Vous êtes sur la page 1sur 3

CONTENT

1. Introduction...(1 - 4)
1.1.About Institution
1.2.Objective of Institution
1.3.Area of Research
1.4.R&D Thrust Area
1.4.1. Technology up gradation
1.4.2. Mines Safety
1.4.3. Environmental Issues
1.4.4. Equipment Utilization
1.4.5. Alternative Energy Sources

2. About Project Monitoring and Evaluation Cell.(5 - 6)


2.1. Monitoring & Evaluation
2.2. Abstract
2.3. Introduction of project Monitoring
2.3.1 Objective of Project Monitoring

3. System Analysis.(7 - 12)


3.1.1. Proposed System
3.1.1.1.1.
Advantages of Proposed System
3.1.2. Requirement Elicitation/Gathering
3.1.2.1.1. Feasibility Study
3.1.2.1.2. operational feasibility
3.1.2.1.3. Technical feasibility
3.1.2.1.4. Economic feasibility
3.1.2.1.5. Behavioural feasibility
3.1.2.1.6. Software feasibility
3.1.2.1.7. hardware feasibility
3.1.3. Requirement definition
3.1.3.1.1. Functional requirement
3.1.3.1.2. Non-functional requirement
3.1.3.1.3. Performance requirement
3.1.3.1.4. Safety requirement
3.1.3.1.5. Security requirement
3.1.4. Software Quality Attributes

4. System specification..(13 - 18)


4.1.1.
4.1.2.
4.1.3.
4.1.4.

Hardware specification
Software specification
Software description
Database
4.1.4.1.1. Advantage to use of Mysql with PHP
4.1.4.1.2. Code for established connection with database

5. System Design(19 - 45)


5.1.1. Module incorporated in the system
5.1.1.1.1. Transparency Portal
5.1.1.1.2. Project Monitoring and Evaluation System
5.1.1.1.3. Tables of Database
5.1.1.1.4. Data Flow Diagram
5.1.1.1.4.1 DFD for registered user
5.1.1.1.4.2 DFD for Administrator
5.1.1.1.4.3 DFD for General User

6. System Testing...(46 - 53)


6.1.1. Technique of testing
6.1.2. Test cases

7. System Implementation(54 - 55)


7.1.1 Activity implementing in project

8. System Maintenance.56
8.1.1. system Planning

9. Screenshot......(57 - 67)
9.1.1. Screenshot of Transparency Portal
9.1.2. Screenshot of PME System

10.

Conclusion.68

11.

References..69

Vous aimerez peut-être aussi