry pump
station.

Noted. The treated waste water shall be preferably discharge to ash


slurry pump station

Please note that because this drawing is prepared based on balancing


of mass flow rate, it is difficult to consider and estimate the dry season
condition.

Please confirm that the Return water flow has been considerd
for Dry season in Thai Sinh Province

1 of 2

Thai Binh 2 Thermal Power Plant Project - PEB Comment for Transmittal Ref. No TB2-SDC-PEB-TE-0103
Comments marked up in Drawing

Noted.

[B2] Revise this value based on balancing


[B4] Revise this value based on revision the flow rate of waste water
from WWT and FGD System

Noted.
Please note that backwash water is from feedwater for ACF, so it does
not have to be indicated in this drawing.
Noted.
Refer to No. 4

[C6] Please show flow of backwash water to ACF


[F9] It must be 147.0
[F9] To Ash Slurry Pumps Station
Legend
Contractor Purpose:
AP = For Approval
RE = For Reference
FC = For Construction
AB = As Built
INFO = For Information

TB2PEB Approval Status:


For AP:
A = Approved
B = Approved with Comments
C = Returned for Correction
D = Rejected
For RE:
I=Accepted for Reference
IB=Accepted for Reference with Comments
R= Returned for Correction

2 of 2

Thai Binh 2 Thermal Power Plant Project - PEB Comment for Transmittal Ref. No TB2-SDC-PEB-TE-0103

Document Review Comment Sheet


No.
1

Document No.

Rev
B

TB2-SDC-00100-M-M3-PFD-0001

No
1

Ref. No TB2-SDC-PEB-TE-0103

Owner/PMC's Comments

Title
Water Balance Diagram

Purpose
AP

Approval Status
In
Out
N/A

Contractor's Response

Item status

Please recheck flow capacity input and return water form Ash Pond
shall be equal

It shall be depending on site specific condition. We have considered


return ratio from ash pond shall be 85% ~ 100%. PVC need to check.

SCD to clarify Service Water (C3) and Service Water Distribution


(Dl) where they shall intake from?
Ash Pond outlet (B8): Waste Water discharge from Ash Pond to the
Clarified Waste Water Tank before returning to Ash Slurry Station.
SDC to confirm Clarified Waste Water Tank shall include Waste
Water Treatment System scope.
Clarifier sludge(D3), Filter Backwash of Gravity Filter Water (D4)
and Filter Backwash of AFC (D6) outlet: Clarifier sludge, Filter
Backwash of Gravity Filter Water (D4) and Filter Backwash of AFC
(D6) outlet shall feed to Equalization Tank before treating at Waste
Water Treatment System. SDC to confirm Equalization Tank shall
include Waste Water Treatment System scope.

It will taken from Service water distribution system. The coordinates


have been indicated.
Because return water system from ash pond is not belong to SDC's
scope of supply, all necessary facilities for return water system shall be
provided by PVC.

Noted

SDC to provide the supplied water for Air-Conditioner, Conveyer


Water Spray System and General Services from Filtered Water
Storage Tank.

Please note that water for Air-Conditioner is not required. And Water for
Conveyer Spray System and General Services is already shown. The
purposes of waters and coordinates have been indicated to identity
easily.

Treated waste water shall be discharge to two ways: the first way is
directly discharge to Ash slurry pump station and another discharge
to Waste water canal. SDC to clarify

Noted. Treated waste water shall be preferably discharged to ash slurry


pump station.

Legend

1 of 2

Thai Binh 2 Thermal Power Plant Project - PEB Comment for Transmittal Ref. No TB2-SDC-PEB-TE-0103
Contractor Purpose:
AP = For Approval
RE = For Reference
FC = For Construction
AB = As Built
INFO = For Information

TB2PEB Approval Status:


For AP:
A = Approved
B = Approved with Comments
C = Returned for Correction
D = Rejected
For RE:
I=Accepted for Reference
IB=Accepted for Reference with Comments
R= Returned for Correction

2 of 2